<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	>

<channel>
	<title>Generator &#8211; Spress</title>
	<atom:link href="https://en.spress.net/tag/generator/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.spress.net</link>
	<description>Spress is a general newspaper in English which is updated 24 hours a day.</description>
	<lastBuildDate>Thu, 27 May 2021 19:50:06 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">191965906</site>	<item>
		<title>The student bought a used bus and turned it into a mobile home</title>
		<link>https://en.spress.net/the-student-bought-a-used-bus-and-turned-it-into-a-mobile-home/</link>
		
		<dc:creator><![CDATA[Hoàng Tuấn]]></dc:creator>
		<pubDate>Thu, 27 May 2021 19:50:06 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[American]]></category>
		<category><![CDATA[bought]]></category>
		<category><![CDATA[Bus]]></category>
		<category><![CDATA[Car ceiling]]></category>
		<category><![CDATA[Convenient]]></category>
		<category><![CDATA[Double bed]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Hair cutting]]></category>
		<category><![CDATA[Home]]></category>
		<category><![CDATA[House]]></category>
		<category><![CDATA[Inner space]]></category>
		<category><![CDATA[Mobile]]></category>
		<category><![CDATA[Nguyen Hoai Thanh]]></category>
		<category><![CDATA[Old]]></category>
		<category><![CDATA[Oven mitts]]></category>
		<category><![CDATA[Refurbished]]></category>
		<category><![CDATA[Renovations]]></category>
		<category><![CDATA[Repurchase]]></category>
		<category><![CDATA[student]]></category>
		<category><![CDATA[The student]]></category>
		<category><![CDATA[transform]]></category>
		<category><![CDATA[turned]]></category>
		<category><![CDATA[Upgrade]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-student-bought-a-used-bus-and-turned-it-into-a-mobile-home/</guid>

					<description><![CDATA[An American architecture student bought an old 1995 bus and converted it into a fully furnished mobile home. In February 2020, an American architecture student named Caleb Brackney decided to buy a 1995 school bus for $3,000. The vehicle was later converted into a mobile home by Brackney at a cost of $7,000 to upgrade. [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>An American architecture student bought an old 1995 bus and converted it into a fully furnished mobile home.</strong><br />
<span id="more-18656"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/3d411a980fdae684bfcb.jpg" width="625" height="468"> </p>
<p> <em> In February 2020, an American architecture student named Caleb Brackney decided to buy a 1995 school bus for $3,000. The vehicle was later converted into a mobile home by Brackney at a cost of $7,000 to upgrade. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/b2208cf999bb70e529aa.jpg" width="625" height="468"> <em> Caleb Brackney spent the next six months designing and completing his new home by himself, including refurbishing the exterior, removing the old seats, reinforcing the floor and ceiling, and installing convenience equipment. benefits inside the car. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/bf95bb4cae0e47501e1f.jpg" width="625" height="451"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/c981ce58db1a32446b0b.jpg" width="625" height="461"> <em> Caleb Brackney started moving into his mobile home in August 2020. This mobile home is named The Roamer, after the town where the old bus was purchased.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/3cdc3d052847c1199856.jpg" width="625" height="416"> <em> Most of the interior space of the bus is used as a living place with all the necessary facilities of a small house, the total area used is about 20 square meters. Right behind the driver&#8217;s seat is a cooking area with an oven, microwave, sink&#8230; </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/ec07ecdef99c10c2498d.jpg" width="625" height="416"> <em> The space between the car is used as a place to study and work with a wooden table next to the window. This is also where Brackney can play the piano and entertain. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/3f033cda2998c0c69989.jpg" width="625" height="416"> <em> Taking up the most space is a resting place with a double bed, next to it is a sofa and TV. Supplying domestic electricity for mobile homes is a generator system, solar batteries and electricity storage batteries. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/ae18acc1b98350dd0992.jpg" width="625" height="507"> <em> The house&#8217;s clean water tank has a capacity of 190 liters, enough for Brackney to live for about 2 weeks. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/91b49c6d892f6071393e.jpg" width="625" height="416"> <em> Most of the items and materials that make up The Roamer bus are recycled to protect the environment. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_25_119_38956888/0cc10018155afc04a54b.jpg" width="625" height="416"> <em> Brackney plans to live in his mobile home for the next 2-3 years until he completes his master&#8217;s degree. </em> <em> <strong> Turn an old bus into a barber shop in Ho Chi Minh City with VND 400 million</strong> </em> <em> With the desire to move to many places so that he could cut everyone&#8217;s hair, Mr. Nguyen Hoai Thanh converted the bus into a mobile barber shop at a cost of nearly 400 million VND.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18656</post-id>	</item>
		<item>
		<title>Wireless tissue transplant technology</title>
		<link>https://en.spress.net/wireless-tissue-transplant-technology/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 15 May 2021 11:15:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[chip]]></category>
		<category><![CDATA[Conductor]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Engineer]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[HYDRA]]></category>
		<category><![CDATA[IEEE]]></category>
		<category><![CDATA[Implant]]></category>
		<category><![CDATA[Millimeters]]></category>
		<category><![CDATA[Program]]></category>
		<category><![CDATA[Rice University]]></category>
		<category><![CDATA[Rodents]]></category>
		<category><![CDATA[Sciatic nerve]]></category>
		<category><![CDATA[Shui ie]]></category>
		<category><![CDATA[Spinal cord]]></category>
		<category><![CDATA[Stimulate]]></category>
		<category><![CDATA[Technology]]></category>
		<category><![CDATA[Tissue]]></category>
		<category><![CDATA[transplant]]></category>
		<category><![CDATA[Veer]]></category>
		<category><![CDATA[Wireless]]></category>
		<category><![CDATA[Yang]]></category>
		<guid isPermaLink="false">https://en.spress.net/wireless-tissue-transplant-technology/</guid>

					<description><![CDATA[Previously, engineers from Rice University (USA) developed an implantable device to electrically stimulate patients with spinal cord injuries. Recently, the team upgraded the technique to power and program the multipoint biostimulator from a single transmitter. Thanks to new research, electrical and computer engineer Kaiyuan Yang and colleagues at the George R. Brown School of Engineering [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Previously, engineers from Rice University (USA) developed an implantable device to electrically stimulate patients with spinal cord injuries.</strong><br />
<span id="more-14618"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_181_38828179/392e879c98de718028cf.jpg" width="625" height="414"> </p>
<p> Recently, the team upgraded the technique to power and program the multipoint biostimulator from a single transmitter. Thanks to new research, electrical and computer engineer Kaiyuan Yang and colleagues at the George R. Brown School of Engineering (Rice University) won an award at the Society of Electrical and Electrical Engineers&#8217; Custom Integrated Circuits Conference death (IEEE). The researchers performed experiments showing that an alternating magnetic field can be controlled by a battery-powered generator outside the body. The transmitter can be mounted on a belt or harness, powering and programming two or more implants at least 60 millimeters away. The implant can be programmed with a delay measured in microseconds. That could allow them to coordinate the activation of multiple wireless pacemakers in individual heart chambers, says engineer Yang. “Our study shows that it is possible to program the implants to stimulate in a coordinated pattern. We sync every device, like a symphony. That gives us a lot of scope in stimulant treatments, whether it&#8217;s for the heart rhythm or the spinal cord.&#8221; The scientists also experimented using small implants. Each tissue is about the size and weight of a vitamin. Experiments performed on hydra vulgaris rodents have demonstrated that, for at least a short distance, such devices can stimulate two separate hydras to contract. Then, activate a fluorescent tag to respond to electrical signals and respond at controlled amplitudes along the rodent&#8217;s sciatic nerve. “A study on spinal cord regeneration showed that multipoint stimulation in a certain pattern helps restore the nervous system. Several clinical studies are underway, but all are using desktop devices. There is no implantable tool that can do this,&#8221; said engineer Yang. Lab devices, called MagNI (for electromagnetic nerve implantation). MagNI was introduced early last year as a cordless spinal cord stimulator for power and programming. That means the wire does not need to be passed through the patient&#8217;s skin. Because, putting the wire through the skin is a method that can cause infection.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14618</post-id>	</item>
		<item>
		<title>Central Region &#8211; Central Highlands: Ensuring a stable power supply on the occasion of April 30 and May 1</title>
		<link>https://en.spress.net/central-region-central-highlands-ensuring-a-stable-power-supply-on-the-occasion-of-april-30-and-may-1/</link>
		
		<dc:creator><![CDATA[Đình Tăng]]></dc:creator>
		<pubDate>Fri, 07 May 2021 21:25:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[In the area]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[occasion]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[stable]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/central-region-central-highlands-ensuring-a-stable-power-supply-on-the-occasion-of-april-30-and-may-1/</guid>

					<description><![CDATA[This is the affirmation of the representative of Central Power Corporation (EVNCPC) when talking about the forecast of electricity demand during the holidays of April 30 and May 1 this year as well as the efforts of this unit and other companies. Member power companies in the Central-Central Highlands aim to provide safe and continuous [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>This is the affirmation of the representative of Central Power Corporation (EVNCPC) when talking about the forecast of electricity demand during the holidays of April 30 and May 1 this year as well as the efforts of this unit and other companies. Member power companies in the Central-Central Highlands aim to provide safe and continuous electricity to over 4.3 million customers in the region.</strong><br />
<span id="more-12242"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_115_38615582/cb7f52d774959dcbc484.jpg" width="625" height="390"> </p>
<p> <em> EVNCPC strengthens the inspection and repair of the power grid to ensure that customers do not cut off electricity during the holidays of April 30 and May 1 this year. (Photo: Tel).</em> Mr. Nguyen Thanh &#8211; Deputy General Director of EVNCPC said that on the occasion of April 30 and May 1 this year, employees are entitled to 4 days off, so EVNCPC forecasts the demand for electricity for domestic activities and public holidays. This will also increase. In order to ensure safe and continuous electricity supply to over 4.3 million customers in the Central region &#8211; Central Highlands, in addition to focusing on power sources for political events in 13 provinces and cities in the region, EVNCPC has a specific plan to not cut the power from 0:00 to 24h00 on April 30 and May 1, 2021. At the same time, from the time before the holiday, 13 Electricity Companies under EVNCPC have also actively worked with the local authorities to grasp the time and venue of festivals, festivals, and arrange the mode of power supply. reasonable for safe operation, reliable power, grid under normal conditions and flexible switching in fault situations. In particular, the units give priority to electricity assurance at the locations where the local political and cultural activities take place. With venues where major and important political and cultural events take place, in addition to the national grid, EVNCPC also directs its affiliated Power Companies to consider and arrange backup diesel generators; re-established the duty shift at 110kV substations without personnel on duty. The units strengthen inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent incidents. in electrical system operation. During this time, the units throughout EVNCPC arranged to strengthen the organization of leaders, mobile operators, operation, power repair, troubleshooting of private telecommunications network system. ; At the same time, fully preparing supplies, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires its affiliated Power Companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the line causing violations. grid safety corridor; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity. Especially on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requirements and problems of customers./.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12242</post-id>	</item>
		<item>
		<title>EVNCPC guarantees to provide electricity for the holidays April 30 and May 1</title>
		<link>https://en.spress.net/evncpc-guarantees-to-provide-electricity-for-the-holidays-april-30-and-may-1-2/</link>
		
		<dc:creator><![CDATA[Thế Phong]]></dc:creator>
		<pubDate>Fri, 07 May 2021 19:35:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central Highlands]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Guaranteed]]></category>
		<category><![CDATA[guarantees]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[provide]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[Safety corridors]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/evncpc-guarantees-to-provide-electricity-for-the-holidays-april-30-and-may-1-2/</guid>

					<description><![CDATA[On the afternoon of April 23, the Central Power Corporation (EVNCPC) said it would provide electricity to 13 provinces and cities in the Central and Central Highlands continuously on April 30 and May 1. Illustration According to EVNCPC, on the occasion of April 30 and May 1 this year, employees are entitled to 4 days [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the afternoon of April 23, the Central Power Corporation (EVNCPC) said it would provide electricity to 13 provinces and cities in the Central and Central Highlands continuously on April 30 and May 1.</strong><br />
<span id="more-12224"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_146_38615650/081f36b710f5f9aba0e4.jpg" width="625" height="390"> </p>
<p> <em> Illustration </em> According to EVNCPC, on the occasion of April 30 and May 1 this year, employees are entitled to 4 days off, so the demand for electricity for daily life and service will also increase. In addition to focusing on electricity sources for political events in 13 provinces and cities in the Central and Central Highlands, EVNCPC has specifically planned to not cut off power from 0:00 to 24h00 on April 30 and May 1 to provide providing safe and continuous electricity to over 4.3 million customers in the region. Mr. Nguyen Thanh, Deputy General Director of EVNCPC, said that before the holiday, 13 power companies under EVNCPC have actively worked with local authorities to grasp the time and location of festivals, festivals, and fathers. reasonable power supply mode for safe and reliable operation of the source, the power grid under normal conditions and flexible switching in the event of an incident. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. For venues of major and important political and cultural events, in addition to the national grid, EVNCPC directs power companies to consider arranging backup d iesel generators; re-established the duty shift at 110kV substations without personnel on duty. The units strengthened the inspection, detection and timely treatment of defects of source equipment, power grids, unmanned 110 kV substations, SCADA systems, and luminescence to ensure safety of the corridor to prevent the trouble in operating the power system. During this time, the units throughout EVNCPC organize increased duty for leaders, mobile operators, operation, power repair, troubleshooting of private and copper telecommunication network systems. sufficiently prepared materials, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires electricity companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the lines that cause a corridor violation. grid safety; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity. In particular, on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requirements and problems of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12224</post-id>	</item>
		<item>
		<title>EVNCPC provides safe electricity, continuously during the holidays April 30 and May 1-5</title>
		<link>https://en.spress.net/evncpc-provides-safe-electricity-continuously-during-the-holidays-april-30-and-may-1-5/</link>
		
		<dc:creator><![CDATA[Tin, ảnh: VĂN CHUNG]]></dc:creator>
		<pubDate>Fri, 07 May 2021 10:50:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[continuously]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[Politic]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[safe]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://en.spress.net/evncpc-provides-safe-electricity-continuously-during-the-holidays-april-30-and-may-1-5/</guid>

					<description><![CDATA[On the occasion of April 30 and May 1, in addition to focusing on electricity sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, the Central Power Corporation (EVNCPC) has made a specific plan. to not cut off electricity from 0 hours to 24 hours on April 30 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the occasion of April 30 and May 1, in addition to focusing on electricity sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, the Central Power Corporation (EVNCPC) has made a specific plan. to not cut off electricity from 0 hours to 24 hours on April 30 and May 1-5 to provide safe and continuous electricity to over 4.3 million customers in the region.</strong><br />
<span id="more-12150"></span> On April 23, Mr. Nguyen Thanh, Deputy General Director of EVNCPC, said that before the holidays of April 30 and May 1, 13 power companies under EVNCPC actively worked with local authorities to grasp the time. time and venue for festivals and festivals, and arrange reasonable power supply methods to safely and reliably operate the power source and grid in normal conditions and flexibly change in the event of an incident. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. In places where major political and cultural events take place, in addition to the national grid, EVNCPC directs Power companies to consider and arrange standby diesel generators; re-established the duty shift at 110kV substations without personnel on duty.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_16_38616584/59f2b8509e12774c2e03.jpg" width="625" height="389"> <em> EVNCPC increased the use of grid repair technology that did not cut off customers&#8217; power. </em> The units strengthen inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent incidents. in electrical system operation. During this time, the units throughout the EVNCPC organize increased duty for leaders, mobile operators, operation, power repair, troubleshooting of private telecommunications network system; At the same time, fully preparing supplies, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires electricity companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the lines, causing a corridor violation. grid safety &#8230; Especially on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requests. requirements and problems of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12150</post-id>	</item>
		<item>
		<title>No power cuts on the occasion of April 30 and May 1 in the Central region and the Central Highlands</title>
		<link>https://en.spress.net/no-power-cuts-on-the-occasion-of-april-30-and-may-1-in-the-central-region-and-the-central-highlands/</link>
		
		<dc:creator><![CDATA[Đ.Hoàng]]></dc:creator>
		<pubDate>Wed, 05 May 2021 14:20:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[cuts]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[In the area]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[occasion]]></category>
		<category><![CDATA[Plan]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://en.spress.net/no-power-cuts-on-the-occasion-of-april-30-and-may-1-in-the-central-region-and-the-central-highlands/</guid>

					<description><![CDATA[Central Power Corporation has specifically planned to not cut off electricity from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide safe and continuous electricity to over 4.3 million customers. Central Vietnam Power Corporation has specifically planned to not cut off the power from 0:00 to 24h00 on April 30 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Central Power Corporation has specifically planned to not cut off electricity from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide safe and continuous electricity to over 4.3 million customers. Central Vietnam Power Corporation has specifically planned to not cut off the power from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide power safely and continuously for more than 4, 3 million customers in the region.</strong><br />
<span id="more-11727"></span> On the afternoon of April 24, Mr. Nguyen Thanh, Deputy General Director of Central Power Corporation (EVNCPC) said that on the occasion of April 30 and May 1 of this year, employees have 4 days off, the demand for electricity. for subsistence, service will also increase. Therefore, in addition to focusing on power sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, EVNCPC has made a specific plan to not cut the power from 0:00 to 24h00 on April 30 and January 1. 5/2021, to provide safe and continuous electricity to over 4.3 million customers in the region.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_101_38624624/e9d13c971ad5f38baac4.jpg" width="625" height="390"> <em> EVNCPC increased the use of grid repair technology that did not cut off customers&#8217; power.</em> According to Mr. Thanh, before the holiday, 13 Electricity Companies under EVNCPC have actively worked with local authorities to grasp the time and location of festivals and festivals, and arrange reasonable power supply methods to safe operation, reliable power, grid under normal conditions and flexible switching in the event of a breakdown. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. With venues of major and important political and cultural events, in addition to the national grid, EVNCPC directs Power Companies to consider and arrange standby diesel generators; re-established the duty shift at 110kV substations without personnel on duty. &#8220;The units enhance inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent trying to operate the power system &#8220;, Mr. Thanh said. It is known that EVNCPC requires Power Companies to promote propaganda among the people to prevent kites flying near power lines, metal-coated paper fireworks and throwing objects on the line causing violations. grid safety corridor; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11727</post-id>	</item>
		<item>
		<title>Phone maker Huawei launches the first car Huawei Seres SF5</title>
		<link>https://en.spress.net/phone-maker-huawei-launches-the-first-car-huawei-seres-sf5/</link>
		
		<dc:creator><![CDATA[Hiểu Lam]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 18:21:08 +0000</pubDate>
				<category><![CDATA[Vehicles]]></category>
		<category><![CDATA[Acceleration]]></category>
		<category><![CDATA[car]]></category>
		<category><![CDATA[Daytime]]></category>
		<category><![CDATA[Door knobs]]></category>
		<category><![CDATA[Electric motor]]></category>
		<category><![CDATA[Equipment]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Headlight]]></category>
		<category><![CDATA[Huawei]]></category>
		<category><![CDATA[Huawei Seres SF5]]></category>
		<category><![CDATA[launches]]></category>
		<category><![CDATA[maker]]></category>
		<category><![CDATA[phone]]></category>
		<category><![CDATA[Producer]]></category>
		<category><![CDATA[Radiators]]></category>
		<category><![CDATA[SERES]]></category>
		<category><![CDATA[Seres SF5]]></category>
		<category><![CDATA[SF5]]></category>
		<category><![CDATA[Sound reduction]]></category>
		<category><![CDATA[speak]]></category>
		<category><![CDATA[Technology]]></category>
		<category><![CDATA[Tram]]></category>
		<category><![CDATA[Vehicle body]]></category>
		<category><![CDATA[Voice]]></category>
		<guid isPermaLink="false">https://en.spress.net/phone-maker-huawei-launches-the-first-car-huawei-seres-sf5/</guid>

					<description><![CDATA[Phone maker Huawei unveiled its first car Seres SF5 at the Shanghai Auto show, equipped with voice control technology. Smartphone maker Huawei launches the first car model Huawei is best known for making smartphones, but the Chinese tech giant is planning to invest $ 1 billion in research into electric vehicle technology and self-driving cars. [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Phone maker Huawei unveiled its first car Seres SF5 at the Shanghai Auto show, equipped with voice control technology.</strong><br />
<span id="more-7888"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/c87eb3e995ab7cf525ba.jpg" width="625" height="350"> </p>
<p> Smartphone maker Huawei launches the first car model Huawei is best known for making smartphones, but the Chinese tech giant is planning to invest $ 1 billion in research into electric vehicle technology and self-driving cars. As part of that plan, at the ongoing Shanghai Auto Show, Huawei officially introduced its first self-made model, the Huawei Seres SF5. The SF5 stands out with its elongated headlamp, reverse claw, LED daytime running lights and a mesh grille with body color. Hidden door handles in the bodywork with a rounded overall style. Inside the interior compartment, the SF5 is equipped with a digital clock, two-spoke steering wheel, next to a dial selector. The materials used to decorate the cabin include wood and metal. Mood lighting, sunroof, heated front seats, cooling and massage mode are all other options on the car. Huawei can connect to smartphones and automatically deliver music and positioning information between the two sides. Also equipped with voice control technology and audio system with 11 speakers. Engineers also focused on noise and vibration reduction, demonstrated through the addition of double-layered front glass and a variety of damping materials. The interior noise is only 38 dB in idling mode, according to the company. SF5 is also equipped with mm-frequency radar, ultrasonic sensors, a series of cameras, adaptive cruise control, traffic congestion assistance, automatic emergency braking, lane keeping assist and collision warning. front. The 1.5-liter, 4-cylinder engine acts as a generator. The vehicle is equipped with a battery pack that powers two electric motors with a capacity of 543 hp and 820 Nm of torque. SF5 is capable of accelerating from 0-100 km / h in 4.7 seconds. In pure electric mode, the car can run 180 km and with the help of a gas generator, the mileage is more than 1,000 km. Seres SF5 is currently on display at the Shanghai auto show and will be available in Huawei showrooms soon. Expected selling price is 33,356 USD (about 770 million VND) and delivery may start in May. <em> See also some pictures of Huawei Seres SF5:</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/f2f28b65ad2744791d36.jpg" width="625" height="324"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/572231b517f7fea9a7e6.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/322857bf71fd98a3c1ec.jpg" width="625" height="198"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/dbdbbb4c9d0e74502d1f.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/8988e61fc05d2903704c.jpg" width="625" height="208"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/307b5cec7aae93f0cabf.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/8f51e5c6c3842ada7395.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/7299190e3f4cd6128f5d.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/1f2177b651f4b8aae1e5.jpg" width="625" height="315"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/245c4dcb6b8982d7db98.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/e14477d25190b8cee181.jpg" width="625" height="182"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/2865bff399b170ef29a0.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/3c9ea8088e4a67143e5b.jpg" width="625" height="350"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_326_38620564/4ec8db5efd1c14424d0d.jpg" width="625" height="350"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7888</post-id>	</item>
		<item>
		<title>Revolution with UAV electric motors</title>
		<link>https://en.spress.net/revolution-with-uav-electric-motors/</link>
		
		<dc:creator><![CDATA[Thùy Dung]]></dc:creator>
		<pubDate>Tue, 20 Apr 2021 01:48:14 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Camera]]></category>
		<category><![CDATA[Cushion]]></category>
		<category><![CDATA[Design]]></category>
		<category><![CDATA[Electric]]></category>
		<category><![CDATA[Electric motor]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Hot air balloon]]></category>
		<category><![CDATA[Internal combustion engine]]></category>
		<category><![CDATA[Kalashnikov Group]]></category>
		<category><![CDATA[Lost keeping in touch]]></category>
		<category><![CDATA[Main product]]></category>
		<category><![CDATA[Motors]]></category>
		<category><![CDATA[Overhead]]></category>
		<category><![CDATA[Project manager]]></category>
		<category><![CDATA[Revolution]]></category>
		<category><![CDATA[Runway]]></category>
		<category><![CDATA[Scout]]></category>
		<category><![CDATA[Small size]]></category>
		<category><![CDATA[Topographic]]></category>
		<category><![CDATA[UAV]]></category>
		<category><![CDATA[Um]]></category>
		<category><![CDATA[Unmanned aircraft]]></category>
		<category><![CDATA[Zala Aero]]></category>
		<guid isPermaLink="false">https://en.spress.net/revolution-with-uav-electric-motors/</guid>

					<description><![CDATA[The Russian company ZALA Aero was the first country in the world to successfully develop a small UAV with an internal combustion engine combined with an electric motor. According to the head of special project ZALA Aero (part of Kalashnikov Group of state technology corporation Rostec), Nikita Khamitov said that Russia has revolutionized the ZALA [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Russian company ZALA Aero was the first country in the world to successfully develop a small UAV with an internal combustion engine combined with an electric motor.</strong><br />
<span id="more-5104"></span> According to the head of special project ZALA Aero (part of Kalashnikov Group of state technology corporation Rostec), Nikita Khamitov said that Russia has revolutionized the ZALA 421-16E5G product.</p>
<p> &#8220;We are the first manufacturer in the world to combine the internal combustion engine and the electric motor in a small UAV. In flight, internal combustion engines are not the main engine, they only provide energy. for generators, battery buffers and electric motors with electronic systems working, &#8220;said project leader Khamitov. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_17_132_38552864/a821efa6c4e42dba74f5.jpg" width="625" height="397"> <em> Aero Company&#8217;s product. </em> The electric motor increases uptime, making the aircraft quieter enough to perform unexpected secret missions. Meanwhile, similar products using other internal combustion engines can hardly do that. It is known that, before announcing the ZALA 421-16E5G, ZALA Aero Company also made a surprise with ZALA 421-16E5. This UAV is not only capable of operating 16 hours continuously in the air but is also designed to return to base in the event of a loss of contact with the control center. In the UAV&#8217;s electronics department there are cameras with high resolution cameras, night vision equipment and thermal imaging equipment. The images are stacked to facilitate terrain monitoring at any time of day. &#8220;The design of this UAV model uses unique technology to create a quality and reliable product. The engine management system is completely inside and controls every detail of the aircraft. In addition, the ZALA 421-16E5 can also be deployed from an electrically controlled launch system in special terrain areas. This is a feature that is being developed with attention in new UAV models today. Old drones can only take off at flat runways and are carefully prepared, &#8220;said Zala Aero design director Alexander Zakharov. In addition, Mr. Zakharov also ensured that the ZALA 421-16E5 protective and landing gear has a special design to make the process safe. What makes this UAV so special is its ability to return to the base in case something goes wrong with the control system. Zala Aero is a subsidiary of the Kalashnikov group mainly develops and manufactures air reconnaissance and reconnaissance weapons. The company&#8217;s main products include UAVs, helicopters and hot air balloons.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5104</post-id>	</item>
	</channel>
</rss>