<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	>

<channel>
	<title>Grid &#8211; Spress</title>
	<atom:link href="https://en.spress.net/tag/grid/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.spress.net</link>
	<description>Spress is a general newspaper in English which is updated 24 hours a day.</description>
	<lastBuildDate>Sun, 20 Jun 2021 09:15:22 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">191965906</site>	<item>
		<title>Like a test of the heart</title>
		<link>https://en.spress.net/like-a-test-of-the-heart/</link>
		
		<dc:creator><![CDATA[Thanh Mai (Icon.com.vn)]]></dc:creator>
		<pubDate>Sun, 20 Jun 2021 09:15:22 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[500KV Pleiku station]]></category>
		<category><![CDATA[AT1]]></category>
		<category><![CDATA[AT2]]></category>
		<category><![CDATA[connection]]></category>
		<category><![CDATA[Dak Nong]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[Embolism]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[EVNSPC]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Heart]]></category>
		<category><![CDATA[hearts]]></category>
		<category><![CDATA[Khanh Hoa Palace]]></category>
		<category><![CDATA[Krong Buk]]></category>
		<category><![CDATA[Lam Dong Electricity Transmission]]></category>
		<category><![CDATA[Pleiku 2]]></category>
		<category><![CDATA[PTC3]]></category>
		<category><![CDATA[test]]></category>
		<category><![CDATA[total capacity]]></category>
		<category><![CDATA[Transformers]]></category>
		<category><![CDATA[Transmission]]></category>
		<category><![CDATA[Voltage]]></category>
		<guid isPermaLink="false">https://en.spress.net/like-a-test-of-the-heart/</guid>

					<description><![CDATA[In the days of May, the summer sun in the context of El Nino is strong and lasts like a fire that covers everything. Endless ups and downs on the street, everyone is covered in clothes, hats, gloves, masks, sunglasses. Using remote-controlled unmanned aerial vehicles (UAV) with image recording equipment and specialized cameras in power [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>In the days of May, the summer sun in the context of El Nino is strong and lasts like a fire that covers everything. Endless ups and downs on the street, everyone is covered in clothes, hats, gloves, masks, sunglasses.</strong><br />
<span id="more-25840"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_20_232_39244215/c8b42de027a2cefc97b3.jpg" width="625" height="416"> </p>
<p> <em> Using remote-controlled unmanned aerial vehicles (UAV) with image recording equipment and specialized cameras in power grid management and operation at Lam Dong Power Transmission. Photo: Ngoc Ha/Icon.com.vn.</em> From mid-morning to late-afternoon, the heat reached more than 40 degrees Celsius, blowing hot air in every corner from the countryside to the city, the demand for electricity increased continuously for many days and the transmission grid always at the full load warning threshold. In order to ensure the safe operation of equipment on the transmission grid, the National Power Transmission Corporation (EVNNPT) requires units to strengthen the inspection and monitoring of transformers, resistance, current transformers, etc. voltage transformers, pole clamps, connections on lines, substations. In particular, special attention should be paid to the full-load 500kV transformers such as Viet Tri, Hoa Binh, Nho Quan, Thuong Tin, PleiKu 2, Dak Nong, Vinh Tan and the North &#8211; Central 500kV lines. <strong> Troubled hot season</strong> Deputy Director of Power Transmission Company 3 (PTC3) Ho Cong said that by May 2021, the total installed capacity of solar power will be connected to the PTC3 transmission grid and the distribution grid of Power companies in the region. the area of ​​the provinces: Khanh Hoa, Phu Yen, Binh Dinh, Gia Lai, Dak Lak and Dak Nong has reached 4,093MW, accounting for 36% of the total installed capacity of power sources connected to the transmission and distribution grids in the region. this. In which, the connection at the voltage level of 500kV is 600 MW, at the voltage level of 220kV is 753 MW, at the voltage level of 110kV is 940 MW, and the farm and rooftop solar power connected at the voltage level below 22kV is 1,801 MW. With the very fast development speed of solar power plants, farm solar power, rooftop solar power in a short time, some 220kV transmission lines have been built in Phu Yen, Binh Dinh, Gia Lai and Dak Lak areas. and Dak Nong always operate at full load, overload occurs in the rainy season of the Central Highlands. Especially the 220kV transmission lines: Sinh Mass An Khe &#8211; Pleiku (100%); An Khe Biomass – An Khe Hydropower Plant (100%); Quy Nhon – An Khe Power Plant (99%); Quy Nhon &#8211; Tuy Hoa (96%); Tianjin – Nha Trang (98%); Nha Trang – Krong Buk (87%); Krong Buk &#8211; Pleiku 2: (88%) Dak Nong &#8211; Buon Tuahar (102%); Dak Nong – Buon Kuop (99%) and AT1 transformer (97.%), AT2 (96%) 500kV Dak Nong substation; transformer AT1 (94%), AT2 (95%) 500kV Pleiku 2 station; transformer AT1 (100%), AT5 (94%) 500kV Pleiku station… When the power grid is operating in a state of full load or overload, PTC3 must request units to increase the frequency of inspection and monitoring of equipment, transformers, lines and corridors to promptly overcome and handle handle unusual phenomena. In addition, some repair and maintenance works that need to be cut off or periodically tested must be arranged at night when solar power stops generating. The implementation of safety measures, as well as the process of construction supervision, supervision of load-bearing equipment, safety control at poles that cross with medium and low voltage lines and roads at it is dark, at night it will be very difficult, potentially dangerous. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_20_232_39244215/3e3ae66eec2c05725c3d.jpg" width="625" height="417"> <em> Khanh Hoa Power Transmission installed an AI camera to warn of fire in the corridor of the 220kV line: Nha Trang &#8211; KrongBuk. Photo: Ngoc Ha/Icon.com.vn</em> According to the document No. 795/TTg-CN dated June 25, 2020 of the Prime Minister on adding the list of wind power projects to the electricity development planning, wind power plant projects in the Central Highlands region. with a total capacity of 2,358MW (accounting for 21% of the total installed capacity of power sources connected to the transmission and distribution grids in this area) is in the process of construction, installation, and putting these projects into operation. November 2021 will put more pressure on the existing transmission grid, which is already full and overloaded in the provinces: Khanh Hoa, Phu Yen, Binh Dinh, Gia Lai, Dak Lak and Dak Nong. In particular, in Gia Lai area, there is a total capacity of 1,242.4MW (voltage level 500kV: 200MW, 220kV: 650MW, 110kV: 392.4MW); Dak Lak area has a total capacity of 685.8MW (voltage level 500kV: 400MW, 220kV: 200MW, 110kV: 85.8MW); Dak Nong area has a total capacity of 430 MW (voltage level 220kV: 380MW, 110kV: 50MW), when put into operation, it will continue to overload 220kV lines of Yang Trung &#8211; Pleiku 2 wind power plant; An Khe &#8211; Pleiku Biomass, An Khe Biomass &#8211; An Khe Hydropower Plant; An Khe &#8211; Quy Nhon Hydropower Plant; Krong Buk – Pleiku 2, Dak Nong – Buon Tua shar, Dak Nong – Buon Kuop and AT1 and AT2 transformers at 500kV Dak Nong substation; AT1, AT2 500kV Pleiku substation 2. As a line soldier, the sun also goes to the line, the rain also goes to the line, as a station soldier, flood, or hot weather must be on duty 24/24. In order to mobilize sources effectively, in the current conditions, EVN requires the Power Transmission Companies to transmit the maximum mobilized capacity of the power plant cluster at 100% until the congestion or overload is reached. The associated load is removed. With this requirement, the new operating status of the PTC3 grid is often at 100% full load. Thus, it is necessary to keep the current flowing smoothly in all situations, especially on hot sunny days. With a &#8220;hot&#8221; area like PTC3, all units, regardless of whether they were on duty or off duty, must gather their manpower to check the grid&#8217;s congestion points, the points with high risk of heat generation. The point of line cross-section is small compared to the whole line, the rated current of the equipment in the exposed compartment is smaller than the line, the points have a large deflection, the risk of breaking the distance when the load is high..etc and so on and so forth. problems can occur when the temperature reaches more than 40 degrees Celsius and lasts for many days. It can be said that the transmission shifts during the heat wave are no different from the ones on duty during the flood season. After detecting the risk, it is necessary to propose to reduce the rated current of the line; if the ambient temperature rises suddenly, it is necessary to monitor that the conductor temperature does not exceed the allowable level; make a plan for temporary handling and a plan for long-term handling of bottlenecks of the power grid, determine the time for remediation, and submit it to the Company. For example, during the recent heat wave in May, the transmission units must make statistics of the number of enhanced inspections from the beginning of 2020, thereby proposing a reasonable plan to arrange human resources for the new operation situation; propose the addition of production equipment and tools to serve the operation management in the new operating situation, make a list of proposed equipment to be added immediately. <strong> A place to test people&#8217;s hearts</strong> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_20_232_39244215/894d5b19515bb805e14a.jpg" width="625" height="401"> <em> Using remote-controlled unmanned aerial vehicles (UAV) with image recording equipment and specialized cameras in power grid management and operation at Lam Dong Power Transmission. Photo: Ngoc Ha/Icon.com.vn.</em> Head of PTC3 Dispatch Department Nguyen Manh Tuong said that in the first 5 months of 2021, the electricity output received by the PTC3 transmission grid under management and operation reached 23,918,261,392 kWh, an increase of 16.30% over the same period in 2020; delivered electricity output reached 23,445,807,704 kWh, up 16.10% over the same period in 2020; power output received on the 500kV grid reached 17,223,481,412 kWh, an increase of 26.40% over the same period in 2020; electricity output delivered on the 500kV grid reached 17,000,463,190 kWh, up 26.26% over the same period in 2020; power output received on the 220kV grid reached 13,549,084,784 kWh, up 29.86% over the same period in 2020; electricity output delivered on the 220kV grid reached 13,299,649,317 kWh, up 30.08% over the same period in 2020. Despite this output, the transmission output of Power Transmission Company 3 (Khanh Hoa, Phu Yen, Binh Dinh, Gia Lai, Dak Lak, Dak Nong, Ninh Thuan, Lam Dong, Binh Thuan power transmission lines) assigned to Power companies under the Central Power Corporation (EVNCPC), the South (EVNSPC) and power plants (ND, DT, Solar, EIA) in the first 5 months of 2021, reaching 2,826,264,307 kWh, down 37.85% over the same period in 2020, accounting for 49.18% of commercial electricity output of 9 Power companies. The highest transmission power output in May is May 16, 2021 at 22,436,520 kWh. The main reason for the decrease in transmission power output is due to the performance of commercial power production of Khanh Hoa, Phu Yen, Binh Dinh, Gia Lai, Dak Lak, Dak Nong, Ninh Thuan and Lam Power companies. Dong and Binh Thuan under the Central Power Corporation (EVNCPC) and the South (EVNSPC) in the first 5 months of 2021 reached 5.746 billion kWh, a low growth rate, reaching only 0.67% over the same period in 2020. Meanwhile, the electricity output of 110kV solar power, 22kV farm solar, 0.4kV rooftop solar, small and medium hydroelectricity power generation to the distribution grid of 9 Southern Central and Western Power companies Originally belonging to EVNCPC, EVNSPC increased sharply in the first 5 months of 2021, reaching 5.010 billion kWh. The transmission output of renewable energy sources, medium and small hydroelectricity from the distribution grid, in addition to meeting the load demand of the Power Companies, is also transmitted to the transmission grid at 220kv substations of the Transmission lines. Khanh Hoa, Phu Yen, Binh Dinh, Gia Lai, Dak Lak, Dak Nong, Ninh Thuan, Lam Dong, Binh Thuan in the first 5 months of 2021 are 2.090 billion kWh, which means that the renewable energy output is reversed. to the transmission grid from the distribution grid of the power companies. Thus, the transmission grid under the management of PTC3, in addition to receiving power from the 500kV system and 220kV power plants in the area to supply loads, also receives back-generated output from the distribution grid through the distribution networks. 220kV transformers connected to the national grid cause full load, overload the 220kV grid. This is also one of the reasons for the full load situation for the regional transmission grid, and at the same time brings about the paradox in the operation of PTC3 that the transmission grid managed by PTC3 always operates in a poor condition. state of full load, overload, but the commercial power output did not meet the delivery plan. This shows that there has been an inadequacy when the planned transmission power output is not counted when the renewable energy output is back to the grid. Despite such difficulties, PTC3&#8217;s employees are always committed to the power grid and are responsible for their work. They memorized the characteristics of each area of ​​the transmission grid, each compartment of the substation. In the dry season, which columns are at risk of fire due to trees in the corridor. In the rainy season, which pillars are prone to landslide. Which residential areas often fly kites, stretch canvas to dry agricultural products&#8230; Just entering the third day of the second heat wave of summer 2021, the national electricity consumption capacity at noon on June 18, 2021, has reached a new peak of 41,709 MW, the PTC3 transmission soldiers are again straining themselves with the harsh climate. of the southern central provinces and the Central Highlands, with the transmission grid always in a state of 100% full load, but not allowing problems due to subjectivity &#8211; that is the duty and also the command from the soldier&#8217;s heart. Electricity transmission. The current must be kept smoothly despite the unresolved inadequacies, because the story of the mechanism, in order to be removed, still has to be discussed, considered, must be appropriate&#8230;and the mission of the transmission soldier is Under any circumstances, the current must be maintained. Because the difficulties that PTC3 is going through is also to test people&#8217;s hearts.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">25840</post-id>	</item>
		<item>
		<title>Hon Thom: &#8216;Beauty&#8217; is sexier than Boracay, Philippines</title>
		<link>https://en.spress.net/hon-thom-beauty-is-sexier-than-boracay-philippines/</link>
		
		<dc:creator><![CDATA[Theo Bảo Khanh/Báo Giao thông]]></dc:creator>
		<pubDate>Thu, 17 Jun 2021 18:15:10 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[An Thoi Island]]></category>
		<category><![CDATA[An Thoi Islands]]></category>
		<category><![CDATA[Bai Chuong]]></category>
		<category><![CDATA[Beauty]]></category>
		<category><![CDATA[Boracay]]></category>
		<category><![CDATA[Fish market]]></category>
		<category><![CDATA[fisherman]]></category>
		<category><![CDATA[Four lands]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Hon]]></category>
		<category><![CDATA[Hon Thom]]></category>
		<category><![CDATA[Hon Thom Island]]></category>
		<category><![CDATA[Island]]></category>
		<category><![CDATA[kilometers]]></category>
		<category><![CDATA[Pearl Island Phu Quoc]]></category>
		<category><![CDATA[Philippines]]></category>
		<category><![CDATA[Phu Quoc]]></category>
		<category><![CDATA[residence]]></category>
		<category><![CDATA[Resort]]></category>
		<category><![CDATA[sexier]]></category>
		<category><![CDATA[Slings]]></category>
		<category><![CDATA[Southeast Asia Aquatopia]]></category>
		<category><![CDATA[Sun Group]]></category>
		<category><![CDATA[Thom]]></category>
		<guid isPermaLink="false">https://en.spress.net/hon-thom-beauty-is-sexier-than-boracay-philippines/</guid>

					<description><![CDATA[Phu Quoc district government determined that Hon Thom &#8211; the largest island in An Thoi island cluster will develop in the direction of entertainment and resort tourism. If you are still skeptical about the comparison of Hon Thom with Boracay, you need to know that Hon Thom is completely capable of causing &#8220;nostalgia&#8221; for a [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Phu Quoc district government determined that Hon Thom &#8211; the largest island in An Thoi island cluster will develop in the direction of entertainment and resort tourism.</strong><br />
<span id="more-24551"></span> If you are still skeptical about the comparison of Hon Thom with Boracay, you need to know that Hon Thom is completely capable of causing &#8220;nostalgia&#8221; for a stranger even though they have never set foot in it, or even miss it more. Boracay by its famous beauty blends wild rustic features with experiences only available in paradise island.</p>
<p> <strong> From the abode of the poor fisherman</strong> Hon Thom is a beautiful island located in the South of Phu Quoc island with an area of ​​about 6km2. With an equivalent area and favored by nature with wild, poetic beauty and beautiful scenery, this &#8220;emerging&#8221; tropical paradise is likened to Boracay of Vietnam. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_17_304_39214068/a944998490c6799820d7.jpg" width="625" height="416"> <em> Hon Thom used to be a poor fishing village, a resting place for ships from all over the world.</em> 10 years ago, Hon Thom was literally a &#8220;fish market&#8221; filled with all kinds of fishing boats of all sizes anchored to exchange and trade after the trip to sea. The coast is gently sloping, small cruise ships cannot dock close to the shore, so it is rare for a group of tourists to visit for a while. Tourists go to the island early in the morning, swim in the sea, watch the sky and see the mountains, then quickly get on the canoe and board the ship back to the mainland before the afternoon has passed. Hon Thom then looked like a beautiful girl still hiding in the middle of the ocean. On the white sandy shore are small but quite bustling markets, all mainly serving strangers from fishing boats in Ca Mau, Phu Quoc, Rach Gia&#8230; anchored outside. The temporary shops set up almost exclusively sell to people taking the train to stop by. Follow the small sandy road lined with coconut trees, about a kilometer long running from the south to the north of the main island where the island&#8217;s inhabitants live. Due to the peculiarities of custom, fishing boats often pull together to change places, so the rows of shops or houses are just thatched roofs, sagging wooden houses, it is difficult to find a spacious walled house on the island. This island is about 6km2 wide. <strong> The awakening of Hon Thom</strong> In 2015, the Phu Quoc district government determined that Hon Thom &#8211; the largest island in the An Thoi island cluster would develop in the direction of entertainment and resort tourism. And very quickly, after only a few years, the small island infrastructure completely changed with &#8220;terrible&#8221; projects invested by Sun Group. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_17_304_39214068/6eaa5c6a5528bc76e539.jpg" width="625" height="351"> If before, the island commune still did not have electricity to the grid, the phone wave was also very unstable, and it was inconvenient to travel to the island, now, thanks to the world&#8217;s longest three-wire cable car system, it is less than 15 years old. minutes, visitors will be at the island. Not only the grid is ready to light up day and night, but the wifi is also covered to the cable car cabin. At the end of the cable car in Hon Thom, a vibrant four-season Sun World Hon Thom Nature Park entertainment complex has also been formed, turning the once sleazy &#8220;fish market&#8221; into a top-class entertainment center on the island. Ngoc Phu Quoc. The performances and festivals are jubilant everywhere, plus the most modern water park in Southeast Asia Aquatopia makes the visitor&#8217;s experience seem to be endless. The beaches of Nom, Bai Nam, Bai Chuong, Bai Trao, which were somewhat &#8220;wild&#8221; and quietly beside the leaning coconut shadows, have now really &#8220;awakened&#8221; by a series of sea experiences such as jet skiing, paragliding, kayak,… attract tourists to have fun and forget the way home. <strong> To the future of luxury residence of the rich</strong> The rapid &#8220;makeover&#8221; of Hon Thom has led to a change in the tourism landscape on the island, tourists no longer focus on the North and Central islands but focus on the South, An Thoi archipelago area, which attracts Number 1 is Hon Thom island. In 2019, Phu Quoc welcomed more than 5.1 million visitors, making the main contribution to Kien Giang&#8217;s revenue of nearly 19,000 billion VND, of which the southern island area, notably Hon Thom, also contributed to the number of visitors. small. Along with receiving a huge capital poured into transport and tourism infrastructure, in the near future Hon Thom promises to become the new tourism capital of Phu Quoc. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_17_304_39214068/205516951fd7f689afc6.jpg" width="625" height="468"> Currently, the rich have begun to &#8220;hunt&#8221; for the opportunity to find a second home on this paradise island. The attraction of an ideal, fresh and affluent life on a rich tourist island in the middle of the ocean is always the desire of many people, so experts predict that a wave of migration will soon appear. to Hon Thom. It is believed that soon this place will be as busy as Boracay of the Philippines with a busy chain of business shops, high-class resorts by the beaches with potential. The strengths of Hon Thom will be &#8220;activated&#8221; with unprecedented strength. And the South island in general, Hon Thom in particular will be a lively destination, representing the development of Phu Quoc. Therefore, this is the golden time to own a second home in Hon Thom with a small amount of capital at the early stages of development, before it becomes a highly sought-after property just a few years later on the island. tourist island &#8220;earn money&#8221;. Thus, you can both enjoy the vacation of your dreams, and at the same time can &#8220;pocket&#8221; a large profit from rental or self-service travel business. Seize the opportunity soon, creating a prosperous life. Prosperity and prosperity in this place will not take too much time.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24551</post-id>	</item>
		<item>
		<title>Original Savage Capital intends to repeat capital routines in the charging market, but it is denounced by State Grid</title>
		<link>https://en.spress.net/original-savage-capital-intends-to-repeat-capital-routines-in-the-charging-market-but-it-is-denounced-by-state-grid/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 17 Jun 2021 05:44:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Capital]]></category>
		<category><![CDATA[Charging]]></category>
		<category><![CDATA[denounced]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[intends]]></category>
		<category><![CDATA[market]]></category>
		<category><![CDATA[Original]]></category>
		<category><![CDATA[Repeat]]></category>
		<category><![CDATA[routines]]></category>
		<category><![CDATA[SAVAGE]]></category>
		<category><![CDATA[State]]></category>
		<guid isPermaLink="false">https://en.spress.net/original-savage-capital-intends-to-repeat-capital-routines-in-the-charging-market-but-it-is-denounced-by-state-grid/</guid>

					<description><![CDATA[Recently, State Grid (Shandong) Electric Vehicle Service Co., Ltd. issued a document denounced that some charging operators rely on capital advantages to promote low-price promotions and vicious competition such as 1 cent charging, showing that some Internet capital intends to repeat their harvesting routines in other industries in the charging market , But finally hit [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Recently, State Grid (Shandong) Electric Vehicle Service Co., Ltd. issued a document denounced that some charging operators rely on capital advantages to promote low-price promotions and vicious competition such as 1 cent charging, showing that some Internet capital intends to repeat their harvesting routines in other industries in the charging market , But finally hit the iron plate this time.</strong></p>
<p><span id="more-24235"></span> <img fifu-featured="1" decoding="async" src="https://p9.itc.cn/images01/20210615/ecc51080f9d94b2abae4560117c79353.jpeg" max-width="600"></p>
<p>Internet capital’s routines have always been based on low prices or even free of charge. The widely-familiar online car-hailing and takeaway industries are all like this. They enclose land at low prices. After they have a monopoly market share, they have increased their prices significantly. Now the price of online car-hailing It is already more expensive than taxis, and the takeaway industry has forced catering businesses to go nowhere, leading to the consequences of bad money driving out good money. A considerable proportion of takeaways directly turn factory-supplied food bags into fast food boxes.</p>
<p>After the capital has gradually harvested many industries, now it has begun to target the last outlet of the middle-aged and elderly-the vegetable vendor. The routine is still so familiar, and it grabs the market at a low price, with the intention of killing the vegetable vendor and waits for the vegetable market. All were forced to close and then raise prices drastically, and this process is still in progress.</p>
<p>For public services such as the power grid, there have been similar cases at home and abroad where capital seized the market and then maliciously increased prices. In the 1990s, Britain promoted privatization and the British gas company was privatized. After the privatization, the British gas company increased its expenses year after year. As a result, the British could not consume fuel. In desperation, they could not turn on the heating in the cold. Cold Bird&#8221;.</p>
<p>In the domestic market, foreign capital structures such as Veolia and Suez have successively acquired water supply networks in more than 10 cities. Before the acquisition, they painted a beautiful picture. However, after the acquisition, they did not invest heavily in improving the water supply network. Prices have been raised year after year. In 2014, many cities across the country had odor incidents of tap water, and almost all of the water supply networks in these cities were acquired by foreign capital, which made people rethink the pros and cons of privatizing public services.</p>
<p><img decoding="async" src="https://p9.itc.cn/images01/20210615/e02d3a912e9a4278be91d7a8790ad54d.jpeg" max-width="600"> </p>
<p> Today’s charging services that capital intends to intervene will undoubtedly be similar to previous capital stories. They try to seize the market at low prices or even for free. After occupying the market, they will inevitably increase prices. After all, the ultimate goal of capital is to obtain huge profits. .</p>
<p>However, this time the capital is facing the giant State Grid. State Grid has built the largest charging network in the country, comparable to Sinopec and PetroChina in the era of fuel vehicles. State Grid can quickly build a huge charging network and its own National Grid. It is inseparable as a solid foundation, and this has become its confidence.</p>
<p>As the State Grid has issued a warning to some charging operators, it cannot be ruled out that it will take other measures in the future. After all, with the State Grid as the foundation and power resources in its hands, these vicious competitors will face penalties at any time.</p>
<p>The author supports State Grid&#8217;s punishment of these vicious competitors, because it has repeatedly proved that private capital has no bottom line for profit after monopolizing an industry, and State Grid, as a non-private entity, is better able to ensure service quality due to more supervision. And provide reasonable prices.</p>
<p><img decoding="async" src="https://p8.itc.cn/images01/20210615/3ad1a0bcd609404cb61513f254a3ff03.jpeg" max-width="600"></p>
<p>Internet capital has received a lot of praise for a long time, but as they have achieved monopoly status in multiple industries, the people are disgusted by the people. All parties are becoming more familiar with the behavior of these capitals. There are just a few routines back and forth. I don&#8217;t believe in the beautiful vision they portray, but I believe that the ultimate purpose of capital is to make money.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24235</post-id>	</item>
		<item>
		<title>Focusing on propagandizing economical use of electricity in hot weather</title>
		<link>https://en.spress.net/focusing-on-propagandizing-economical-use-of-electricity-in-hot-weather/</link>
		
		<dc:creator><![CDATA[Tùy Phong]]></dc:creator>
		<pubDate>Wed, 16 Jun 2021 12:20:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[app]]></category>
		<category><![CDATA[Dry season]]></category>
		<category><![CDATA[economical]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity bill]]></category>
		<category><![CDATA[EVNCPC CSKH]]></category>
		<category><![CDATA[Focusing]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Hoang Hieu Trung]]></category>
		<category><![CDATA[hot]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[PC Quang Binh]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power off]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Propaganda]]></category>
		<category><![CDATA[propagandizing]]></category>
		<category><![CDATA[Quang Binh]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[Saving]]></category>
		<category><![CDATA[Wattage]]></category>
		<category><![CDATA[weather]]></category>
		<guid isPermaLink="false">https://en.spress.net/focusing-on-propagandizing-economical-use-of-electricity-in-hot-weather/</guid>

					<description><![CDATA[Although just entering the dry season, the hot weather lasted for a long time, the demand for electricity of the people increased, causing the load capacity to increase dramatically. In order to provide stable electricity to customers, Quang Binh Power Company (PC) has actively implemented many measures to ensure safe operation and improve the reliability [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Although just entering the dry season, the hot weather lasted for a long time, the demand for electricity of the people increased, causing the load capacity to increase dramatically. In order to provide stable electricity to customers, Quang Binh Power Company (PC) has actively implemented many measures to ensure safe operation and improve the reliability of power supply; at the same time promoting propaganda on economical and efficient use of electricity.</strong><br />
<span id="more-23766"></span> The peak power consumption in recent days is 186.8 MW and the electricity output is over 3.7 million kWh/day. According to PC Quang Binh&#8217;s forecast, commercial electricity output in June may reach 109 million kWh, up 23% compared to May.</p>
<p> Hoang Hieu Trung, Director of Quang Binh PC said, to ensure stable power supply, the unit will continue to invest in completing the power grid, improving power supply capacity to meet the demand for capacity growth of the load. . The company has also assigned 100% of officers and employees to be on duty, to regularly check the system of transmission lines and substations; mobilize vehicles and machinery to promptly handle incidents in the fastest time. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_10_446_39142529/556c97f49ab673e82aa7.jpg" width="625" height="441"> <em> Instructing customers to install the EVNCPC CSKH app to monitor electricity consumption.</em> Due to extreme hot weather, the frequency of using air conditioners, cooling devices, and electronic devices for family activities will be more. This leads to the risk of overloading, power failure, even increased risk of fire and explosion, unsafe operation of the power system. Therefore, in order to save electricity costs effectively and ensure enough electricity for socio-economic development, national defense &#8211; security and daily life, production and business of people in the province, PC Quang Binh recommends that customers use electricity safely and economically. Specifically, for businesses, PC Quang Binh recommends balancing and arranging production schedules in the direction of reducing electricity use during peak hours, increasing electricity use during off-peak hours; at the same time, enterprises invest in energy-saving production equipment and coordinate with the Electricity sector to monitor and control power quality. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_10_446_39142529/19ba21222c60c53e9c71.jpg" width="625" height="419"> <em> &#8220;Hot repair&#8221; is one of the solutions to minimize the power outage time of customers in hot weather.</em> In addition, Quang Binh PC requires the electricity companies to actively answer customers about problems in calculating electricity bills, and advise people on how to use electricity economically and efficiently. The affiliated units must well control the index recording and index review to promptly detect and handle abnormal cases, avoiding possible errors. In particular, the Company propagates to customers to use tools and utilities of the electricity industry to actively monitor electricity consumption and control high electricity bills in the hot season such as the EVNCPC Customer Service application on devices. mobile phone or a tool to estimate electricity consumption in daily life for electricity users nationwide at website: https://uoctinhdiennang.evn.com.vn/.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">23766</post-id>	</item>
		<item>
		<title>EVNSPC digitizes production and business</title>
		<link>https://en.spress.net/evnspc-digitizes-production-and-business/</link>
		
		<dc:creator><![CDATA[Hoàng Dũng/BNEWS/TTXVN]]></dc:creator>
		<pubDate>Wed, 16 Jun 2021 04:38:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[administration]]></category>
		<category><![CDATA[Business]]></category>
		<category><![CDATA[Center]]></category>
		<category><![CDATA[Convert]]></category>
		<category><![CDATA[Corporations]]></category>
		<category><![CDATA[Digital]]></category>
		<category><![CDATA[digitizes]]></category>
		<category><![CDATA[Digitizing]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[EVNICT]]></category>
		<category><![CDATA[EVNSPC]]></category>
		<category><![CDATA[Field]]></category>
		<category><![CDATA[Force building]]></category>
		<category><![CDATA[general manager]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Improve]]></category>
		<category><![CDATA[Nguyen Phuoc Duc]]></category>
		<category><![CDATA[Optimization math]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[production]]></category>
		<category><![CDATA[Project management]]></category>
		<category><![CDATA[Vietnam Electricity Corporation]]></category>
		<guid isPermaLink="false">https://en.spress.net/evnspc-digitizes-production-and-business/</guid>

					<description><![CDATA[Nguyen Phuoc Duc, General Director of Southern Electricity Corporation (EVNSPC), said that in the period of 2021 -2022 to 2025, the Corporation is implementing digital transformation with 5 key tasks. Customers are using the electricity customer management system built by EVNICT. Hoang Dung/BNEWS/VNA Specifically, the Corporation promotes the application of digital technology to innovate and [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Nguyen Phuoc Duc, General Director of Southern Electricity Corporation (EVNSPC), said that in the period of 2021 -2022 to 2025, the Corporation is implementing digital transformation with 5 key tasks.</strong><br />
<span id="more-23409"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_10_324_39141243/395f28ede3ae0af053bf.jpg" width="625" height="468"> </p>
<p> <em> Customers are using the electricity customer management system built by EVNICT. Hoang Dung/BNEWS/VNA</em> Specifically, the Corporation promotes the application of digital technology to innovate and improve the management and operation process of the power system; Design experiences to attract more and more customers to interact on digital channels, enhance analytics to understand customers. The Corporation also improves processes, optimizes corporate governance, enhances governance and data-driven decision-making; Build a digitally savvy, conscious and skilled workforce. At the same time, build a strong and flexible digital ecosystem, maximize shared services and data, and enhance security. This transformation, according to EVNSPC&#8217;s General Director, aims to improve management capacity and efficient exploitation and operation of the power grid; improve the quality of customer service in the field of electricity business. Besides, improving project management capacity in the field of construction investment; improve internal management capacity; improve telecommunications infrastructure capacity, apply digital technology platforms. In order to carry out the set tasks, EVNSPC has developed specific plans and solutions. One of the remarkable solutions being implemented by the Corporation is the successful deployment of interconnected and integrated shared applications of the Electricity of Vietnam (EVN) according to the roadmap, and at the same time studying develop specific software to meet the requirements of sustainable development of EVNSPC. Along with the coordination to complete the overall monitoring system of information technology and telecommunications infrastructure, used exclusively as a capacity building tool for management consulting and administration on the application and development of science and technology in Vietnam. At all levels throughout EVNSPC, the Corporation also ensures information safety and security at all levels, meeting the readiness for the digital transformation roadmap for the period 2021 &#8211; 2022./</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">23409</post-id>	</item>
		<item>
		<title>Three scenarios of Power Master Plan 8 create renewable energy sources accounting for 38-42% by 2045</title>
		<link>https://en.spress.net/three-scenarios-of-power-master-plan-8-create-renewable-energy-sources-accounting-for-38-42-by-2045/</link>
		
		<dc:creator><![CDATA[Huyền Vy -]]></dc:creator>
		<pubDate>Sun, 06 Jun 2021 14:31:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Accounting]]></category>
		<category><![CDATA[create]]></category>
		<category><![CDATA[Development strategy]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Ice]]></category>
		<category><![CDATA[Inner area]]></category>
		<category><![CDATA[Institute of Energy]]></category>
		<category><![CDATA[Le Van Thanh]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Master]]></category>
		<category><![CDATA[Ministry of Industry and Trade]]></category>
		<category><![CDATA[Plan]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power Planning 8]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[Recycled energy]]></category>
		<category><![CDATA[renewable]]></category>
		<category><![CDATA[Scenarios]]></category>
		<category><![CDATA[Script]]></category>
		<category><![CDATA[Sources]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Thermal]]></category>
		<category><![CDATA[Wind electricity]]></category>
		<category><![CDATA[Zoning]]></category>
		<guid isPermaLink="false">https://en.spress.net/three-scenarios-of-power-master-plan-8-create-renewable-energy-sources-accounting-for-38-42-by-2045/</guid>

					<description><![CDATA[The proportion of electricity from renewable energy sources in the total electricity production of the selected scenarios all meet the target of renewable energy development in Vietnam&#8217;s Renewable Energy Development Strategy, reaching 32% by 2030 and 32% by 2030. 40.3% in 2045… Power planning 8 proposes 3 scenarios for power source development. The Institute of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The proportion of electricity from renewable energy sources in the total electricity production of the selected scenarios all meet the target of renewable energy development in Vietnam&#8217;s Renewable Energy Development Strategy, reaching 32% by 2030 and 32% by 2030. 40.3% in 2045…</strong><br />
<span id="more-21077"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_3_39053045/b1eece79d23b3b65622a.jpg" width="625" height="410"> </p>
<p> Power planning 8 proposes 3 scenarios for power source development. The Institute of Energy (Ministry of Industry and Trade) has just released a report explaining the conclusions of Deputy Prime Minister Le Van Thanh on the national electricity development plan for the period 2021-2030 with a vision to 2045 (Planning for electricity development). electricity 8). In which, receiving opinions on reviewing the scale of power source development, reasonable power source structure compared to electricity demand in each period, especially in the period to 2030; In order to prevent unreasonable backup of power sources (such as the plan to develop the total installed capacity of 167GW of power sources by 2030, while the load demand is forecast at 86.3GW), the Consultant said Power planning. 8 proposed 3 scenarios for developing power sources to meet 3 scenarios of low load demand, base load and high load. The results of capacity balance of 3 selected scenarios show that renewable energy sources (wind and solar) have the proportion of 24% in 2020; 24-27% in 2030 and 38-42% in 2045 depending on the load scenario. The crude reserve ratio if including wind and solar is always high at 60-80%, but wind and solar power sources are variable renewable energy sources, contributing very little to power system redundancy, especially At the time of maximum load in the evening, there is no sun. Specifically, in the dry season, in the evening, when the national wind power occurs, it only reaches the guaranteed capacity (about 10% of the installed capacity for onshore wind and 20% of the installed capacity for offshore wind). ), at this time, the national crude reserve ratio of power supply will only reach 21% in 2020, 11%-14% in 2030 and 5%-8% in 2045 depending on the load scenario. The consultant said that in order to confirm the redundant or insufficient spare capacity, it is necessary to calculate the expected number of hours that do not meet the load demand. The calculation results show that the reserve scale as above ensures the reliability of the system&#8217;s power supply. <strong> The proportion of electricity from renewable energy sources (including hydroelectricity) in total electricity production of the selected scenarios all meet the objectives of renewable energy development in Vietnam&#8217;s Renewable Energy Development Strategy, reaching 32% in 2030 and 40.3% in 2045.</strong> According to the Institute of Energy, although the simulation of energy storage sources has been included, the minimum-cost planning model still chooses to cut a part of renewable energy to meet the flexible needs of the system instead. because investing in more storage resources, because investing in these resources will not be economically viable. The reduction rate calculated from the model is about 1.5% of renewable energy output/year (excluding cuts due to local transmission). The use of a partial reduction in renewable energy to meet flexible demand is used by countries around the world, and accepting a partial reduction in renewable energy is also one of the solutions. to develop renewable energy sources. At the request of ministries, agencies and appraisal councils, Power Master Plan 8 has included additional power source options that occur in addition to the above 3 scenarios to provide information for competent authorities to consider in determining the power supply. operating. In particular, the most difficult option to build power sources and grids is when there are risks of stacking, including high load growth and slow progress of thermal power sources (especially domestic gas exploitation sources). Accordingly, the proposal proposes to select the power source development scenario corresponding to the baseline load demand forecast, which is the selected scenario to calculate the design of the transmission grid, calculate economic and financial criteria. of Power Planning 8. At the same time, the project proposes a power source scenario corresponding to the forecast of high load demand to be considered for use in the management and development of power sources, ensuring to meet demand in the event that the national economy and electricity demand are met. load demand increased dramatically. In case of risk of stacking (high load, slow progress of coal-fired power sources, domestic gas-fired power sources), it will be necessary to add wind power, solar power, flexible power sources, etc. operate ICE to meet the demand for electricity and build more one-way lines from the South Central region to the North to transmit the capacity of power plants.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">21077</post-id>	</item>
		<item>
		<title>Hai Phong PC strives to accelerate the application of digital transformation in power system operation management</title>
		<link>https://en.spress.net/hai-phong-pc-strives-to-accelerate-the-application-of-digital-transformation-in-power-system-operation-management/</link>
		
		<dc:creator><![CDATA[Hồ Thanh Nam]]></dc:creator>
		<pubDate>Sat, 05 Jun 2021 21:03:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Accelerate]]></category>
		<category><![CDATA[Acceleration]]></category>
		<category><![CDATA[application]]></category>
		<category><![CDATA[Convert]]></category>
		<category><![CDATA[Digital]]></category>
		<category><![CDATA[DMS]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Hai]]></category>
		<category><![CDATA[Hai Phong]]></category>
		<category><![CDATA[MAIFI]]></category>
		<category><![CDATA[Management]]></category>
		<category><![CDATA[OMS]]></category>
		<category><![CDATA[operate]]></category>
		<category><![CDATA[operation]]></category>
		<category><![CDATA[PC Hai Phong]]></category>
		<category><![CDATA[Phong]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[Remote Control]]></category>
		<category><![CDATA[SAIDI]]></category>
		<category><![CDATA[SAIFI]]></category>
		<category><![CDATA[SCADA DMS]]></category>
		<category><![CDATA[strives]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[Substation 110kV]]></category>
		<category><![CDATA[System]]></category>
		<category><![CDATA[Touch the ground]]></category>
		<category><![CDATA[transformation]]></category>
		<category><![CDATA[VV]]></category>
		<guid isPermaLink="false">https://en.spress.net/hai-phong-pc-strives-to-accelerate-the-application-of-digital-transformation-in-power-system-operation-management/</guid>

					<description><![CDATA[Implementing the 2021 theme of digital transformation of the Electricity of Vietnam and the Northern Power Corporation, Hai Phong Power One Member Company Limited (PC) has promoted the application of science and technology in all fields. manage and operate the power system, including the conversion of substations (TBAs) from manned to unmanned. With the goal [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Implementing the 2021 theme of digital transformation of the Electricity of Vietnam and the Northern Power Corporation, Hai Phong Power One Member Company Limited (PC) has promoted the application of science and technology in all fields. manage and operate the power system, including the conversion of substations (TBAs) from manned to unmanned.</strong><br />
<span id="more-20913"></span> With the goal of converting all substations to the unmanned substation model, Hai Phong PC is actively implementing digitization in the field of power system operation management. Technical management and grid operation management activities have been carried out on software systems such as power system operation reporting system, technical management system, data collection system. metering on the power grid, power failure information management system (OMS), general reporting on 110kV grid operation, control, monitoring and SCADA/DMS data collection system.</p>
<p> At the Hai Phong remote control center, the basic features of the SCADA/DMS central software system have been fully exploited such as: managing the grid information model including managing all the main data of the network. control center, edit or create new single-strand diagram structure of TBA, color grid, edit graphics, batch data import, declare and map signals of equipment at TBA and devices on the distribution grid (Recloser/LBS/FI), set up audio and event alarms, simulate the status of equipment on the grid, store, analyze and exploit historical data on the system. In addition, Hai Phong remote control center is gradually deploying and building a smart grid subsystem (DMS) with grid computing applications such as: load reporting, distribution estimation, capacity flow calculation, fault locating and isolation, etc. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_35_39050667/3b86ed2dfc6f15314c7e.jpg" width="625" height="391"> <em> Operations Engineer at Remote Control Center</em> The conversion of manned 110kV substations into 110kV unmanned substations helps to promote the application of digital technology, innovate and improve the management and operation process of the power system. As of May 27, 2021, the Company has 07/24 110kV substations operating with unmanned criteria, 09/24 110kV substations operating in remote operation mode with on-site supervision. 70/90 devices (Recloser/LBS) on medium voltage grid are connected and controlled remotely from Hai Phong Remote Control Center. With 99% success rate of remote manipulation <em> (</em> <em> As planned in 2021 put </em> <em> 110kV and . substations </em> <em> control devices</em> <em> Recloser/LBS</em> <em> rest </em> <em> perform remote control)</em> contributed to improving labor productivity, reducing system operating costs, improving reliability of power supply and ensuring safe grid operation. In early 2021, Hai Phong PC applied digital technology to develop software for automatic ground fault handling. The software is currently being put into trial operation. Automatic ground fault handling software is highly applicable, helping to automate the current ground fault handling process, reducing the time to find fault points, and minimizing the number of customers. affected by incidents, thereby reducing power supply reliability indicators SAIDI, SAIFI, MAIFI, improving power quality, avoiding confusion that may occur due to subjective factors of users caused by operation. Automating the troubleshooting process enhances worker productivity by reducing the dependence of the troubleshooting process on the operator. The software is a premise for the development and expansion of advanced applications in the process of modernizing the distribution grid towards operating the smart grid in Hai Phong city. With efforts and determination to realize the goal of digital transformation, Hai Phong PC in particular and the Power industry in general are gradually implementing innovation, creativity, digital technology integration and production management model. business, technical management, making an important contribution to the digital transformation roadmap of the Electricity industry in order to improve the quality of customer service, to meet the needs of socio-economic development of Hai Phong city.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20913</post-id>	</item>
		<item>
		<title>Promote the application of science and technology to the transmission grid</title>
		<link>https://en.spress.net/promote-the-application-of-science-and-technology-to-the-transmission-grid/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 03 Jun 2021 14:40:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Acceptance]]></category>
		<category><![CDATA[application]]></category>
		<category><![CDATA[Bring]]></category>
		<category><![CDATA[Conductor]]></category>
		<category><![CDATA[Construction supervision]]></category>
		<category><![CDATA[Craggy]]></category>
		<category><![CDATA[Electromagnetic fields]]></category>
		<category><![CDATA[EVNNPT]]></category>
		<category><![CDATA[flora and fauna]]></category>
		<category><![CDATA[FLYCAM]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Heavy]]></category>
		<category><![CDATA[line]]></category>
		<category><![CDATA[Line 500 kv]]></category>
		<category><![CDATA[Moderation room]]></category>
		<category><![CDATA[operate]]></category>
		<category><![CDATA[Promote]]></category>
		<category><![CDATA[PTC2]]></category>
		<category><![CDATA[Science]]></category>
		<category><![CDATA[Science and technology]]></category>
		<category><![CDATA[Technology]]></category>
		<category><![CDATA[Tran Thanh Phong]]></category>
		<category><![CDATA[Transmission]]></category>
		<guid isPermaLink="false">https://en.spress.net/promote-the-application-of-science-and-technology-to-the-transmission-grid/</guid>

					<description><![CDATA[PTC2 strengthens research and application of science and technology into the company&#8217;s production activities, bringing practical efficiency. Power Transmission Company 2 (PTC2) has strengthened research and applied science and technology to its production activities and has brought practical effects. Flight equipment application PTC2 uses drones to manage and operate the transmission grid. Assigned by the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>PTC2 strengthens research and application of science and technology into the company&#8217;s production activities, bringing practical efficiency.</strong><br />
<span id="more-20326"></span> Power Transmission Company 2 (PTC2) has strengthened research and applied science and technology to its production activities and has brought practical effects.</p>
<p> <strong> Flight equipment application</strong> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_31_114_39023277/81ce35df229dcbc3928c.jpg" width="625" height="417"> <em> PTC2 uses drones to manage and operate the transmission grid.</em> Assigned by the National Power Transmission Corporation (EVNNPT) to pilot deploy many scientific and technological applications in the management and operation of the transmission grid, since 2017, PTC2 has researched and applied drones in the field of power transmission. management and operation of the transmission grid. The application helps to reduce the level of burden, improve safety and efficiency, and productivity for workers. Mr. Tran Thanh Phong, Director of PTC2 said that in 2019, after being accepted by EVNNPT, PTC2 has synchronously deployed to all affiliated units to deploy the application of flying equipment in the inspection of the power grid and supporting construction supervision and acceptance of power transmission works. From March 2020 up to now, PTC2 has deployed the application of aircraft to periodically check 1,100 km of 220 kV and 500 kV lines with a total flight time of 29,000 minutes. Thereby, it has contributed to reducing the burden, improving safety, efficiency and productivity for workers such as climbing high, contacting electrical equipment with large electromagnetic fields, moving on difficult terrains. difficult access to dangerous plants and animals. Rapid inspection deployment, being able to access locations in areas divided by rainstorms, landslides, real-time recording of the current situation with good quality images, clear viewing angles to help analyze information more accurate assessment and, most importantly, does not require power line interruption. Mr. Tran Thanh Phong analyzed, when applying flying equipment, according to preliminary calculations, on average, to test 1 km of 500 kV transmission line, it takes 0.52 time to perform the traditional method, and 0. 25 workers, down 0.27 jobs (52.38%). In addition, it also saves a lot of time, costs, and other human resources such as: checking thematically on corridors, conductors, lightning conductors, techniques, insulation status, accessories&#8230; Along with that, the application of flying equipment to support construction supervision of power transmission works, inspection, supervision and acceptance of pole erection, inspection of conductors, accessories, route corridors, etc. 220 kV, 500 kV works. Not only that, the application of flying equipment helps closely monitor the technical status of the power grid from above and in places where the human eye cannot see (or is very difficult to see). From there, it contributes to reducing the level of burden, improving safety, efficiency and productivity for workers such as climbing high, contacting electrical equipment with large electromagnetic fields, moving on difficult terrains. , access to dangerous plants and animals. Check for dangerous landslide areas or break off during flooding. <strong> Efficiency from surveillance camera system thống</strong> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_31_114_39023277/82be33af24edcdb394fc.jpg" width="625" height="450"> <em> Camera system to monitor power transmission lines.</em> An effective application for EVNNPT and PTC2 is the installation of line surveillance camera systems. Realizing the high efficiency and applicability of line cameras, PTC2 has installed cameras at all affiliated Power Transmissions since 2020. Up to now, on the PTC2 grid, 31 CCTV cameras have been installed on the transmission lines of the company. The cameras are connected to the company&#8217;s dispatching room so that functional departments as well as company leaders can monitor the current status and direct handling remotely when there are abnormalities on the line. According to Mr. Phong, the camera has a wide field of view, so it helps remote observers to easily detect and accurately assess abnormalities arising on the route such as: fires near the corridor, landslides, vehicles passing photos affect the safe operation of the line. Along with that, the camera helps to quickly access the scene to locations in flooded areas, thereby capturing the situation of the route section and directing appropriate handling. Since installing the camera up to now, PTC2 has detected 35 unusual incidents that may affect the safe operation of the line, thereby taking appropriate measures to ensure operation. In the coming time, PTC2 will continue to research on technology solutions for cameras, solutions for data transmission and analysis, image processing, and propose equipment and installation at necessary and important locations for roads. cord.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20326</post-id>	</item>
		<item>
		<title>Good power saving will contribute to ensuring power supply</title>
		<link>https://en.spress.net/good-power-saving-will-contribute-to-ensuring-power-supply/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Mon, 31 May 2021 01:52:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Actively exercise]]></category>
		<category><![CDATA[Confusion]]></category>
		<category><![CDATA[Contribute]]></category>
		<category><![CDATA[Dry season]]></category>
		<category><![CDATA[Electrical equipment]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[FLYCAM]]></category>
		<category><![CDATA[good]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Heater]]></category>
		<category><![CDATA[Iron]]></category>
		<category><![CDATA[Meaning]]></category>
		<category><![CDATA[My home]]></category>
		<category><![CDATA[Nguyen Nghiem]]></category>
		<category><![CDATA[PC Quang Ngai]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power saving]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Quang Ngai]]></category>
		<category><![CDATA[Save electricity]]></category>
		<category><![CDATA[Saving]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Wire]]></category>
		<guid isPermaLink="false">https://en.spress.net/good-power-saving-will-contribute-to-ensuring-power-supply/</guid>

					<description><![CDATA[Quang Ngai is entering the hot hot days. Due to the epidemic, people rarely go out at this time, mainly at home, so the demand for electricity increases. The province&#8217;s electricity output is maintained at nearly 6.2 million kWh/day. PC Quang Ngai forecasts the weather situation and the coming demand for electricity, the electricity consumption [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><em> Quang Ngai is entering the hot hot days. Due to the epidemic, people rarely go out at this time, mainly at home, so the demand for electricity increases. The province&#8217;s electricity output is maintained at nearly 6.2 million kWh/day. PC Quang Ngai forecasts the weather situation and the coming demand for electricity, the electricity consumption in Quang Ngai will be in the range of 6.3-6.5 million kWh/day. Therefore, Quang Ngai PC actively mobilizes businesses and people to use electricity economically to contribute to stabilizing and ensuring electricity supply for production and daily life in the dry season of 2021.</em> </p>
<p> Changing habits of saving electricity not only reduces costs for the family but also contributes to saving electricity in general. Although there are not many electrical appliances in the home, only using them in accordance with the needs and reasonable time will contribute to saving a lot of electricity. In addition, customers need to check and maintain the indoor wiring system to ensure reasonable science because if the wiring is confused, it will cause power consumption to be lost in the transmission process; at the same time properly use appliances that consume large electricity such as water heaters, irons, refrigerators, etc. Customer Le Diep Lai in Nguyen Nghiem ward &#8211; Quang Ngai city said: &#8220;My house has never left the air conditioner below 25 degrees, usually around 26-27 degrees. I find that to be appropriate, not much different from the outside, both protecting health and saving electricity. I also educate my children to turn off electrical appliances in the house when they do not need to use them. Vu Ha Ty customer in Nghia Dung commune &#8211; Quang Ngai city only uses the air conditioner when absolutely necessary and usually adjusts the temperature not too low to save energy. Ms. Ty shared: “My house is not located in the center, there are many gaps around, so I often use the wind and natural light in the house, minimizing the use of electricity to operate the cooling equipment. lighting&#8221;. Changing the habit of using electricity will save electricity, reduce costs for the family and contribute to saving electricity in general. Although there are not many electrical appliances in the home, only using them in accordance with the needs and reasonable time will contribute to saving a lot of electricity. Currently, customers can use the monthly electricity consumption estimator https://uoctinhdiennang.evn.com.vn to calculate the monthly electricity consumption of the family, thereby adjusting the usage. Use electricity in the most efficient and economical way. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_173_38992753/3eec7daf6bed82b3dbfc.jpg" width="625" height="469"> <em> Propagate the use of electricity to the people.</em> Huynh Trong Nguyen &#8211; Quang Ngai PC Business City recommended: &#8220;In addition to daily-life customers, manufacturing enterprises need to review and arrange reasonable production plans, minimizing the simultaneous mobilization of devices. consume large electricity capacity during peak hours and do not leave electrical equipment idle. This is the necessary coordination to ensure the stability of the infrastructure, and to ensure the supply of electricity for production and daily life in the dry season of 2021.&#8221;<br />
In addition, to prevent local overload due to high demand for electricity, from the beginning of the second quarter of 2021, PC Quang Ngai also directed its affiliated units to regularly check lines and substations. Thanks to the initiative in the plan and the use of modern equipment such as thermal cameras, flycams, Quang Ngai PC was able to immediately detect and detect abnormal signs occurring with the equipment, preventing problems. can happen.<br />
The economical and efficient use of electricity by customers is also one of the important solutions to help Quang Ngai PCs fight overload, reduce &#8220;heat&#8221; for the power grid system; thereby contributing to helping PC Quang Ngai perform well the management and operation of the power grid safely and effectively, improving the quality of power supply for customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19419</post-id>	</item>
		<item>
		<title>Prioritize resources to modernize Thu Duc city&#8217;s electricity system</title>
		<link>https://en.spress.net/prioritize-resources-to-modernize-thu-duc-citys-electricity-system/</link>
		
		<dc:creator><![CDATA[Giang Ngân Nhi]]></dc:creator>
		<pubDate>Sat, 22 May 2021 04:33:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[app]]></category>
		<category><![CDATA[citys]]></category>
		<category><![CDATA[Council]]></category>
		<category><![CDATA[Duc]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[EVNHCMC]]></category>
		<category><![CDATA[EVNHCMC Customer Service]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Ho Chi Minh City]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Low voltage]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Modernize]]></category>
		<category><![CDATA[Pham Quoc Bao]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power off]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[Prioritize]]></category>
		<category><![CDATA[Resources]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[System]]></category>
		<category><![CDATA[TCT]]></category>
		<category><![CDATA[Thu]]></category>
		<category><![CDATA[Thu Duc]]></category>
		<category><![CDATA[total capacity]]></category>
		<guid isPermaLink="false">https://en.spress.net/prioritize-resources-to-modernize-thu-duc-citys-electricity-system/</guid>

					<description><![CDATA[Thu Duc is expected to become a smart city, contributing 30% of HCMC&#8217;s GRDP. To do so, this place must have a modern technical infrastructure system, first of all, electricity infrastructure. Mr. Pham Quoc Bao, Chairman of the Members&#8217; Council of Ho Chi Minh City Electricity Corporation, said that by the end of 2020, the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Thu Duc is expected to become a smart city, contributing 30% of HCMC&#8217;s GRDP. To do so, this place must have a modern technical infrastructure system, first of all, electricity infrastructure.</strong><br />
<span id="more-17248"></span> Mr. Pham Quoc Bao, Chairman of the Members&#8217; Council of Ho Chi Minh City Electricity Corporation, said that by the end of 2020, the scale of the power grid in Thu Duc City includes 3,136 transformer stations, 13 break stations and more than 3,300 km of transmission lines. medium-low voltage, with an electricity consumption of more than 4.3 billion kWh (average 4000 kWh/person/year). In 2020, 100% of medium-voltage lines in Thu Duc city will be controlled remotely (Thu Duc Power Station: 38 lines; Thu Thiem Power Station: 48 lines).</p>
<p> The remote operation success rate is over 99%. When an incident occurred, 81% of affected customers were immediately transferred and restored to power in less than 5 minutes (compared to 120 minutes of TCT&#8217;s regulation). The process of investment in development and modernization of the power system in Thu Duc City over the past years has shown that the reliability of power supply has improved significantly. Average number of outages per customer (SAIFI) is 1 time/year; the average outage time of a customer (SAIDI) is about 60 minutes/year &#8211; much lower than the 2015 index of 6 times/year and 700 minutes/year, respectively. With the motto &#8220;Electricity is one step ahead&#8221;, Ho Chi Minh City Electricity Corporation has a plan to prioritize investment in the development of the power system for Thu Duc City, focusing on developing smart grids in parallel with deploying other utilities. underground works. The goal is that by 2025, the electricity output supplied to the people of Thu Duc City will reach 5,500-6,500 kWh/person/year, the average number of power outages is less than 0.3 times/person/year and the average duration of power failure. less than 30 minutes/person/year. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_21_119_38923123/560e3d68262acf74963b.jpg" width="625" height="417"> <em> Mr. Pham Quoc Bao, Chairman of the Members&#8217; Council of Ho Chi Minh City Electricity Corporation. </em> In the period of 2021-2025, Ho Chi Minh City Electricity Corporation will invest about VND 3,200 billion to build a new 220 kV station and 6 110 kV stations (total added capacity is 1,382 MVA), develop 245 new stations km of medium voltage grid; 585 km of low voltage power grid, renovating and installing 447 distribution substations with a total capacity of 363 MVA in Thu Duc city. In this year, the corporation will complete Phuoc Long 110 kV station, start construction of new 110 kV Linh Dong station, 220/110 kV Thu Thiem station and 110 kV Thu Thiem station 1. In addition, the Ho Chi Minh City Electricity Corporation deployed 27 projects to undergroundize the power grid combined with information lines in Thu Duc city, in order to increase the undergroundization rate of the medium voltage grid from less than 50% at present to 75. -80% by 2025. With the motto &#8220;Customer is the center&#8221;, the electricity industry promotes digital transformation to improve the quality of electricity supply and customer service for the whole Ho Chi Minh City, including Thu Duc City. The focus is on promoting digital transformation in power system operation management and customer service provision in Ho Chi Minh City. The Corporation promotes the development of smart grids in Thu Duc city with the investment of a remote metering system, increasing automatic components on the power grid. Currently, the Corporation has basically completed the installation of distance meters in Thu Duc city. By the end of this year, 100% of medium voltage lines in Thu Duc city will operate fully automatically (DAS/DMS). In the period of 2021-2025, the corporation will continue to invest in strengthening remote control devices for medium voltage lines, along with solutions to close loops, and enhance the form of construction without power cut (live- line), in order to improve the flexibility of transmission, reduce the range and number of customers affected by power outages (if any). <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_21_119_38923123/897bea1df15f1801414e.jpg" width="625" height="351"> <em> View of Thu Duc city. </em> On the other hand, the corporation promotes the development of EVNHCMC Customer Care application (app) on the phone. The area of ​​Thu Duc district (old) has completed the installation of distance meters since 2020. Customers can monitor their daily electricity consumption through this application. All electrical services are provided online by the corporation. Customers do not have to go to the electricity headquarters to register, instead register for the service on the customer care website or via the app) EVNHCMC Customer Service of the corporation. In addition, TCT also promotes the application of 4.0 technology in surveying, designing and improving procedures to continue to improve the electricity access index, ensuring all investment projects through the medium voltage grid. 22 kV power supply for customers is carried out by the electricity industry within 5 days, contributing to attracting investment businesses in the city. “EVNHCMC prioritizes focusing resources, rapidly developing modern power systems in Thu Duc city, in order to ensure the power supply capacity to meet the city&#8217;s development needs, constantly improving the quality of electricity. electricity and customer service, contributing to building Thu Duc City into a new growth pole of Ho Chi Minh City, worthy of its potential and meeting the expectations of leaders and people&#8221;, Mr. Pham Quoc Bao positive.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">17248</post-id>	</item>
		<item>
		<title>Brazil: Worst drought in 2 decades puts pressure on power grid</title>
		<link>https://en.spress.net/brazil-worst-drought-in-2-decades-puts-pressure-on-power-grid/</link>
		
		<dc:creator><![CDATA[Nguyễn Hồng]]></dc:creator>
		<pubDate>Tue, 18 May 2021 20:20:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[BAD]]></category>
		<category><![CDATA[Brasilia]]></category>
		<category><![CDATA[Brazil]]></category>
		<category><![CDATA[Decade]]></category>
		<category><![CDATA[decades]]></category>
		<category><![CDATA[Drought]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[High voltage electricity]]></category>
		<category><![CDATA[hydroelectric]]></category>
		<category><![CDATA[Hydropower plants]]></category>
		<category><![CDATA[Jair Bolsonaro]]></category>
		<category><![CDATA[List of countries]]></category>
		<category><![CDATA[Offset]]></category>
		<category><![CDATA[ONS]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power production]]></category>
		<category><![CDATA[Power shortage]]></category>
		<category><![CDATA[Pressure]]></category>
		<category><![CDATA[puts]]></category>
		<category><![CDATA[quantity]]></category>
		<category><![CDATA[reduced]]></category>
		<category><![CDATA[Reuters]]></category>
		<category><![CDATA[Second round]]></category>
		<category><![CDATA[Thermal power plants]]></category>
		<category><![CDATA[worst]]></category>
		<guid isPermaLink="false">https://en.spress.net/brazil-worst-drought-in-2-decades-puts-pressure-on-power-grid/</guid>

					<description><![CDATA[The worst drought in Brazil in two decades will force the country to become more dependent on electricity, a source from Brazil&#8217;s National Power System Operator (ONS) said on May 11, Reuters reported. thermal power plants to compensate for the reduced amount of hydroelectricity. Power lines connecting high-voltage poles near the capital Brasilia (Brazil). Photo: [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The worst drought in Brazil in two decades will force the country to become more dependent on electricity, a source from Brazil&#8217;s National Power System Operator (ONS) said on May 11, Reuters reported. thermal power plants to compensate for the reduced amount of hydroelectricity.</strong><br />
<span id="more-15915"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_11_8_38805956/dca1322f2c6dc5339c7c.jpg" width="625" height="394"> </p>
<p> Power lines connecting high-voltage poles near the capital Brasilia (Brazil). <em> Photo: Reuters.</em> According to ONS General Manager Luiz Carlos Ciocchi, this could lead to higher electricity prices. However, the situation is still positive when the risk of power shortage or interruption of distribution has not yet occurred. About three-quarters of Brazil&#8217;s electricity is generated from hydroelectric plants. This is one of the largest percentages compared to countries in the world. Brazilian President Jair Bolsonaro said on May 10 that the country was experiencing the worst water crisis in its history, and warned of major problems with electricity production. The crisis comes at a time of increased demand for energy, as temperatures rise in the coming summer months. Last week, Brazil&#8217;s Electricity Supervision Commission approved potential additional measures to meet electricity demand, including increasing the power output of thermal power plants and importing energy from Argentina and Uruguay. Mr. L.Ciocchi said that the government should reserve water in the lakes to meet the needs of the people and maintain the necessary hydropower output.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15915</post-id>	</item>
		<item>
		<title>Positive effects from hot power repair technology at PC Ha Tinh</title>
		<link>https://en.spress.net/positive-effects-from-hot-power-repair-technology-at-pc-ha-tinh/</link>
		
		<dc:creator><![CDATA[Phương Thảo - Huy Hải]]></dc:creator>
		<pubDate>Mon, 17 May 2021 15:32:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Breaker]]></category>
		<category><![CDATA[connection]]></category>
		<category><![CDATA[Discharge]]></category>
		<category><![CDATA[effects]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Examination]]></category>
		<category><![CDATA[Field sports]]></category>
		<category><![CDATA[Go into action]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Ha Tinh]]></category>
		<category><![CDATA[hot]]></category>
		<category><![CDATA[Insulation]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Member in a group]]></category>
		<category><![CDATA[PC Ha Tinh]]></category>
		<category><![CDATA[Personal computer]]></category>
		<category><![CDATA[Positive]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Repair]]></category>
		<category><![CDATA[Technology]]></category>
		<category><![CDATA[Tinh]]></category>
		<guid isPermaLink="false">https://en.spress.net/positive-effects-from-hot-power-repair-technology-at-pc-ha-tinh/</guid>

					<description><![CDATA[Although it has only been in operation for nearly 2 months, the hot power repair team on the 22kV power grid of Ha Tinh Power Company (Ha Tinh PC) has carried out nearly 70 working sessions, helping to reduce the time for customers to cut power. . In order to improve the quality of electricity [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Although it has only been in operation for nearly 2 months, the hot power repair team on the 22kV power grid of Ha Tinh Power Company (Ha Tinh PC) has carried out nearly 70 working sessions, helping to reduce the time for customers to cut power. .</strong><br />
<span id="more-15515"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_35_38813027/1bc3e59afbd812864bc9.jpg" width="625" height="468"> </p>
<p> In order to improve the quality of electricity supply and reduce the time of customers&#8217; power cuts, especially in the approaching hot season, in addition to 04 hotline insulation cleaning teams, they perform the task of cleaning electrical insulators with pressurized water. On March 10, 2021, Ha Tinh PC established a hot line repair team on the 22kV power grid that is carrying power (belonging to the Ha Tinh high voltage grid operation management team). The team is responsible for managing vehicles and equipment and implementing plans for repair, maintenance, replacement and connection of equipment on the 22kV live grid. The members of the team have been well trained, and invested in modern and advanced equipment, tools and instruments. After nearly 02 months of operation, the team has carried out nearly 70 sessions of hot repair work, including the following work contents: Separation of connections; poor breaker contact handling; replace lightning protection valve; new installation of load circuit breakers; replacing the shaped porcelain neck ties to prevent surface discharge and handling defects in bows and legs &#8230; have been done by the hotline repair team in the past time. In order to operate effectively, before that, the team was sent by the Company to study the construction and repair of hot line electricity at the Northern Electricity College; Trained and tested to meet the requirements of theory and practice on live lines at the hotline field, then continued testing on the 22kV power grid of Ha Tinh PC. Through training and practical tests, team members are not only strong in their expertise and techniques, but also create a stable and calm mentality for members, improve their sense of discipline, and strictly follow them. regulations and procedures for occupational safety. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_35_38813027/0a49f210ec52050c5c43.jpg" width="625" height="468"> <em> Workers of Ha Tinh PC hotline team perform operations on a live grid</em> Mr. Nguyen Van Nhu &#8211; Team leader of the hotline said: &#8220;When switching to hotline work, at first, the brothers in the group were still confused. However, through the process of being trained and trained, and timely grasping new techniques, up to now, the team members have mastered the technology when accessing the power grid. During the construction process, members always have a sense of reminding and monitoring each other, absolutely no redundant movements to ensure absolute safety when performing tasks. According to Mr. Nhu, in the past, even a small problem had to be cut off to fix it, but when applying new technology, customers can still use electricity normally, daily activities, production and business. business is not interrupted. It can be seen that the application of hotline repair technology into operation has brought many practical benefits, the work contents on the grid have been shortened, helping to save time, prevent and minimize incidents on the network. electricity grid, reducing power loss, contributing to increasing labor productivity, improving the reliability of power supply to meet the increasing demand for electricity of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15515</post-id>	</item>
		<item>
		<title>Summer electricity consumption increased by 12%, Nghe An is committed to ensuring enough electricity</title>
		<link>https://en.spress.net/summer-electricity-consumption-increased-by-12-nghe-an-is-committed-to-ensuring-enough-electricity/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sun, 16 May 2021 17:06:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[committed]]></category>
		<category><![CDATA[Consumption]]></category>
		<category><![CDATA[Cope with]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Elevate]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[hot]]></category>
		<category><![CDATA[increased]]></category>
		<category><![CDATA[line]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Low voltage]]></category>
		<category><![CDATA[Nghe]]></category>
		<category><![CDATA[Nghe An]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Quy Hop]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[summer]]></category>
		<category><![CDATA[Wattage]]></category>
		<guid isPermaLink="false">https://en.spress.net/summer-electricity-consumption-increased-by-12-nghe-an-is-committed-to-ensuring-enough-electricity/</guid>

					<description><![CDATA[With always having load forecast, with short and long-term solutions to respond; investing in many new substations as well as increasing the capacity of substations, this year&#8217;s hot season electricity in the city as well as localities in Nghe An will be guaranteed, and remote areas will also be provided with electricity. safe electricity. Build [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>With always having load forecast, with short and long-term solutions to respond; investing in many new substations as well as increasing the capacity of substations, this year&#8217;s hot season electricity in the city as well as localities in Nghe An will be guaranteed, and remote areas will also be provided with electricity. safe electricity.</strong><br />
<span id="more-15042"></span> <strong> Build multiple response scenarios</strong> </p>
<p> In order to prepare for the heat wave in 2021, Nghe An Power Company (Nghe An PC) has directed its units to quickly deploy the proposed solutions and scenarios to ensure electricity supply for the whole country. Nghe An province. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_35_38819191/d5caa8d1b6935fcd0682.jpg" width="625" height="440"> <em> Nghe An PC workers check outdoor equipment at Hung Hoa Substation (Nghe An)</em> PC Nghe An information, during this year&#8217;s hot season in Nghe An, there will be many prolonged heat waves, leading to an increase in the demand for electricity for cooling than in previous years. It is expected that power output will increase, with an estimated capacity of about 820 MW. In order to ensure stable power supply in the face of increasing electricity demand in the summer of 2021, Nghe An PC has prepared a &#8220;scenario&#8221; carefully, with many solutions to supply electricity to people and businesses. Mr. Le Quang Thanh &#8211; Deputy Director of PC Nghe An said that 2021 is not expected to be as hot as the previous year, but despite the prolonged epidemic, most businesses in the area are operating stably again. power consumption is expected to increase. Regarding the load forecast, this year&#8217;s output growth will be higher than last year&#8217;s at over 12%. The most important and basic solution identified by the unit is to increase the power supply capacity, with the rapid completion of construction of substations and power lines for areas in the province. Accordingly, from the end of 2020 until now, Nghe An PC has built and installed hundreds of large and small projects, including: Raising the capacity of 110kV substation in Cua Lo route, increasing the capacity of 110kV Quynh Luu substation, completing upgrading the transmission line. 110kV from Quynh Luu &#8211; Quy Hop. Along with that, renovating and upgrading low-voltage trunk roads; replace the meter periodically; strengthening overhaul, cleaning of transmission lines and transformers; replacing the name plate number of the road, pole number, safety sign of the substation transmission line&#8230; and is implementing the plan to energize and put into operation 110kV Con Cuong substation, increasing the capacity of 110kV Hung Nguyen and Quy Hop substations in the month. 6/2021. After energizing, the station will power on in time to serve the people&#8217;s demand for electricity in the summer months; support stable and safe power supply in the area. However, according to PC Nghe An, the case of an unexpected increase in output through monitoring is unlikely and in fact, if it happens, the power infrastructure including medium voltage transmission lines, substations and power grids. low voltage will still be able to meet. Alternating power cuts to reduce capacity as announced by EVN will not happen, however, it does not exclude some cases such as: The power supply of the whole system is malfunctioning, incidents such as the breakdown of hydroelectric power units , the North &#8211; South 500kV transmission fault leading to failure to mobilize the grid capacity of the whole system will be automatically laid off. In addition, there is a problem of maintenance schedules of power plants (thermal power plants, hydroelectric plants) which can also lead to lack of power, requiring capacity regulation between regions. In the coming period, the vicinity of Nghe An will record a sudden increase in load, especially in Thanh Hoa area, and in Nghe An will also have a sudden increase at the end of 2021 when Hoang Mai 1 and Hoang Mai IPs WHA Industrial Park comes into operation. This is not only a problem for the electricity industry in Nghe An but also for the power system in the North as well as in the whole country. To solve it, EVN will have capacity coordination solutions to meet demand. Power supply scenarios have been developed at the transmission grid level (220kV, 500kV) in order to mobilize and balance capacity in the North &#8211; Central &#8211; South region. Thus, in the short term, the stable and continuous power supply for Nghe An will be ensured. <strong> PC </strong> <strong> Attention Nghe An </strong> <strong> Use electricity in hot weather</strong> PC Nghe An also noted that, in order for the power grid to operate stably during the peak of heat, it is necessary to coordinate and propagate propaganda at all levels of the government, local and central media agencies on the appropriate use of content. , saving. This content is very important for the national power system and grid, will avoid unnecessary grid overload due to unreasonable use, reduce the greenhouse effect, help limit environmental pollution, have a enough electricity to serve economic development for production and also save living costs for electricity users themselves. PC Nghe An continuously advises customers to avoid being subjective, negligent, not to misunderstand between electricity price and electricity consumption; Use electricity in the most efficient and economical way when entering the hot season. Just small actions from the people such as turning off electrical appliances when not in use, not using many large-capacity devices at the same time, using low-power consumption equipment labeled energy-saving by the Ministry of Industry and Trade. Industry and Trade inspection will help save electricity. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_35_38819191/0a4a73516d13844ddd02.jpg" width="625" height="469"> <em> PC Nghe An has prepared scenarios for electricity growth in hot weather</em> Families should use air conditioners at a reasonable level of 26-27 degrees Celsius or higher and use fans in combination to reduce power consumption. When using a cold room, do not open the door often, do not use electrical appliances with heat-generating features in the room such as irons, ovens, electric kettles, and hot water heaters. Families have many rooms, when watching TV should focus on watching together, turn off all devices in neighboring rooms. Use electricity only when absolutely necessary, avoid using devices simultaneously during peak hours… For factories, make sure to use the correct capacity and load chart. Along with that, implementing a reasonable production plan, minimizing the mobilization of equipment and machinery with large electricity consumption capacity at peak hours. To minimize electrical equipment operating at no-load, key energy-using establishments must save at least 2% of electricity consumed per product unit per year. Advise customers to use electricity as committed to the electricity industry in terms of registered load and time frame, or reduce capacity when required by the electricity industry due to sudden increase in load&#8230; When purchasing new equipment, pay attention to use equipment with energy-saving certification label of the Ministry of Industry and Trade. Responding to the electricity sector, coordinating propaganda and recommending surrounding households to save together.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15042</post-id>	</item>
		<item>
		<title>The &#8216;divine&#8217; fan does not need electricity, warning after the super cheap price</title>
		<link>https://en.spress.net/the-divine-fan-does-not-need-electricity-warning-after-the-super-cheap-price/</link>
		
		<dc:creator><![CDATA[Nhật Thanh]]></dc:creator>
		<pubDate>Sun, 16 May 2021 13:58:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[advertisement]]></category>
		<category><![CDATA[Appliances]]></category>
		<category><![CDATA[battery]]></category>
		<category><![CDATA[Cause fever]]></category>
		<category><![CDATA[Charged]]></category>
		<category><![CDATA[Cheap]]></category>
		<category><![CDATA[Cost]]></category>
		<category><![CDATA[divine]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity bill]]></category>
		<category><![CDATA[Electricity price]]></category>
		<category><![CDATA[Fan]]></category>
		<category><![CDATA[God]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Need to use]]></category>
		<category><![CDATA[Power production]]></category>
		<category><![CDATA[Price]]></category>
		<category><![CDATA[Save electricity]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[SUNLIGHT]]></category>
		<category><![CDATA[Super]]></category>
		<category><![CDATA[The battery]]></category>
		<category><![CDATA[Tree fan]]></category>
		<category><![CDATA[Very cheap]]></category>
		<category><![CDATA[Warning]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-divine-fan-does-not-need-electricity-warning-after-the-super-cheap-price/</guid>

					<description><![CDATA[Having a super cheap price, advertised as without using electricity, it still runs well, easy to move&#8230; so the solar fan causes a fever and is bought by many people this summer. In recent years, when the price of electricity for living is increasing, people often have a need to buy energy-saving household electrical appliances. [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Having a super cheap price, advertised as without using electricity, it still runs well, easy to move&#8230; so the solar fan causes a fever and is bought by many people this summer.</strong><br />
<span id="more-14990"></span> In recent years, when the price of electricity for living is increasing, people often have a need to buy energy-saving household electrical appliances. However, the investment in these devices is often quite expensive because on the market they are quite expensive.</p>
<p> This time started in the summer, the demand for cooling devices increased, leading to a dizzying increase in electricity bills, so solar fan models were sold on the market. They are advertised, instead of running on electricity like conventional types, this type of fan operates entirely on solar power. Specifically, each solar fan will come with a solar panel to help absorb sunlight and produce electricity to maintain operation. Depending on the type of panel, when placed in the sun, the fan controller will charge the battery, which takes 4-6 hours. After the battery is fully charged, the fan will work for 6-10 hours continuously, even on rainy days without sunshine. In addition, users can use grid electricity to charge the battery for storage and use. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_23_38821434/c664ac87b3c55a9b03d4.jpg" width="625" height="746"> <em> Solar fans are causing fever in the market this summer</em> Currently, on the market, these fans come from many places such as: China, Korea, Vietnam, &#8230; with very diverse prices, depending on size and function. In which, the lowest price is about 200,000-300,000 VND (mini fan), tree fan costs 800,000-2 million VND. Many fan lines are being discounted by 20-50% to attract buyers. For example, the 20W mini solar fan line is being discounted by up to 50%, from VND 830,000 to VND 417,000; mini fan 3.5W X9E is 40% off, from 510,000 VND to 306,000 VND; The Sunisi FT-30 fan model is priced at 1 million VND, 50% less than the original price of 2.1 million VND; Korichi KRC 6300 fan model reduced from 1.2 million VND to 890,000 VND; Jenpect 220V fan model has the original price of 1.3 million VND, down 34%, now only 850,000 VND,&#8230; According to the advertisement of the staff of household electrical stores, compared to traditional fans, solar fans have many advantages such as: no electricity costs, no fear of sudden power outages in hot summer days. Not only that, they are also very convenient when going on a picnic or camping trip; can directly charge other mobile devices such as phones, flashlights, &#8230; via USB port, which is very convenient. Moreover, long battery life 3-5 years of use, battery capacity up to 12,000 mAh, using time up to 8-12 hours. With &#8220;divine&#8221; functions, especially without consuming electricity, this type of solar fan immediately caused a fever in the market and was sought after by many people. Mr. Nguyen Hung &#8211; an employee of an electronics store in Ho Chi Minh City &#8211; said that at this point, the demand for cooling fans has begun to increase sharply, in which the solar fan line is the best-selling model. . As at the beginning of summer, his shop sold about 300 solar fans, at the peak of last year&#8217;s heat, he sold up to 800 units. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_23_38821434/3ccc5b2f446dad33f47c.jpg" width="625" height="390"> <em> Many fan models are having super cheap prices to attract buyers</em> Similarly, Mr. Hoang Van Binh &#8211; an employee of an electrical appliance store in Thanh Xuan (Hanoi) &#8211; also said that in recent years, the price of electricity has tended to increase, people have the need to buy and use electricity. Use energy-saving appliances and take advantage of natural energy sources. Therefore, from May, customers looking to buy solar fans are busier. Currently, he only has 15 more fans to sell out. According to him, this type of fan is often suitable for low-rise houses, level 4 houses rather than high-rise buildings and apartments like in the city. Because the fan and solar panels are separate, it is necessary to choose a location to mount the panels to catch the sun (roof, rooftop, balcony, front yard, &#8230;) then connect to the fan set. Therefore, with high-rise buildings, moving equipment is quite difficult. But Binh also admitted, when it rains, the charging capacity of the fan will be poor, so in the prolonged rainy season solar fans will not be able to promote their full benefits. At that time, the fan can still be used by the grid as usual. Talk to PV. VietNamNet, Mr. Le Van Kien &#8211; a technical staff member of an electrical appliance store in Khuat Duy Tien (Thanh Xuan, Hanoi) &#8211; shared, when buying a solar fan, it is necessary to pay attention to the lifespan of the panels. The origin of the battery is unclear, poor quality will make the fan&#8217;s performance worse, the fan runs erratically, the lifespan is reduced, and it pollutes the environment. Moreover, the life of the battery is usually only 2-3 years, then it has to be replaced at a considerable cost. In addition, the capacity of the battery will determine the operating time of the fan, the battery is designed with a high capacity, the better the charge will be and vice versa. Limit the selection of multi-function rechargeable fans that are equipped with lights, alarms or clocks&#8230; because these features consume power from large batteries, making it easier for the battery to fail faster. Users should not be greedy, but buying low-quality fans will have many potential risks, so consider when choosing and need to choose to buy products of reputable brands and addresses.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14990</post-id>	</item>
		<item>
		<title>Waterfall &#8211; Should experience it once</title>
		<link>https://en.spress.net/waterfall-should-experience-it-once/</link>
		
		<dc:creator><![CDATA[Baothuathienhue.vn]]></dc:creator>
		<pubDate>Sun, 16 May 2021 13:40:09 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Bach Ma mountain peak]]></category>
		<category><![CDATA[Bald Coconut]]></category>
		<category><![CDATA[Bald Jackfruit]]></category>
		<category><![CDATA[Blessed statue pass]]></category>
		<category><![CDATA[Cave]]></category>
		<category><![CDATA[Chatting]]></category>
		<category><![CDATA[Cool shower]]></category>
		<category><![CDATA[delighted]]></category>
		<category><![CDATA[Experience]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Hit the bullet]]></category>
		<category><![CDATA[Institutions]]></category>
		<category><![CDATA[isolated]]></category>
		<category><![CDATA[Lang Co]]></category>
		<category><![CDATA[Lang Co Town]]></category>
		<category><![CDATA[Lap An]]></category>
		<category><![CDATA[Phu Gia Pass]]></category>
		<category><![CDATA[Phu Loc]]></category>
		<category><![CDATA[Road route]]></category>
		<category><![CDATA[Swamp]]></category>
		<category><![CDATA[The outside world]]></category>
		<category><![CDATA[Waterfall]]></category>
		<guid isPermaLink="false">https://en.spress.net/waterfall-should-experience-it-once/</guid>

					<description><![CDATA[The &#8216;Bad Coconut, Bald Jackfruit&#8217; area of ​​Lang Co (Phu Loc) was previously almost isolated from the outside world because there were no roads, no electricity, all infrastructure facilities, and conditions for serving people. Social life is very poor. But after the day the road along Lap An lagoon was built, the infrastructure was invested, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The &#8216;Bad Coconut, Bald Jackfruit&#8217; area of ​​Lang Co (Phu Loc) was previously almost isolated from the outside world because there were no roads, no electricity, all infrastructure facilities, and conditions for serving people. Social life is very poor.</strong><br />
<span id="more-14985"></span> But after the day the road along Lap An lagoon was built, the infrastructure was invested, the face of life here has flourished and changed day by day.</p>
<p> In particular, thanks to the opening of the road along Lap An lagoon, many eco-tourism sites in the area were discovered and exploited, contributing to creating jobs and improving the lives of many households. in the area. And Do Waterfall in Bald Coconut is one of the eco-tourist destinations that in our opinion you should come to experience this summer. If you depart from Hue, follow Highway 1A to Phu Loc, cross 2 passes Phuoc Tuong, Phu Gia, look to the right, you will see a wide lagoon with a soft winding road bordered by a picturesque landscape. drawing &#8211; That is the lagoon and the road along Lap An. You can choose to turn right from the foot of Phu Gia pass, or continue to go straight towards Lang Co town and turn in, leisurely follow this road for a few more kilometers, to the territory of Bald Dua village, you will see a signpost. ; Or simply ask the locals, anyone can show you the right way. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_16_232_38857139/0ce051be49fca0a2f9ed.jpg" width="625" height="400"> <em> Clear water for guests to enjoy swimming and bathing</em> The road to Thac Do is very easy to go, low-rise 4-seater cars can also come to the place. The waterfall originates from the top of Bach Ma mountain, when it rumbles, when it travels through the green primeval forest canopy of the National Forest, to Bald Coconut, the water poured over many years has created 3 successive lakes. connected, transparent. Each lake is about a hundred square meters wide, enough for visitors to enjoy bathing and swimming. At the bottom of the lake, which is not too deep, there are many small stream fish swimming, working hard to find moss to eat, or hiding in the rock holes that make the children love to dive and catch them tirelessly. From the lakes, guests can go upstream, just a short distance to check-in, cool off with pure white water. Those who want more can find a certain niche, sit with their backs to the massage water comfortably without having to be afraid of charging fees and calculating &#8220;tips&#8221;. Of course, care must be taken to avoid locations with a lot of moss to avoid dangerous falls. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_16_232_38857139/a8e9f7b7eff506ab5fe4.jpg" width="625" height="725"> Eating and drinking, shacks are served by local people, simple and reasonable prices. The food is fresh and delicious, but in general, the scenery is so fresh and beautiful, everything feels delicious. In the first years, go to the place to find the shack before ordering. Later on, tourists heard the voice coming back a lot, the service was also &#8220;pro&#8221; gradually, there was a Fb page, there was a phone number for customers to book in advance. I just hope that the business people here know how to respect and preserve the landscape, which is also preserving their source of life. Must raise awareness of environmental protection, awareness of preserving beautiful views for the lake and waterfall. Avoid the situation where everyone does, strong everyone wins, leading to damage to the destination, tourists turning away is a waste and a waste. Sunny days have sounded very acrid. Get in the car, Thac Do is on duty. You will surely be satisfied. https://dulich.petrotimes.vn/</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14985</post-id>	</item>
		<item>
		<title>Ba Ria-Vung Tau Power Company with the problem of minimizing power loss</title>
		<link>https://en.spress.net/ba-ria-vung-tau-power-company-with-the-problem-of-minimizing-power-loss/</link>
		
		<dc:creator><![CDATA[Dương Hoàng]]></dc:creator>
		<pubDate>Sun, 16 May 2021 05:45:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Ba Ria]]></category>
		<category><![CDATA[Ba Ria Vung Tau]]></category>
		<category><![CDATA[Business activities]]></category>
		<category><![CDATA[Commodity]]></category>
		<category><![CDATA[Company]]></category>
		<category><![CDATA[damage]]></category>
		<category><![CDATA[Electric meter]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Ho Tram]]></category>
		<category><![CDATA[Irrigation]]></category>
		<category><![CDATA[Loss]]></category>
		<category><![CDATA[Minimize]]></category>
		<category><![CDATA[minimizing]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[problem]]></category>
		<category><![CDATA[RiaVung]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Tau]]></category>
		<category><![CDATA[Voltage]]></category>
		<category><![CDATA[Vung Tau]]></category>
		<guid isPermaLink="false">https://en.spress.net/ba-ria-vung-tau-power-company-with-the-problem-of-minimizing-power-loss/</guid>

					<description><![CDATA[In order to improve the quality of business activities and serve commercial electricity in Ba Ria-Vung Tau area (BRVT), BRVT Power Company has actively researched, invested, upgraded and applied many technologies synchronously. Modern technology helps to reduce power loss, increase both output and power quality. The company has implemented many measures to reduce power loss [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>In order to improve the quality of business activities and serve commercial electricity in Ba Ria-Vung Tau area (BRVT), BRVT Power Company has actively researched, invested, upgraded and applied many technologies synchronously. Modern technology helps to reduce power loss, increase both output and power quality.</strong><br />
<span id="more-14864"></span> The company has implemented many measures to <strong> reduce power loss</strong> Typically, the project &#8220;Research and development of monitoring, storage and control system (referred to as SCADA) in the power system&#8221;: Real-time operation of the power system to enhance safety, information reliable and stable, contributing to the optimal and efficient operation of the power system.</p>
<p> The company has automated the voltage and frequency adjustment of the power system to ensure power quality; Reducing the amount of electricity that cannot be supplied to customers, creating more revenue for the electricity industry; Reduce long distance transmission and optimize transmission grid loss. Modernizing the development of electricity meters and remote metering data collection systems has helped to collect complete data on customers&#8217; electricity usage, timely detect problems of the metering system. count. This technology also helps the Company closely monitor the electricity usage mode of customers, especially large customers, and at the same time serve to calculate the unit&#8217;s power loss accurately as well as the power loss of the station. public in particular. In addition, the Company also encourages customers to actively adjust or change electricity demand during peak hours. Thereby, reducing the maximum capacity of the power system, reducing the overload of the grid, contributing to improving the economic efficiency of the power system. At the same time, it will also create conditions for the community to be more aware of electricity saving and efficient use of electricity, contributing to the protection of national resources. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_503_38823482/d23d84f39bb172ef2ba0.jpg" width="625" height="372"> <em> Ba Ria &#8211; Vung Tau Power Company has implemented many measures to reduce power loss</em> With the unremitting efforts of all employees <strong> Ba Ria-Vung Tau Power Company</strong> in the control of power loss in particular, the rate of power loss continuously decreased from 2015 to 3.97% at 22kV level; in 2019 is 1.75% (including 110kV level) and in 2020 is an impressive number: 1.57% (including 110kV level). With the mission &#8220;<strong> Electricity is one step ahead</strong> ”, BRVT Power Company has actively invested and upgraded the power grid system, ensuring safe and reliable power supply for tourist centers such as Thuy Van beach (Vung Tau City), Long Hai beach. (Dat Do district), Ho Coc &#8211; Ho Tram resort (Xuyen Moc district)&#8230; Every year, the Company focuses its capital to invest in preventing overload and strengthening the power grid; Electric islands for industrial shrimp farming, irrigation pumping stations to fight against drought, concave areas without electricity, removing fishing tackle&#8230; to meet the demand for irrigation for agricultural production and aquaculture. fisheries and tourism development in the province. Doing a good job of reducing power loss makes a lot of sense. help reduce production costs, increase profits for the company and increase the efficiency of production and business of the unit.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14864</post-id>	</item>
		<item>
		<title>Fish sauce job in Co To</title>
		<link>https://en.spress.net/fish-sauce-job-in-co-to/</link>
		
		<dc:creator><![CDATA[Công Thành]]></dc:creator>
		<pubDate>Thu, 13 May 2021 19:18:09 +0000</pubDate>
				<category><![CDATA[Cuisine]]></category>
		<category><![CDATA[Anchovy]]></category>
		<category><![CDATA[Do it in moderation]]></category>
		<category><![CDATA[Fish]]></category>
		<category><![CDATA[Fish sauce]]></category>
		<category><![CDATA[Fishing net]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Hai Tien Village]]></category>
		<category><![CDATA[Incubation]]></category>
		<category><![CDATA[Job]]></category>
		<category><![CDATA[Le Van Chin]]></category>
		<category><![CDATA[Marinated]]></category>
		<category><![CDATA[Ms To]]></category>
		<category><![CDATA[OCOP]]></category>
		<category><![CDATA[Phan Thi Tuyet]]></category>
		<category><![CDATA[Rain drops]]></category>
		<category><![CDATA[Redundant]]></category>
		<category><![CDATA[reversed]]></category>
		<category><![CDATA[Sauce]]></category>
		<category><![CDATA[shrimp]]></category>
		<category><![CDATA[standards]]></category>
		<category><![CDATA[Swallow]]></category>
		<category><![CDATA[Truong Xuan Village]]></category>
		<guid isPermaLink="false">https://en.spress.net/fish-sauce-job-in-co-to/</guid>

					<description><![CDATA[The natural preference for Co To with a variety of fish and shrimp plus the sun and wind is the main condition for the development of fish sauce making, bringing Co To Fish Sauce products up to 3-star OCOP standard. To learn about making Co To fish sauce, I went to Mr. Le Van Chin&#8217;s [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The natural preference for Co To with a variety of fish and shrimp plus the sun and wind is the main condition for the development of fish sauce making, bringing Co To Fish Sauce products up to 3-star OCOP standard.</strong><br />
<span id="more-13906"></span> To learn about making Co To fish sauce, I went to Mr. Le Van Chin&#8217;s family, Truong Xuan village, Dong Tien commune, Co To district. Mr. Chin&#8217;s family has 25 years working as a fish sauce.</p>
<p> Mr. Chin&#8217;s family also has a long tradition of fishing. Initially, every day with boat cruises filled with fish. So I did not eat all, and added Co To many years ago, there was no electricity to the net, so almost every family with a fishing job would have a job of making fish sauce, because that would only be able to handle the amount of fish. Rice &#8230; a lot of redundancy after each trip out to sea. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_09_448_38776566/f274a982b4c05d9e04d1.jpg" width="625" height="416"> <em> Mr. Le Van Chin has worked as a fish sauce for several decades.</em> Mr. Chin said, this profession ranged from selecting fish, making the best fish sauce which is anchovy, to the stage of brewing and distilling according to a process. Although there is a general recipe, but the workers also need a certain experience, so the same ingredients, the same recipe tools for fish sauce are the same, but some people produce delicious fish sauce products, others do not. The fish sauce factories in Co To all use ceramic jars to make fish sauce, not cement tanks, to ensure that the fish sauce in the jars is kept intact, because the fish sauce has salt, and other materials are soaked for a long time. corrosive but not in jars. When finished a batch of fish sauce, jars are cleaned and sanitized, then dried to kill bacteria before preparing a new batch of fish sauce. To make fish sauce delicious, Mr. Chin is very careful from the import of ingredients. He contracts with fishing vessels, purchasing as soon as anchovies are imported into the port early in the morning. Being a fisherman, he chooses anchovies that are fresh, bright and not damaged. Because the fish sauce must be marinated every year to be used, Mr. Chin actively imports fish at the coldest time of the year from November of the previous year to March of the following year. This is the time when anchovies are abundant, fatty, of good quality. On the other hand, due to the cold climate, fish are also best preserved. Co To anchovies are rich in protein, preliminary processing, marinated with a certain percentage of salt in the jars, Mr. Chin carefully reverses every day in the sunlight, repeating every day from 12 to 15 months. At that time, the fish can gobble up enough to produce fish sauce products. Mr. Chin said, even keeping fish in jars requires a certain experience, it is best to choose the best sunny days, not to dry on bad weather days with rain, because it only needs a few drops of rain. also ruined the jar of fish sauce. Now that the age is high, Mr. Chin only works moderately, he produces about 700 liters of fish sauce annually. His family&#8217;s fish sauce products have a reputation among the islanders, and many tourists also order them. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_09_448_38776566/b8d614270965e03bb974.jpg" width="625" height="416"> <em> Co To has an abundant source of raw materials to produce fish sauce.</em> In recent years, Co To district has stepped up vocational training for people, many families have learned to do fish sauce. Ms. Phan Thi Tuyet, Hai Tien village, Dong Tien commune, after attending a seafood processing class taught by staff of the Department of Labor, War Invalids and Social Affairs since 2015. Having a job, Tuyet and her husband arrested her. Right hand on making fish sauce. Initially, Ms. Tuyet only made a few jars to eat gradually, then introduced it to the neighbors. Seeing that everyone praised the deliciousness, so Tuyet boldly borrowed to buy 36 jars to make fish sauce and annually produced about 3,000 liters. Co To fish sauce makers are self-conscious about food safety and hygiene to make fish sauce, that is why Co To fish sauce is a prestigious OCOP product for many tourists from near and far. When coming to Co To, when returning home, many tourists do not forget to bring back a few liters to tens of liters of fish sauce to make gifts for their family members. Even when they got home, they still contacted the Co To fish sauce maker to send the goods to them.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13906</post-id>	</item>
		<item>
		<title>Central Region &#8211; Central Highlands: Ensuring a stable power supply on the occasion of April 30 and May 1</title>
		<link>https://en.spress.net/central-region-central-highlands-ensuring-a-stable-power-supply-on-the-occasion-of-april-30-and-may-1/</link>
		
		<dc:creator><![CDATA[Đình Tăng]]></dc:creator>
		<pubDate>Fri, 07 May 2021 21:25:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[In the area]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[occasion]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[stable]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/central-region-central-highlands-ensuring-a-stable-power-supply-on-the-occasion-of-april-30-and-may-1/</guid>

					<description><![CDATA[This is the affirmation of the representative of Central Power Corporation (EVNCPC) when talking about the forecast of electricity demand during the holidays of April 30 and May 1 this year as well as the efforts of this unit and other companies. Member power companies in the Central-Central Highlands aim to provide safe and continuous [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>This is the affirmation of the representative of Central Power Corporation (EVNCPC) when talking about the forecast of electricity demand during the holidays of April 30 and May 1 this year as well as the efforts of this unit and other companies. Member power companies in the Central-Central Highlands aim to provide safe and continuous electricity to over 4.3 million customers in the region.</strong><br />
<span id="more-12242"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_115_38615582/cb7f52d774959dcbc484.jpg" width="625" height="390"> </p>
<p> <em> EVNCPC strengthens the inspection and repair of the power grid to ensure that customers do not cut off electricity during the holidays of April 30 and May 1 this year. (Photo: Tel).</em> Mr. Nguyen Thanh &#8211; Deputy General Director of EVNCPC said that on the occasion of April 30 and May 1 this year, employees are entitled to 4 days off, so EVNCPC forecasts the demand for electricity for domestic activities and public holidays. This will also increase. In order to ensure safe and continuous electricity supply to over 4.3 million customers in the Central region &#8211; Central Highlands, in addition to focusing on power sources for political events in 13 provinces and cities in the region, EVNCPC has a specific plan to not cut the power from 0:00 to 24h00 on April 30 and May 1, 2021. At the same time, from the time before the holiday, 13 Electricity Companies under EVNCPC have also actively worked with the local authorities to grasp the time and venue of festivals, festivals, and arrange the mode of power supply. reasonable for safe operation, reliable power, grid under normal conditions and flexible switching in fault situations. In particular, the units give priority to electricity assurance at the locations where the local political and cultural activities take place. With venues where major and important political and cultural events take place, in addition to the national grid, EVNCPC also directs its affiliated Power Companies to consider and arrange backup diesel generators; re-established the duty shift at 110kV substations without personnel on duty. The units strengthen inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent incidents. in electrical system operation. During this time, the units throughout EVNCPC arranged to strengthen the organization of leaders, mobile operators, operation, power repair, troubleshooting of private telecommunications network system. ; At the same time, fully preparing supplies, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires its affiliated Power Companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the line causing violations. grid safety corridor; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity. Especially on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requirements and problems of customers./.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12242</post-id>	</item>
		<item>
		<title>EVNCPC guarantees to provide electricity for the holidays April 30 and May 1</title>
		<link>https://en.spress.net/evncpc-guarantees-to-provide-electricity-for-the-holidays-april-30-and-may-1-2/</link>
		
		<dc:creator><![CDATA[Thế Phong]]></dc:creator>
		<pubDate>Fri, 07 May 2021 19:35:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central Highlands]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Guaranteed]]></category>
		<category><![CDATA[guarantees]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[provide]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[Safety corridors]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/evncpc-guarantees-to-provide-electricity-for-the-holidays-april-30-and-may-1-2/</guid>

					<description><![CDATA[On the afternoon of April 23, the Central Power Corporation (EVNCPC) said it would provide electricity to 13 provinces and cities in the Central and Central Highlands continuously on April 30 and May 1. Illustration According to EVNCPC, on the occasion of April 30 and May 1 this year, employees are entitled to 4 days [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the afternoon of April 23, the Central Power Corporation (EVNCPC) said it would provide electricity to 13 provinces and cities in the Central and Central Highlands continuously on April 30 and May 1.</strong><br />
<span id="more-12224"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_146_38615650/081f36b710f5f9aba0e4.jpg" width="625" height="390"> </p>
<p> <em> Illustration </em> According to EVNCPC, on the occasion of April 30 and May 1 this year, employees are entitled to 4 days off, so the demand for electricity for daily life and service will also increase. In addition to focusing on electricity sources for political events in 13 provinces and cities in the Central and Central Highlands, EVNCPC has specifically planned to not cut off power from 0:00 to 24h00 on April 30 and May 1 to provide providing safe and continuous electricity to over 4.3 million customers in the region. Mr. Nguyen Thanh, Deputy General Director of EVNCPC, said that before the holiday, 13 power companies under EVNCPC have actively worked with local authorities to grasp the time and location of festivals, festivals, and fathers. reasonable power supply mode for safe and reliable operation of the source, the power grid under normal conditions and flexible switching in the event of an incident. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. For venues of major and important political and cultural events, in addition to the national grid, EVNCPC directs power companies to consider arranging backup d iesel generators; re-established the duty shift at 110kV substations without personnel on duty. The units strengthened the inspection, detection and timely treatment of defects of source equipment, power grids, unmanned 110 kV substations, SCADA systems, and luminescence to ensure safety of the corridor to prevent the trouble in operating the power system. During this time, the units throughout EVNCPC organize increased duty for leaders, mobile operators, operation, power repair, troubleshooting of private and copper telecommunication network systems. sufficiently prepared materials, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires electricity companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the lines that cause a corridor violation. grid safety; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity. In particular, on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requirements and problems of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12224</post-id>	</item>
		<item>
		<title>EVNCPC provides safe electricity, continuously during the holidays April 30 and May 1-5</title>
		<link>https://en.spress.net/evncpc-provides-safe-electricity-continuously-during-the-holidays-april-30-and-may-1-5/</link>
		
		<dc:creator><![CDATA[Tin, ảnh: VĂN CHUNG]]></dc:creator>
		<pubDate>Fri, 07 May 2021 10:50:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[continuously]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[Politic]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[safe]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://en.spress.net/evncpc-provides-safe-electricity-continuously-during-the-holidays-april-30-and-may-1-5/</guid>

					<description><![CDATA[On the occasion of April 30 and May 1, in addition to focusing on electricity sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, the Central Power Corporation (EVNCPC) has made a specific plan. to not cut off electricity from 0 hours to 24 hours on April 30 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the occasion of April 30 and May 1, in addition to focusing on electricity sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, the Central Power Corporation (EVNCPC) has made a specific plan. to not cut off electricity from 0 hours to 24 hours on April 30 and May 1-5 to provide safe and continuous electricity to over 4.3 million customers in the region.</strong><br />
<span id="more-12150"></span> On April 23, Mr. Nguyen Thanh, Deputy General Director of EVNCPC, said that before the holidays of April 30 and May 1, 13 power companies under EVNCPC actively worked with local authorities to grasp the time. time and venue for festivals and festivals, and arrange reasonable power supply methods to safely and reliably operate the power source and grid in normal conditions and flexibly change in the event of an incident. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. In places where major political and cultural events take place, in addition to the national grid, EVNCPC directs Power companies to consider and arrange standby diesel generators; re-established the duty shift at 110kV substations without personnel on duty.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_16_38616584/59f2b8509e12774c2e03.jpg" width="625" height="389"> <em> EVNCPC increased the use of grid repair technology that did not cut off customers&#8217; power. </em> The units strengthen inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent incidents. in electrical system operation. During this time, the units throughout the EVNCPC organize increased duty for leaders, mobile operators, operation, power repair, troubleshooting of private telecommunications network system; At the same time, fully preparing supplies, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires electricity companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the lines, causing a corridor violation. grid safety &#8230; Especially on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requests. requirements and problems of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12150</post-id>	</item>
		<item>
		<title>No power cuts on the occasion of April 30 and May 1 in the Central region and the Central Highlands</title>
		<link>https://en.spress.net/no-power-cuts-on-the-occasion-of-april-30-and-may-1-in-the-central-region-and-the-central-highlands/</link>
		
		<dc:creator><![CDATA[Đ.Hoàng]]></dc:creator>
		<pubDate>Wed, 05 May 2021 14:20:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[cuts]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[In the area]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[occasion]]></category>
		<category><![CDATA[Plan]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://en.spress.net/no-power-cuts-on-the-occasion-of-april-30-and-may-1-in-the-central-region-and-the-central-highlands/</guid>

					<description><![CDATA[Central Power Corporation has specifically planned to not cut off electricity from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide safe and continuous electricity to over 4.3 million customers. Central Vietnam Power Corporation has specifically planned to not cut off the power from 0:00 to 24h00 on April 30 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Central Power Corporation has specifically planned to not cut off electricity from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide safe and continuous electricity to over 4.3 million customers. Central Vietnam Power Corporation has specifically planned to not cut off the power from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide power safely and continuously for more than 4, 3 million customers in the region.</strong><br />
<span id="more-11727"></span> On the afternoon of April 24, Mr. Nguyen Thanh, Deputy General Director of Central Power Corporation (EVNCPC) said that on the occasion of April 30 and May 1 of this year, employees have 4 days off, the demand for electricity. for subsistence, service will also increase. Therefore, in addition to focusing on power sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, EVNCPC has made a specific plan to not cut the power from 0:00 to 24h00 on April 30 and January 1. 5/2021, to provide safe and continuous electricity to over 4.3 million customers in the region.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_101_38624624/e9d13c971ad5f38baac4.jpg" width="625" height="390"> <em> EVNCPC increased the use of grid repair technology that did not cut off customers&#8217; power.</em> According to Mr. Thanh, before the holiday, 13 Electricity Companies under EVNCPC have actively worked with local authorities to grasp the time and location of festivals and festivals, and arrange reasonable power supply methods to safe operation, reliable power, grid under normal conditions and flexible switching in the event of a breakdown. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. With venues of major and important political and cultural events, in addition to the national grid, EVNCPC directs Power Companies to consider and arrange standby diesel generators; re-established the duty shift at 110kV substations without personnel on duty. &#8220;The units enhance inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent trying to operate the power system &#8220;, Mr. Thanh said. It is known that EVNCPC requires Power Companies to promote propaganda among the people to prevent kites flying near power lines, metal-coated paper fireworks and throwing objects on the line causing violations. grid safety corridor; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11727</post-id>	</item>
		<item>
		<title>Engineer Tran Nien Thuy benefits the electricity industry billions of dong</title>
		<link>https://en.spress.net/engineer-tran-nien-thuy-benefits-the-electricity-industry-billions-of-dong/</link>
		
		<dc:creator><![CDATA[Bài và ảnh: CÔNG HIỀN]]></dc:creator>
		<pubDate>Thu, 29 Apr 2021 00:53:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[benefits]]></category>
		<category><![CDATA[billions]]></category>
		<category><![CDATA[Bring]]></category>
		<category><![CDATA[Creation]]></category>
		<category><![CDATA[Devoted]]></category>
		<category><![CDATA[Distribution]]></category>
		<category><![CDATA[Do my best]]></category>
		<category><![CDATA[dong]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Emulation soldiers]]></category>
		<category><![CDATA[Engineer]]></category>
		<category><![CDATA[Go to work]]></category>
		<category><![CDATA[Graduate]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Le Quang Truong]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Method]]></category>
		<category><![CDATA[Moderate]]></category>
		<category><![CDATA[Moderate room]]></category>
		<category><![CDATA[Nien]]></category>
		<category><![CDATA[Passion]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Reactive power]]></category>
		<category><![CDATA[Relays]]></category>
		<category><![CDATA[Thuy]]></category>
		<category><![CDATA[Tran]]></category>
		<guid isPermaLink="false">https://en.spress.net/engineer-tran-nien-thuy-benefits-the-electricity-industry-billions-of-dong/</guid>

					<description><![CDATA[Passionate about creativity, responsibility, dedication, wholeheartedly in the work that brought many successes for Mr. Tran Nien Thuy, modal engineer, dispatcher of the provincial distribution grid (Gia Lai Power Company) and benefit the electricity industry billions of dong. In 2004, after graduating from university, Mr. Thuy was recruited to work in the Dispatch Department (Gia [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Passionate about creativity, responsibility, dedication, wholeheartedly in the work that brought many successes for Mr. Tran Nien Thuy, modal engineer, dispatcher of the provincial distribution grid (Gia Lai Power Company) and benefit the electricity industry billions of dong.</strong><br />
<span id="more-10032"></span> In 2004, after graduating from university, Mr. Thuy was recruited to work in the Dispatch Department (Gia Lai Electricity Company). That was the time when the new Dispatch Department was established with many difficulties and challenges. To ensure a safe and stable electricity supply, to meet the requirements of socio-economic development and people&#8217;s life in the area, Mr. Thuy and his colleagues each have to work with two or three degrees, especially receive and process customer information that reflects and fix electrical problems in outdated technology; communication system, programs and applications of the industry are incomplete. Many jobs must be done manually, with great time and pressure.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_16_38621086/1b20354d130ffa51a31e.jpg" width="625" height="540"> <em> Engineer Tran Nien Thuy. </em> In 2017, the Control Center was established and officially put into operation. The 110kV grid system was transferred to the provincial distribution grid, and Mr. Tran Nien Thuy continues to be trusted with the responsibility of the company&#8217;s leaders to assign the responsibility of modal staff of the department. Directly in charge of many jobs that require deep expertise, such as: Calculation of operating modes and grid reactive capacity; forecast load demand serving assessment of electricity system security; make cards according to plans and irregularities; basic wiring diagrams of the system; calculation of automatic relay protection correction; calculating the loss of medium voltage and 110kV grid &#8230; At this time, in order to fulfill the task well, in addition to responsibility, the dedication must also be constantly innovating, mastering advanced technology and techniques. Mr. Le Quang Truong, Deputy Technical Director of Gia Lai Power Company affirmed: “Mr. Thuy has met that expectation, not only good at expertise, he also has many valuable initiatives, contributing to development of the power sector, typically as initiatives: Grid power loss reporting program; the program synthesizes the daily operating parameters report and manages the operation sheet; The initiative to connect the MCAP capacitor to the ABB SYS600 system &#8230; benefits the power industry billions of dong. Mr. Thuy was awarded many certificates of merit, certificates of merit by the Central Power Corporation and Gia Lai Electricity Company, the title of Grassroots Emulation Soldier &#8220;&#8230;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">10032</post-id>	</item>
		<item>
		<title>Vision from the first island grid in Vietnam</title>
		<link>https://en.spress.net/vision-from-the-first-island-grid-in-vietnam/</link>
		
		<dc:creator><![CDATA[Thanh Phong - Hiếu Công]]></dc:creator>
		<pubDate>Tue, 27 Apr 2021 10:55:23 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Bottom of the sea]]></category>
		<category><![CDATA[Cable]]></category>
		<category><![CDATA[Cai Rong Port]]></category>
		<category><![CDATA[Co to island]]></category>
		<category><![CDATA[Dao Van Vu]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Explosive machine]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Island]]></category>
		<category><![CDATA[Islands District]]></category>
		<category><![CDATA[Le Hung Son]]></category>
		<category><![CDATA[Money to spend]]></category>
		<category><![CDATA[Ms To]]></category>
		<category><![CDATA[Nguyen Duc Thanh]]></category>
		<category><![CDATA[Outstanding]]></category>
		<category><![CDATA[People s Committee of Co To district]]></category>
		<category><![CDATA[Power shortage]]></category>
		<category><![CDATA[Quang Ninh]]></category>
		<category><![CDATA[reservoir]]></category>
		<category><![CDATA[Soft drink]]></category>
		<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Vision]]></category>
		<guid isPermaLink="false">https://en.spress.net/vision-from-the-first-island-grid-in-vietnam/</guid>

					<description><![CDATA[Quang Ninh leaders were determined to find capital and technology to pull the grid to Co To island. As a result, Co To has developed dramatically, becoming a rich place to spend economically and firmly on national defense. 7:00 am, we arrived at Cai Rong port (Van Don district), boarded a modern 2-hull boat straight [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Quang Ninh leaders were determined to find capital and technology to pull the grid to Co To island. As a result, Co To has developed dramatically, becoming a rich place to spend economically and firmly on national defense.</strong><br />
<span id="more-9384"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/157871605c22b57cec33.jpg" width="625" height="351"> </p>
<p> 7:00 am, we arrived at Cai Rong port (Van Don district), boarded a modern 2-hull boat straight to Co To. Only 65 minutes later, the ship cut off the waves to dock on the island. An area of ​​pearl island with white sand and blue sea, spacious roads make people feel like a corner of Nha Trang or Phu Quoc. Few people know that this place used to be a difficult area lacking hundreds of faces, even fresh water is also a luxury. The turning point came in 2013, the leaders of Quang Ninh province were determined to pull the power grid to the island, although the resources and technology were still limited at that time. Along with that is the construction of fresh water reservoirs. Having electricity and water has helped Co To&#8217;s economy &#8220;brighten&#8221;, people&#8217;s lives have been rapidly improved. Co To rose to become an attractive destination for tourists. <em> <strong> &#8216;Bringing electricity to Co To island is strategic thinking&#8217;</strong> </em> <em> Mr. Le Hung Son, Secretary of the District Party Committee, Chairman of the People&#8217;s Committee of Co To district assessed that the project of bringing electricity to Co To island in 2013 was a great turning point, helping this island district to have great development.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/c4b1e786cac4239a7ad5.jpg" width="625" height="140"> Co To is a pre-pepper island district of the country with 200 km of sea border stretching from Tran Island to Bach Long Vi archipelago of Hai Phong. The district has 50 islands, large and small, of which the largest is Co To island, about 50 km2 wide. The primeval forest here is preserved almost intact with hundreds of years old trees, tangled vines. Co To also owns 300 km2 of fishing grounds. The potential is that, but before 2010, the economy in Co To is almost underdeveloped due to limited infrastructure, especially the 3 shortages: lack of electricity, lack of fresh water and lack of ships to the island. Only over 50 nautical miles from Cai Rong and Van Don ports (more than 60 km), but in 2011, Co To was still very far away because only 2 wooden ships traveled for more than 3 hours to arrive. There is a lack of electricity on the island, especially fresh water in the dry season, so all services and tourism cannot be developed. Mr. Dao Van Vu, now Vice Chairman of the People&#8217;s Committee of Van Don district, who had more than 20 years of attachment to Co To, recalled the difficulties on the island: “There were times when I started from Cai Rong, but only 6 hours later to arrive. Because of the strong wind, the train had to go around to avoid the waves. When coming ashore, they must carry sandals, roll up their pants and wade ashore but do not have a wharf. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/1238300f1d4df413ad5c.jpg" width="625" height="240"> The district has no grid electricity, the main source of electricity is 2 diesel-powered engines. One day only power supply until 20-21h is to be cut off. Because electricity is powered by generators, the cost is very high, 5,000-6,000 VND / kWh, homes using a lot of high stairs can reach 15,000-16,000 VND / kWh. Most houses only use electricity for lighting and fans for essential needs. The tourism industry is less developed due to difficult travel and modest accommodation conditions. There are almost no hotels in the whole district, mainly small motels. Even if guests want to use the air conditioner, they have to pay extra electricity with very expensive prices. There is only one old police force on the big island. Therefore, traveling and transporting passengers and goods is very difficult. In 2010, Co To welcomed less than 5,000 guests. By 2011-2012, although the engine was more equipped and had a larger capacity, the guests only reached about 30,000 visitors. Also because there is no electricity, the seafood caught on the sea is difficult to preserve, many fishermen have to sell directly at sea to the merchant boats from the mainland to buy at low prices, because bringing back to the island is also difficult to preserve. and there is no electricity for processing. In addition to lack of electricity, Co To also lacks fresh water. During the dry season, families have to divide each barrel of water. Mr. Nguyen Duc Thanh, former Secretary of Co To island district in the period of 2010-2015, recalled: “When I went to the island to take office as the island district&#8217;s secretary and president, I and the district leaders also struggled to find solutions to overcome the power shortage. lack of water, lack of boats for people on the island, but until 2011 it is only possible to start the construction of freshwater reservoirs, while pulling electricity is too far away, never can do it ”. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/1d857e9d53dfba81e3ce.jpg" width="625" height="228"> With that same lake, Mr. Thanh used to sign a &#8220;military status order&#8221; with the Secretary of the Provincial Party Committee: &#8220;In August 2011, just a few days after he took office as Secretary of the Quang Ninh Provincial Party Committee, Mr. Pham Minh Chinh made a visit. Unofficially went to Co To money island district. Myself and a comrade drove the new Secretary to visit the island on the only pickup truck borrowed from the district police. When he saw that we were building the Truong Xuan freshwater lake, he asked how long the project would take, I said it took 3 years because of lack of capital. Then the Secretary asked: If the province prioritizes to allocate capital, can you do it in 1 year, do it quickly but must ensure the quality? I confirmed that I could do it, the Secretary immediately asked to write the commitment, I made 2 copies, 1 copy sent to the Provincial Party Committee and one sent to the Provincial People&#8217;s Committee. After supplementing capital and mobilizing labor, mechanical equipment, we put the lake into operation on time as committed, still operating well, is the largest source of fresh water on the island ”. Regarding electricity, Mr. Thanh said, at that time he reported to the Secretary the optimal plan is to pull cables, but with difficulties in technology and capital; If we make coal-fired power, we cannot develop tourism because it will be polluted for the whole island. &#8220;At that time, the Secretary did not make any decisions, we did not know if we could pull the cable to the island, because there has never been such a long submarine cable project in Vietnam,&#8221; said Thanh. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/daf486c3ab8142df1b90.jpg" width="625" height="140"> A few weeks after the new Secretary of the Provincial Party Committee&#8217;s visit to Co To, Mr. Thanh was summoned to attend a meeting of Quang Ninh leadership chaired by Pham Minh Chinh Provincial Party Secretary, where a decision made 5,000 people. Co To island district is very happy: Pulling electricity by underground cable to the island. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/f410ab2786656f3b3674.jpg" width="625" height="1234"> Mr. Thanh said at that time, the head of the party committee of Quang Ninh province told him: &#8220;We try to bring electricity to the island, to build a reservoir to take care of water for the people, then the enterprise will invest in a modern fleet. connect the island to the shore &#8220;. So, the three difficult things of Co To have been solved. Technically, to pull the grid to the island is a big challenge as the longest underground cable distance is 25 km (between island and island). Technology to pull electrical cables under the seabed was very new and almost nonexistent in Vietnam. To bury the cable, the engineering unit must use a robot to cut the rock, dig the surface of the seabed to a depth of about 1.5-2 m, then the divers lower the cable to the newly dug slot, then place a solid material. special coating to protect the underground cable bundle. Many people are skeptical about the safety and feasibility of towing the cable under the sea. Another problem is the huge cost of capital to pull out electricity, up to more than 1,000 billion dong. In 2011, the budget for development investment of the whole Quang Ninh was only about 6,000 billion VND, not too much for such a large project. The Northern Power Company cannot afford to do a big project, while the immediate business efficiency is not high. “There were many difficulties, but the Secretary and the Standing Committee of the Provincial Party Committee at that time were determined to pull the power grid to the island. The difficulties in both finance and technology have been gradually removed with a drastic, urgent and detailed participation ”, recalled Mr. Nguyen Duc Thanh. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/ad35f302de40371e6e51.jpg" width="625" height="240"> Project scale includes more than 27.5 km of 2-circuit 110 kV transmission line; 22 km of 22 kV overhead transmission line; 23 km of underground cable line; 8 cutting stations 22 kV; 12 substations and 34 km of low voltage transmission lines. The 100 kV line sections are wired by a hot air balloon, while the average depth of the seabed to lower the underground cable is 29 m. At that time, the leaders of Quang Ninh province had a valuable decision to include fiber-optic Internet in the bundle of electrical cables, so now Co To has both grid electricity and broadband optical fiber lines. The project&#8217;s estimate is about VND 1,100 billion, of which the Northern Power Corporation will contribute VND 350 billion. The remaining amount in Quang Ninh is about 830 billion, mobilized by socialization and the provincial budget. Many Quang Ninh people cannot forget a very exciting and meaningful campaign to contribute: Contribute to the people to pull electricity out to Co To. Each civil servant in the whole province contributes 1 day of his salary. The province also calls on people, businesses, social organizations, even people from Quang Ninh who are far away from their hometown to contribute. The remainder is taken from the provincial budget. After 350 days of construction, in October 2013, the project of pulling the grid to Co To by underground cable was completed before the overwhelming joy of the people of Co To and the whole province of Quang Ninh. Many old people on the island shed tears when they see the light from the national grid on the island. Young people radiant eyes look at computer screens, phones with high-speed Internet connection, merging with the global flow of information. Along with electricity, Truong Xuan lake with a capacity of 170,000 m2 together with Lake C4, Ong Thanh, Ong Cu &#8230; is a strategic source of fresh water for Co To island district. Thus, in just a few years, Co To had both electricity from the grid, fresh water, an unprecedented change in this front-end island. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/8fe2d6d5fb9712c94b86.jpg" width="625" height="316"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/acb3f484d9c6309869d7.jpg" width="625" height="140"> Every morning, Co To wharf is busy with dozens of tram cars waiting to welcome guests, see off guests, and carry goods from ships connecting to the mainland. Mr. Nguyen Van Hung, owner of a 2-star hotel near the wharf, recalled that eight years ago, when Co To did not have electricity, he never dreamed that he could do it like today. After Co To got electricity, Hung finished building a small motel. The number of visitors to the island increased sharply this year and a half years ago, making his motel continuously expand. Anh Hung is now the owner of a 2-star hotel with nearly 60 rooms, a few more electric cars to pick up guests. Mr. Nguyen Toan, manager of Tuan Vu Hotel on Co To Island recalled in 2013, when the owners on the mainland poured hundreds of billions to build a 3-star hotel on the island, many relatives and friends were discouraged. and said &#8220;crazy&#8221;. Someone said Co To at that time was both difficult and difficult to come by. When we invested so much money, we knew when we could recover our capital. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/fa5ca16b8c2965773c38.jpg" width="625" height="478"> However, with the love of the sea and islands and seeing the potential for development, the owner is still determined with his plan. And the sweet fruit has come to the summer tourism season in 2014. The hotel is always in a full room with many large groups of guests. The investor initially expected 12-15 years to break even, but so far has been able to recover the capital in 8-9 years. Since the electricity came on, the number of visitors to Co To skyrocketed. From 35,000 turns in 2012, in 2019 (before the translation of Covid-19), Co To received nearly 300,000 visitors, nearly 10 times higher than before. When electricity is available, many people also have conditions to invest in accommodation, food, and services to provide tourists. On the contrary, as the service develops, more tourists come to Co To. Currently, traveling from the mainland to Co To is very convenient with many trains going and arriving during the day. There was even a 5-star standard train running the Cai Rong &#8211; Co To route which traveled less than 60 minutes, can be used in the wind situation of level 7, carrying 850 passengers / trip at the same time. On the island, there are 300 electric cars to serve tourists, nearly 200 accommodation establishments, nearly 2,500 rooms, 51 homestays &#8230; Up to now, Co To can welcome 10,000 tourists at the same time. Tourism revenue from 50 billion in 2013 to reach 700 billion in 2019. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/7ca9269e0bdce282bbcd.jpg" width="625" height="290"> With electricity and water available, the processing industry also developed. People can invest in means, catch seafood and then return to deep processing on the spot to sell at high prices. The Secretary of the District Party Committee, Chairman of District People&#8217;s Committee Co To Le Hung Son said that the most important thing when having electricity and water is to help improve people&#8217;s lives in all aspects, the economy can achieve important developments. The average income of Co To people reached 4,500 USD / year, higher than the national average of more than 1,000 USD. &#8220;Improving people&#8217;s lives and economic development is also a measure to maintain security and national defense in the country&#8217;s pre-emptive and anti-dumping islands,&#8221; said Mr. Son. Mr. Thanh said that the success of Co To today is a clear proof to see the vision and determination of the provincial leaders before. Mr. Le Hung Son said that in the future, Co To strives to become stronger, and welcomes 1.6 million visitors by 2030. The island will also focus on attracting large investors, bringing tourism to development. larger, with more premium products to increase the spending per visitor. She also wished that in the near future, she would be approved with the policy of building a small airport, serving tourism and national security, avoiding obstacles caused by weather and climate change. “Past generations of leaders have created a foundation for fundamental change in Co To island district. We want to continue to grow, making Co To become an indispensable destination for tourists ”, Mr. Son said. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_05_119_38424946/1d8b48bc65fe8ca0d5ef.jpg" width="625" height="410"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9384</post-id>	</item>
		<item>
		<title>PTC1: Journey to conquer the top</title>
		<link>https://en.spress.net/ptc1-journey-to-conquer-the-top/</link>
		
		<dc:creator><![CDATA[Nguyễn Anh Tú]]></dc:creator>
		<pubDate>Tue, 27 Apr 2021 08:35:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[500kV Thuong Tin substation]]></category>
		<category><![CDATA[Acceptance]]></category>
		<category><![CDATA[Compact]]></category>
		<category><![CDATA[Conquer]]></category>
		<category><![CDATA[EVNNPT]]></category>
		<category><![CDATA[Gis]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Heat generation]]></category>
		<category><![CDATA[Hoa Binh Station]]></category>
		<category><![CDATA[journey]]></category>
		<category><![CDATA[Medal of Independence]]></category>
		<category><![CDATA[Nho Quan]]></category>
		<category><![CDATA[operate]]></category>
		<category><![CDATA[Overhaul]]></category>
		<category><![CDATA[Own]]></category>
		<category><![CDATA[Pressurized]]></category>
		<category><![CDATA[PTC1]]></category>
		<category><![CDATA[Remote Control]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[Thuy Nguyen 220 kV substation]]></category>
		<category><![CDATA[Top]]></category>
		<category><![CDATA[Transformers]]></category>
		<category><![CDATA[Transmission]]></category>
		<guid isPermaLink="false">https://en.spress.net/ptc1-journey-to-conquer-the-top/</guid>

					<description><![CDATA[After 40 years of establishment and development, Power Transmission Company 1 (PTC1) has become the leading unit of the National Power Transmission Corporation (EVNNPT). The ownership of technology has helped the company complete early, on schedule, and ensure the quality of many national key transmission projects. Take the human factor seriously As a unit of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>After 40 years of establishment and development, Power Transmission Company 1 (PTC1) has become the leading unit of the National Power Transmission Corporation (EVNNPT). The ownership of technology has helped the company complete early, on schedule, and ensure the quality of many national key transmission projects.</strong><br />
<span id="more-9335"></span> <strong> Take the human factor seriously </strong> </p>
<p> As a unit of EVNNPT established on May 1, 1981, after 40 years of building and maturing, generations of leaders of PTC1 always care and invest in people, so that employees can own equipment, technology, ensure the power grid operation, safety, efficiency and quality assurance. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_35_38602933/320063564614af4af605.jpg" width="625" height="388"> <em> Apply technology to check heat emission, detect the cause of the problem early </em> Currently, the power grid managed by PTC1 is mostly transformers with large capacity (250MVA with 220 kV), (900 MVA with 500kV), along with oil resistance are the main equipment in the substations ( TBA). The company has widely applied online monitoring equipment to control the pressurized state under OLTC load, cooling system, current, pressure, oil &#8230; revealing the breaker of the company applying GIS, COMPACT technology, vertical compensation systems 500kV-2000A, new technology &#8230; is implementing the roadmap of gradually bringing 220 kV substations into remote control. The company is also the leading unit in the lead and acceptance of digital substations in Vietnam (220 kV Thuy Nguyen substation) and is assigned by EVNNPT to develop a process for accepting digital substations in the corporation. The development of technology and the rapid growth of the volume and scope of management requires that the qualifications of the staff be enhanced to meet the requirements. Accordingly, the company has identified training objectives for each specific target group with many types of training. At the same time, to alternate dispatching qualified, qualified and young staff members at substations, functional departments and regional power transmissions to the company&#8217;s technical department, while training in the form of mentoring, just participating in the work of acceptance of new projects to get an overview, synchronize and improve the level &#8230; <strong> Owning technology equipment</strong> The results of many recent years show that the company always ensures good implementation of the incident targets. The quality of human resources has been raised, creating conditions to arouse a movement to promote technical innovation initiatives in labor. In the past 5 years, the company has had 288 initiatives proposed to be applied in production, bringing an estimated value of several tens of billion VND, more importantly, initiatives and rationalization of production are all derived from practical needs of production. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_35_38602933/37866ad04f92a6ccff83.jpg" width="625" height="288"> <em> Thuy Nguyen 220kV substation (Hai Phong) is the first digital substation of EVNNPT managed and operated by PTC1. </em> The appreciation of the human factor and creating conditions for each individual to improve their skills has helped the company to master equipment, technology and become more and more professional in management. By internal force, the company has successfully implemented a number of typical projects such as: replacing porcelain and accessories for the whole 220kV Hoa Binh &#8211; Ha Dong transmission line; overhaul and overhaul 500 kV transformers at Ha Tinh, Nho Quan and Hoa Binh stations &#8230; In addition to major repair works, the company has also successfully implemented many large-scale and complex construction investment projects such as: Raising the capacity of 500 kV capacitor line in Nho Quan- Ha Tinh; increase capacity of 500kV Thuong Tin substation; raising the capacity of the 220 kV transmission line Hoa Binh &#8211; Nho Quan &#8230; are all group B projects with total investment value of 300 to 450 billion dong. With efforts to care about people, the company has overcome many difficulties and always completes the assigned tasks. With the achievements in the past 40 years, PTC1 has been awarded many noble titles and awards by the Party and the State such as: Third Class Independence Medal in 2000; Labor Hero 2005; Second Class Independence Medal in 2007; First Class Independence Medal 2014.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9335</post-id>	</item>
		<item>
		<title>Ensuring the power source to serve the development needs</title>
		<link>https://en.spress.net/ensuring-the-power-source-to-serve-the-development-needs/</link>
		
		<dc:creator><![CDATA[Bài, ảnh: THANH NHỊ]]></dc:creator>
		<pubDate>Fri, 23 Apr 2021 02:03:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Bac An Binh Village]]></category>
		<category><![CDATA[battery]]></category>
		<category><![CDATA[Ca Du]]></category>
		<category><![CDATA[Dakdrinh Hydropower]]></category>
		<category><![CDATA[Dakdrinh hydropower plant]]></category>
		<category><![CDATA[development]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Doc Gravel]]></category>
		<category><![CDATA[Dung Quat EZ]]></category>
		<category><![CDATA[Electric Factory]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Ha Nang]]></category>
		<category><![CDATA[Huy Mang]]></category>
		<category><![CDATA[INVERTER]]></category>
		<category><![CDATA[IREX]]></category>
		<category><![CDATA[Le Hoang Anh Dung]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power generation]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Serve]]></category>
		<category><![CDATA[source]]></category>
		<category><![CDATA[The engine unit]]></category>
		<category><![CDATA[total capacity]]></category>
		<guid isPermaLink="false">https://en.spress.net/ensuring-the-power-source-to-serve-the-development-needs/</guid>

					<description><![CDATA[The socio-economic development leads to an increase in the demand for electricity. With many combined power sources, the electricity industry always ensures safe, adequate and quality power supply for the development needs in the area. Quang Ngai currently has 3 power generation sources, including: on-site diesel power plant; small and medium hydroelectricity; rooftop solar power. [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The socio-economic development leads to an increase in the demand for electricity. With many combined power sources, the electricity industry always ensures safe, adequate and quality power supply for the development needs in the area.</strong><br />
<span id="more-6167"></span> Quang Ngai currently has 3 power generation sources, including: on-site diesel power plant; small and medium hydroelectricity; rooftop solar power.</p>
<p> For power plants and diesel generation sources, currently located in 2 areas: Dung Quat EZ and Bac An Binh village (Ly Son). In Dung Quat EZ, there is a power plant of Dung Quat Oil Refinery, with 4 units (4x27MW), total capacity of 108MW, regularly generating 50-60MW. In Bac An Binh village, the diesel generator system consists of 4 units with a total capacity of 402kW. In addition, in Bac An Binh village there is also a solar energy system that supplies electricity to the people on the island. Specifically, the solar energy system here includes: The battery system consists of 300 IREX panels, each with a capacity of 320Wp, a total capacity of 96 kWp; Sunny Tripower grid connected inverter system with 5 sets, total capacity of 100kW; Storage battery system has 192 batteries, total capacity 9,600Ah; Sunny Island battery inverter system has 12 sets, total capacity of 72kW. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_20_449_38579543/3c9549d06d9284ccdd83.jpg" width="625" height="345"> Dakdrinh Hydropower (Son Tay). As for solar power, Quang Ngai currently has 2 power plants: Binh Nguyen (49MWp) and Mo Duc (19MWp). In addition, there is a rooftop solar power system installed at the headquarters of Quang Ngai Power Company and the High-voltage Grid Operation Management Team (327kWp); installed at 110kV transformer stations: 295kWp. In particular, customers&#8217; rooftop solar power is quite a lot. Accumulated to December 31, 2020, the province had 1,332 installation customers, with a total installed capacity of 163,881.86kWp. Particularly power from hydroelectricity, currently 10 hydroelectricity has been put into operation. In which, the power source connected to the 110kV power grid is 4 hydropower plants, with a total installed capacity of 263 MW, including: Dakdrinh Hydropower Plant (125MW), Dakre (60MW), Son Tra (60MW), Son Tay ( 18MW). Hydropower source connected to the distribution grid has 6 hydropower plants connected to the medium voltage grid, with a total capacity of 35.6MW, including: Ca Du (2.6MW), Song Rieng (3MW), Ha Nang (11MW) ), Clear Water (16.5MW), Huy Mang (1.8MW), and Nui Ngang (0.7MW). By 2020, these hydroelectric plants will operate and generate electricity to meet the electricity needs of people and businesses across the province. Quang Ngai province is supplied with electricity mainly from the national grid through the 500kV Doc Soi (Binh Son) 500kV transformer station (Binh Son), including: 500kV line from Da Nang &#8211; Doc Soi (110km) and the substation 500kV- (450 + 600) MVA Doc Soi. For the 220kV power grid, currently in the province there are 220kV lines Doc Soi &#8211; Dung Quat, Doc Soi &#8211; Quang Ngai, Doc Soi &#8211; Son Ha, Doc Soi &#8211; Tam Ky. The 110kV power grid in the province with load in Quang Ngai province receives power from 13 110kV stations, with a total capacity of 953MVA. For medium voltage grid, the entire distribution grid of the province has been operated at voltage levels 22kV and 35kV. Low voltage grid has over 3,520km of low voltage lines. &#8220;Currently, Quang Ngai Electricity Company supplies electricity to 13/13 districts, towns and cities of the province; 173/173 communes, wards and towns have electricity (100%). Particularly Be Island &#8211; Bac An village. Binh (Ly Son) uses diesel power and solar battery system to supply electricity, the number of households with electricity reaches 99.68%. Commercial electricity output in 2020 will be 1,715 million kWh, up 10.6% compared to to 2019. In the first 2 months of 2021, reaching 324.5 million kWh, up 49% over the same period in 2020. The electricity industry always ensures safe, adequate and quality power supply for the above development needs. area &#8220;, Director of Quang Ngai Electricity Company Le Hoang Anh Dung said.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">6167</post-id>	</item>
		<item>
		<title>Da Nang: Increasing reliability of power supply for industrial parks and hi-tech parks</title>
		<link>https://en.spress.net/da-nang-increasing-reliability-of-power-supply-for-industrial-parks-and-hi-tech-parks/</link>
		
		<dc:creator><![CDATA[Vũ Lê]]></dc:creator>
		<pubDate>Fri, 23 Apr 2021 00:48:11 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[40MVA]]></category>
		<category><![CDATA[An Don Industrial Park]]></category>
		<category><![CDATA[Cau Do Station]]></category>
		<category><![CDATA[CPC]]></category>
		<category><![CDATA[DA NANG ELECTRICITY]]></category>
		<category><![CDATA[Danang]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[High tech Zone]]></category>
		<category><![CDATA[hitech]]></category>
		<category><![CDATA[Hoa Cam industrial park]]></category>
		<category><![CDATA[Hoa Xuan urban area]]></category>
		<category><![CDATA[increasing]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Industrial and commercial facilities]]></category>
		<category><![CDATA[industrial area]]></category>
		<category><![CDATA[Le Hong Cuong]]></category>
		<category><![CDATA[Lien chieu industrial park]]></category>
		<category><![CDATA[Nang]]></category>
		<category><![CDATA[Nguyen Van Quang]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[PC Danang]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[RMU]]></category>
		<category><![CDATA[Supply]]></category>
		<guid isPermaLink="false">https://en.spress.net/da-nang-increasing-reliability-of-power-supply-for-industrial-parks-and-hi-tech-parks/</guid>

					<description><![CDATA[&#8216;One of the contents that investors always pay attention to when investing in Da Nang hi-tech park is the ability to meet the power quality. Only facilitating land is not enough, but electricity quality is a very important factor to attract investment. &#8216; That is the opinion of the Secretary of the Da Nang City [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>&#8216;One of the contents that investors always pay attention to when investing in Da Nang hi-tech park is the ability to meet the power quality. Only facilitating land is not enough, but electricity quality is a very important factor to attract investment. &#8216;</strong><br />
<span id="more-6149"></span> That is the opinion of the Secretary of the Da Nang City Party Committee &#8211; Mr. Nguyen Van Quang to the Department of Industry and Trade and Da Nang Power One Member Company Limited (Da Nang PC) when referring to the issue of stable power supply to industrial zones. and Da Nang high-tech park.</p>
<p> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_35_38606494/11c763ca4688afd6f699.jpg" width="625" height="416"> <em> Each year, the electricity industry invests nearly 1,000 billion VND to invest, renovate and upgrade the power grid for the city. Danang</em> <strong> Continuously invest in and upgrade the power grid to supply electricity stably and continuously for businesses</strong> According to Director of Electricity of Da Nang &#8211; Mr. Le Hong Cuong, in recent years, the PC of Da Nang annually invests 400 billion VND to invest, renovate and upgrade the power grid to ensure power supply for the city. Including the investment of Central Power Corporation (CPC) and Power Transmission Company 2, the total investment each year is about 1,000 billion VND. City grid. Da Nang has many good functions as a smart grid. Da Nang PC is also the first unit in the country that will basically complete the automation of the grid, the substation without any personnel on duty &#8230;. In particular, Da Nang PC is always interested in ensuring to improve the quality of electricity for industrial parks (IZs) and High-Tech (CNC) zones. Currently, in Da Nang there are main industrial zones, stable electricity supply from 110kV substations in the area including: An Don Industrial Park (power supply via An Don 110kV substation), Lien Chieu Industrial Park (Lien Chieu Station), Industrial Park Hoa Khanh (Hoa Khanh 1 Station, Hoa Khanh 2), Hoa Cam Industrial Park (Cau Do Station), High-Tech Park and Information Technology Park (Hoa Lien Station). Notably, the high-tech park and the IT zone have great potential for expansion, attracting many domestic and foreign enterprises to invest in production. In recent years, the Company has invested in building a power grid according to N-1 criteria to improve the reliability of power supply for this area. In the year 2021, the Company continues to invest in implementing key projects: Installation of 2 more substations 110kV Hoa Lien (40MVA); Exploit 22kV transmission line from Hoa Khanh 2 substation to high-tech park and other projects to improve reliability of power supply. After completion, projects will ensure safe and continuous power supply for businesses and the ability to expand the scale of the High-Tech Park in the coming time. Along with that, Da Nang PC is also implementing many power grid projects in parallel with the construction progress of a number of key projects in Da Nang to be ready for power to serve when the project is completed and put into operation as Construction works of 22kV lines along Bach Dang-Nhu Nguyet street with the scale of 3.5km underground cable, 10 RMU cabinets, serving power supply of Software Park No.2 (ICT Building Block 01 will complete the power supply in October 2021 and by August 2022, completing the whole project); 22kV Exploitation Project after 110kV Khue Trung substation with expected scale of 3.7Km underground cable, 05 RMU cabinets for power supply in Hoa Xuan urban area and Hoa Xuan creative space. The completed works will contribute to the city&#8217;s development goals, especially the development of information technology, electronics and telecommunications industries in the industrial era 4.0. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_35_38606494/bebce4f0d8b231ec68a3.jpg" width="625" height="416"> <em> Manufacturing in high-tech industries requires very high reliability of power supply</em> <strong> High-tech industries require very high power supply reliability</strong> Mr. Pham Truong Son &#8211; Head of Management Board of Da Nang Hi-Tech and Industrial Zones, said that in 2017 and 2018, the Management Board regularly received recommendations from businesses related to power outages and power supply. Stable in production. Da Nang Department of Industry and Trade is assigned by the City People&#8217;s Committee for state management in electricity development; Based on receiving feedback from businesses, the Management Board and the Department of Industry and Trade of the city, Da Nang PC has closely coordinated to resolve difficulties and problems for businesses related to electrical connection as well as other problems in the power supply such as troubleshooting for the business; installation of electronic relays…. Thanks to that, in the past 2 years, the supply of electricity to serve the production of enterprises in industrial parks and hi-tech zones has been very good. Compared with the common ground there is more progress, the power quality is relatively. However, according to Mr. Son, in the coming time, CNC production and supporting industries require very high power quality and greater stability of electricity. Therefore, it is necessary to have measures and solutions to support investors and manufacturers to ensure the quality of electricity supply. “Power outages and power outages in the past have been greatly strengthened. However, in the coming time, with industrial development, the power source is a very important issue. Especially in the high-tech zone, production needs very high and stable power quality, requiring Da Nang PC to provide reliable power ”, Mr. Son said, at the same time proposing that Da Nang PC will have criteria in the near future. and an underground roadmap for the power transmission system to serve the industrial parks and the city&#8217;s high-tech zones to ensure aesthetics, aesthetics, and facilitate maintenance. Commenting on this issue, Secretary of the Da Nang City Party Committee &#8211; Mr. Nguyen Van Quang said that one of the contents that investors are always interested in when investing in high-tech zones is the ability to meet the quality. electricity of the city. “Calling for investment in the city is not only favorable land conditions, but electricity quality is a very important factor. Therefore, the Industry and Trade industry is concerned with Da Nang PC and CPC to ensure a stable, constant and quality power supply for production ”, Mr. Quang emphasized.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">6149</post-id>	</item>
		<item>
		<title>Inside the apartment of Miss Ta Gia Di</title>
		<link>https://en.spress.net/inside-the-apartment-of-miss-ta-gia-di/</link>
		
		<dc:creator><![CDATA[Anh Phan]]></dc:creator>
		<pubDate>Thu, 22 Apr 2021 11:34:08 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Apartment]]></category>
		<category><![CDATA[Arrange]]></category>
		<category><![CDATA[Ask]]></category>
		<category><![CDATA[Bench]]></category>
		<category><![CDATA[Bending song]]></category>
		<category><![CDATA[Double bed]]></category>
		<category><![CDATA[Female artist]]></category>
		<category><![CDATA[Feng Shui]]></category>
		<category><![CDATA[furniture]]></category>
		<category><![CDATA[Gia]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Living room]]></category>
		<category><![CDATA[Magnolia]]></category>
		<category><![CDATA[Minimalist style]]></category>
		<category><![CDATA[miss]]></category>
		<category><![CDATA[Neutral]]></category>
		<category><![CDATA[ON CC]]></category>
		<category><![CDATA[Phung Doanh Doanh]]></category>
		<category><![CDATA[Ta Gia Di]]></category>
		<category><![CDATA[Thiet carpentry]]></category>
		<category><![CDATA[TVB]]></category>
		<guid isPermaLink="false">https://en.spress.net/inside-the-apartment-of-miss-ta-gia-di/</guid>

					<description><![CDATA[Miss Hong Kong lives in an apartment with a minimalist style, neutral color furniture. On TVB&#8217;s new Fortune Show, Hong Kong artists will bring audiences and feng shui experts to their homes. Ta Gia Di crowned Miss Hong Kong in 2020. On.cc reported that Miss Hong Kong 2020 Ta Gia Di was the guest of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Miss Hong Kong lives in an apartment with a minimalist style, neutral color furniture.</strong><br />
<span id="more-5936"></span> On TVB&#8217;s new Fortune Show, Hong Kong artists will bring audiences and feng shui experts to their homes.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_03_09_119_38152855/a0ef52316873812dd862.jpg" width="625" height="416"> <em> Ta Gia Di crowned Miss Hong Kong in 2020. </em> <em> On.cc </em> reported that Miss Hong Kong 2020 Ta Gia Di was the guest of the latest episode of the Fortune Show. In the show, Ta Gia Di&#8217;s living room and bedroom space was revealed. Ta Gia Di chooses neutral colors such as gray and white for living room interiors. Furniture is decorated in a minimalist style with a tea table, a bench, TV shelf, small corner closet and a pet&#8217;s nest. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_03_09_119_38152855/3315c2cbf88911d74898.jpg" width="625" height="351"> <em> Overview of the living room of Ta Gia Di. </em> Next, the bedroom is also simply decorated by the female artist, with a double bed in the center. The most noticeable item in the room is the blanket with the picture of her and her mother. When the host Phung Doanh Doanh asked for advice, Feng Shui expert said the color of Ta Gia Di&#8217;s bed sheets needed to be changed. The beauty queen is suggested to choose red, pink or purple bedding &#8211; the colors that will bring her luck. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_03_09_119_38152855/1954ee8ad4c83d9664d9.jpg" width="625" height="351"> <em> Ta Gia Di&#8217;s bedroom with unique photo printed blanket. </em> The expert also commented that the magnolia pot placed by Ta Gia Di in the corner of the bedroom is not suitable. Magnolia should not be placed next to the bed because plant growth can affect the quality of sleep of the homeowner. Following the advice, Ta Gia Di moved the potted plant outside the living room. In addition, the bedroom window of the 25-year-old female artist is fitted with safety bars. According to Feng Shui experts, the bars will make the room cramped. The expert suggested that the female artist should open the window during the day to allow energy to circulate.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5936</post-id>	</item>
		<item>
		<title>An Giang: Creativity helps Khmer households escape poverty</title>
		<link>https://en.spress.net/an-giang-creativity-helps-khmer-households-escape-poverty/</link>
		
		<dc:creator><![CDATA[NGÔ CHUẨN]]></dc:creator>
		<pubDate>Wed, 21 Apr 2021 19:05:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Agriculture]]></category>
		<category><![CDATA[An Giang]]></category>
		<category><![CDATA[An Hoa hamlet]]></category>
		<category><![CDATA[Chau Lang]]></category>
		<category><![CDATA[Creativity]]></category>
		<category><![CDATA[Cultivated area]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[escape]]></category>
		<category><![CDATA[Exit]]></category>
		<category><![CDATA[Giang]]></category>
		<category><![CDATA[GREENID]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[helps]]></category>
		<category><![CDATA[households]]></category>
		<category><![CDATA[Installation]]></category>
		<category><![CDATA[Khmer]]></category>
		<category><![CDATA[Khmer farmers]]></category>
		<category><![CDATA[Optical power]]></category>
		<category><![CDATA[poor]]></category>
		<category><![CDATA[Poverty]]></category>
		<category><![CDATA[Solar battery]]></category>
		<category><![CDATA[Stakeholders]]></category>
		<category><![CDATA[stretch]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Tri Ton]]></category>
		<category><![CDATA[Vegetable]]></category>
		<guid isPermaLink="false">https://en.spress.net/an-giang-creativity-helps-khmer-households-escape-poverty/</guid>

					<description><![CDATA[By supporting the installation of solar panels on cultivated areas with suitable spacing, Khmer farmers earn &#8216;double profit&#8217; from having electricity sold to the national grid and earning revenue. imported from vegetable production. The model opens up prospects for sustainable poverty reduction in areas with a large number of ethnic Khmer. Benefit harmony Stemming from [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>By supporting the installation of solar panels on cultivated areas with suitable spacing, Khmer farmers earn &#8216;double profit&#8217; from having electricity sold to the national grid and earning revenue. imported from vegetable production. The model opens up prospects for sustainable poverty reduction in areas with a large number of ethnic Khmer.</strong><br />
<span id="more-5705"></span> <strong> Benefit harmony</strong> </p>
<p> Stemming from the research on the model combining agricultural production and solar power in 2018, the Green Innovation and Development Center (GreenID) continues to do field research to pilot the model in An Giang province. The selected place is the cultivated land of Mr. Chau Hon&#8217;s family, Khmer household in An Hoa hamlet (Chau Lang commune, Tri Ton). The model was implemented by GreenID and Climate Sense Co., Ltd. (Climate Sense) from May 2020, with the support of the Management Board of the Sustainable Energy Development Project in An Giang province, Department of Agriculture and Development. Tri Ton district rural area and Chau Lang Commune People&#8217;s Committee. The model is designed according to the standards of rooftop solar power installed on construction works, tree-growing houses and instructions of EVN (Vietnam Electricity) with a capacity of 45Kwp, installed on an area of ​​400m2. of Mr. Chau Hon&#8217;s family. The model is completed and the grid is connected in December 2020. To ensure the efficiency of the plants underneath, the solar panels are designed with the right spacing, to ensure the growth of the plant variety. This is considered the first model with tripartite cooperation (people, businesses and non-profit organizations). The benefit sharing mechanism is discussed, agreed and harmonized among the participants. Agricultural production and sub-system farming activities are calculated and tested as soon as the system is completed with a number of short-term crops to assess growth and economic efficiency of the system. paradigm. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_406_38569241/6752118935cbdc9585da.jpg" width="625" height="468"> The solar model associates agricultural production with double efficiency According to GreenID, the profit from the model will be divided among the parties according to the proportion of capital contribution invested. The disbursement period for Climate Sense is in the first 10 years because Climate Sense capital is meant to support initial investment. After 10 years, the whole system will be handed over to GreenID and households for management and use. After 20 years, GreenID will hand over to households full ownership. This model is expected to bring many multilateral financial benefits to the participants and facilitate as well as a typical model to call for more investors to expand. <strong> Farmers are excited</strong> Since commissioning in early 2021, the power generation portion is monitored remotely on the phone application. As recorded, the sunniest day, the model produces about 246Kwh of electricity and the lowest is 43Kwh on the day. On average, the system produces 103 kWh of electricity per day (as of April 7, 2021). Every month, electricity will record the indexes and payout on the amount of electricity sold to the investor&#8217;s account. From January to March 2021, the project has sold more than 4,471 kWh of electricity, equivalent to over VND 22 million. In this joint venture model, all participants benefit from the project. All profits earned from the sale of electricity to EVN will be distributed to the parties to the investment according to the profit sharing structure agreed upon by the parties in the joint venture cooperation contract. Joining the model, Mr. Chau Hon&#8217;s family and the project planted some new crops to test new crops for research. From January to April 2021, the research team collaborated with the project team and farmers to experiment with water spinach and cucumber to calculate the suitability of plants under solar panels and compare them with planting. outside. In fact, plants in the shade under solar panels grow well because they retain moisture, avoid direct sunlight due to extremely sunny weather and improved farming techniques. “I planted cucumber from February to 2021, the plants grown in a greenhouse under the panels outperform the control field outside, the fruiting rate is quite stable. Currently, my family harvests more than 30kg of cucumber per day. The fruit has a nice design and is long, fresh and delicious, highly appreciated by customers ”- Mr. Chau Hon said excitedly. Deputy Director of Department of Agriculture and Rural Development Truong Kien Tho said that the combination of agricultural production and solar power is a new model, showing initial efficiency. “When looking at the pictures of the panels covering the agricultural land, many people think it is impossible to cultivate. However, when choosing suitable crops, productivity and quality are higher. In the same arid land, farmers can keep an income from farming while also earning a monthly electricity bill. This is a model that can help many farmers to escape poverty sustainably and get better-off ”- Mr. Tho assessed. The model of installing solar cells combining agricultural production below helps generate additional revenue from selling solar power, making the most of arable land to increase income, and reduce conflicts in use. use of land resources. Some crops benefit from increased coverage, resulting in higher yields and better product quality</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5705</post-id>	</item>
		<item>
		<title>Minh Hoa Electricity: Efforts to ensure electricity supply</title>
		<link>https://en.spress.net/minh-hoa-electricity-efforts-to-ensure-electricity-supply/</link>
		
		<dc:creator><![CDATA[Nguyễn Hoàng]]></dc:creator>
		<pubDate>Wed, 21 Apr 2021 11:31:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Dan Hoa]]></category>
		<category><![CDATA[Efforts]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensure]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Guaranteed]]></category>
		<category><![CDATA[Hoa]]></category>
		<category><![CDATA[Isotopes]]></category>
		<category><![CDATA[KVA]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Minh]]></category>
		<category><![CDATA[Minh Hoa]]></category>
		<category><![CDATA[Minh Hoa Electricity]]></category>
		<category><![CDATA[Nguyen Hoang]]></category>
		<category><![CDATA[Overhaul]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[Proportion]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Thuong Hoa]]></category>
		<category><![CDATA[Transfer]]></category>
		<guid isPermaLink="false">https://en.spress.net/minh-hoa-electricity-efforts-to-ensure-electricity-supply/</guid>

					<description><![CDATA[Minh Hoa district is now stepping up economic restructuring in the direction of gradually increasing the proportion of industry-construction and trade-services, reducing the proportion of agriculture-forestry. In particular, many new residential areas and businesses have formed the increasing demand for sufficient electricity to serve production, business and daily life of customers. Facing that fact, Minh [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Minh Hoa district is now stepping up economic restructuring in the direction of gradually increasing the proportion of industry-construction and trade-services, reducing the proportion of agriculture-forestry. In particular, many new residential areas and businesses have formed the increasing demand for sufficient electricity to serve production, business and daily life of customers. Facing that fact, Minh Hoa Electricity has brought into play its pioneering role, accompanying, and promoting socio-economic development in the area.</strong><br />
<span id="more-5601"></span> Clearly defining the tasks in the new period, Minh Hoa Electricity has closely followed the local socio-economic development orientation to advise and mobilize resources for synchronous investment in the electrical technical infrastructure system in the direction of focus, key point. For the capital of the electricity industry, Minh Hoa Electricity has planned and implemented periodic overhaul and repair of the power system, ensuring both quantity and quality, gradually modernizing the power grid according to direction of automation and application of science, technology and technology to management and operation.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_446_38568687/24dd570173439a1dc352.jpg" width="625" height="416"> <em> Minh Hoa Electricity Worker constructs and renovates the medium voltage grid.</em> Mr. Nguyen Hoang, Minh Hoa Electricity Director, said that in 2020, Minh Hoa Electricity is one of the units in charge of the construction of many works under the major repair and construction investment source of Quang Binh Power Company. including the work of overhaul of the Minh Hoa medium voltage electrical network in 2020, the work to improve the reliability of electricity supply in Quang Binh province by 2020; works to reduce power loss of medium voltage electrical network in Quang Binh province by 2020. All works are constructed with the highest sense of responsibility, ensure on schedule, complete and put into use, making an important contribution to recovering operating capacity, saving investment capital and supplying electricity safely and continuously, improving the reliability of power supply in the area. Minh Hoa Electricity currently manages an intermediate transformer station (TBA) with a capacity of 8,000kVA; 18.36km of 35kV line; 189,97 kilometers of the 22 kV transmission line, and 153 TBA with the capacity of 21,027kVA. In order to ensure the safe operation of the power grid, and at the same time supply enough electricity to meet the growing demand in the area, Minh Hoa Electricity has strengthened the on-duty force at the line management team and the substation; consolidate and well organize the information receiving and processing system to promptly handle incidents and improve customer care services; Regularly deploying the inspection of the grid with the temperature camera, promptly preventing and detecting a number of locations at risk. Up to now, Minh Hoa Electricity has the ability to remotely control 14/14 recloser of various types on the grid; at the same time, deploying the outgoing phase isotope 481 substation 110kV Tuyen Hoa with the busbar C41 Quy Dat intermediate substation to ensure the safe and continuous power supply when the incident occurs. Currently, the unit has been focusing on implementing the closed circuit of Vè-Si to ensure more optimal power supply in the coming time. Along with that, thanks to the foreign capital funding to supply electricity to the villages and hamlets that do not have electricity, so far most of the poor and difficult border communes, such as Thuong Hoa and Dan Hoa have been &#8220;covered&#8221;. national grid. With efforts to invest in the development of power sources and grids aiming to improve the quality of electricity services, Minh Hoa Electricity always ensures to meet the needs of electricity loads for the people as well as effectively implement the generation target. socio-economic development, ensuring national defense and security in the area. According to Mr. Nguyen Hoang, in the coming years, the demand for electricity of customers will increase, inevitably will create supply pressure on the grid power generation and management unit, requiring management. , forecasts of load demand must be detailed and close. Therefore, Minh Hoa Electricity determined that the concentration of management, operation, investment in construction and repair of the power system must be implemented according to a long-term and regular plan to increase supply reliability and quality. Electrical Power. “The goal of Minh Hoa Electricity is to strive to achieve an annual average commercial electricity growth rate of over 10% by 2022; the rate used to transmit and distribute electricity reached the plan assigned by Quang Binh Power Company; Average electricity price is 1,895 VND / kWh; electricity bill collection coefficient> 100% &#8230; Therefore, each employee of the whole Electricity must have the highest solidarity, unanimity, striving to comprehensively complete political tasks and economic and technical targets. art, steadfastly accompany the constant growth of heroic Minh Hoa homeland in the process of industrialization and modernization ”-ong Nguyen Hoang shared more.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5601</post-id>	</item>
		<item>
		<title>An Giang: Inauguration of a model combining agricultural production and solar power</title>
		<link>https://en.spress.net/an-giang-inauguration-of-a-model-combining-agricultural-production-and-solar-power/</link>
		
		<dc:creator><![CDATA[Tin, ảnh: BÌNH NGUYÊN]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 21:58:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[agricultural]]></category>
		<category><![CDATA[Agriculture]]></category>
		<category><![CDATA[An Giang]]></category>
		<category><![CDATA[An Hoa hamlet]]></category>
		<category><![CDATA[Chau Lang]]></category>
		<category><![CDATA[combined]]></category>
		<category><![CDATA[combining]]></category>
		<category><![CDATA[connection]]></category>
		<category><![CDATA[Control]]></category>
		<category><![CDATA[cucumber]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electromagnetism]]></category>
		<category><![CDATA[Experiment]]></category>
		<category><![CDATA[Giang]]></category>
		<category><![CDATA[GREENID]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[inaugurate]]></category>
		<category><![CDATA[Inauguration]]></category>
		<category><![CDATA[Model]]></category>
		<category><![CDATA[Optical power]]></category>
		<category><![CDATA[Paradigm]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[production]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Tri Ton]]></category>
		<category><![CDATA[Truong Kien Tho]]></category>
		<guid isPermaLink="false">https://en.spress.net/an-giang-inauguration-of-a-model-combining-agricultural-production-and-solar-power/</guid>

					<description><![CDATA[On the morning of April 16, the Sustainable Energy Development Project Management Unit (Department of Agriculture and Rural Development of An Giang province) in collaboration with the Green Innovation and Development Center (GreenID) and partners held the inauguration. pilot model combining agricultural production and solar power in An Hoa hamlet, Chau Lang commune, Tri Ton [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the morning of April 16, the Sustainable Energy Development Project Management Unit (Department of Agriculture and Rural Development of An Giang province) in collaboration with the Green Innovation and Development Center (GreenID) and partners held the inauguration. pilot model combining agricultural production and solar power in An Hoa hamlet, Chau Lang commune, Tri Ton district.</strong><br />
<span id="more-5039"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_418_38546923/374e17843cc6d5988cd7.jpg" width="625" height="288"> </p>
<p> <em> Inauguration of a model combining agricultural production and solar power.</em> The model will be deployed from May 2020, completed and connected to the grid in December 2020, exploiting electricity from the beginning of 2021. Solar power system with a capacity of 45kwp, installed on an area of ​​400m2, Below is a plant membrane house. Photovoltaic panels are designed with suitable spacing, ensuring the growth of plants. On average, the system produces 103kwh of electricity per day. From January to March 2021, the project has sold more than 4,471kwh of electricity, equivalent to more than VND 22 million. Underneath the panel system, farmers experimentally planted cucumbers. Cucumbers grown in the model had a higher fruiting rate than the outside control field. The fruits were long, beautiful, and the average fruit was harvested more than 30kg per day. Mr. Truong Kien Tho, Deputy Director of the Department of Agriculture and Rural Development of An Giang province, said that this is the first model of combining agriculture &#8211; solar power with a tripartite cooperation between people, businesses and teams. non-profit organizations are conducted in An Giang. The model helps farmers have dual income sources, increases production efficiency in a sustainable direction. The positive test results have proved the suitability and feasibility for replication. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_418_38546923/d7a28d68a62a4f74163b.jpg" width="625" height="468"> <em> Farmers grow cucumbers in a net house, with solar panels above.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_418_38546923/72052dcf068defd3b69c.jpg" width="625" height="346"> <em> Delegates visit the model.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5039</post-id>	</item>
		<item>
		<title>To install rooftop solar PV, your home must meet this requirement</title>
		<link>https://en.spress.net/to-install-rooftop-solar-pv-your-home-must-meet-this-requirement/</link>
		
		<dc:creator><![CDATA[Sơn Hà]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 13:05:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[connection]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Family]]></category>
		<category><![CDATA[Fitting]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Home]]></category>
		<category><![CDATA[Install]]></category>
		<category><![CDATA[Installation]]></category>
		<category><![CDATA[INVERTER]]></category>
		<category><![CDATA[meet]]></category>
		<category><![CDATA[Optical power]]></category>
		<category><![CDATA[Photoelectricity]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[Radiation]]></category>
		<category><![CDATA[requirement]]></category>
		<category><![CDATA[Roof]]></category>
		<category><![CDATA[Rooftop]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Vietnam Electricity Corporation]]></category>
		<category><![CDATA[VTV24]]></category>
		<category><![CDATA[Wattage]]></category>
		<guid isPermaLink="false">https://en.spress.net/to-install-rooftop-solar-pv-your-home-must-meet-this-requirement/</guid>

					<description><![CDATA[Rooftop solar PV is an attractive solution for households, especially in the summer. However, when installing, you must note: the ground is sturdy, the area is large enough &#8230; for installation, Ms. Tran Vu Diem Hang, Green Development Innovation Center, said that the rooftop solar power system is a solar power system with photovoltaic panels [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Rooftop solar PV is an attractive solution for households, especially in the summer. However, when installing, you must note: the ground is sturdy, the area is large enough &#8230; for installation,</strong><br />
<span id="more-4904"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/d4fbc50dee4f07115e5e.jpg" width="625" height="326"> </p>
<p> <em> Ms. Tran Vu Diem Hang, Green Development Innovation Center, said that the rooftop solar power system is a solar power system with photovoltaic panels installed on the roof of a building, with capacity? exceeding 1 MW, directly or indirectly connected to the electricity grid with a voltage of 35 kV or less of the buyer.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/72c664304f72a62cff63.jpg" width="625" height="351"> <em> Every region in our country has potential for solar power. For example, in Hanoi, the radiation intensity and total radiation are not small, the installation of grid-connected solar power brings high efficiency. The Northwest region also has solar energy potential &#8230; So, no matter where you live, people can install rooftop solar PV.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/203635c01e82f7dcae93.jpg" width="625" height="335"> <em> For households, rooftop solar power saves electricity costs, reduces the pressure of paying high-tier electricity bills for households using a lot of electricity; increase household income because it is possible to sell excess electricity after it is used to EVN; help protect the roof to cool the roof, especially in the summer &#8230;</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/014d15bb3ef9d7a78ee8.jpg" width="625" height="375"> <em> A rooftop solar PV system consists of photovoltaic panels, power converters (inverters) and wires as well as a lightning protection system.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/6f6c649a4fd8a686ffc9.jpg" width="625" height="413"> <em> Currently, the cost of installing a rooftop solar power system is not too expensive: the current investment price of 01 kWp ranges from 13-18 million VND depending on the size and origin of the equipment.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/b8e7b2119953700d2942.jpg" width="625" height="351"> <em> However, in order to install solar power on the roof, people must pay attention to a number of points. First, the area must be large enough for installation. Accordingly, the roof area must be at least 6 &#8211; 7 m2 / kWp and 3 kWp should have a roof area of ​​21 square meters.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/ed61e497cfd5268b7fc4.jpg" width="625" height="351"> <em> You also need to make sure the roof is sturdy enough to place the mechanical system, the battery plate on top.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/502158d773959acbc384.jpg" width="625" height="351"> <em> In addition, the installation space must be ensured that there is no shade obscured by trees or other construction works.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/72c664304f72a62cff63.jpg" width="625" height="351"> <em> In particular, you must test the construction unit&#8217;s capabilities. Currently, each unit has its own capabilities, experience and standards leading to very different quality and price. Therefore, people should choose units with good capacity and years of experience.</em> <em> Invite readers to watch the video: Spontaneous gas sales are rampant. Source: VTV24 </em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4904</post-id>	</item>
		<item>
		<title>TP. Ho Chi Minh City: Many solutions to ensure electricity safety in the rainy season</title>
		<link>https://en.spress.net/tp-ho-chi-minh-city-many-solutions-to-ensure-electricity-safety-in-the-rainy-season/</link>
		
		<dc:creator><![CDATA[Minh Khuê]]></dc:creator>
		<pubDate>Sun, 18 Apr 2021 20:01:11 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Breaker]]></category>
		<category><![CDATA[Chi]]></category>
		<category><![CDATA[City]]></category>
		<category><![CDATA[Cope with]]></category>
		<category><![CDATA[ELCB]]></category>
		<category><![CDATA[Electric leakage]]></category>
		<category><![CDATA[Electrical equipment]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[ensure]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[High pressure]]></category>
		<category><![CDATA[Ho Chi Minh]]></category>
		<category><![CDATA[It rains]]></category>
		<category><![CDATA[Minh]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power poles]]></category>
		<category><![CDATA[rainy]]></category>
		<category><![CDATA[Rainy season]]></category>
		<category><![CDATA[safe]]></category>
		<category><![CDATA[safety]]></category>
		<category><![CDATA[season]]></category>
		<category><![CDATA[Sockets]]></category>
		<category><![CDATA[solutions]]></category>
		<category><![CDATA[Stand by]]></category>
		<category><![CDATA[Storm]]></category>
		<category><![CDATA[tides]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/tp-ho-chi-minh-city-many-solutions-to-ensure-electricity-safety-in-the-rainy-season/</guid>

					<description><![CDATA[This year, the rainy season comes early in the southern region, to minimize the risk of weather problems to ensure electrical safety, City Power Corporation. Ho Chi Minh City has stepped up the implementation of many response measures, at the same time issued electrical safety warnings in the rainy season to the city residents. Propagate [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>This year, the rainy season comes early in the southern region, to minimize the risk of weather problems to ensure electrical safety, City Power Corporation. Ho Chi Minh City has stepped up the implementation of many response measures, at the same time issued electrical safety warnings in the rainy season to the city residents.</strong><br />
<span id="more-4435"></span> <strong> Propagate and mobilize people to actively prevent</strong> </p>
<p> Before the impact of the early coming of the rainy season on the work of electricity safety, City Power Corporation. Ho Chi Minh City (EVNHCMC) has requested the affiliated power units to strictly respond 24/24 hours, at the same time, strengthen the inspection of preparedness and response when unexpected incidents occur. In particular, to ensure the safety of people and property, prevent and prevent electrical accidents that can occur when it rains, local flooding due to the influence of high tide or thunderstorms, high winds, trees. mortars fell &#8230; EVNHCMC gives warnings about electrical safety in the rainy season to the people of the city. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_18_35_38566424/11e866134251ab0ff240.jpg" width="625" height="438"> <em> Employees of EVNHCMC advise on safe and economical use of electricity in households</em> Specifically, the city electricity industry. Ho Chi Minh City regularly and continuously propagates and propagates to customers who use electricity and people in the city understand and grasp the most basic contents of safe use of electricity in the rainy season. When detecting unusual phenomenon or loss of electrical safety, customers, people immediately call the hotline 1900 545454 (Customer care center of EVNHCMC) or phone number 114 &#8211; Fire department &#8211; Rescue, rescue city. Ho Chi Minh to be handled, prevented, and overcome in time. The electricity industry also recommends that, when it rains, people do not stay at the foot of the electric poles, under the eaves of the transformer station, do not directly touch the electric poles, ground wires, electric poles ligaments, electric meters, barrels. circuit breaker &#8230; In particular, do not go to the terrace, the roof where the power line crosses and do not manually repair the lines, outdoor electrical equipment. &#8230; Residents should disconnect the power supply (switch off the circuit breaker, CB) if the indoor area is flooded or the floor is wet by rain (splashing, leaking), wet from the electrical outlet, and wet with electrical equipment which can lead to the risk of local electric shock, likely to cause electric shock or fire, especially portable power tools such as hairdryers, vacuum cleaners &#8230; According to EVNHCMC, people should arrange places to install electric lines, power sockets, equipment using electricity in the house higher than the water level that is often flooded, wet; installing switchgear with appropriate anti-leakage (ELCB) function. In addition, people should cut off the power supply for electrical equipment installed outdoors (signs, billboards &#8230;) when it rains, strong winds. Especially, people need to stay away, warn everyone around them and set up barriers when it detects that electric poles have fallen (fallen), broken wires in roads, fields, lakes &#8230; <strong> Implement many measures to ensure electrical safety</strong> In order to ensure safety and prevent electrical accidents for people in the rainy season, EVNHCMC always gives top priority to grid safety. EVNHCMC has requested the heads of units to inspect and repair power grids in areas at risk of landslides, and even urgently move electrical works out of the landslide area to ensure safety. electrical works. In parallel, the city electricity industry. Ho Chi Minh City strengthened coordination with local authorities to carry out propaganda and warning among people not living, trading &#8230; near or below lines, power stations, electrical cabinets. At the same time, relieve cases of encroachment and encroachment on the safety corridor of high-voltage grid. In addition, EVNHCMC coordinates with the greenery management unit to promptly handle branches, branches, trees that can affect the safety corridor or may cause power grid problems when breaking or falling. , collision &#8230; At the same time, to strengthen the inspection of the power grid in order to promptly detect and resolutely not arise new points of violation of the high-voltage grid safety protection corridor that cannot be handled. The weather is becoming more and more complicated, besides the rain, there are often floods, so within the electricity industry, thoroughly grasp each officer, not letting subjective thoughts, neglect the object. with natural disaster prevention, fighting and response. EVNHCMC directs to bring into play the motto &#8220;4 on the spot&#8221; and the principle &#8220;3 ready&#8221; in preparing sufficient human resources, facilities, equipment and materials to be ready to respond when natural disasters occur unexpected incident. If there is any unexpected situation, it will ensure to re-establish electricity for production and daily life of customers in the shortest time.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4435</post-id>	</item>
		<item>
		<title>&#8220;Dongdian Cloud Sharing&#8221; State Grid 27 provincial company key tasks released in 2021</title>
		<link>https://en.spress.net/dongdian-cloud-sharing-state-grid-27-provincial-company-key-tasks-released-in-2021/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Fri, 16 Apr 2021 11:15:07 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Cloud]]></category>
		<category><![CDATA[Company]]></category>
		<category><![CDATA[Dongdian]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Key]]></category>
		<category><![CDATA[Provincial]]></category>
		<category><![CDATA[released]]></category>
		<category><![CDATA[sharing]]></category>
		<category><![CDATA[State]]></category>
		<category><![CDATA[tasks]]></category>
		<guid isPermaLink="false">https://en.spress.net/dongdian-cloud-sharing-state-grid-27-provincial-company-key-tasks-released-in-2021/</guid>

					<description><![CDATA[Recently, the State Grid announced the special commitments of 27 provincial companies in 2021, and the commitments of various provincial companies also revealed key tasks and goals for 2021, which involve the development of clean energy, digitalization, and electric energy substitution. 1. State Grid Beijing Electric Power Do a good job in ensuring power supply [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><img fifu-featured="1" decoding="async" src="https://p6.itc.cn/images01/20210416/45c542556f074fa2bd8e42e68bd5f6bb.jpeg" max-width="600"></p>
<p>Recently, the State Grid announced the special commitments of 27 provincial companies in 2021, and the commitments of various provincial companies also revealed key tasks and goals for 2021, which involve the development of clean energy, digitalization, and electric energy substitution.</p>
<p><strong>1. State Grid Beijing Electric Power</strong></p>
<p>Do a good job in ensuring power supply for important events in the 100th anniversary of the founding of the party.</p>
<p><strong>2. State Grid Shanxi Electric Power</strong></p>
<p>The utilization rate of new energy is maintained at more than 95%; the replacement of electricity by electric energy is more than 7 billion kwh; and the &#8220;three zeros&#8221; service for small and micro enterprises is realized.</p>
<p><strong>3. State Grid Tianjin Electric Power</strong></p>
<p>Expand the depth and breadth of electric energy substitution, promote new technologies and new applications, and achieve 2.8 billion kilowatt-hours of electricity replacement.</p>
<p><strong>4. State Grid Shandong Electric Power</strong></p>
<p>Completed inter-provincial transactions of 126 billion kilowatt-hours of electricity. Build 200 fully electrified digital power supply stations.</p>
<p><strong>5. State Grid Hebei Electric Power</strong></p>
<p>Achieve clean energy power generation exceeding 18 billion kilowatt-hours, and the total installed capacity of new energy will reach 18 million kilowatts.</p>
<p><strong>6. State Grid Haidian Power</strong></p>
<p>The city&#8217;s power supply reliability rate reached 99.991%, and the core area reached 99.999%.</p>
<p><strong>7. State Grid Jibei Electric Power</strong></p>
<p>The installed capacity of regional grid-connected new energy exceeds 30 million kilowatts. The proportion of clean energy installed capacity reached 63%.</p>
<p><strong>8. State Grid Jiangsu Electric Power</strong></p>
<p>The replacement of electricity by electric energy was 24.5 billion kilowatt-hours, and the installed capacity of clean energy exceeded 47 million kilowatts.</p>
<p><strong>9. State Grid Zhejiang Electric Power</strong></p>
<p>Realize the replacement of electricity by 9 billion kilowatt-hours of electricity, and the installed capacity of clean energy exceeds 350,000 kilowatts.</p>
<p><strong>10. State Grid Henan Electric Power</strong></p>
<p>Completion of the &#8220;Key Livelihood Practical Project&#8221;: the construction and transformation of 5,000 power distribution stations and 5,000 kilometers of 10 kV and below lines.</p>
<p><img decoding="async" src="https://p5.itc.cn/images01/20210416/7a9871f1ed3f419bb284532b99989dfa.jpeg" max-width="600"></p>
<p><strong>11. State Grid Anhui Electric Power</strong></p>
<p>Newly built 6 high-speed fast charging stations, 17 dedicated stations, 68 public charging stations, and 476 charging piles in the station.</p>
<p><strong>12. State Grid Jiangxi Electric Power</strong></p>
<p>Promote the sharing of information on power management by government and enterprises, embed the function of power management on the Internet into the provincial government service platform, and realize users&#8217; online “one certificate for power management”.</p>
<p><strong>13. State Grid Fujian Electric Power</strong></p>
<p>Consumption of clean energy in full; promote the replacement of electric energy, and realize the replacement of electricity exceeding 9 billion kwh</p>
<p><strong>14. State Grid Sichuan Electric Power</strong></p>
<p>The amount of hydropower transmission exceeded 137 billion kWh. Promote the development of electric vehicles, and the total charging capacity of the whole society reaches 1 billion kWh.</p>
<p><strong>15. State Grid Hubei Electric Power</strong></p>
<p>Completed full coverage of charging facilities in county-level urban areas, with a coverage rate of more than 10% in towns, towns and districts; built and put into operation 80 multi-station integrated data center stations.</p>
<p><strong>16. State Grid Chongqing Electric Power</strong></p>
<p>Low-voltage small and micro enterprises have 2 links in the whole process of power supply, zero cost of external line projects, and the whole process of power connection does not exceed 8 working days.</p>
<p><strong>17. State Grid Hunan Electric Power</strong></p>
<p>Complete the replacement of 7 billion kilowatt-hours of electricity with electric energy; invest no less than 1 billion yuan to help small and micro enterprises, and use telegrams to install &#8220;zero investment&#8221;.</p>
<p><strong>18. State Grid Liaoning Electric Power</strong></p>
<p>Consume 71 billion kWh of clean energy.</p>
<p><strong>19. State Grid Jilin Electric Power</strong></p>
<p>The utilization rate of new energy reached 95.6%, the wind power generation capacity was 12.7 billion kWh, and the full-caliber photovoltaic power generation capacity was 4 billion kWh.</p>
<p><strong>20. State Grid Qinghai Electric Power</strong></p>
<p>Improve industrial development and the construction of supporting power grids for public services after relocation to ensure that fixed-point poverty alleviation in Maduo County will not return to poverty.</p>
<p><strong>21. State Grid Heilongjiang Electric Power</strong></p>
<p>Expansion of clean energy consumption, new energy utilization rate not less than 97.4%. Achieve electric energy replacement of 2.3 billion kilowatt-hours of electricity.</p>
<p><strong>22. State Grid Ningxia Electric Power</strong></p>
<p>Achieve replacement of 2 billion kilowatt-hours of electricity; reduce the entire process of power-off time to within 20 working days; implement the &#8220;three zeros&#8221; service for small and micro enterprises.</p>
<p><strong>23. State Grid Mengdong Electric Power</strong></p>
<p>Clean energy electricity was 30.5 billion kWh, accounting for 81.3% of the electricity sold; it completed the delivery of 115 billion kWh of electricity.</p>
<p><strong>24. State Grid Xinjiang Electric Power</strong></p>
<p>Completed the remaining 287,000 households in the first phase of the “coal-to-electricity” project; replaced 4 billion kilowatt-hours of electricity.</p>
<p><strong>25. State Grid Shaanxi Electric Power</strong></p>
<p>Do a good job in ensuring electricity for the National Games; build 5000 charging piles to achieve full coverage of charging facilities in expressway service areas and all urban areas and counties.</p>
<p><strong>26. State Grid Tibet Electric Power</strong></p>
<p>Transmit 2 billion kWh of clean energy such as hydropower and photovoltaics in Tibet to 11 provinces (cities) in the central and eastern regions for consumption.</p>
<p><strong>27. State Grid Gansu Electric Power</strong></p>
<p>Solve 11 110kV single-line and single-transformation substations that are at risk of large-scale power outages.</p>
<p><img decoding="async" src="https://p2.itc.cn/images01/20210416/5bf55a3eb2944846b829aa887d0009b9.jpeg" max-width="600"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2647</post-id>	</item>
		<item>
		<title>Are electric cars &#8216;cleaner&#8217; than gasoline cars?</title>
		<link>https://en.spress.net/are-electric-cars-cleaner-than-gasoline-cars/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 22:27:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Angle]]></category>
		<category><![CDATA[Bloomberg NEF]]></category>
		<category><![CDATA[car]]></category>
		<category><![CDATA[cars]]></category>
		<category><![CDATA[Cleaner]]></category>
		<category><![CDATA[CO2]]></category>
		<category><![CDATA[Colin Sheppard]]></category>
		<category><![CDATA[Diesel engine]]></category>
		<category><![CDATA[Electric]]></category>
		<category><![CDATA[Electric Car]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity production]]></category>
		<category><![CDATA[Gas]]></category>
		<category><![CDATA[Gasoline]]></category>
		<category><![CDATA[Gordon Bauer]]></category>
		<category><![CDATA[Greenhouse gas]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Internal combustion engine]]></category>
		<category><![CDATA[Lawrence Berkeley]]></category>
		<category><![CDATA[Li exam]]></category>
		<category><![CDATA[Power production]]></category>
		<category><![CDATA[Tram]]></category>
		<category><![CDATA[Wind electricity]]></category>
		<guid isPermaLink="false">https://en.spress.net/are-electric-cars-cleaner-than-gasoline-cars/</guid>

					<description><![CDATA[Buying an electric car is much more affordable than a gas or diesel car from an environmental perspective. If to answer the question &#8220;Which vehicle is better for the Earth: Electric car or gas car&#8221; then the answer seems too obvious: Of course electric cars because they do not have exhaust pipes and does not [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Buying an electric car is much more affordable than a gas or diesel car from an environmental perspective.</strong><br />
<span id="more-1975"></span> If to answer the question &#8220;Which vehicle is better for the Earth: Electric car or gas car&#8221; then the answer seems too obvious: Of course electric cars because they do not have exhaust pipes and does not emit greenhouse gases.</p>
<p>However, electric cars are not perfect and they come with their own pollution problems. Typically, their batteries contain ingredients such as lithium, which require a considerable amount of energy to source and extract.</p>
<p>However, making batteries is only part of the life cycle of electric vehicles. A 2014 study published in the Proceedings of the National Academy of Sciences looked at the entire emissions life cycle of an electric vehicle, from mining the metals needed for batteries to producing the electricity needed. to power them, then compare this to the average emissions of a gasoline car. The team found that when electric cars are charged with coal-fired electricity, they actually do more harm to the environment than conventional gasoline cars.</p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_14_252_38526301/91cdf21bd85931076848.jpg" width="625" height="411"></p>
<p><em> Buying an electric car is much more affordable than a gas or diesel from an environmental perspective. Illustration</em></p>
<p>But that is not a problem because today, in most countries around the world, the national grid is &#8220;clean&#8221; enough for electric cars to beat competitors running on gasoline.</p>
<p>There are very few countries in the world where the grid is entirely or mostly coal. China is one of them. In 2019, an estimated 58% of the country&#8217;s electricity supply comes from coal. China&#8217;s grid is improving, however, with more investments in renewables &#8211; for example, it has twice the capacity of wind power as the US and builds more solar panels than any other country. Every year, according to Nature.</p>
<p>Mr. Gordon Bauer, an electric vehicle researcher at the International Council for Clean Transport in San Francisco, USA, said the current improved grid model, with more renewable energy and less fossil fuels. , is a global model and helps improve the environmental quality of electric vehicles. &#8220;As the grid becomes&#8221; greener &#8220;, the use of electric vehicles will be more perfect,&#8221; he said.</p>
<p>In a study published this month in the journal Environmental Science and Technology, Colin Sheppard, a researcher in energy and transport systems engineering at Lawrence Berkeley National Laboratory in California, Work with Gordon Bauer to model a hypothetical future scenario where all cars are powered by electricity. &#8220;We want to understand the impact of energy, infrastructure and emissions if all passenger vehicles are electrified,&#8221; Sheppard told Live Science.</p>
<p>For example, Mr. Sheppard calculated that if all private vehicles in the United States were powered by electricity, the annual reduction in greenhouse gas emissions in the country would be 46% (0.5 gigatons of CO2) compared to cars. run on conventional gas.</p>
<p>This reduction could be further increased if the vehicles were subjected to so-called &#8220;controlled charging&#8221;, a technique also known as &#8220;smart charging&#8221;, in which the vehicles are recharged into Timing is selected to minimize the financial cost of electricity generation. (For example, charging at night is generally less expensive than during the day; this strategy also favors plants that produce more energy efficiently to generate cheaper electricity.) If all privately owned electric cars were charged in the same way, emissions savings could be increased by up to 49% annually.</p>
<p>In addition, electric vehicles are said to also emit CO2, but not during use, but when generating electricity &#8211; this is why many people believe that this car is not completely pure. Even the president of Toyota once harshly said that electric cars are being overblown.</p>
<p>In fact, electrochemical vehicles including Hybrid (HEV), Plug-in Hybrid (PHEV) still emit CO2 even when used (because there is still an internal combustion engine) and possibly when generating electricity, depending on how it is generated. electricity. While pure electric vehicles can only generate CO2 in the production process, not when used.</p>
<p>Depending on the source of electricity generation is hydroelectricity, wind power or thermal power, nuclear power &#8230; that the amount of CO2 generation will be different. If hydroelectricity, CO2 level is almost zero, while thermal power is too much CO2.</p>
<p>Research by Bloomberg NEF in Thailand shows that electric cars generate 60% of the CO2 equivalent of a gasoline equivalent vehicle. This source of CO2 comes entirely from production, because Thailand generates electricity mainly from natural gas. While internal combustion engine vehicles produce CO2 in an 80/20 ratio between use and production.</p>
<p>For example, if a gasoline car generates 100 g CO2 / km 80 g from use and 20 g from gas production. While a corresponding electric car model only generates 60 g of CO2 from use. As such, electric cars are still significantly cleaner than gasoline cars.</p>
<p>For countries with clean electricity generation sources such as Norway, up to 95% of electrical energy comes from hydroelectricity, CO2 emissions are even lower. The future of electric vehicles is becoming clearer as more automakers are involved in the production and research of electric vehicles. Users often do not care too much about CO2 emissions in production, but realize that when used, it will help where cars circulate with less pollution.</p>
<p>Ultimately, the conclusion is that buying an electric car is much more affordable than a gas or diesel car from an environmental perspective.</p>
<p><strong>Thu Ha</strong> (Th)</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1975</post-id>	</item>
	</channel>
</rss>