<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	>

<channel>
	<title>Maintenance &#8211; Spress</title>
	<atom:link href="https://en.spress.net/tag/maintenance/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.spress.net</link>
	<description>Spress is a general newspaper in English which is updated 24 hours a day.</description>
	<lastBuildDate>Tue, 22 Jun 2021 10:50:08 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">191965906</site>	<item>
		<title>Wang Huiyu investigates epidemic prevention and control, vaccination, safe production, dual energy consumption control, food safety, and stability maintenance work</title>
		<link>https://en.spress.net/wang-huiyu-investigates-epidemic-prevention-and-control-vaccination-safe-production-dual-energy-consumption-control-food-safety-and-stability-maintenance-work/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Tue, 22 Jun 2021 10:50:08 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Consumption]]></category>
		<category><![CDATA[Control]]></category>
		<category><![CDATA[DUAL]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[epidemic]]></category>
		<category><![CDATA[Food]]></category>
		<category><![CDATA[Food safety]]></category>
		<category><![CDATA[Huiyu]]></category>
		<category><![CDATA[investigates]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Prevention]]></category>
		<category><![CDATA[production]]></category>
		<category><![CDATA[safe]]></category>
		<category><![CDATA[safety]]></category>
		<category><![CDATA[Stability]]></category>
		<category><![CDATA[vaccination]]></category>
		<category><![CDATA[WANG]]></category>
		<category><![CDATA[Work]]></category>
		<guid isPermaLink="false">https://en.spress.net/wang-huiyu-investigates-epidemic-prevention-and-control-vaccination-safe-production-dual-energy-consumption-control-food-safety-and-stability-maintenance-work/</guid>

					<description><![CDATA[On June 19th, Wang Huiyu, secretary of the Xinghe County Party Committee of Ulan Qab City, went to Xinghe County Epidemic Prevention and Control Headquarters, China Mongolia Hospital, Kejieran Gas Company, Xingjie Natural Gas Company, Longxing Technology Company, Ruisheng New Energy The company, Xinglong Farmer’s Market, Hualian Supermarket, Xintai Ferroalloy Company, Xinghua Community investigate epidemic [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong> <strong> <strong> <strong>On June 19th, Wang Huiyu, secretary of the Xinghe County Party Committee of Ulan Qab City, went to Xinghe County Epidemic Prevention and Control Headquarters, China Mongolia Hospital, Kejieran Gas Company, Xingjie Natural Gas Company, Longxing Technology Company, Ruisheng New Energy The company, Xinglong Farmer’s Market, Hualian Supermarket, Xintai Ferroalloy Company, Xinghua Community investigate epidemic prevention and control, vaccination, safe production, food safety, dual energy consumption control, petition and stability maintenance.</strong></strong> </strong> </strong><br />
<span id="more-26664"></span></p>
<p>Wang Huiyu and his party went to the epidemic prevention and control headquarters and the China Mongolia Hospital to investigate epidemic prevention and control and vaccination. At the headquarters, they listened to reports on the progress of the epidemic prevention and control and vaccination work for gays. Wang Huiyu pointed out that the epidemic prevention and control should always be tightened. Root strings, strengthen work placement politically, maintain a high level of ideological vigilance, firmly grasp implementation in action, and effectively enhance the sense of responsibility and urgency in epidemic prevention and control and vaccination work, and resolutely overcome paralyzing thoughts and war exhaustion , Lucky mentality, a relaxed mentality, and be cautious to normalize epidemic prevention and control, and firmly hold on to the results of epidemic prevention and control.
 </p>
<p> In Kejieran Gas Company, Xingjie Natural Gas Company, Longxing Technology Company, Ruisheng New Energy Company, and Xintai Ferroalloy Company, Wang Huiyu inspected the operation and maintenance of enterprise facilities and equipment, and the equipment of fire fighting facilities, and learned more about the safety production, Energy consumptionHe emphasized the development of dual control, potential accident investigation and management, and emergency response plans. He emphasized that we must resolutely curb the blind development of high energy-consuming and high-emission projects, comprehensively promote the coordinated control of pollution reduction and carbon reduction of &#8220;two highs&#8221; projects, and strengthen the &#8220;two highs&#8221; industries Guided by green development, do a good job in carbon peaking and carbon neutrality; safety is no small matter, and all enterprises must strengthen SafetyBottom line, strengthen the sense of responsibility, continuously improve the construction of the emergency system, implement the management and control measures for the elimination of hidden risks of the enterprise, and build a solid foundation Safe ProductionLine of defense. Strictly supervise and control the links and parts that are highly dangerous and prone to accidents, and conduct regular safety production inspections and fire safety drills to resolutely prevent safety production accidents from occurring and ensure the safety of people&#8217;s lives and property.  At Xinglong Farmer’s Market and Hualian Supermarket, Wang Huiyu emphasized that the current epidemic prevention and control situation is still complicated and severe, and should not be paralyzed. Control measures.All departments must fully realize food safetyThe importance and urgency of the work is to work together to manage all aspects of food production, operation and consumption, and form a joint force to effectively ensure the safety of the people of the county on the &#8220;tip of the tongue&#8221;.  During the investigation in the Xinghua Community of Chengguan Town, it was emphasized that on the occasion of the 100th anniversary of the founding of the party, we should coordinate petitions and visits to maintain stability and vaccination, and accelerate vaccination to build a nationwide Immune barrier, Is the most fundamental way to stop the spread of the new crown virus and an effective means to protect the health of the whole people; it is necessary to do a good job in petition and stability maintenance, grasp the focus of work, strengthen work scheduling, and combine the practical activities of &#8220;I do practical things for the people&#8221; to solve the problem. The masses are desperate and worried about the problem, and promote the deepening and solidification of the work of petitioning and stability maintenance, so as to achieve early detection, early disposal, and early resolution. Party buildingCreate a good atmosphere for a century. Member of the Standing Committee of the County Party Committee, governmentExecutive Deputy County Mayor He Yingzi, Member of the Standing Committee of the County Party Committee and Deputy County Mayor of the Government Yu Hongliang, Member of the Standing Committee of the County Party Committee and Director of the County Party Committee Office Wang Xiaojun, Deputy County Mayor Gong Xiulong, Deputy County Mayor Zhang Jun, County Health Commission, Housing Construction Bureau, Industry and Information Bureau , The emergency management bureau and the main persons in charge of relevant towns and villages participated in the investigation</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">26664</post-id>	</item>
		<item>
		<title>GS E&#038;C Group (Korea) welcomes the growth of the Vietnamese market</title>
		<link>https://en.spress.net/gs-ec-group-korea-welcomes-the-growth-of-the-vietnamese-market/</link>
		
		<dc:creator><![CDATA[Quỳnh Như]]></dc:creator>
		<pubDate>Sun, 20 Jun 2021 21:02:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Activated carbon]]></category>
		<category><![CDATA[Bac Ninh Industrial Park]]></category>
		<category><![CDATA[Catch]]></category>
		<category><![CDATA[Connect]]></category>
		<category><![CDATA[Dong Nai]]></category>
		<category><![CDATA[Elevator]]></category>
		<category><![CDATA[Escalator]]></category>
		<category><![CDATA[Factory]]></category>
		<category><![CDATA[global]]></category>
		<category><![CDATA[Group]]></category>
		<category><![CDATA[Growth]]></category>
		<category><![CDATA[GS E C Corporation]]></category>
		<category><![CDATA[HEPA]]></category>
		<category><![CDATA[Korea]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[market]]></category>
		<category><![CDATA[Nhan Trach Industrial Park 6]]></category>
		<category><![CDATA[Phuc Dat Group]]></category>
		<category><![CDATA[Phuc Dat Tower]]></category>
		<category><![CDATA[Thrust force]]></category>
		<category><![CDATA[Tower]]></category>
		<category><![CDATA[VGSI]]></category>
		<category><![CDATA[Vietnamese]]></category>
		<category><![CDATA[welcomes]]></category>
		<guid isPermaLink="false">https://en.spress.net/gs-ec-group-korea-welcomes-the-growth-of-the-vietnamese-market/</guid>

					<description><![CDATA[GS E&#38;C Group built a factory to manufacture elevators &#38; escalators in Dong Nai, providing global quality products throughout Vietnam and the world. Catch the market trend According to the representative in charge of the global elevator industry of GS E&#038;C Group (Korea), the demand for elevators will continue to grow in the near future [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>GS E&amp;C Group built a factory to manufacture elevators &amp; escalators in Dong Nai, providing global quality products throughout Vietnam and the world.</strong><br />
<span id="more-26022"></span> <strong> Catch the market trend</strong> </p>
<p> According to the representative in charge of the global elevator industry of GS E&#038;C Group (Korea), the demand for elevators will continue to grow in the near future due to the positive push from the economy in general and the market. construction and real estate market in particular in Vietnam. Every year, tens of thousands of elevators are put into operation and this number shows no sign of stopping. To access this potential market, GS E&#038;C Group built a factory to manufacture elevators &#038; escalators in Nhon Trach 6 Industrial Park, Dong Nai Province. The group has put the most modern Korean technology production line into operation, producing elevators in the high-end segment with a speed of up to 7 meters per second. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_15_365_39188459/00362f052047c9199056.jpg" width="625" height="351"> To be proactive in terms of technology and quality, the group has developed a research center with a large force of Korea&#8217;s leading elevator experts engaged in the entire research, design and production process, ensure that elevators and escalators are suitable and meet domestic and export standards and regulations. At the same time, building an elevator test tower with a journey higher than 100m right in the GS Vietnam &#8211; VGSI elevator factory in Dong Nai, this is considered a solution to ensure safety and quality criteria for high-speed ranges. Levels and loads in the elevator must be tested at this tower before being shipped to supply high-rise projects in Vietnam and the world. <strong> Improve </strong> <strong> strong </strong> <strong> technology</strong> VGSI elevators &#038; escalators are designed with the aim of optimizing usability features, being simple in operation but still ensuring optimal aesthetics. Exquisite &#038; spacious interior, integrated with modern, fast intelligent control technologies, intuitively simple to use, increasing convenience, making users comfortable. VGSI elevators are installed with a multi-stage air purification system to help remove large dust particles, using an activated carbon filter to remove unpleasant odors and other harmful gases in the elevator, preventing particles from entering the elevator. fine dust by HEPA technology. UV germicidal lamps and anti-virus handrails are also installed, contributing to the general cleaning of the air environment inside the elevator cabin. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_15_365_39188459/e399cdaac2e82bb672f9.jpg" width="625" height="562"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_15_365_39188459/e973c340cc02255c7c13.jpg" width="625" height="574"> <strong> Innovation in after-sales service operations &#8211; future trend</strong> GS Elevator Vietnam &#8211; VGSI is entering the digital era 4.0 and is gradually changing the way elevator manufacturers provide maintenance services in the future. In order to improve the safe and reliable operation of elevators &#038; escalators, VGSI installed a system for real-time operation of elevators and escalators. This system connects to elevators and escalators on the GMS/Internet cloud platform. This strong connection helps to predict the problem of elevator equipment, immediately the technician is there to handle it before the customer calls to report the problem. This system also helps to track the history of repair and replacement requests in the day, week, month, year as well as track down to the minute response time of elevator &#038; escalator services provided by VGSI. . <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_15_365_39188459/f128d81bd7593e076748.jpg" width="625" height="351"> Focusing on elevator &#038; escalator performance, we apply ZeMS solution which is a preventive maintenance system that will soon help engineers predict the life of equipment to come up with repair solutions. Repair and upgrade effective elevators &#038; escalators. Besides, we have been setting up warranty &#038; maintenance centers for elevators and escalators within a travel radius of only a few minutes to a maximum of 30 minutes in many provinces and cities throughout the country, Binh Duong, Ho Chi Minh, Hanoi, Da Nang…etc., as well as set up repair, warranty &#038; maintenance centers right in the building where GS Vietnam &#8211; VGSI strategically cooperates and provides elevators like high-class apartment buildings Phuc Dat Tower Connect 2, Van Phuc City urban area, factories with extremely large production capacity in Bac Ninh Industrial Park, Bac Giang, Vinh Phuc &#8230; etc. Recently, to promote business activities, GS Vietnam &#8211; VGSI signed a cooperation agreement with Phuc Dat Group. Accordingly, GS Vietnam &#8211; VGSI will set up warranty office at Phuc Dat Tower project (Binh Duong) and support business in introducing the project to about 500 of its experts working in Nhon Trach area. , Di An, HCMC&#8230;. GS E&amp;C Group is ranked 44th globally in construction &amp; real estate. The Group has focused on the combination of smart technology (Smart Technology) and green factor (Green Factor) as the foundation to create valuable products. GS E&amp;C is a pioneer in sustainable growth with product lines and technology development orientation in the future.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">26022</post-id>	</item>
		<item>
		<title>Transport enterprises &#8216;swallowed up&#8217;</title>
		<link>https://en.spress.net/transport-enterprises-swallowed-up/</link>
		
		<dc:creator><![CDATA[Bài và ảnh: Văn Duẩn]]></dc:creator>
		<pubDate>Sun, 20 Jun 2021 15:05:12 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Accreditation]]></category>
		<category><![CDATA[Business]]></category>
		<category><![CDATA[Carriage]]></category>
		<category><![CDATA[Circular 112 2020]]></category>
		<category><![CDATA[Circular No 70 2015]]></category>
		<category><![CDATA[COVID-19]]></category>
		<category><![CDATA[cycle]]></category>
		<category><![CDATA[Enterprises]]></category>
		<category><![CDATA[fee]]></category>
		<category><![CDATA[fees]]></category>
		<category><![CDATA[Hard]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Offer]]></category>
		<category><![CDATA[Periodic]]></category>
		<category><![CDATA[Remove]]></category>
		<category><![CDATA[Revision]]></category>
		<category><![CDATA[Road]]></category>
		<category><![CDATA[swallowed]]></category>
		<category><![CDATA[The financial]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[To be affected by something]]></category>
		<category><![CDATA[Translate]]></category>
		<category><![CDATA[Transport]]></category>
		<guid isPermaLink="false">https://en.spress.net/transport-enterprises-swallowed-up/</guid>

					<description><![CDATA[The Prime Minister has just assigned the Ministry of Transport to assume the prime responsibility for reviewing and proposing policies and solutions to support various types of transport that are falling into tragedy when they are continuously affected by four waves of Covid-19 epidemic. 19 As an enterprise (DN) with nearly 100 passenger cars, Mr. [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Prime Minister has just assigned the Ministry of Transport to assume the prime responsibility for reviewing and proposing policies and solutions to support various types of transport that are falling into tragedy when they are continuously affected by four waves of Covid-19 epidemic. 19</strong><br />
<span id="more-25932"></span> As an enterprise (DN) with nearly 100 passenger cars, Mr. Do Van Bang, Director of Minh Thanh Phat Trading and Service Co., Ltd (Star Viet garage running the Lao Cai &#8211; Hanoi route), said from the beginning of the year. From 2021 to now, the enterprise is almost &#8220;clinically dead&#8221; when there are only 5 cars left. Businesses are struggling but still have to keep employees, if they let them rest, it will be difficult to recruit them when they resume operations.</p>
<p> <strong> Close to the limit of insolvency</strong> According to the director of Sao Viet car company, production and business revenue is almost zero, but every day still has to bear countless expenses such as bank interest; rent for factories, warehouses, salaries to support officials, employees, drivers; road maintenance fees &#8230; A series of passenger transport enterprises are in the &#8220;swallowing&#8221; scene. &#8220;Before the epidemic, on average, each month we spent about 3 billion dong on salaries and bonuses for drivers and employees. However, today, even though there is no revenue, we still have to &#8220;burden&#8221; nearly 1 billion dong/month &#8220;- Mr. Bang stated. Not only road transport, the air transport market has suffered the most severe decline ever, prompting the Ministry of Planning and Investment to issue a warning that the solvency of enterprises is declining close to the limit of insolvency. maths. For example, the national airline of Vietnam (Vietnam Airlines), it is expected that the loss of the first quarter of 2021 will be at VND 4,800 billion and in the first six months of the year may reach VND 10,000 billion. Currently, the amount of overdue debt has reached VND 6,240 billion and is in a very difficult situation. Vietnam Airlines has more than 9,000 employees who are on unpaid leave and temporary suspension of labor contracts. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_20_15_39244367/89eeb6b8bcfa55a40ceb.jpg" width="625" height="468"> <em> Most transport businesses are facing great difficulties due to the Covid-19 epidemic</em> Vietnam Railways Corporation (VNR) also lost 50% of passenger transport revenue in the past 5 months due to people restricting travel, the railway industry had to cut many passenger trains. Mr. Nguyen Cong Hung, Chairman of the Hanoi Taxi Association, said that the number of passengers decreased by 80%-90%, revenue fell seriously, and workers&#8217; lives were difficult. A series of taxi companies are facing the risk of bankruptcy, and bad debts are at high risk of increasing in the banking system. Therefore, recently, the Taxi Associations of Hanoi, Da Nang and Ho Chi Minh City have jointly signed a document to send to the Prime Minister, proposing to support taxi transport enterprises to overcome difficulties before the Covid-19 pandemic. <strong> Proposing many solutions</strong> Facing the above situation, the Prime Minister has just assigned the Ministry of Transport to consider and propose policies and solutions to support passenger transport enterprises facing difficulties due to the Covid-19 epidemic. to border gates and between regions in the domestic market. According to Mr. Tran Bao Ngoc, Director of the Transport Department (Ministry of Transport), since the outbreak of the epidemic, the Ministry of Transport has proposed policies and solutions to support transport enterprises in difficulty. Regarding the solution to remove the vehicle inspection cycle, Mr. Ngoc said that the Ministry of Transport is amending Circular No. 70/2015 in the direction of adjusting the inspection cycle of passenger cars of all kinds up to 9 seats with transportation business. , adjusted from 18 months to 24 months for the first cycle and from 6 to 12 months for the recurring cycle. In addition, the Ministry of Transport also proposed that the Government delay the time of sanctioning transport enterprises that do not install surveillance cameras due to the impact of the Covid-19 epidemic. Regarding the proposal to exempt road maintenance fees until the end of this year, Mr. Ngoc said that in order to remove difficulties for those affected by the Covid-19 epidemic, Circular 112/2020 of the Ministry of Finance allows to reduce collect road user fees from January 1 to June 30, 2021. &#8220;The Ministry of Transport has proposed to the Government to reduce value-added tax to 0%, reduce 50% of corporate income tax for industries seriously damaged by the epidemic. Besides, delay payment of tax amount for 6 months for 6 months. arrears until December 31, 2021 and there is no fee for parking, parking and picking up passengers at the airport, train station, port and 50% discount on service prices through the bus station for passenger cars. sign for new registered vehicles for transport business until December 31,&#8221; said Mr. Ngoc. <strong> It is still difficult to access support policies</strong> As a large passenger transport enterprise in Quang Ninh province, Mr. Doan The Xuyen, director of Phuc Xuyen Co., Ltd., said that the company has over 300 vehicles that have stopped working but still have not been exempted from road maintenance fees because of cumbersome procedures. . For example, to be exempted under the regulations of the Ministry of Finance, the vehicle must stop working for 30 days or more, then return the badge and be certified by the Department of Transport. &#8220;You can stop for less than 30 days to be able to run again, then you have to apply for a new badge. Many businesses still have to pay even though the car is not running because they are afraid of procedures,&#8221; said Xuyen.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">25932</post-id>	</item>
		<item>
		<title>Tomorrow, APG cable will be repaired, AAE-1 is expected to interrupt service until July 23</title>
		<link>https://en.spress.net/tomorrow-apg-cable-will-be-repaired-aae-1-is-expected-to-interrupt-service-until-july-23/</link>
		
		<dc:creator><![CDATA[Vân Anh]]></dc:creator>
		<pubDate>Wed, 16 Jun 2021 01:59:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[A GRID]]></category>
		<category><![CDATA[AAE 1]]></category>
		<category><![CDATA[AAE1]]></category>
		<category><![CDATA[AAG]]></category>
		<category><![CDATA[APG]]></category>
		<category><![CDATA[Asia Africa Europe 1]]></category>
		<category><![CDATA[Asia Pacific Gateway]]></category>
		<category><![CDATA[Cable]]></category>
		<category><![CDATA[capacity]]></category>
		<category><![CDATA[CMC Telecom]]></category>
		<category><![CDATA[CSC]]></category>
		<category><![CDATA[Discontinuity]]></category>
		<category><![CDATA[expected]]></category>
		<category><![CDATA[international]]></category>
		<category><![CDATA[internet]]></category>
		<category><![CDATA[Internet connection]]></category>
		<category><![CDATA[Interrupt]]></category>
		<category><![CDATA[Isp]]></category>
		<category><![CDATA[July]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Marine fiber optic cable]]></category>
		<category><![CDATA[repaired]]></category>
		<category><![CDATA[service]]></category>
		<category><![CDATA[SMW3]]></category>
		<category><![CDATA[Tomorrow]]></category>
		<category><![CDATA[Trouble]]></category>
		<category><![CDATA[Vnpt]]></category>
		<guid isPermaLink="false">https://en.spress.net/tomorrow-apg-cable-will-be-repaired-aae-1-is-expected-to-interrupt-service-until-july-23/</guid>

					<description><![CDATA[According to the latest information from ISPs, it is expected that on June 11, transmission channels on the APG cable route will be fully restored. Meanwhile, the problem on the S1H.1 segment of the AAE-1 cable route will be fixed from June 22 to July 13. As 2 of the 5 undersea cable routes that [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>According to the latest information from ISPs, it is expected that on June 11, transmission channels on the APG cable route will be fully restored. Meanwhile, the problem on the S1H.1 segment of the AAE-1 cable route will be fixed from June 22 to July 13.</strong><br />
<span id="more-23264"></span> As 2 of the 5 undersea cable routes that account for the majority of Internet connection capacity from Vietnam to international, Asia Pacific Gateway (APG) and Asia Africa Europe 1 (AAE-1) are currently experiencing service interruptions.</p>
<p> Sharing with ICTnews this afternoon, June 10, a representative of Viettel confirmed, according to information from the operator of the undersea optical cable routes, on May 11 and May 25, two routes APG and AAE-1 have crashes in turn. Specifically, on May 11, a problem occurred on the S6 segment of the APG undersea cable line. The location of the cable problem is about 352 to 355 km from the TKO docking station in Hong Kong, China. The cause of the problem was determined to be a “shunt fault” but did not cause service disruption. The cable route management unit has mobilized the ship and started to carry out maintenance to fix the fault on the APG cable line from June 6 and is expected to be completed tomorrow, June 11. During the repair period, it will disrupt all services to and from Hong Kong, China of APG project member partners. The APG route is invested by four Vietnamese carriers, VNPT, Viettel, FPT and CMC. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_10_107_39141059/fcdded50e012094c5003.jpg" width="625" height="471"> The incident occurred on May 25 on the S1H.1 segment of the AAE-1 cable line, which is expected to be fixed from June 22 to July 13 (Artwork: Internet) With the AAE-1 undersea cable, according to Internet service providers (ISPs) in Vietnam, the incident occurred on May 25 on the FP10 pair of the S1H.1 segment, far from the Cape D&#8217;Aguilar landing station. , HongKong, China about 2,072 km towards the port of Vung Tau, Vietnam. The cause of the problem was a fiber break, which partially disrupted the service to Hong Kong on the FP10 pair. The plan to overcome the problem that occurred on May 25 on the S1H.1 segment of the AAE-1 international undersea fiber optic cable has also been announced to ISPs in Vietnam, expected to start from June 22. and completed on 7/13. The fact that sea cable incidents occurred at the same time in the past time has affected the international connection capacity of telecommunications service providers in Vietnam. This is a common problem affecting all network operators and Internet service providers in Vietnam. However, according to a Viettel representative, the level of influence of this network operator is the lowest because before the sea cable incident, Viettel actively planned, routed, allocated and supplemented capacity, including capacity. redundancy on international connection cables to ensure the quality of service provided to customers. When an incident occurred, Viettel immediately implemented a routing plan, optimized and added capacity on other undersea cable routes including: TGN-IA towards Hong Kong and Singapore; APG heading to Singapore; AAE-1 goes to France as well as prepares land cable resources for international connections to ensure quality service for customers. “Viettel is continuing to work with the Management Board, operating the APG, AAE-1 undersea cable lines and the NEC contractor to have continuous updates on the plan to repair the above incidents. In case of difficulty accessing, customers contact Viettel via the switchboard 18008119 to find out the exact cause and support the fastest, &#8220;a Viettel representative said. Previously, talking to ICTnews, other carriers said that they had carried out load balancing, redirected connections to other undersea cable routes as well as some land cables to ensure the quality of service provided to customers. row. Specifically, CMC Telecom has increased capacity through the cable direction across Southeast Asia (A-Grid), connecting the Internet from Vietnam to Cambodia, Thailand, Malaysia and Singapore. VNPT has actively navigated and loaded other cable directions that are operating stably such as CSC, AAG, IA, SMW3&#8230; Besides, VNPT is also actively coordinating with relevant units and partners to thoroughly check and fix international Internet connection problems.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">23264</post-id>	</item>
		<item>
		<title>Technical maintenance on the top floor of Landmark 81 building</title>
		<link>https://en.spress.net/technical-maintenance-on-the-top-floor-of-landmark-81-building/</link>
		
		<dc:creator><![CDATA[Phạm Ngôn]]></dc:creator>
		<pubDate>Fri, 11 Jun 2021 04:05:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Briefings]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Conductor]]></category>
		<category><![CDATA[Cooling system]]></category>
		<category><![CDATA[Dedicated]]></category>
		<category><![CDATA[Elevator]]></category>
		<category><![CDATA[Floor]]></category>
		<category><![CDATA[Gauge]]></category>
		<category><![CDATA[High floor]]></category>
		<category><![CDATA[Landmark]]></category>
		<category><![CDATA[Landmark 81]]></category>
		<category><![CDATA[Lunch break]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Mr Vu]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Skill]]></category>
		<category><![CDATA[specifications]]></category>
		<category><![CDATA[technical]]></category>
		<category><![CDATA[Technical inspection]]></category>
		<category><![CDATA[Technical staff]]></category>
		<category><![CDATA[Top]]></category>
		<category><![CDATA[Unintended]]></category>
		<category><![CDATA[Worker]]></category>
		<guid isPermaLink="false">https://en.spress.net/technical-maintenance-on-the-top-floor-of-landmark-81-building/</guid>

					<description><![CDATA[Every day, a team of technical workers maintains professional work on the highest floors of the Landmark 81 building. All are absolutely safe. Landmark 81 has a total of 81 floors, 461 m high. This is the tallest building in Vietnam, located in the center of Binh Thanh District, Ho Chi Minh City. The maintenance [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Every day, a team of technical workers maintains professional work on the highest floors of the Landmark 81 building. All are absolutely safe.</strong><br />
<span id="more-22602"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/22de907183336a6d3322.jpg" width="625" height="1018"> </p>
<p> <em> Landmark 81 has a total of 81 floors, 461 m high. This is the tallest building in Vietnam, located in the center of Binh Thanh District, Ho Chi Minh City. The maintenance and technical maintenance of the entire building is performed daily by the management team and staff. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/de4c6fe37ca195ffccb0.jpg" width="625" height="408"> <em> Anh Vu &#8211; the technical manager of the Landmark 81 building, said that the technical team often had quick briefings early in the morning to determine the arising work to do during the day. At the same time, the technical status of the building, the work done in the previous day must be reported in detail. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/8894383b2b79c2279b68.jpg" width="625" height="416"> <em> After that, the group of employees moved to the 79th floor of the building. This is the highest floor accessible by elevator. After that, people will walk up to the 80th and 81st floors (top floor) of the building to do their assigned work. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/e9445eeb4da9a4f7fdb8.jpg" width="625" height="416"> <em> Check the building&#8217;s power supply system. All electrical specifications must ensure safety conditions in accordance with regulations. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/43d3f57ce63e0f60562f.jpg" width="625" height="460"> <em> Technical staff use specialized temperature gauges to check the heat at conductor structures and power-using equipment on the 80th floor. This is a routine job to promptly detect problems and limit problems. minimize the risk of accidental fire or explosion. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/8d0738a82beac2b49bfb.jpg" width="625" height="416"> <em> A group of workers periodically maintain the glass. To do this, the worker must move on specialized rigs, in turn, check all the glass panes. The outer glass of the building is reinforced with special materials, ensuring safety and durability. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/6d3ed991cad3238d7ac2.jpg" width="625" height="416"> <em> Workers check a building&#8217;s cooling system. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/5050ebfff8bd11e348ac.jpg" width="625" height="416"> <em> The staff checks the operating parameters of the elevator. &#8220;The building is tall, the elevator is an indispensable element in the operation. We understand this, so we should pay attention to the daily maintenance and technical maintenance, so that the elevator does not cause problems,&#8221; said Mr. Vu. to speak. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/59fde352f010194e4001.jpg" width="625" height="432"> <em> The elevator of Landmark 81 building has a pulling force of 12,500 kg, each car has a load of 2,000 kg, a speed of 5m/s &#8211; is one of the fastest elevators in Vietnam. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/26dc9f738c31656f3c20.jpg" width="625" height="412"> <em> &#8220;Working on high-rise buildings requires us to have good health and overcome specific limitations. For example, when it comes to glass maintenance, every worker must overcome fear, focus on work and comply with all protection principles to ensure safety,&#8221; said Quang Trung, a technical staff member. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/c50c7da36ee187bfdef0.jpg" width="625" height="435"> <em> Periodic inspection and technical maintenance is carried out in the early morning hours, or when people take a lunch break. Troubleshooting was also implemented urgently. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/faaf45005642bf1ce653.jpg" width="625" height="424"> <em> This helps the building operate in a safe condition, and at the same time does not affect the activities of residents, merchants and visitors. In the photo is a visitor visiting the observatory on the 81st floor of the building on April 11. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/c8d1767e653c8c62d52d.jpg" width="625" height="273"> <em> When put into operation in July 2018, the Landmark 81 building has become one of the symbols of Ho Chi Minh City. Inside the building, service-commercial activities take place quite bustling, contributing to the driving force to promote the development of the city in the direction of civilization and modernity. </em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">22602</post-id>	</item>
		<item>
		<title>Tourism freezes, billion-dollar yachts are crowded in Quang Ninh</title>
		<link>https://en.spress.net/tourism-freezes-billion-dollar-yachts-are-crowded-in-quang-ninh/</link>
		
		<dc:creator><![CDATA[Trường Giang/VOV-Đông Bắc]]></dc:creator>
		<pubDate>Sat, 05 Jun 2021 14:55:23 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Bai Chay Beach]]></category>
		<category><![CDATA[Bai Chay tourist area]]></category>
		<category><![CDATA[billiondollar]]></category>
		<category><![CDATA[crowded]]></category>
		<category><![CDATA[Cruise ship]]></category>
		<category><![CDATA[Envelope]]></category>
		<category><![CDATA[Freeze]]></category>
		<category><![CDATA[freezes]]></category>
		<category><![CDATA[Ha Long Bay]]></category>
		<category><![CDATA[human]]></category>
		<category><![CDATA[In debt]]></category>
		<category><![CDATA[Look after]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Ninh]]></category>
		<category><![CDATA[No one here]]></category>
		<category><![CDATA[Off]]></category>
		<category><![CDATA[Quang]]></category>
		<category><![CDATA[Quang Ninh]]></category>
		<category><![CDATA[Shadows]]></category>
		<category><![CDATA[Ship]]></category>
		<category><![CDATA[Sporadic]]></category>
		<category><![CDATA[Tight]]></category>
		<category><![CDATA[tourism]]></category>
		<category><![CDATA[Tuan Chau tourist area]]></category>
		<category><![CDATA[Yacht]]></category>
		<category><![CDATA[yachts]]></category>
		<guid isPermaLink="false">https://en.spress.net/tourism-freezes-billion-dollar-yachts-are-crowded-in-quang-ninh/</guid>

					<description><![CDATA[A ship owner said, &#8216;The ship does not go to sea but still has to maintain maintenance and care personnel, and the bank debt keeps increasing&#8217;. Although it is summer, Quang Ninh tourism is &#8220;frozen&#8221; due to the influence of the Covid-19 epidemic. Ha Long international passenger ship port these days seems to be more [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>A ship owner said, &#8216;The ship does not go to sea but still has to maintain maintenance and care personnel, and the bank debt keeps increasing&#8217;.</strong><br />
<span id="more-20854"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/b70d75e66ca485fadcb5.jpg" width="625" height="387"> </p>
<p> <em> Although it is summer, Quang Ninh tourism is &#8220;frozen&#8221; due to the influence of the Covid-19 epidemic. Ha Long international passenger ship port these days seems to be more crowded, because hundreds of ships are anchored at the same time.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/7e2ca0c7b98550db0994.jpg" width="625" height="357"> <em> The scenery is beautiful but gloomy because all the ships are lying on the shore. From May 6, due to the extremely complicated developments of the Covid-19 epidemic, Quang Ninh province has suspended all sightseeing and tourism activities at tourist sites, tourist attractions, relics and scenic spots on the island. locality.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/61964c7d553fbc61e52e.jpg" width="625" height="374"> <em> Ha Long Bay has about 500 cruise ships operating, but now from ships serving day visitors to overnight cruises worth hundreds of billions of dollars, all are subject to dormant anchorage at the wharf.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/803faed4b7965ec80787.jpg" width="625" height="376"> <em> No longer crowded with tourists, the harbor is deserted. It is estimated that before the pandemic, there were peak days when Ha Long Bay welcomed nearly 20,000 visitors. Many weekends in the summer of last year, the number of visitors has also recovered.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/3e051dee04acedf2b4bd.jpg" width="625" height="393"> <em> Bai Chay tourist area is equally deserted. Along with tightening 5K, Quang Ninh has also asked to stop many non-essential services, making the streets even more deserted.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/ee81ca6ad3283a766339.jpg" width="625" height="403"> <em> While a number of large hotels have chosen to temporarily close at the beginning of the year, many small and medium hotels are still operating in moderation.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/0c8c34672d25c47b9d34.jpg" width="625" height="394"> <em> &#8220;The travel stop is necessary to prevent the epidemic, we also have to adapt by letting employees take a break, then selling online,&#8221; said the owner of a restaurant.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/0d4630ad29efc0b199fe.jpg" width="625" height="385"> <em> At the weekend, people came to Bai Chay beach to admire the scenery, some people still went to the beach to swim despite the regulations to suspend beach activities, not to gather crowds on the beach, and the loudspeakers continuously warned.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/56ec6a0773459a1bc354.jpg" width="625" height="414"> <em> The border of the sea is mainly local people going to exercise, complying with wearing masks to prevent epidemics.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/04ec3b072245cb1b9254.jpg" width="625" height="379"> <em> At Tuan Chau Tourist Area, the port area to welcome guests is also no longer a shadow of ships coming in and out.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/98a1a64abf0856560f19.jpg" width="625" height="392"> <em> Previously, after the outbreak of the epidemic in early 2021, from about March, tourism activities in Quang Ninh returned, but the number of visitors was not large. Many ships in a state of &#8220;not being able to restart yet were lying ashore&#8221;.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/e98edb65c2272b797236.jpg" width="625" height="390"> <em> &#8220;The ship doesn&#8217;t go to sea but still has to maintain maintenance and lookout personnel, the bank debt also keeps increasing,&#8221; a ship owner lamented.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_65_38863885/6ea95a424300aa5ef311.jpg" width="625" height="363"> <em> Tens of thousands of direct and indirect workers in the tourism industry in Quang Ninh are also having to quit, relax, and struggle to wait for the end of the epidemic.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20854</post-id>	</item>
		<item>
		<title>Bringing nature into the house should pay attention to what?</title>
		<link>https://en.spress.net/bringing-nature-into-the-house-should-pay-attention-to-what/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 05 Jun 2021 14:55:09 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Architects]]></category>
		<category><![CDATA[attention]]></category>
		<category><![CDATA[Bringing]]></category>
		<category><![CDATA[Creative Architects]]></category>
		<category><![CDATA[Crops]]></category>
		<category><![CDATA[CTA]]></category>
		<category><![CDATA[Deciduous]]></category>
		<category><![CDATA[homeowners]]></category>
		<category><![CDATA[House]]></category>
		<category><![CDATA[Irrigation bath]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Messy]]></category>
		<category><![CDATA[nature]]></category>
		<category><![CDATA[Note]]></category>
		<category><![CDATA[pay]]></category>
		<category><![CDATA[Pile roots]]></category>
		<category><![CDATA[Plant tree]]></category>
		<category><![CDATA[Sesame fortune]]></category>
		<category><![CDATA[Shed]]></category>
		<category><![CDATA[Shrubs]]></category>
		<category><![CDATA[Star fruit]]></category>
		<category><![CDATA[Trees]]></category>
		<category><![CDATA[Vo The Duy]]></category>
		<category><![CDATA[Wall House]]></category>
		<guid isPermaLink="false">https://en.spress.net/bringing-nature-into-the-house-should-pay-attention-to-what/</guid>

					<description><![CDATA[The selection of varieties, placement and plant maintenance are three factors that homeowners need to keep in mind. In today&#8217;s urban life, bringing nature into the home is a trend to balance people&#8217;s lives, as well as create more utility. In addition to depending on the preferences of the homeowner, according to architect Vo The [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The selection of varieties, placement and plant maintenance are three factors that homeowners need to keep in mind.</strong><br />
<span id="more-20853"></span> In today&#8217;s urban life, bringing nature into the home is a trend to balance people&#8217;s lives, as well as create more utility.</p>
<p> In addition to depending on the preferences of the homeowner, according to architect Vo The Duy (CTA | Creative Architects), homeowners need to pay attention to the following three factors: <strong> The first step is the selection of plant varieties</strong> Most urban houses are narrow tube townhouses, the area for the garden is also limited, so choose tree varieties with pile roots (the roots are not too massive, less horizontal growth affects the structure of the building). Plants often lose their leaves and many people, although they like nature, are afraid to sweep leaves because of their busy schedule. Meanwhile, sweeping leaves is also a tree care job, people who love taking care of trees, nature will love this job. However, when the homeowner does not have much time, it is still possible to grow houseplants with varieties of plants with few leaves or less falling or falling seasonally such as peach fairy, sesame buds, Taiwanese eagle &#8230; Depending on the preferences and nature of the project, homeowners can choose tree varieties for shade, fruit trees, beautiful flowering trees, shrubs, etc. Therefore, homeowners need to pay attention to coordinate for harmony, have parents. Reasonable arrangement, avoid planting too many varieties causing confusion and confusion. For example, a large tree with beautiful shape or beautiful flowers like star fruit and longan needs space and space to be able to exploit the beauty, avoid planting many varieties of trees that are crowded or obscured. The accompanying plants should be low trees, not too prominent in color or just gravel to clean the area below the tree. If you mix shrubs, you need to choose 3-4 varieties, don&#8217;t choose too many or you will get confused. Priority is given to varieties with beautiful leaves, larger size to make the main point, the rest are varieties with small leaves or different leaf shapes and colors to honor the main tree. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_01_114_39036283/dcf75b904bd2a28cfbc3.jpg" width="625" height="936"> <em> Arrange trees and shrubs in Wall house (CTA|Creative Architects).</em> <strong> The second is the planting location</strong> The location should be well-lit, ventilated and spaced enough to ensure the growth needs of the tree as well as a place with a good location. The planting locations are usually arranged in the front, backyard or atrium, skylight to meet the above requirements as well as increase the aesthetics of the building. In addition, for large plants, it is required to avoid positions such as beams and large beams because of structural safety factors. In addition, homeowners need to have techniques for planting planting holes to avoid the influence of tree roots on the construction. The requirements for waterproofing and drainage for the plant location also need to be considered when intending to grow plants indoors and need professional advice to ensure technical factors. <strong> Finally, homeowners need to pay attention to maintenance</strong> Trees need to be cared for and easily replaced if damaged or dead or the owner&#8217;s needs. Besides good drainage, the plant also needs to be watered and fertilized regularly. From maintenance requirements, the location of plants may have to be changed to suit reality. Homeowners should install a smart automatic irrigation system to reduce watering and bathing while still enjoying the lush nature in the house.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20853</post-id>	</item>
		<item>
		<title>Every time you make these 4 mistakes, why do you keep on burning hot summer days</title>
		<link>https://en.spress.net/every-time-you-make-these-4-mistakes-why-do-you-keep-on-burning-hot-summer-days/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 05 Jun 2021 10:21:09 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[app]]></category>
		<category><![CDATA[Burn]]></category>
		<category><![CDATA[burned]]></category>
		<category><![CDATA[Burning]]></category>
		<category><![CDATA[Ceiling fans]]></category>
		<category><![CDATA[Clockwise]]></category>
		<category><![CDATA[Cool]]></category>
		<category><![CDATA[Cool wind]]></category>
		<category><![CDATA[Curtains]]></category>
		<category><![CDATA[days]]></category>
		<category><![CDATA[EVN Hanoi]]></category>
		<category><![CDATA[hot]]></category>
		<category><![CDATA[House]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Mistake]]></category>
		<category><![CDATA[mistakes]]></category>
		<category><![CDATA[mystical gem]]></category>
		<category><![CDATA[Oven mitts]]></category>
		<category><![CDATA[Rotation]]></category>
		<category><![CDATA[summer]]></category>
		<category><![CDATA[Sundown]]></category>
		<category><![CDATA[Sunshade]]></category>
		<category><![CDATA[time]]></category>
		<category><![CDATA[Visor]]></category>
		<guid isPermaLink="false">https://en.spress.net/every-time-you-make-these-4-mistakes-why-do-you-keep-on-burning-hot-summer-days/</guid>

					<description><![CDATA[If you want to cool down your home, immediately avoid the following mistakes this summer! No maintenance of the air conditioner Like any other essential appliance, to function properly, an air conditioner needs regular maintenance. However, many families forget this. Maintaining your air conditioner both saves money and keeps your home cool. It is best [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>If you want to cool down your home, immediately avoid the following mistakes this summer!</strong><br />
<span id="more-20808"></span> <strong> No maintenance of the air conditioner</strong> </p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_276_39051514/0a0991ab80e969b730f8.jpg" width="625" height="416"> Like any other essential appliance, to function properly, an air conditioner needs regular maintenance. However, many families forget this. Maintaining your air conditioner both saves money and keeps your home cool. It is best to refer to the maintenance schedule recommended by the air conditioner manufacturer. You won&#8217;t have to spend a lot of money every year. <strong> Using the wrong ceiling fan</strong> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_276_39051514/9e1f7ebd6fff86a1dfee.jpg" width="625" height="312"> Most homes have a ceiling fan, but there are many families that don&#8217;t make the most of it. Many people think that ceiling fans are not equal to air conditioners. But ceiling fans can cool a home if used correctly. Installing ceiling fans in important areas of the house will help the air conditioner circulate cool air throughout the house. Also, if your home only uses the air conditioner when necessary, try setting the ceiling fan to rotate counterclockwise to push the air down into the house and create a cool breeze instead of just circulating the air. hot. In addition, installing an outdoor ceiling fan will help family members have a fun and cool outdoor dining and relaxing space. <strong> Open the curtains during the day</strong> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_276_39051514/d14635e424a6cdf894b7.jpg" width="625" height="357"> Opening the curtains during the day is a great way to take advantage of the sun&#8217;s natural light. But UV rays can raise indoor temperatures, especially during the summer. Keep the curtains closed until the sun goes down. You can buy sunshades, curtains or handy window shades to let light into your home but not heat it up. <strong> Use the oven regularly</strong> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_276_39051514/b0cf576d462faf71f63e.jpg" width="625" height="344"> For housewives, the oven is a necessary tool. However, using the oven frequently can make the house hotter. Best in the summer, you should limit the use of the oven. <strong> <em> Ngoc Huyen – According to smalldesignideas</em> </strong> <strong> On hot sunny days, the demand for electricity is high, you want to know the daily electricity index of your family to have a reasonable saving plan?</strong> <strong> Everything is simple when using the EPoint app of EVN Hanoi. Download and track electricity on the EPoint app &#8211; Daily electricity monitoring here</strong> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_02_276_39051514/811f3c302c72c52c9c63.jpg" width="625" height="231"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20808</post-id>	</item>
		<item>
		<title>Chronicles of Truong Sa: &#8216;Eyes of God&#8217; in a remote island</title>
		<link>https://en.spress.net/chronicles-of-truong-sa-eyes-of-god-in-a-remote-island/</link>
		
		<dc:creator><![CDATA[Cảnh Huệ]]></dc:creator>
		<pubDate>Mon, 17 May 2021 20:05:10 +0000</pubDate>
				<category><![CDATA[Science]]></category>
		<category><![CDATA[Chronicle]]></category>
		<category><![CDATA[Chronicles]]></category>
		<category><![CDATA[Country]]></category>
		<category><![CDATA[Da Lat Island]]></category>
		<category><![CDATA[direct]]></category>
		<category><![CDATA[employees]]></category>
		<category><![CDATA[Eyes]]></category>
		<category><![CDATA[God]]></category>
		<category><![CDATA[God s eyes]]></category>
		<category><![CDATA[Head station]]></category>
		<category><![CDATA[Island]]></category>
		<category><![CDATA[Lighthouse]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Navy]]></category>
		<category><![CDATA[Pham Van Thuong]]></category>
		<category><![CDATA[REMOTE]]></category>
		<category><![CDATA[Shining]]></category>
		<category><![CDATA[ships]]></category>
		<category><![CDATA[Son Ca Island]]></category>
		<category><![CDATA[Station Hai]]></category>
		<category><![CDATA[The dark night]]></category>
		<category><![CDATA[Truong]]></category>
		<category><![CDATA[Trường Sa]]></category>
		<category><![CDATA[Western Stone]]></category>
		<guid isPermaLink="false">https://en.spress.net/chronicles-of-truong-sa-eyes-of-god-in-a-remote-island/</guid>

					<description><![CDATA[Amidst thousands of seas, officials and employees of Lighthouse stations day and night silently dedicate their youth so that the Lighthouse never goes out. That &#8216;divine eye&#8217; not only illuminates the way for ships to pass in the dark, but also affirms the landmark of sovereignty over the country&#8217;s sea and islands. Mr. Pham Van [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Amidst thousands of seas, officials and employees of Lighthouse stations day and night silently dedicate their youth so that the Lighthouse never goes out. That &#8216;divine eye&#8217; not only illuminates the way for ships to pass in the dark, but also affirms the landmark of sovereignty over the country&#8217;s sea and islands.</strong><br />
<span id="more-15592"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_20_38863987/4186706c692e8070d93f.jpg" width="625" height="416"> </p>
<p> Mr. Pham Van Thuong (Nam Yet Lighthouse) cleans and maintains the &#8220;magic eye&#8221; <strong> The &#8220;divine eyes&#8221; </strong> During the voyage, every time the ship 571 anchored to the shore while it was still dark, the only thing for us to know the island&#8217;s location was from the light of the Lighthouse, also known as the &#8220;magic eye&#8221;. According to a sailor, currently on the islands and points of Truong Sa island, there are 9 lighthouses in Da Lat, An Bang, Da Tay, Tien Nu, Song Tu Tay, Truong Sa Lon, Sinh Ton, Son Ca and Nam Yet islands. . All 9 lighthouses are operated and maintained by engineers, officers and employees of the East Sea and Islands Maritime Safety Company. The construction of the lighthouse station on the islands was started when the international shipping route expanded at sea and to meet the requirements of protecting the Fatherland in the new situation. In particular, Song Tu Tay lighthouse was first built on the archipelago (1993), 17 nautical miles away from which ships can see bright white lights, single blinking every 15 seconds. The construction of the Lighthouse depends on the geology and coral background. On Song Tu Tay island, the lighthouse is built in the shape of a circular tower in the east of the island; The lighthouse on Da Lat island is built in the shape of an arrow on a coral background, has an iron and steel structure with flower slanting holes to reduce the acceleration of the wind, while the lighthouse on Son Ca island has a cylindrical shape&#8230; Son Ca island lighthouse stands tall like a fortress, standing tall in the middle of the ocean and is considered the most beautiful lighthouse in the 9 lighthouses in the Truong Sa archipelago. Tran Van Chien &#8211; Head of Son Ca Lighthouse said: &#8220;Son Ca lighthouse is 28m high, 25.5m bright center, group 2 white flash, 10 seconds period, 15 nautical miles effective range. During the day, in good weather, dozens of nautical miles away from passing ships can be seen. The lighthouse operates from 5:30 p.m. the previous day to 5:30 a.m. the next morning. On a day with thunderstorms, fog, or bad weather, the lights must be turned on earlier and turned off later. When there is a problem, the main light is damaged, the auxiliary light will be turned on for replacement and the main lamp must be repaired immediately. Under no circumstances shall the Lighthouse be turned off. Because the lighthouse is not only a landmark for ships operating in the area, but also a light of national sovereignty at sea. <strong> The &#8220;lighters&#8221;</strong> With the task of not letting the Lighthouse be turned off under any circumstances, engineers, officers and employees of the East Sea and Islands Maritime Safety Company must work day and night. The environment is harsh, often in contact with batteries, acids, mechanical equipment, and conductive objects, but they always fulfill their noble duties. They are considered to be diligent &#8220;lighters&#8221;, so that the flame of love for their homeland and country always shines. Their idyllic work is a silent sacrifice, the Lighthouse shines with time, which means that their hair is partly gray because of the sun and wind. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_17_20_38863987/3a270dcd148ffdd1a49e.jpg" width="625" height="416"> <em> Son Ca Lighthouse Station</em> Mr. Pham Van Thuong (SN 1990, Nam Yet Lighthouse Station) worked for 4 years in the profession and went to 6 islands to do his duty. “Due to saltwater contamination, the lighthouses are often rusted, if not maintained continuously, the lights are easy to catch fire. Whether it&#8217;s scorching sun or howling wind and rain, we have to climb to the top of the lamp post for periodic cleaning and maintenance. At a height of tens of meters, it only takes a small mistake to have an accident. When the sea is rough, at the lighthouse stations on the island, the waves hit the ground floor. Every 15 minutes, the brothers have to take turns on duty to check the technical parameters. Now there is solar power, so it&#8217;s less difficult, but before, it was very tiring to use the generator to generate electricity. It was an opportunity for me to come to the profession,” said Pham Van Thuong. The &#8220;magic eye&#8221; is never allowed to turn off, because it is lit from the hearts of all officers and employees of the Stations and the naval soldiers guarding the rooster of the Fatherland on a remote island&#8230; As a senior in the profession of &#8220;lighting lighthouses&#8221; for more than 24 years, Mr. Nguyen Ngoc Tuan (SN 1976, Song Tu Tay Lighthouse Station) has celebrated Tet more than 15 times on the island. Mr. Tuan confided: &#8220;Working in harsh climates and poor conditions, although it is hard, it has trained me more will and bravery. I am proud to work in Truong Sa. Looking at the bright lights in the black sky, I feel that my country is too sacred. Each flash is the breath and life of the person lighting the fire. To do this job, you must love the job, love the sea and islands of the homeland to complete the task well.&#8221; Mr. Bui Van Son (Chief of Sinh Ton Lighthouse Station) is considered an ancient tree of lighthouse stations in Truong Sa. With a period of more than 25 years, Mr. Son has gone to all 9 stations, with the lighthouse he went to for the fifth time. “Each station has its own look, different facilities and conditions. As the station chief, I had to balance the food, calculate how it was reasonable, and then call the mainland to buy what&#8217;s urgent so that my brothers and sisters would be less needy. In addition to regulating the work in the station, I often capture the emotional feelings of the staff, timely motivate, help people overcome difficulties. Along with carrying out the task of training and practicing island defense plans, contributing to strengthening the island&#8217;s combat strength when situations arise, sports and cultural exchanges are also maintained. We all came together very naturally, the brothers on the station lived more together than with their families,” said Mr. Son. Lighthouse lights run on solar power and automatically turn on and off when it gets dark, but always ensure that the engine and generator operate normally in all conditions, especially prolonged rainstorms. Salt vapor and sea breeze easily damage machinery and technical equipment, so officers and employees must regularly check, preserve and maintain equipment on the station. The &#8220;magic eye&#8221; is never allowed to turn off, because it is lit from the hearts of every officer, station staff and the navy soldiers guarding the rooster of the Fatherland on a remote island&#8230;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15592</post-id>	</item>
		<item>
		<title>Surprise: The US Air Force has more F-35s than both the F-15 and the F-10</title>
		<link>https://en.spress.net/surprise-the-us-air-force-has-more-f-35s-than-both-the-f-15-and-the-f-10/</link>
		
		<dc:creator><![CDATA[Trân Trân]]></dc:creator>
		<pubDate>Tue, 11 May 2021 12:30:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[A 10]]></category>
		<category><![CDATA[A 10 Warthog]]></category>
		<category><![CDATA[Aggressive]]></category>
		<category><![CDATA[air]]></category>
		<category><![CDATA[Air Force]]></category>
		<category><![CDATA[Backbone]]></category>
		<category><![CDATA[Cheap]]></category>
		<category><![CDATA[Combat aircrafts]]></category>
		<category><![CDATA[Dizziness]]></category>
		<category><![CDATA[F 15 Eagle]]></category>
		<category><![CDATA[F 15EX]]></category>
		<category><![CDATA[F 16 Fighting Falcon]]></category>
		<category><![CDATA[F-35 Lightning II]]></category>
		<category><![CDATA[F10]]></category>
		<category><![CDATA[F15]]></category>
		<category><![CDATA[F35s]]></category>
		<category><![CDATA[Fighters]]></category>
		<category><![CDATA[Force]]></category>
		<category><![CDATA[Ground attack aircraft]]></category>
		<category><![CDATA[Hurry]]></category>
		<category><![CDATA[Losing out]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Payroll]]></category>
		<category><![CDATA[Squadron]]></category>
		<category><![CDATA[strafe]]></category>
		<category><![CDATA[Surprise]]></category>
		<category><![CDATA[US Air Force]]></category>
		<guid isPermaLink="false">https://en.spress.net/surprise-the-us-air-force-has-more-f-35s-than-both-the-f-15-and-the-f-10/</guid>

					<description><![CDATA[The US Air Force&#8217;s F-35 fighter squadron is growing rapidly, now the number of F-35 fighters of this force is only inferior to the &#8216;cheap&#8217; F-16. According to the latest reports, the number of F-35 fighters in service with the US Air Force, now surpassing all other aircraft of this force, rose to second place [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The US Air Force&#8217;s F-35 fighter squadron is growing rapidly, now the number of F-35 fighters of this force is only inferior to the &#8216;cheap&#8217; F-16.</strong><br />
<span id="more-13114"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/13b49ee283a06afe33b1.jpg" width="625" height="312"> </p>
<p> <em> According to the latest reports, the number of F-35 fighters in service with the US Air Force, now surpassing all other aircraft of this force, rose to second place &#8211; after injections. click F-16.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/06e18db790f579ab20e4.jpg" width="625" height="416"> <em> Specifically, with a squadron of F-35 fighters up to 283 aircraft, the number of F-35s of the US Air Force has surpassed both the F-15 and F-10 &#8211; two types of backbone aircraft of this force. throughout the decades.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/d8bd5ceb41a9a8f7f1b8.jpg" width="625" height="351"> <em> The single-engine F-16 fighter with the advantage of low maintenance costs and low operating costs is still the most popular fighter in the US Air Force.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/e22e63787e3a9764ce2b.jpg" width="625" height="353"> <em> Specifically, the US Air Force owns 934 F-16 fighters. This number of F-16s will be gradually replaced by F-35 fighter jets in the future.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/1ba999ff84bd6de334ac.jpg" width="625" height="416"> <em> Designed to be a mixed-attack fighter and strike aircraft, the US F-35 is capable of replacing all other fighters currently in service with this force.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/a0943ec22380cade9391.jpg" width="625" height="351"> <em> However, while the F-35 is being finalized and corrected for hundreds of defects, it still cannot become the backbone of the US Air Force at the present time.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/405dd80bc5492c177558.jpg" width="625" height="375"> <em> In fact, the heavy F-15 fighter jets still have a dominant position in the US Air Force&#8217;s bombardments if there is a war.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/37a3adf5b0b759e900a6.jpg" width="625" height="416"> <em> The latest version of the F-15 is the F-15EX, which was rushed into service by this force shortly after making its first flight earlier this year.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/3666a130bc72552c0c63.jpg" width="625" height="417"> <em> It is expected that until the 40s of this century, the F-15 will still serve in the US Air Force.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/c83a586c452eac70f53f.jpg" width="625" height="468"> <em> As for the A-10 fighter jet, this type of aircraft that is nearly half a century old is still considered &#8220;without a worthy substitute&#8221;.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/6203f155ec1705495c06.jpg" width="625" height="416"> <em> The failure of the US Air Force to develop a serial version of the A-10 is simply because the aircraft is currently too efficient, and effective enough, until the F-35 comes into its own. future.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/3b48a91eb45c5d02044d.jpg" width="625" height="351"> <em> Up to the present time, the US Air Force owns 279 A-10 Warthog attack aircraft in service. However, only about 60% of these are qualified to fight, the rest need constant revolving maintenance.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_10_180_38790312/2814c542d800315e6811.jpg" width="625" height="416"> <em> The US Air Force expects the entire A-10 strike group to be phased out gradually from 2032, even sooner if there are serious accidents in the future. By that point, the F-35 would have to be completed to take the place of the A-10. Photo source: BI.</em> <em> The US is producing F-35 fighters at breakneck speed, both for domestic service and for delivery to allied countries as planned. Source: Chosul.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13114</post-id>	</item>
		<item>
		<title>New service: Solar battery cleaning</title>
		<link>https://en.spress.net/new-service-solar-battery-cleaning/</link>
		
		<dc:creator><![CDATA[Trần Thế]]></dc:creator>
		<pubDate>Wed, 28 Apr 2021 18:32:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[All in one]]></category>
		<category><![CDATA[battery]]></category>
		<category><![CDATA[cleaning]]></category>
		<category><![CDATA[efficiency]]></category>
		<category><![CDATA[EVNSPC]]></category>
		<category><![CDATA[Expensive goods]]></category>
		<category><![CDATA[Hard water]]></category>
		<category><![CDATA[Huynh Duc Thanh]]></category>
		<category><![CDATA[Huynh Duc Tien]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Majority]]></category>
		<category><![CDATA[Organic matter]]></category>
		<category><![CDATA[Photoelectric cells]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[profession]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[Sawdust]]></category>
		<category><![CDATA[service]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[Solar battery]]></category>
		<category><![CDATA[solution]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[The battery]]></category>
		<guid isPermaLink="false">https://en.spress.net/new-service-solar-battery-cleaning/</guid>

					<description><![CDATA[The cleaning work for solar panels for a long time is mostly done by the investor and very unscientific. To increase the durability and efficiency of about tens of millions of panels, a number of businesses have launched professional and expensive solar cell cleaning services. Huynh Duc Thanh, an electrical engineer working at the Southern [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The cleaning work for solar panels for a long time is mostly done by the investor and very unscientific. To increase the durability and efficiency of about tens of millions of panels, a number of businesses have launched professional and expensive solar cell cleaning services.</strong><br />
<span id="more-9904"></span> Huynh Duc Thanh, an electrical engineer working at the Southern Power Corporation (EVNSPC), said that in the solar power system that investors are installing, solar panels (photovoltaic cells) are equipment. important and vulnerable to the influence of external factors. Vietnam is a tropical, hot, humid area with a lot of rain, objects that have a great impact on the life expectancy by wind, rain, sea water, ash &#8230; For solar panels, seawater, and rock dust. In areas where cement exploitation, production, sawdust of wood factories, chemicals in industrial zones &#8230; have a great impact on the durability and efficiency of the panels is very high.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_35_38620276/733de1a8c7ea2eb477fb.jpg" width="625" height="921"> <em> Professional solar battery cleaning worker for a project in the city. Ho Chi Minh</em> Meanwhile, according to engineer Thanh, the current method of cleaning the panels is mostly done by investors, most of them are using water, available facilities and using a hose to wash them, this method is not technically correct. in terms of maintenance, because many areas have water contaminated with alum, hard water, there is a lot of organic matter, more dissolved metals… leading to further damage to the panels. “The effectiveness of the project apart from equipment, materials, installation techniques, the operation and maintaining the efficiency of the system is related to the cleaning of the panels. Keeping the panels clean is the key to maximizing output, increasing economic efficiency for investors, ”Thanh said. Solar power is booming in Vietnam, especially household investment packages, concentrated in remote and island areas in the South. According to the Vietnam Electricity (EVN), by the end of 2020, the total capacity of renewable energy sources will be 17,430 MW (up 11,780 MW compared to 2019) and accounting for 25.3%. . In which, there are about 8,000 MW of rooftop solar power and more than 8,400 MW of large farm solar power. Thus, according to investors&#8217; calculations, the whole country currently has no less than 30 million solar panels operating in the whole system and will increase when many projects are under construction and about to be operational. Seeing this potential, a number of businesses in the South have added new services, which are professional cleaning of solar panels and package maintenance for solar power systems. the investors. Mr. Le Tran Khanh Vy &#8211; General Director of Nhat Hung Environmental Technology Co., Ltd. (Thu Duc City) &#8211; said that in the face of more and more investors installing solar equipment, the company opened more professional solar battery cleaning service, currently hundreds of customers across the country have signed contracts to participate in cleaning and maintaining solar power systems with this package. To meet the needs of customers, especially solar power investment packages in industrial form, the company is forced to professionalize by producing standard cleaning solutions, investing in specialized cleaning equipment. and has a team of professional staff in charge. “The solution that the company offers is to keep batteries clean by cleaning them regularly and properly; Check the water source, if the water source is contaminated with alum, hard water, contains a lot of organic matter, lots of dissolved metals, it must be handled; choosing a cleaning solution specialized for cleaning panels, because now there are domestically produced products with appropriate and safe prices, ”said Mr. Vy. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_35_38620276/879217073145d81b8154.jpg" width="625" height="351"> <em> On the market, there are specialized solutions for cleaning solar cells</em> According to electricity experts, at present, many solar power projects are invested billions of dong, even more money, but the stage of battery cleaning and system maintenance is less concerned by investors properly. This leads to a reduced lifespan of the building, especially the heat collection efficiency of the panels is low, while if cleaned and maintained properly, the economic efficiency is not small. Mr. Huynh Duc Tien, living in Hoc Mon district, city. Ho Chi Minh has just signed a package contract with a company specializing in solar battery cleaning and maintenance of the solar power system with an investment of more than 1.2 billion VND nearly 2 years ago. Mr. Tien said that the cleaning company has specialized solutions, tools and techniques, so it is handed over to them for management because the cost is not much and it saves time.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9904</post-id>	</item>
		<item>
		<title>Bamboo Airways selected PIA Group as a strategic partner</title>
		<link>https://en.spress.net/bamboo-airways-selected-pia-group-as-a-strategic-partner/</link>
		
		<dc:creator><![CDATA[Hà An]]></dc:creator>
		<pubDate>Sun, 25 Apr 2021 01:00:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[air]]></category>
		<category><![CDATA[airplane]]></category>
		<category><![CDATA[Airways]]></category>
		<category><![CDATA[bamboo]]></category>
		<category><![CDATA[Bamboo Airways]]></category>
		<category><![CDATA[Co operate]]></category>
		<category><![CDATA[Doan Van Phuong]]></category>
		<category><![CDATA[Equipment]]></category>
		<category><![CDATA[Group]]></category>
		<category><![CDATA[Guarantee]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Nguyen Ngoc Trong]]></category>
		<category><![CDATA[On time]]></category>
		<category><![CDATA[operate]]></category>
		<category><![CDATA[Overhaul]]></category>
		<category><![CDATA[Partner]]></category>
		<category><![CDATA[PIA]]></category>
		<category><![CDATA[PIA Group]]></category>
		<category><![CDATA[Planes]]></category>
		<category><![CDATA[Safety factor]]></category>
		<category><![CDATA[selected]]></category>
		<category><![CDATA[Skill]]></category>
		<category><![CDATA[Strategic]]></category>
		<category><![CDATA[Strategic partnership]]></category>
		<category><![CDATA[Strategy]]></category>
		<guid isPermaLink="false">https://en.spress.net/bamboo-airways-selected-pia-group-as-a-strategic-partner/</guid>

					<description><![CDATA[For Bamboo Airways, the strategic cooperation with PIA Group is in line with Bamboo Airways&#8217; strategy of modernizing and professionalizing its fleet and flight operators in the coming years. PIA will provide Bamboo Airways with maintenance, repair and warranty services for aviation equipment &#8230; Professional partner Under the cooperation agreement, when becoming a strategic partner [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>For Bamboo Airways, the strategic cooperation with PIA Group is in line with Bamboo Airways&#8217; strategy of modernizing and professionalizing its fleet and flight operators in the coming years.</strong><br />
<span id="more-8091"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_21_325_38593265/2ff3a554801669483007.jpg" width="625" height="351"> </p>
<p> PIA will provide Bamboo Airways with maintenance, repair and warranty services for aviation equipment &#8230; <strong> Professional partner</strong> Under the cooperation agreement, when becoming a strategic partner of Bamboo Airways, the Aviation Technical Service Center under PIA Group Joint Stock Company will provide Bamboo Airways with maintenance, repair and warranty services. aviation equipment such as maintenance, overhaul, and upgrade of aircraft equipment; supply of spare parts for aircraft and aircraft equipment; providing aircraft equipment rental services and special technical services of international standards. Along with that, the Center also provides technical training services to support human resources for Bamboo Airways as well as for other airlines; designing, manufacturing, replacing aircraft interior details and many other ancillary services. Regarding the selection of the Aviation Technical Service Center under PIA Group Joint Stock Company as a strategic partner, Bamboo Airways leaders said that the two sides have gone through a close working process, learning the capacity of the work in a far-reaching way. “Always putting safety and punctuality ratios on top, Bamboo Airways has very strict requirements for technical units. For the Aviation Technical Service Center of PIA Group Joint Stock Company, this is a maintenance facility with the most modern equipment system in the region. In particular, many stages have been automated to limit errors caused by human factors. Currently, in the field of aircraft equipment maintenance in Vietnam, there are few domestic units that have a serious and methodical investment like PIA ”, said Nguyen Ngoc Trong, Deputy General Director of Bamboo Airways. concentration. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_21_325_38593265/5f31c97ce73e0e60572f.jpg" width="625" height="351"> PIA meets very strict requirements from Bamboo Airways. Mr. Nguyen Ngoc Trong added that, in addition to being approved by the Vietnam Aviation Administration for the rating, the aircraft maintenance facility must pass the inspection process carried out by Bamboo Airways internally to assess the status of equipment. tools, human resources, inventory, &#8230; to ensure the provision of high quality services and to strictly comply with all strict requirements of the manufacturer as well as the authorities. In addition, partners must be available 24/7 to promptly process requests from the airline regardless of day and night, which helps to minimize waiting time to ensure the aircraft is operating in good technical condition. , fly on time. <strong> Long-term strategy fit</strong> Since its inception, Bamboo Airways has positioned itself as an airline towards 5-star standards. The strategic cooperation with PIA is in line with Bamboo Airways&#8217; strategy of modernizing and professionalizing its fleet and flight operations team in the coming years. It is known that since cooperating with PIA, Bamboo Airways has been able to on-site maintenance of many equipment instead of sending abroad as before. In addition to saving direct costs, the turnaround time is also shortened, creating favorable conditions for the technical assurance of the fleet. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_21_325_38593265/7418ca890dcae494bddb.jpg" width="625" height="351"> Since cooperating with PIA, Bamboo Airways has been able to on-site maintenance of many equipment instead of sending them abroad. The field of aviation engineering in Vietnam still has a lot of room for development. In fact, many equipment is not too complicated but still have to be regularly sent abroad for maintenance, causing costly such as: in-flight kitchen equipment, entertainment equipment, float boats, slide troughs. , aircraft interior &#8230; Bamboo Airways expects PIA to continue to expand its capacity to repair and maintain many aircraft equipment in the future, thereby creating a solid foundation to accompany Bamboo Airways on its journey to become an airline. most reputable and safest aviation in the region and in the world. “With the right vision and serious investment, PIA Group aims to provide professional and professional aviation services. This is clearly shown in the slogan and also a criterion for all activities of the Group &#8211; Professional Aviation Services &#8211; Professional Aviation Services, ”said Doan Van Phuong &#8211; Chairman and CEO of Group Joint Stock Company. PIA said. PIA Group was established in 2013, headquartered in Hanoi. The Group includes many member units operating in multiple fields such as aviation, transportation, tourism, construction, real estate &#8230; In particular, the PIA Group&#8217;s aviation services include machinery maintenance. flight and aircraft equipment, ground services; supply of flying fuel, airline meals; freight; aviation agent; pilot training &#8230; Taking service quality as a guideline, putting the interests of customers as a priority in all activities, Aviation Technical Service Center in particular and PIA Group in general are constantly striving to provide optimal solutions. to best meet the needs of customers according to 3 criteria: Professionalism &#8211; Responsibility &#8211; Creativity. Along with that, the management team, technicians of the Center are recognized for having high professional expertise, years of experience in the industry and full capacity to ensure service quality according to the standards of the home. aviation authorities &#8230;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">8091</post-id>	</item>
		<item>
		<title>Do well the logistics, fire protection vehicle management</title>
		<link>https://en.spress.net/do-well-the-logistics-fire-protection-vehicle-management/</link>
		
		<dc:creator><![CDATA[Hằng Ngần]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 13:22:13 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Canoe]]></category>
		<category><![CDATA[Causing serious consequences]]></category>
		<category><![CDATA[CNCH]]></category>
		<category><![CDATA[Enter the warehouse]]></category>
		<category><![CDATA[Explosion]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fire and Rescue Police Department]]></category>
		<category><![CDATA[Fire fighting]]></category>
		<category><![CDATA[Fire protection]]></category>
		<category><![CDATA[Fire Protection CNCH]]></category>
		<category><![CDATA[Fire truck]]></category>
		<category><![CDATA[logistics]]></category>
		<category><![CDATA[Logistics room]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Major]]></category>
		<category><![CDATA[Management]]></category>
		<category><![CDATA[nguyen Thi Thom]]></category>
		<category><![CDATA[Overhaul]]></category>
		<category><![CDATA[Protection]]></category>
		<category><![CDATA[Pump]]></category>
		<category><![CDATA[typical]]></category>
		<category><![CDATA[Vehicle]]></category>
		<guid isPermaLink="false">https://en.spress.net/do-well-the-logistics-fire-protection-vehicle-management/</guid>

					<description><![CDATA[Although it is an area with a high risk of fire and explosion, but from 2020 to now, the fires in the province not only decrease in number but also almost no major fires have caused serious consequences. important. To get that result, besides the professional teams, the financial and logistics forces also play an [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Although it is an area with a high risk of fire and explosion, but from 2020 to now, the fires in the province not only decrease in number but also almost no major fires have caused serious consequences. important. To get that result, besides the professional teams, the financial and logistics forces also play an important role in the implementation of the specific tasks of the Fire and Rescue Police Department (Provincial Police).</strong><br />
<span id="more-7711"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_448_38621320/ccf47c2dbe6e57300e7f.jpg" width="625" height="408"> </p>
<p> <em> Fire fighting vehicles and equipment of the provincial police force of Firefighting and Firefighting are inspected and maintained regularly.</em> The Fire and Rescue Police Department (Provincial Police) currently manages 34 vehicles for firefighting and CNCH, including 5 fire trucks, 2 ladder cars, 3 pump cars, 1 boat and 5 fire boats on the river. , sea. These are special vehicles with high usage frequency, effectively serving the task of ensuring fire safety in the area, so management and maintenance also set higher requirements than other conventional means. Major Nguyen Thi Thom, Team Leader of the Logistics Team, manager of fire protection vehicles and CNCH vehicles (Fire and Rescue Police Department, Provincial Police) said: Over the past years, there has been an increasing requirement for the task of ensuring security in love In the new model, we strictly maintain the maintenance and maintenance regime of fire-fighting and CNCH vehicles, proactively inspect and repair minor damage, promptly propose major repairs or replace vehicles, machines, Permanent service equipment is ready to fire at the highest level. Thanks to that, in time detecting problems to repair and replace spare parts, ensure regular operation of vehicles, meet urgent requirements when dealing with fires, explosions, CNCH. Right in the headquarters of the unit, fire engines, CNCH, fire pumps &#8230; are located in the covered house; fire fighting equipment and means of fire fighting and CNCH are stored in warehouses, neatly and scientifically arranged. The monitoring of warehousing and ex-warehousing is done carefully, regularly updated in accordance with the form, process and regulations. By 2020, the unit has received 9 new vehicles (including fire trucks, fire boats &#8230;), which have registered for the first time and periodically ensure according to regulations. At the same time, coordinated with the Logistics Department (Provincial Police) to repair and maintain 19 vehicles, fire pumps and CNCH with the amount of over 875 million VND. After receiving, they have been allocated and distributed to professional teams according to their functions. Repair and maintenance are carried out in accordance with regulations, ensuring quality and financial disclosure. With the vehicle management function, the inspection of fire protection vehicles is also seriously implemented, contributing to improving the administrative reform index of the unit. In an effort to reform administrative procedures, with the slogan &#8220;running out of work without running out of time&#8221;, CBCS are not afraid to work overtime, focusing on shortening the time to resolve administrative procedures. Accordingly, for the procedures for granting fire protection equipment inspection certificates, in order to create favorable conditions for enterprises and organizations to quickly carry out the work acceptance steps, the unit has reduced the processing time. from 30 working days as required down to 20 days. Statistics in 2020 show that the unit has resolved 125 dossiers requesting inspection of fire-fighting vehicles, granted 117 certificates of inspection of fire-fighting means and 8 written notices of fire protection equipment inspection results. In which, 100% of procedures and dossiers are received and processed ahead of time. In addition, the financial work is done seriously, openly and transparently, ensuring financial requirements for professional work. Financial resources and assets are managed, used effectively, and practice thrift. The collection, payment, management and use of the fire protection design appraisal and approval fee and the fire protection equipment appraisal fee comply with regulations. Major Vuong Duc Tho, Deputy Head of Fire Prevention and Fighting Police Department, said: The financial and logistics force of the unit over the past years has performed well the advisory function to ensure resources and funding to meet the work requirements. , regular and unexpected combat by the Fire Police force of the whole province. In addition, it has closely coordinated with the provincial police professional departments as well as professional teams under the unit to actively grasp, analyze, forecast the situation, advise the Party Committee, department leaders in orientation. invest, mobilize resources, meet the requirements of the police work in the new situation.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7711</post-id>	</item>
		<item>
		<title>When do we need to replace car brake pads to ensure safety?</title>
		<link>https://en.spress.net/when-do-we-need-to-replace-car-brake-pads-to-ensure-safety/</link>
		
		<dc:creator><![CDATA[KTV Lê Hùng (Việt Đức Autospa, Lê Văn Lương, Hà Nội)]]></dc:creator>
		<pubDate>Fri, 23 Apr 2021 13:11:14 +0000</pubDate>
				<category><![CDATA[Vehicles]]></category>
		<category><![CDATA[Bicycle]]></category>
		<category><![CDATA[Brake]]></category>
		<category><![CDATA[Brake pads]]></category>
		<category><![CDATA[Braking system]]></category>
		<category><![CDATA[car]]></category>
		<category><![CDATA[Chirp]]></category>
		<category><![CDATA[Dashboard]]></category>
		<category><![CDATA[ensure]]></category>
		<category><![CDATA[Have influence]]></category>
		<category><![CDATA[Know]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Pads]]></category>
		<category><![CDATA[Part]]></category>
		<category><![CDATA[Pedal]]></category>
		<category><![CDATA[Periodic]]></category>
		<category><![CDATA[replace]]></category>
		<category><![CDATA[safe]]></category>
		<category><![CDATA[safety]]></category>
		<category><![CDATA[Speed]]></category>
		<category><![CDATA[Steering]]></category>
		<category><![CDATA[Take the road]]></category>
		<category><![CDATA[To replace]]></category>
		<category><![CDATA[Traffic jam]]></category>
		<category><![CDATA[Trail]]></category>
		<category><![CDATA[Vehicle]]></category>
		<category><![CDATA[Youth]]></category>
		<guid isPermaLink="false">https://en.spress.net/when-do-we-need-to-replace-car-brake-pads-to-ensure-safety/</guid>

					<description><![CDATA[The brake pads are a very important part of ensuring the safety of the vehicle. If the brake pads are worn out, it will affect the speed reduction and stop the vehicle. The brake pad is a part that needs to be replaced periodically Ask: I am using a 2010 Volkswagen Scirocco. Lately when I [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The brake pads are a very important part of ensuring the safety of the vehicle. If the brake pads are worn out, it will affect the speed reduction and stop the vehicle.</strong><br />
<span id="more-6689"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_326_38610673/de063be61da4f4faadb5.jpg" width="625" height="416"> </p>
<p> The brake pad is a part that needs to be replaced periodically <strong> Ask:</strong> <strong> <em> I am using a 2010 Volkswagen Scirocco. Lately when I step on the brake pedal, the pedal is deeper than when I first bought it. Is it a sign of brake wear and must be replaced?</em> </strong> <strong> Le Huyen Chi</strong> <em> (Thanh Xuan, Hanoi)</em> <strong> Reply: </strong> Based on the conditions described initially, it is possible to predict that the brake pads of the vehicle are worn out and it is time to replace them to ensure safety. For vehicles, brake pads are a very important part of reducing vehicle speed, ensuring safety. If the brake pads are worn deeply, it will directly affect the slowdown or stop the vehicle. How fast or slow the brake pads wear depends on the way each person runs. However, the brake pads will wear out faster when used by a car in crowded cities, where the brakes are always pressed, constantly checking due to traffic congestion. Conversely, if the road is open, wide, less using the brake, the brake pads will wear longer. Some signs of discernible brake pads wear such as: Brake pedal often hits the floor, when the brake has phenomenon of vehicle or steering wheel shaking, hissing noise or metal sounds colliding due to worn brake pads &#8230; Then, it can be found through the brake warning lights that light up on the dashboard. It is recommended that the brake pads need to be replaced periodically, usually for 2 years or 50,000km, whichever comes first. If you regularly check the brake or move continuously in crowded road conditions, the time to replace this part will be sooner. However, because the safety system is very important, when there are strange signs related to the brake system, it is best to immediately take the car to a warranty center, genuine maintenance or a reputable garage for inspection. and soonest remedy.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">6689</post-id>	</item>
		<item>
		<title>VinFast VF e34 &#8211; the most delicious and cheap C-size SUV in the market</title>
		<link>https://en.spress.net/vinfast-vf-e34-the-most-delicious-and-cheap-c-size-suv-in-the-market/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Tue, 20 Apr 2021 19:10:12 +0000</pubDate>
				<category><![CDATA[Vehicles]]></category>
		<category><![CDATA[Charger]]></category>
		<category><![CDATA[Cheap]]></category>
		<category><![CDATA[Csize]]></category>
		<category><![CDATA[Delicious]]></category>
		<category><![CDATA[E34]]></category>
		<category><![CDATA[Electric Car]]></category>
		<category><![CDATA[Electronic brake force distribution system]]></category>
		<category><![CDATA[ESC]]></category>
		<category><![CDATA[Feature]]></category>
		<category><![CDATA[HSA]]></category>
		<category><![CDATA[Indiscriminate]]></category>
		<category><![CDATA[Lithium ion battery]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[market]]></category>
		<category><![CDATA[Ordered]]></category>
		<category><![CDATA[Price]]></category>
		<category><![CDATA[Reserve]]></category>
		<category><![CDATA[Subscriber]]></category>
		<category><![CDATA[SUV]]></category>
		<category><![CDATA[The battery]]></category>
		<category><![CDATA[Tram]]></category>
		<category><![CDATA[Tuan Phong]]></category>
		<category><![CDATA[VF e34]]></category>
		<category><![CDATA[VINFAST]]></category>
		<category><![CDATA[VinFast VF e34]]></category>
		<guid isPermaLink="false">https://en.spress.net/vinfast-vf-e34-the-most-delicious-and-cheap-c-size-suv-in-the-market/</guid>

					<description><![CDATA[VinFast VF e34 meets many criteria that Vietnamese people set when buying a car: easy-to-access price, low maintenance cost, many features and environmental friendliness. The price is easy to access, the maintenance cost is only 1/3 of a gasoline car Launched on March 24, VinFast VF e34 has an official selling price of VND 690 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>VinFast VF e34 meets many criteria that Vietnamese people set when buying a car: easy-to-access price, low maintenance cost, many features and environmental friendliness.</strong><br />
<span id="more-5367"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_20_17_38583769/79a1c896ecd4058a5cc5.jpg" width="625" height="351"> </p>
<p> <strong> The price is easy to access, the maintenance cost is only 1/3 of a gasoline car</strong> Launched on March 24, VinFast VF e34 has an official selling price of VND 690 million, but for customers who ordered before June 30, 2021, the Vietnamese car company offers a special preferential price of only VND 590 million. Includes one-year free battery subscription. This is considered an accessible price for first-time car buyers, young families in big cities in Vietnam. Mr. Tuan Phong (30 years old) ordered VinFast VF e34 just one day after the car was introduced. He said, with outstanding technology such as electric motors, smart features and attractive pre-set price of only 590 million VND and extremely &#8220;open&#8221; pre-order policy, VF e34 persuaded him to &#8220;down money&#8221;. without any hesitation. “The battery rental policy that makes the car price more accessible is the first reasonable one. The second is an immediate incentive of 100 million dong for early booking, and the third one is a deposit of only 10 million dong and can be freely refunded / canceled / transferred without penalty, so I have no reason. to hesitate &#8220;, Mr. Phong said. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_20_17_38583769/5affe6c8c28a2bd4729b.jpg" width="625" height="351"> According to Mr. Phong, young people often like “delicious-nutritious-cheap” cars because their financial resources are not abundant. With the same amount of VND 590 million, in addition to the VF e34, customers cannot even buy a standard B-class SUV, only a few high-end versions of B-class sedans. Meanwhile, VF e34 Being a model in the higher-end C-segment is clearly a bargain. For young people who buy a car for the first time, owning a car is still vague when it comes to solving some concerns such as the cost of buying a car, maintenance, repair, fuel and parking. Mr. Tuan Phong admitted this, thinking that he was no exception, so he decided to buy an electric car. According to him, VinFast VF e34 not only has the most competitive price in the market, but also has a much more optimal cost-effectiveness than traditional cars. “The cost of electric fuel is cheaper than gasoline, of course. Worth mentioning here is that the maintenance cost of VinFast VF e34 is only 25% -30% of gasoline cars due to its simpler structure, ”said Phong. According to calculations, the total maintenance cost for electric cars after the first 40,000 km is only about 4.4 million VND, and only costs about 12.7 million VND for 120,000 km. Not only that, with VF e34, early customers who order early are also free 17.4 million dong of battery subscription fee in the first year. <strong> Overflowing with technology </strong> Attractive price does not mean VinFast VF e34 has reduced features, but instead, the car is fully equipped with &#8220;toys&#8221; and is connected to a smart management application. Through the application, users can update vehicle software, perform many tasks such as checking battery status, travel schedule, maintenance schedule, call for rescue, warning of theft risk, vehicle positioning, error diagnosis &#8230; <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_20_17_38583769/b65a0b6d2f2fc6719f3e.jpg" width="625" height="351"> Young customers will also be pleased with the cabin compartment equipped with a 10-inch touch screen, Apple CarPlay and Android Auto connectivity, 6 audio speakers and 2 driver-row USB ports to connect or charge electrical devices. death. The air-conditioning system integrates the air quality control function with the fine dust filter HEPA PM2.5 which is also an advantage for the current air pollution. In addition, the voice control feature to support Vietnamese for multi-regional adaptation is also expected. List of long-term safety technologies, including ABS anti-lock braking, BA emergency brake assist, EBD electronic brake force distribution, ESC electronic balance, HSA horizontal start assist, 360 surveillance camera , lane departure warning, blind spot warning, traffic flow warning until door opening, vehicle warning when reversing, front and rear sensor, tire pressure monitoring, automatic throttle, 6 airbags &#8230; Help VinFast VF e34 achieve the highest safety standards. <strong> Environmental friendliness </strong> Growing up with the Internet, Generation Y and Z (Gen Y &#8211; Gen Z) are well aware of the urgency of protecting the environment. Many young people are gradually changing to choose means of using electric energy to limit the impact on the living environment. In the opinion that electric cars are not actually too good for the environment compared to traditional cars, due to the generation of electricity and batteries emitting a lot of CO2, the leading renewable energy company in the UK EDF Energy protested. Accordingly, even with more emissions in the current production process, electric cars are still a &#8220;greener&#8221; option than traditional cars when taking into account the vehicle lifecycle. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_20_17_38583769/b54c0b7b2f39c6679f28.jpg" width="625" height="351"> That is not to mention that it will be easier and more efficient to treat the waste from the centralized battery production / recycling process in a closed process than to worry about a series of internal combustion engine vehicles discharging every day. . Technology to produce electricity and batteries is also developing and changing day by day, so emissions from manufacturing will be improved positively in the near future. According to EDF Energy, the biggest benefit of electric cars is improved air quality in large cities. Without exhaust pipes, electric cars have absolutely no NOx, HC, CO, CO2 emissions &#8211; a combination of exhaust gases that seriously affects human health and living environment. Simply put, electric cars are the foundation for cleaner and cleaner cities and roads. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_20_17_38583769/dfd860ef44adadf3f4bc.jpg" width="625" height="877"> Another fairly common myth is that lithium-ion batteries are as toxic as lead batteries. In fact, lithium-ion batteries are safer, causing less harm to the environment or human health. At the same time, lithium-ion batteries are also of high economic value, so they will be collected, recycled and reused instead of being disposed of as lead batteries, so the risk of environmental pollution is also minimized. In particular, the solution to renting batteries instead of &#8220;selling off&#8221; cars with batteries to customers will help manufacturers like VinFast better manage the amount of batteries circulating in the market, ensuring that they will not be disposed of indiscriminately, causing harmful to the environment.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5367</post-id>	</item>
		<item>
		<title>Railway maintenance package: Every year, VNR calls for help</title>
		<link>https://en.spress.net/railway-maintenance-package-every-year-vnr-calls-for-help/</link>
		
		<dc:creator><![CDATA[VIẾT LONG]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 02:19:23 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Backward]]></category>
		<category><![CDATA[Budget year]]></category>
		<category><![CDATA[Call for help]]></category>
		<category><![CDATA[calls]]></category>
		<category><![CDATA[Estimates]]></category>
		<category><![CDATA[Infrastructure structure]]></category>
		<category><![CDATA[Le Hoang Minh]]></category>
		<category><![CDATA[Lump sugar]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Maintenance unit]]></category>
		<category><![CDATA[Order]]></category>
		<category><![CDATA[Package]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[Railway Bureau]]></category>
		<category><![CDATA[Railway Law 2017]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[train]]></category>
		<category><![CDATA[Use it]]></category>
		<category><![CDATA[Vietnam Railway Bureau]]></category>
		<category><![CDATA[Vietnam Railway Corporation]]></category>
		<category><![CDATA[VNR]]></category>
		<category><![CDATA[Vu Anh Minh]]></category>
		<category><![CDATA[year]]></category>
		<guid isPermaLink="false">https://en.spress.net/railway-maintenance-package-every-year-vnr-calls-for-help/</guid>

					<description><![CDATA[Vietnam railway is very outdated and degraded &#8230; but up to now, it is still in a state of &#8216;head go, stay leg&#8217;. According to Mr. Vu Anh Minh, Chairman of Vietnam Railway Corporation (VNR), when transferring to the State Capital Management Committee at enterprises, the industry is still tasked with operating and exploiting the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Vietnam railway is very outdated and degraded &#8230; but up to now, it is still in a state of &#8216;head go, stay leg&#8217;.</strong><br />
<span id="more-4575"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_114_38567372/293a33f517b7fee9a7a6.jpg" width="625" height="403"> </p>
<p> According to Mr. Vu Anh Minh, Chairman of Vietnam Railway Corporation (VNR), when transferring to the State Capital Management Committee at enterprises, the industry is still tasked with operating and exploiting the entire structural system. railway infrastructure. But the railway infrastructure is under the management of the Ministry of Transport, which leads to a situation of &#8220;head going, feet remaining&#8221;. <strong> Use maintenance money</strong> According to previous regulations, at the beginning of the year, the Ministry of Transport carried out the assignment of the budget capital estimates to the VNR. After that, the unit will place an order for public services with 20 affiliated companies to perform the railway maintenance. On December 31st, the company organized to take over and check assets to continue the maintenance cycle of next year. From 2019, VNR transferred to the State Capital Management Committee at Enterprises, no longer under the Ministry of Transport, so this ministry did not continue to assign capital to non-industry units. Therefore, in 2020, VNR once called for help because it was not assigned capital. Then, based on the resolution of the Government, the Ministry of Transport temporarily assigns capital to VNR to carry out the maintenance. However, by 2021, the plan to assign VND 2,800 billion to any maintenance unit has not been removed. The reason is that the project on management, use and exploitation of national railway infrastructure assets made by the Ministry of Transport has not been approved after many submission to the Prime Minister because of differences in opinion. Specifically, the Ministry of Justice believes that the fact that the Ministry of Transport assigns the maintenance cost estimates to the VNR for implementation is not contrary to the current law. At the same time, there is no need to go through unnecessary intermediaries, slow down the progress of the mission, directly affect the safety of the train. &#8220;If assigned to the Railway Bureau, there will be many problems such as inconsistent with the Law on Railways &#8230;&#8221; &#8211; The Ministry of Justice stated. Meanwhile, the Ministry of Finance believes that the assignment of budget estimates for railway management and maintenance to VNR is not in accordance with the provisions of the State Budget Law in Clause 1, Article 49. On this basis, the Ministry of Transport proposed the Government to hand over money for railway maintenance to the Railway Administration, and then return it to the VNR according to the comments of the Ministry of Finance. However, VNR does not agree with this plan. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_114_38567372/58355afa7eb897e6cea9.jpg" width="625" height="403"> <em> The profit that VNR has will be paid to the budget and annually the budget will allocate about 2,800 billion VND for railway system maintenance. Photo: V.LONG</em> <strong> According to which law is reasonable?</strong> According to Mr. Vu Anh Minh, currently all railways in countries around the world, the ownership, management, maintenance, and operation of national railway infrastructure assets invested by the State are allotted to businesses. state industry implementation. State-owned enterprises directly manage, maintain, trade in properties and operate. State management agencies do not directly manage, exploit and trade assets, but only properly perform state management functions such as policy making, planning, inspection, and inspection of the implementation of management. property management, exploitation and trading &#8230; Currently, VNR is managing 3,143 km of railways passing through 34 provinces and cities. In order to maintain this entire infrastructure, the VNR must organize an asset management system from the parent company level to the member units and the majority shareholding companies. Currently, the industry has 11,315 employees. In which, 1,241 labors of bridge week, road patrol, tunnel week; 915 workers indirectly perform the task of planning and cost estimating the maintenance of the works &#8230;; 6,278 maintenance work and quality management of maintenance work; 2,881 employees on duty guarding the crossroads to ensure train operation safety. Therefore, the proposal of the Ministry of Transport will break the consistency between the management and maintenance activities of railway infrastructure with the safety of train operation and railway transport business, delaying the operation. to mobilize railway transport, to eliminate railway transport. “Because then VNR will have to operate railway transportation in the condition that the national infrastructure system is divided, lack of synchronous coordination due to too many entities to manage and operate. This will break the principle of &#8220;unification, concentration&#8221; &#8211; the most basic and key principle in railway transport activities of the railway ever since &#8230; &#8220;- Mr. Minh said. Meanwhile, Mr. Le Hoang Minh, Director of the Department of Transport Infrastructure (Ministry of Transport), said that the Ministry of Transport&#8217;s implementation of the budget for the maintenance of the national railway system to the Railway Administration is is implementing in accordance with the current provisions of the State Budget Law 2020. &#8220;The Ministry of Transport must base on the current regulations, can not arbitrarily do any problems without grounds&#8221; &#8211; Mr. Le Hoang Minh emphasized. The fact that the units leading the Railway Law 2017 stipulate a number of powers for the VNR, including the authority to manage and maintain the national railway infrastructure, Mr. Minh affirmed the budget and financial issues. The main law is to comply with the State Budget Law (general law), while the 2017 Railway Law is a specialized law. However, according to an expert, it is necessary to apply the law in a flexible way, to completely solve this problem, how to create the most favorable conditions for railway maintenance, to avoid people thinking that there is Money is scrambled. &#8220;With the package of railway infrastructure maintenance, I think that it is reasonable to assign it to the VNR, if it is assigned to the Railway Bureau through many unnecessary intermediaries, there may be a mechanism for asking &#8211; giving &#8230;&#8221; or. • <strong> Invite 20 units but can not sign the contract yet</strong> According to the report of the Vietnam Railway Administration, after being assigned with the plan and estimate by the Ministry of Transport, in January 2021, the department drafted a contract to order railway infrastructure maintenance. The Department has invited 20 maintenance units to negotiate and sign orders for orders, but so far the units do not sign contracts. The reason is that VNR, which currently accounts for more than 50% of equity in these companies, does not agree to the member units to sign contracts with the Railway Administration. This is the reason why the contract negotiation has been delayed. &#8220;Therefore, the information that the Ministry of Transport and the Vietnam Railway Administration do not assign budget estimates to the VNR and its member units is not the correct nature&#8221; &#8211; Mr. Le Hoang Minh informed.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4575</post-id>	</item>
		<item>
		<title>Red-leaf maple tree replacement: Essential options for the maintenance of an urban landscape</title>
		<link>https://en.spress.net/red-leaf-maple-tree-replacement-essential-options-for-the-maintenance-of-an-urban-landscape/</link>
		
		<dc:creator><![CDATA[Bảo Hân - Ảnh: Quang Thái]]></dc:creator>
		<pubDate>Sat, 17 Apr 2021 00:05:00 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Deciduous]]></category>
		<category><![CDATA[Diameter]]></category>
		<category><![CDATA[Duong Duc Tuan]]></category>
		<category><![CDATA[Essential]]></category>
		<category><![CDATA[Green trees]]></category>
		<category><![CDATA[Growth]]></category>
		<category><![CDATA[Hanoi]]></category>
		<category><![CDATA[Hanoi Department of Construction]]></category>
		<category><![CDATA[landscape]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[maple]]></category>
		<category><![CDATA[Maple tree]]></category>
		<category><![CDATA[Median strip]]></category>
		<category><![CDATA[Nguyen Chi Thanh]]></category>
		<category><![CDATA[options]]></category>
		<category><![CDATA[Pests]]></category>
		<category><![CDATA[Plan]]></category>
		<category><![CDATA[Redleaf]]></category>
		<category><![CDATA[replacement]]></category>
		<category><![CDATA[Route]]></category>
		<category><![CDATA[Streets]]></category>
		<category><![CDATA[Technical infrastructure projects]]></category>
		<category><![CDATA[To replace]]></category>
		<category><![CDATA[Tran Duy Hung]]></category>
		<category><![CDATA[tree]]></category>
		<category><![CDATA[Trunk]]></category>
		<category><![CDATA[urban]]></category>
		<category><![CDATA[Urban beauty]]></category>
		<category><![CDATA[Withered]]></category>
		<guid isPermaLink="false">https://en.spress.net/red-leaf-maple-tree-replacement-essential-options-for-the-maintenance-of-an-urban-landscape/</guid>

					<description><![CDATA[After 2 years of trial planting showed that it has not adapted to the climatic conditions of Hanoi, the maple trees on the median strip of Nguyen Chi Thanh &#8211; Tran Duy Hung streets are about to be replaced by a more suitable greenery system. This is a necessary and necessary replacement to be implemented [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>After 2 years of trial planting showed that it has not adapted to the climatic conditions of Hanoi, the maple trees on the median strip of Nguyen Chi Thanh &#8211; Tran Duy Hung streets are about to be replaced by a more suitable greenery system. This is a necessary and necessary replacement to be implemented soon in order to ensure the synchronous greenery system, maintain the urban landscape on the route of the capital.</strong><br />
<span id="more-3463"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/6ac6e035ce7727297e66.jpg" width="625" height="328"></p>
<p>After 2 years of trial planting, the red leaf maple trees planted on the median strip of Nguyen Chi Thanh &#8211; Tran Duy Hung routes grew poorly or died dry due to not suitable for Hanoi&#8217;s climate.</p>
<p>As reported, Hanoi City People&#8217;s Committee Office has just issued Document No. 2788 / VP-DT (dated 2-4-2021) announcing the direction of Vice Chairman of the City People&#8217;s Committee Duong Duc Tuan on the replacement plan. The maple tree position is tested on the median strip of Nguyen Chi Thanh &#8211; Tran Duy Hung street.</p>
<p>According to Deputy Director of Hanoi Construction Department Nguyen The Cong, 262 maple trees were tested from 2018 on the median strip of Nguyen Chi Thanh &#8211; Tran Duy Hung streets, donated to the city by Tan Dai Duong Investment Joint Stock Company. After 2 years, it initially showed that the tree was not adapted to the climatic conditions of Hanoi. 45 trees died, 217 trees lived but poor growth and development. After a while, leaves are wilted, branches and branches are dry and often pests and diseases, affecting the street landscape. In order to ensure the landscape, synchronize the system of green trees, meet the aesthetic and urban beauty of the road, the Department has proposed the City People&#8217;s Committee to switch the maple tree and plant it to replace it with a small leaf almond tree.</p>
<p>The planting of new tree systems will be carried out in April 2021 and completed before the holidays April 30 and May 1, 2021.</p>
<p><strong>Later, the tree species is easily confused with red leaf maple</strong></p>
<p>Facing the fact that the red leaf maple goods on the Nguyen Chi Thanh &#8211; Tran Duy Hung route die or grow poorly due to the lack of adaptability to the climate conditions of Hanoi &#8230; some people wonder why the maple is grown at the Diplomatic Corps (Xuan Tao, Bac Tu Liem, Hanoi) is green again, in winter, trees turn red leaves beautifully?</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/b18767ad4fefa6b1fffe.jpg" width="625" height="416"></p>
<p>Many people mistakenly think that the following trees after planting in the Diplomatic Corps are red-leaf maple because of their maple leaf shape and the ability to turn red in winter.</p>
<p>Answering the above question, Assoc.Prof.Dr. Dang Van Ha, Director of the Institute of Landscape Architecture and Urban Greenery, Forestry University affirmed that the crops grown in the Diplomatic Corps area are not red-leaf maple, but tree follows. This native species of Vietnam is being planted widely, from North to South because it has good growth and development, especially in urban areas. In Hue, the latter has been planted for a long time, many trees with a diameter of 60-70cm.</p>
<p>In Hanoi, in addition to the Diplomatic Corps, the latter is also grown in the West Lake, the area of ​​the Korean Embassy, ​​the regulating lake of the Exchange City urban area &#8230; The following trees are growing green. well, trunk diameter 20-30 cm, about 6-7 m high.</p>
<p>“The posterior leaves are shaped quite like maple leaves. In winter, they change from green to dark yellow and red, so many people easily confuse them. However, just based on the leaf lobe it is possible to distinguish 2 species. Specifically, the posterior leaves split into 3 lobes and the maple leaf has 5-6 lobes. In addition, the maple tree has no fruit, while the posterior fruit has many soft, pointed spines ”, Assoc. Analysis by Dr. Dang Van Ha.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/84084d2265608c3ed571.jpg" width="625" height="416"></p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/ac6d66474e05a75bfe14.jpg" width="625" height="416"></p>
<p>However, according to experts, just based on the leaf and fruit lobes can easily distinguish these two plants.</p>
<p>According to Mr. Ha, later it can be planted well in urban areas, parks, sidewalks, medians &#8230; Trees not only have the ability to grow well, but create beautiful landscapes thanks to the characteristic turning the color of leaves to red. . Young shoots that sprout up right after the leaves fall, are also fancy pink. According to the Institute&#8217;s observations for many years, plants do not have pests and diseases affecting humans. After about 50-60 years of growth, the tree has the phenomenon of aging, so it should be noted that dry branches are pruned.</p>
<p><strong>Small leaf wing, why is preferred?</strong></p>
<p>According to both plans to replace the red leaf maple row on the Nguyen Chi Thanh &#8211; Tran Duy Hung route, small leaves are selected. Mr. Tran Anh Tuan, Deputy Director of the Department of Maintenance of Urban Technical Infrastructure (Department of Construction of Hanoi), said that the small leaf eagle has been experimentally planted for a long time and brings beautiful landscapes on many streets in the city. Hanoi like Dao Tan, Nguyen Khanh Toan, Kim Ma &#8230; Through monitoring, the tree grows and develops well and stably. In particular, this plant has very few pests and diseases, is less prone to breakage during storms, and does not take care of and pruning.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/2ed4e5fecdbc24e27dad.jpg" width="625" height="440"></p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/57039b29b36b5a35037a.jpg" width="625" height="415"></p>
<p>Small leaf balm has been planted for a long time and has adapted well, creating a beautiful landscape for Hanoi.</p>
<p>According to Assoc.Prof.Dr. Dang Van Ha, small leaf eagle, also known as Taiwanese eagle, is a suitable crop in urban areas as well as in many other places. Tree has the advantage of strong root system, less breakage, flexible stem and branches.</p>
<p>“Small leaf balm was imported abroad into our country about 20 years ago, and grown in many provinces throughout the country, including Hanoi. Plants are easy to propagate, grow well, do not pick up soil, and can be grown both in dry places and high water levels. Trees give good shade in the summer. In the southern provinces, in the dry season, the tree often loses its leaves. However, in the North, the tree also loses its leaves, but only for a short time and produces young leaves immediately. Because the small leaf almond root has &#8220;floating&#8221; properties, it should be considered when planting in narrow streets, which do not affect the quality of the pavement &#8220;, Assoc.Prof.Dr. Dang Van Ha said.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/6e07a32d8b6f62313b7e.jpg" width="625" height="416"></p>
<p>For the people of Hanoi, the rows of small green-leafed almond trees planted for many years have become familiar and captured the hearts of many people by the beautiful landscape trees. The trunk grows straight, branches grow horizontally or form to create circular, interwoven canopy, creating shade. The leaf is shiny green and gradually darkens over time, the deciduous time is very short.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_11_8_38492396/efd421fe09bce0e2b9ad.jpg" width="625" height="416"></p>
<p>There are many suitable advantages that help the small leaf eagle to be selected as a priority for urban crops.</p>
<p>The trial planting of new species of trees in Hanoi is completely normal in order to supplement and enrich the urban greenery system, which plays a very important role in improving and improving the quality of life for the people. However, before trials showed that new species of trees have not been adapted, the replacement with more suitable species is necessary so that the capital city always maintains green, fresh and urban beauty.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">3463</post-id>	</item>
		<item>
		<title>What does the Ministry of Transport say about not assigning maintenance funds to Vietnam Railway Corporation?</title>
		<link>https://en.spress.net/what-does-the-ministry-of-transport-say-about-not-assigning-maintenance-funds-to-vietnam-railway-corporation/</link>
		
		<dc:creator><![CDATA[Quang Toàn/BNEWS/TTXVN]]></dc:creator>
		<pubDate>Fri, 16 Apr 2021 11:00:10 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[assigning]]></category>
		<category><![CDATA[Budget]]></category>
		<category><![CDATA[Capital]]></category>
		<category><![CDATA[Corporation]]></category>
		<category><![CDATA[Estimates]]></category>
		<category><![CDATA[funds]]></category>
		<category><![CDATA[Infrastructure structure]]></category>
		<category><![CDATA[Law on State Budget]]></category>
		<category><![CDATA[Le Hoang Minh]]></category>
		<category><![CDATA[Le Minh Hoang]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Maintenance plan]]></category>
		<category><![CDATA[Maintenance unit]]></category>
		<category><![CDATA[Ministry]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[Railway Law 2017]]></category>
		<category><![CDATA[Salary]]></category>
		<category><![CDATA[strong]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[train]]></category>
		<category><![CDATA[Transport]]></category>
		<category><![CDATA[Vietnam Railway Bureau]]></category>
		<category><![CDATA[Vietnam Railway Corporation]]></category>
		<category><![CDATA[VNR]]></category>
		<guid isPermaLink="false">https://en.spress.net/what-does-the-ministry-of-transport-say-about-not-assigning-maintenance-funds-to-vietnam-railway-corporation/</guid>

					<description><![CDATA[The Ministry of Transport affirms that the assignment of the budget for the maintenance of the national railway system to the Vietnam Railway Administration is in compliance with the provisions of the Law on State Budget 2020. The Ministry of Transport confirmed that the allocation of budget estimates for the maintenance of the national railway [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Ministry of Transport affirms that the assignment of the budget for the maintenance of the national railway system to the Vietnam Railway Administration is in compliance with the provisions of the Law on State Budget 2020.</strong><br />
<span id="more-2610"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_324_38547395/f3a7bec9e08a09d4509b.jpg" width="625" height="422"></p>
<p><em>The Ministry of Transport confirmed that the allocation of budget estimates for the maintenance of the national railway system to the Vietnam Railway Administration is in compliance with the provisions of the State Budget Law 2020. Photo: VNA</em></p>
<p>Regarding the document No. 803 / BC-ĐS of the Vietnam Railway Corporation (VNR), make an urgent petition to the Prime Minister about problems in the management and maintenance of national railway infrastructure; In which, VNR emphasized that the difficulty of funding maintenance of railway infrastructure makes it difficult for the railway industry to stand by the end of April 2021, talking to the Vietnam News Agency on the morning of April 16, Mr. Le Hoang Minh, Director of the Department of Transport Infrastructure affirmed that the Ministry of Transport assigning the budget estimate for the maintenance of the national railway system to the Vietnam Railway Administration is in compliance with regulations. the current Law on State Budget 2020.</p>
<p>Specifically, Mr. Le Hoang Minh said that the Ministry of Transport cannot arbitrarily do any problems if it does not base on the current law provisions. The Ministry of Transport does not have to voluntarily assign it to the Vietnam Railway Administration because in the past (before 2018) when the Vietnam Railways Corporation was under the Ministry of Transport, according to the Law on State Budget, It is normal for the Ministry of Transport to assign the maintenance capital of VNR.</p>
<p>“However, when the State Budget Law 2020 came into existence to replace the old State Budget Law, and at the same time VNR moved to be under the State Capital Management Committee in Enterprises, the Ministry of Transport was only assigned capital to affiliated units. On the other hand, state budget capital is only allocated to specialized management units that the railway sector is assigned to the Vietnam Railway Administration ”, said Mr. Le Hoang Minh.</p>
<p>The Director of the Department of Transport Infrastructure affirmed that the Ministry of Transport is implementing the basis of Clause 5, Article 9; Clause 8 of Article 44 and Clause 1 of Article 49 of the 2020 Law on State Budget to allocate capital to the Vietnam Railway Administration. The Vietnam Railway Administration will then sign a contract to order the maintenance of the national railway infrastructure system with the maintenance units of VNR.</p>
<p>Mr. Le Minh Hoang added that in 2020, the above problem was also encountered when the Ministry of Transport could not hand over maintenance capital to VNR, so the Ministry of Transport and Vietnam Railway Corporation must have a written document. a report to the Government, then to the National Assembly resolutions on this issue; including the content of the Ministry of Transport assigning budget estimates to VNR as 2019 and earlier. In implementing the resolution of the National Assembly, the Government also issued Resolution No. 41 / NQ-CP dated April 9, 2020; including the implementation of the Resolution of the National Assembly. After this resolution, the Ministry of Transport has just assigned the 2020 budget estimate for national railway infrastructure maintenance to the VNR.</p>
<p>“Thus, the key is that if it wants to assign a budget that is different from the current State Budget Law, the agency that promulgates the law must issue a resolution on that matter and the Government must issue a resolution. decided to guide the implementation of the contents of the National Assembly&#8217;s resolutions ”, Mr. Le Hoang Minh emphasized.</p>
<p>Regarding the content of maintenance companies that are facing difficulties because they do not have maintenance funds, they have to borrow money from banks to pay workers&#8217; salaries, Mr. Le Hoang Minh once again affirmed that the Ministry of Transport attended The budget estimate for the maintenance of the national railway structure system for the Vietnam Railway Administration is in accordance with the Law on State Budget and if the allocation of this budget estimate to the Vietnam Railway Corporation is inconsistent with the regulations. of the State Budget Law.</p>
<p>Returning to the story of the difficulties that 20 maintenance units of Vietnam Railway Corporation are facing, Mr. Le Hoang Minh said that before December 31, 2020, the Ministry of Transport issued a plan. general maintenance for the whole industry; including the railway industry. At the same time, at this time, the Ministry of Transport has also assigned a budget estimate to the Vietnam Railway Administration.</p>
<p>To implement this estimate, the Vietnam Railway Administration has invited 20 railway maintenance units to negotiate and sign an order contract, but so far these units do not sign a contract with the Vietnam Railway Administration. Male. The important reason that these 20 units cannot sign order contracts with the Vietnam Railway Administration is because the Vietnam Railways Corporation currently accounts for more than 50% of the equity in these companies. a member unit signing a contract with the Vietnam Railway Administration. This is the reason why the contract negotiation has been delayed up to this point.</p>
<p>“Thus, the information that the Ministry of Transport and the Vietnam Railway Administration do not assign the budget estimates to the VNR and its member units is not the correct nature. Currently budget estimates and maintenance plans have been built, funding for the maintenance of national railway infrastructure in 2021 is also under the management of the Ministry of Transport, which means money is ready to transport any. When is the time?</p>
<p>Sharing more, Mr. Le Minh Hoang said that the VNR gave the reason that the 2017 Railway Law stipulates a number of powers for the Vietnam Railway Corporation; including the authority to manage the maintenance of national railway infrastructure. However, it must be confirmed that before November 2018, when the VNR was still under the Ministry of Transport. However, when the VNR is no longer under the Ministry but transferred to the State Capital Management Committee in enterprises, and at the same time the State Budget Law in 2020 comes into being, then the new law must be complied with. Although the 2017 Railway Law is still in effect, the budget and financial matters must comply with the State Budget Law (general law) and the Railway Law 2017 is a specialized law.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_324_38547395/dc47598772c59b9bc2d4.jpg" width="625" height="416"></p>
<p><em>Before December 31, 2020, the Ministry of Transport issued a general maintenance plan for the whole industry; including the railway industry. Photo: VNA</em></p>
<p>Previously, Vietnam Railway Corporation issued document No. 803 / BC-ĐS on April 12, 2021, making an urgent petition to the Prime Minister regarding problems in the management and maintenance of infrastructure. national railway.</p>
<p>According to the above document, VNR said that 3,143 km of railway nationwide are currently assigned to the Vietnam Railway Corporation to directly organize the operation, the collected funds are deducted from the state budget 20%, 80 The remaining% is the Corporation&#8217;s revenue which is used to spend on operations for the exploitation organization (labor costs, asset maintenance and maintenance &#8230;). The maintenance of railway infrastructure assets must always be associated with train operation because the plan for maintenance and maintenance of railway infrastructure assets depends on the train run chart (both running train and exam. railway infrastructure maintenance).</p>
<p>Document No. 803 / BC-ĐS of VNR also said that the project on management and use of national railway infrastructure assets, submitted by the Ministry of Transport to the Prime Minister up to now, still created a lot. intermediate management level, many administrative procedures in the management, maintenance and exploitation of assets. Especially, to increase licensing and approving subprojects (sub-permits) when proposing a mechanism for assigning maintenance cost estimates to the Vietnam Railway Administration. Because VNR said that the Vietnam Railway Administration is currently only performing the function of advising the Ministry of Transport, not managing the railway infrastructure, if the capital is allocated to this unit before allocating it to the VNR, it will slow down. Late maintenance, congestion.</p>
<p>Representative of the Vietnam Railway Corporation said that according to the annual estimate, the budget capital for railway maintenance is VND 2,800 billion, but so far it has not been assigned. Currently, 20 railway maintenance companies under the Vietnam National Railways Corporation, which are responsible for the maintenance of railway infrastructure systems, owe wages to workers for many months, and have not yet had funds to buy maintenance materials. maintenance &#8230;</p>
<p>This is not the first time that Vietnam Railway Corporation has called for help because of the slow allocation of maintenance capital. Before that, in early 2020, the railway industry also had to face the same situation when by the end of February 2020, the Ministry of Transport had not yet been assigned funding for railway maintenance. Then, to resolve this situation, the Ministry of Transport had to temporarily hand over the capital to the Railway Corporation after the Resolution of the National Assembly and the Government to place public service orders with 20 companies. under VNR to promptly ensure the safety of train operation such as maintenance, maintenance, patrol, guarding, signal information system &#8230; However, by 2021, the plan to allocate capital to any unit has not been remove.</p>
<p>According to the Vietnam Railway Corporation, the industry currently has 11,315 employees. In which, there are 1,241 workers in bridge week, road patrol, tunnel week; 915 workers indirectly perform the task of planning and cost estimating the maintenance of the works &#8230;; 6,278 maintenance work and quality management of maintenance work; 2,881 workers on duty guarding the crossroads to ensure the safety of the train./.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2610</post-id>	</item>
		<item>
		<title>Technology empowers asset management?Allow more investors to participate in commercial real estate investment and operation and maintenance</title>
		<link>https://en.spress.net/technology-empowers-asset-managementallow-more-investors-to-participate-in-commercial-real-estate-investment-and-operation-and-maintenance/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Fri, 16 Apr 2021 09:59:08 +0000</pubDate>
				<category><![CDATA[World]]></category>
		<category><![CDATA[asset]]></category>
		<category><![CDATA[commercial]]></category>
		<category><![CDATA[empowers]]></category>
		<category><![CDATA[estate]]></category>
		<category><![CDATA[investment]]></category>
		<category><![CDATA[investors]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[managementAllow]]></category>
		<category><![CDATA[operation]]></category>
		<category><![CDATA[participate]]></category>
		<category><![CDATA[real]]></category>
		<category><![CDATA[Technology]]></category>
		<guid isPermaLink="false">https://en.spress.net/technology-empowers-asset-managementallow-more-investors-to-participate-in-commercial-real-estate-investment-and-operation-and-maintenance/</guid>

					<description><![CDATA[In the &#8220;stock era&#8221; of real estate, how AI and other technologies can empower asset management has become a topic of concern in the industry. On April 16, the first Pinqi Real Estate Conference was held in the China Ship Pavilion at the Shanghai World Expo. At the meeting, the world&#8217;s first operational property digital [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>In the &#8220;stock era&#8221; of real estate, how AI and other technologies can empower asset management has become a topic of concern in the industry.</strong></p>
<p><span id="more-2460"></span><br />
On April 16, the first Pinqi Real Estate Conference was held in the China Ship Pavilion at the Shanghai World Expo. At the meeting, the world&#8217;s first operational property digital asset management platform-iREAM system was officially released.</p>
<p><img fifu-featured="1" decoding="async" src="https://p0.itc.cn/q_70/images03/20210416/aeeb4fcac0d04cf68c59343d80b6f010.jpeg"></p>
<p>On April 16, the world&#8217;s first operational property digital asset management platform-iREAM system was officially released.</p>
<p>It is reported that iREAM uses blockchain, AI and other digital technologies to connect real estate investment, transformation, investment promotion, and operation, to create information transparency and build a new integrated platform for commercial property management. Each user can conduct property investment and operation management on the online platform anytime, anywhere.</p>
<p>At present, China&#8217;s real estate has entered the &#8220;stock era&#8221;, and many real estate developers are actively exploring the real estate stock. Available real estate is in the ascendant, and the industry is facing many pain points: the large transaction acquisition process is complex, real estate information is opaque; asset flows lack capital support; traditional businesses cannot keep up with the innovation of the times; front-end data collection is decoupled from practical applications and cannot meet the requirements of operational diversity&#8230; …For ordinary investors, investing in commercial real estate often has a high investment threshold, and it is difficult to identify the value of the project.</p>
<p>Under the epidemic, the outbreak of new demands and the emergence of new scenarios have been accelerated, which has promoted the transition of new service models in the real estate industry from offline to online, and promoted the digital development of work scenarios.</p>
<p>At the conference, Wang Qian, founder of Yufeng (Shanghai) Real Estate Co., Ltd. and iREAM digital real estate asset management platform; Li Chong, a professor in the Department of Electronic Engineering at Columbia University, explained how AI and other cutting-edge technologies can subvert the existing asset management value system, and for the first time Publicly introduce the iREAM asset management platform.</p>
<p>It is understood that iREAM applies digital technologies such as blockchain and AI to all aspects of real estate investment, renovation, investment promotion, and operation. Transaction and real estate data are on the chain to ensure the authenticity of real estate information; point-to-point services and transactions using smart contracts, decentralized communication; asset tokenization splits equity, small amounts can invest in commercial real estate; AI empowerment, intelligent recommendation of housing Source, service automation; VR remote experience real estate structure, open up the real estate information flow, capital chain, business flow, decentralized management, and change the traditional asset management model.</p>
<p>Since April 2020, the iREAM asset management platform has managed 9 real estate projects in the Shanghai and San Francisco Bay Areas, and its business covers all asset management links such as investment, renovation, investment promotion, and operation. In 2021, the team will use cutting-edge technologies such as blockchain, NFT, and AI to realize single-asset digital transactions, digital original certificates, dynamic pricing, smart contracts and other functions.</p>
<p>Currently, many companies in the real estate industry are actively transforming, and technology is one of the important directions. &#8220;Technology improves the efficiency of different aspects of real estate, changes the operational structure, and brings new increments,&#8221; said Wang Qian, the founder of iREAM. Today, in the digital age, exploring new models of asset management with technology will allow more investors to participate in commercial real estate investment and operation and maintenance.</p>
<p>(This article is from The Paper. For more original information, please download the &#8220;The Paper&#8221; APP)</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2460</post-id>	</item>
		<item>
		<title>More than 11,000 workers are owed wages, the Railway Corporation &#8220;pleaded for help&#8221; to the Prime Minister</title>
		<link>https://en.spress.net/more-than-11000-workers-are-owed-wages-the-railway-corporation-pleaded-for-help-to-the-prime-minister/</link>
					<comments>https://en.spress.net/more-than-11000-workers-are-owed-wages-the-railway-corporation-pleaded-for-help-to-the-prime-minister/#respond</comments>
		
		<dc:creator><![CDATA[Văn Duẩn]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 06:54:13 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Ask for help]]></category>
		<category><![CDATA[Corporation]]></category>
		<category><![CDATA[Deadly step]]></category>
		<category><![CDATA[Expense]]></category>
		<category><![CDATA[In debt]]></category>
		<category><![CDATA[Infrastructure structure]]></category>
		<category><![CDATA[KCHTĐS]]></category>
		<category><![CDATA[Labor]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[minister]]></category>
		<category><![CDATA[owed]]></category>
		<category><![CDATA[pleaded]]></category>
		<category><![CDATA[Prime]]></category>
		<category><![CDATA[Prime Minister]]></category>
		<category><![CDATA[Problems]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[Salary]]></category>
		<category><![CDATA[Sugar week]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[train]]></category>
		<category><![CDATA[Vietnam Railway Bureau]]></category>
		<category><![CDATA[Vietnam Railway Corporation]]></category>
		<category><![CDATA[VNR]]></category>
		<category><![CDATA[VNR Members Council]]></category>
		<category><![CDATA[Vu Anh Minh]]></category>
		<category><![CDATA[wages]]></category>
		<category><![CDATA[Workers]]></category>
		<guid isPermaLink="false">https://en.spress.net/more-than-11000-workers-are-owed-wages-the-railway-corporation-pleaded-for-help-to-the-prime-minister/</guid>

					<description><![CDATA[The Chairman of the Board of Members of Vietnam Railway Corporation (VNR) had to send an urgent petition to the Prime Minister about problems related to funding for the maintenance of national railway infrastructure, seriously affecting the life of nearly 25,000 workers Mr. Vu Anh Minh, Chairman of the Board of Members Railway Corporation Vietnam [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Chairman of the Board of Members of Vietnam Railway Corporation (VNR) had to send an urgent petition to the Prime Minister about problems related to funding for the maintenance of national railway infrastructure, seriously affecting the life of nearly 25,000 workers</strong><br />
<span id="more-934"></span> </p>
<p>Mr. Vu Anh Minh, Chairman of the Board of Members <strong>Railway Corporation</strong> Vietnam (VNR) has just issued an urgent petition to the Prime Minister &#8220;calling for help&#8221; on issues related to the development of a National Project on management, use and exploitation of railway infrastructure assets. The State invests and the allocation of resources for management and maintenance of real estate assets.</p>
<p><img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_15_38532144/0728a6468c04655a3c15.jpg" width="625" height="415"></p>
<p>From 1955 to now, VNR is the only 100% state-owned enterprise established by the State with the purpose of assigning the management, exploitation, use and direct trading of all railway infrastructure assets. (KCHTĐS) in the form of excluding capital components in the enterprise.</p>
<p>VNR leaders said that with 3,143 km of railways going through 34 provinces and cities, in the absence of funding for the management of real estate assets, VNR has organized an asset management system from the General level. companies to member units and joint stock companies with dominant capital contribution.</p>
<p>Up to this point, due to the long and unusual effects of the Covid-19 epidemic as well as the construction of an investment package of VND7,000 billion belonging to medium-term capital, in single track conditions, both train and construction. , The railway industry is in a very difficult period.</p>
<p>Along with that, according to Mr. Vu Anh Minh, problems with funding for the maintenance of national real estate infrastructure in 2021 have not been resolved according to the direction of the Prime Minister, 20 companies perform the task of system maintenance. The national real estate infrastructure currently does not have the budget to buy materials to put into the project, regular expenses and especially to pay employees in the first 4 months of 2021, seriously affecting the lives of nearly 25,000 workers in the VNR. .</p>
<p>&#8220;The high risk is that 11,315 workers on the road patrol, bridge week, tunnel patrol, guarding the crossroads &#8230; will quit their jobs because they have no income. This issue has pushed businesses to the end, difficult to sustain. until the end of April 2021 &#8220;- President of VNR stated in the petition.</p>
<p>According to VNR, the project on management and use of national railway infrastructure assets submitted by the Ministry of Transport (MOT) to the Prime Minister up to this point continues to create many levels of management intermediaries, many administrative procedures. in the management, maintenance and exploitation of real estate assets, increasing licensing, and approving the subproject (sub-license). In particular, it is still proposed a mechanism to assign cost estimates for maintenance to the Vietnam Railway Administration (the agency only performs the advisory function under the Ministry of Transport and does not manage the assets of the real estate infrastructure).</p>
<p>&#8220;The proposal of the Ministry of Transport in the Project not only fails to overcome difficulties and problems in production and business activities, but also causes a lot of stagnation and congestion for VNR, pushing businesses to the risk of bankruptcy. , the risk of eliminating railway transport in the transportation system &#8220;- VNR leader said.</p>
<p>According to the VNR leader, in order to manage and maintain the assets of the national real estate infrastructure, VNR must organize a comprehensive and coherent human resources system from the parent company to the base units along the railway lines with a total of 11,315 employees were employed, including: 1,241 workers in bridge, road, and tunnel patrol; 915 indirect workers; 6,278 workers perform maintenance and quality control of maintenance work and 2,881 workers guarding the crossroads to ensure safe train operation.</p>
<p>Meanwhile, at present, the organizational apparatus of the Vietnam Railways Administration has only over 100 staff members (most of them are officers of the railway office and the railway traffic safety inspection force), so if the plan is implemented according to the Project, the Ministry As proposed by transportation, VNR still has to fully allocate the above 11,315 human resources to perform the tasks of asset management and the maintenance of national railway infrastructure assets.</p>
<p>&#8220;VNR will become an intermediary agency to delay, cause congestion in the process of maintenance and operation of transportation, directly affecting train safety&#8221; &#8211; VNR leader explained.</p>
<p>Based on the provisions of relevant laws, international experience and especially the practice of managing and operating operations, VNR believes that the Prime Minister and Deputy Prime Minister have chaired meetings with Ministries many times. , departments to analyze the legal basis and have the conclusions and announcements. The Ministry of Justice also appraised the legality in Document No. 193 / BTP-PLDSKT dated January 22, 2021, which confirmed that the delivery of KCHTDS assets and cost estimate for maintenance to VNR Corporation is correct. current laws (including the State Budget Law).</p>
<p>From the above explanations, the Chairman of the Board of Members of VNR sincerely proposes to the Government, the Prime Minister to: Direct the Ministry of Transport to seriously, fully implement the direction of the Prime Minister in the document. 1956 / VPCP-CN dated March 24, 2021 on the management, use and exploitation of national real estate assets.</p>
<p>VNR also proposed to the Prime Minister to direct the Ministry of Transport to continue to assign estimates of economic causes for the management and maintenance of national real estate assets for the period from 2021 onwards to VNR as in previous years.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/more-than-11000-workers-are-owed-wages-the-railway-corporation-pleaded-for-help-to-the-prime-minister/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">934</post-id>	</item>
		<item>
		<title>Transport infrastructure development in Ba Che</title>
		<link>https://en.spress.net/transport-infrastructure-development-in-ba-che/</link>
					<comments>https://en.spress.net/transport-infrastructure-development-in-ba-che/#respond</comments>
		
		<dc:creator><![CDATA[Thanh Hoa]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 04:02:06 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Ba Che River]]></category>
		<category><![CDATA[Ba Che town]]></category>
		<category><![CDATA[Che]]></category>
		<category><![CDATA[Constraint]]></category>
		<category><![CDATA[Construction investment]]></category>
		<category><![CDATA[development]]></category>
		<category><![CDATA[Economic development]]></category>
		<category><![CDATA[Flood]]></category>
		<category><![CDATA[Flooding]]></category>
		<category><![CDATA[Hard]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Length]]></category>
		<category><![CDATA[Locality]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Mountains]]></category>
		<category><![CDATA[Nguyen Tien Truong]]></category>
		<category><![CDATA[Promoting]]></category>
		<category><![CDATA[Provincial road 330]]></category>
		<category><![CDATA[Renovations]]></category>
		<category><![CDATA[Three Sec]]></category>
		<category><![CDATA[Traffic system]]></category>
		<category><![CDATA[Transport]]></category>
		<category><![CDATA[Transportation infrastructure]]></category>
		<category><![CDATA[Way out]]></category>
		<guid isPermaLink="false">https://en.spress.net/transport-infrastructure-development-in-ba-che/</guid>

					<description><![CDATA[Determining that traffic infrastructure plays an important role in socio-economic development in the area, in recent years, with many resources, Ba Che has focused on investing in building a mountainous transport system, step by step. early to promote efficiency. The flood avoidance road in Ba Che town, Ba Che district will be completed by the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Determining that traffic infrastructure plays an important role in socio-economic development in the area, in recent years, with many resources, Ba Che has focused on investing in building a mountainous transport system, step by step. early to promote efficiency.</strong><br />
<span id="more-631"></span> </p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_448_38531632/327c2ae500a7e9f9b0b6.jpg" width="625" height="468"></p>
<p><em>The flood avoidance road in Ba Che town, Ba Che district will be completed by the end of 2020, contributing to ensuring safe traffic, serving rescue work in the rainy season in the area.</em></p>
<p>Over the past years, with the attention of all levels and sectors, the district&#8217;s socio-economic conditions have been improved, but Ba Che is still the most difficult district in the province, with low economic geography and infrastructure. private, but not synchronized, the lives of ethnic minorities still face many difficulties, of which the basic &#8220;bottleneck&#8221; is still the transport system.</p>
<p>To gradually remove this &#8220;bottleneck&#8221;, create a sustainable development step, create a premise for socio-economic development in the area, shorten the gap between regions, right from 2011, Ba Che has practiced surveying and planning orientations on rural transport in the district to ensure socio-economic development associated with security &#8211; defense, step by step development in accordance with the general planning orientation. traffic of the province. With the right policy, viewpoints and orientation, the district focuses on mobilizing, flexibly integrating from many sources to develop the rural transport system. In particular, to attach importance to propagating and mobilizing the people&#8217;s voluntary contributions with the viewpoint &#8220;people know, people discuss, people do, people check&#8221;. The district has built and upgraded important arterial roads, big bridges, opened new roads to the centers of communes &#8230;</p>
<p>Up to now, most of the important arterial roads of the district have been invested in renovating, upgrading and refreshing, facilitating traffic and travel, opening up great opportunities for economic exchange inside and outside the district. . Ba Che has also completed the transportation system connecting the district to the localities. Traffic connection between the district and communes and villages is concreted 100%, renovated and upgraded roads to avoid floods in the center of the town, provincial road 329 flood avoidance; flooding site improvements &#8230;</p>
<p>Only in the period 2015-2020, the district road system of 6 lines, with a total length of 65.66km, will be hardened (upgraded, renovated and expanded 18,291 miles compared to 2015). 37 lines of commune roads, with a total length of 105.7km hardened, increasing 22 routes and 47.15km compared to 2015. Village roads 47 routes, with a total length of 51.21 km hardened, increased 33 routes compared to 2015. Roads of 47 routes, with a total length of 66.80 km, hardened, increased 24 routes and 11.35 km hardened compared to 2015. in 2015. The production road is 24 lines, with a total length of 20.64km hardened, increasing 19 routes and 9.94km in hardening compared to 2015; The district also upgraded and embellished 9 / 15.68km of urban roads.</p>
<p>The district also completed investment in a bus station in Ba Che town with an area of ​​5,000 square meters by 2020, contributing to serving the needs of picking up and dropping off passengers in the area.</p>
<p>Along with the development of the rural transport system, Ba Che takes advantage of opportunities and conditions, focuses on drastic direction and administration, achieving many outstanding results in socio-economic development in the area. The annual growth rate of production value reaches 15.3%; per capita income reached 40 million / person / year.</p>
<p>According to Mr. Nguyen Tien Truong, Head of the Department of Infrastructure Economics in Ba Che district: In the coming time, Ba Che will focus on completing the district planning, including integrating the transport network development planning in the district, creating favorable conditions for the connection of highly motivated regions such as Ha Long City, Cam Pha City.</p>
<p>Along with that, upgrade the system of provincial roads, district roads, communal roads to ensure according to the plan, in which priority, upgrading and renovation of specific roads with specific strong blood: Continue to synchronously upgrade provincial roads. 330, 330B, 342 according to planning (special focus on immediately completing 8 flooding points on provincial roads 330); By 2022, to invest in building a bridge connecting the provincial road 330 to Ba Che town and the system of Ba Che river bank embankment phase 2 in the period of 2021-2025. Well implement traffic management regulations, in which the management and maintenance of traffic works are decentralized to communes, villages for management and use, so that the units can actively fund maintenance and protection. Regular repairs to increase the life of the project and promote efficiency of investment capital.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/transport-infrastructure-development-in-ba-che/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">631</post-id>	</item>
		<item>
		<title>The US Air Force revealed about the 6th generation super fighter</title>
		<link>https://en.spress.net/the-us-air-force-revealed-about-the-6th-generation-super-fighter/</link>
					<comments>https://en.spress.net/the-us-air-force-revealed-about-the-6th-generation-super-fighter/#respond</comments>
		
		<dc:creator><![CDATA[Đức Trí (lược dịch)]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 03:41:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[6th]]></category>
		<category><![CDATA[air]]></category>
		<category><![CDATA[Air combat]]></category>
		<category><![CDATA[Air Force]]></category>
		<category><![CDATA[Combat aircrafts]]></category>
		<category><![CDATA[Defense World]]></category>
		<category><![CDATA[Dominance]]></category>
		<category><![CDATA[fighter]]></category>
		<category><![CDATA[Fighters]]></category>
		<category><![CDATA[Financial year]]></category>
		<category><![CDATA[Force]]></category>
		<category><![CDATA[Fuselage]]></category>
		<category><![CDATA[Generation]]></category>
		<category><![CDATA[Jet plane]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[NGAD]]></category>
		<category><![CDATA[Overhead]]></category>
		<category><![CDATA[Preliminary]]></category>
		<category><![CDATA[Revealed]]></category>
		<category><![CDATA[Revealing]]></category>
		<category><![CDATA[secret]]></category>
		<category><![CDATA[Super]]></category>
		<category><![CDATA[The driver]]></category>
		<category><![CDATA[Triangle]]></category>
		<category><![CDATA[US Air Force]]></category>
		<category><![CDATA[Will Roper]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-us-air-force-revealed-about-the-6th-generation-super-fighter/</guid>

					<description><![CDATA[The US Air Force had some preliminary introduction to the mysterious 6th generation super fighter being developed by the United States. According to Defense World, the US Air Force recently announced blueprints for a new fighter jet being developed under the &#8220;Next Generation Aviation Advantage&#8221; (NGAD) program, which includes including unmanned and manned fighters. Design [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The US Air Force had some preliminary introduction to the mysterious 6th generation super fighter being developed by the United States.</strong><br />
<span id="more-592"></span> </p>
<p>According to Defense World, the US Air Force recently announced blueprints for a new fighter jet being developed under the &#8220;Next Generation Aviation Advantage&#8221; (NGAD) program, which includes including unmanned and manned fighters.</p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_240_38530440/f663fbe9d1ab38f561ba.jpg" width="625" height="366"></p>
<p><em>Design image of 6th generation fighter aircraft of the US Air Force. Source: Sina.</em></p>
<p>The image shows a triangular flying fighter and its aerial weapons on display as well. The configuration of this fighter is also very different from today&#8217;s fighters, the plane is relatively flat, triangular seen from above, has a pair of vertical V-shaped tails and the air intakes located above. fuselage.</p>
<p>The photo shows that this fighter jet has very highly modular characteristics, can quickly replace engines, landing frames &#8230; thereby reducing the load of logistics maintenance, missile pods inside. The aircraft is also equipped with a variety of missiles.</p>
<p>The NGAD program was originally proposed as a joint project of the US Air Force and Navy. Although there is still some joint cooperation between the two sides, each side has in turn set up independent offices to research and develop next-generation fighters.</p>
<p>From 2019 to 2025, the budget for the NGAD program of the US Air Force is 9 billion USD, of which the budget for the fiscal year 2021 is 1 billion USD and the budget of the fiscal year 2022 is 1.5 billion USD.</p>
<p>According to the report, the NGAD program aims to complement the F-22 and F-35 fighters, creating a system with multi-domain cognitive capabilities, flexible information and strong operational advantages. air raid attack. The program will apply digital technology to large-scale fabrication and replacement of small components.</p>
<p>This approach is based on the automotive industry&#8217;s digital transformation and uses models to solve design, assembly, maintenance and repair issues before, the Air Force said. build a physical system.</p>
<p>The US Air Force report did not specify the cost of the project to build the aircraft. However, the report mentions that a mysterious jet under the project was tested in 2020, and it is still unclear whether the plane is manned or not.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_240_38530440/967c96f6bcb455ea0ca5.jpg" width="625" height="374"></p>
<p><em>Concept art of a fighter in the NGAD project. Source: Sina.</em></p>
<p>&#8220;We have built and tested a new aircraft and broke all aircraft records,&#8221; said Will Roper, Assistant Secretary of the Air Force for US logistics and technology equipment procurement. fight. We are now ready to build the next generation aircraft in an unprecedented way. &#8220;</p>
<p>Some previous reports suggested that the NGAD program plane will have an artificial intelligence co-pilot, maybe even the ARTU system (artificial intelligence system built by algorithm to play chess. ).</p>
<p>The artificial intelligence system will act as a support for true pilots, but the weakness of AI systems lies in their logic, while actual military actions may not obey this logic. Human presence is then required to make a decision in unusual, non-standard situations.</p>
<p>It is known that from March 2018, the US Air Force Laboratory has released the image of the next generation F / X aircraft, showing that this aircraft will have a stealth design, eye-catching appearance with laser. High energy capable of cutting enemy aircraft in half.</p>
<p>This is also the main aircraft in the NGAD program, also known as the Penetration Jet. The future F / X aircraft is expected to have longer range and payload, as well as the ability to carry hypersonic weapons.</p>
<p>Under the NGAD program, the US Air Force advocates to exploit advanced capabilities of the new generation of aircraft such as air combat systems linked to fighters, drones and networking platforms. . With the aim of increasing air superiority, the F / X fighter program offers significantly enhanced stealth and works closely in coordination with the drone.</p>
<p>Until now, all information about the capabilities of the F / X is still a military secret. If the program progresses at a rapid rate through streamlined processes and uses current technology, the new generation fighter could join the US Air Force earlier than expected in 2030. .</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/the-us-air-force-revealed-about-the-6th-generation-super-fighter/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">592</post-id>	</item>
	</channel>
</rss>