<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	>

<channel>
	<title>Power supply &#8211; Spress</title>
	<atom:link href="https://en.spress.net/tag/power-supply/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.spress.net</link>
	<description>Spress is a general newspaper in English which is updated 24 hours a day.</description>
	<lastBuildDate>Thu, 17 Jun 2021 08:08:12 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">191965906</site>	<item>
		<title>Nationwide power generation Coal overtakes wind power again A spring without storms led to a decline in wind power. Coal grew to become the most important energy source in the country in the first quarter. At the same time, the demand for electricity is increasing, says Minister of Economic Affairs Altmaier.</title>
		<link>https://en.spress.net/nationwide-power-generation-coal-overtakes-wind-power-again-a-spring-without-storms-led-to-a-decline-in-wind-power-coal-grew-to-become-the-most-important-energy-source-in-the-country-in-the-first-qua/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 17 Jun 2021 08:08:12 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Affairs]]></category>
		<category><![CDATA[Altmaier]]></category>
		<category><![CDATA[coal]]></category>
		<category><![CDATA[Country]]></category>
		<category><![CDATA[Decline]]></category>
		<category><![CDATA[demand]]></category>
		<category><![CDATA[Economic]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[Generation]]></category>
		<category><![CDATA[German]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[grew]]></category>
		<category><![CDATA[important]]></category>
		<category><![CDATA[increasing]]></category>
		<category><![CDATA[led]]></category>
		<category><![CDATA[minister]]></category>
		<category><![CDATA[Most important]]></category>
		<category><![CDATA[Nationwide]]></category>
		<category><![CDATA[Nuclear power]]></category>
		<category><![CDATA[overtakes]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power generation]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[quarter]]></category>
		<category><![CDATA[source]]></category>
		<category><![CDATA[spring]]></category>
		<category><![CDATA[storms]]></category>
		<category><![CDATA[The same]]></category>
		<category><![CDATA[time]]></category>
		<category><![CDATA[Wind]]></category>
		<category><![CDATA[Wind power]]></category>
		<guid isPermaLink="false">https://en.spress.net/?p=24293</guid>

					<description><![CDATA[Nationwide electricity generation Coal is overtaking wind power again Status: 06/11/2021 1:53 p.m. A spring without storms has led to a decline in wind energy. Coal grew to become the most important energy source in the country in the first quarter. At the same time, the demand for electricity is increasing, says Minister of Economic [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" class="ts-image" src="https://www.tagesschau.de/multimedia/bilder/kohle-129https://www.tagesschau.de/https://www.tagesschau.de/~_v-videowebm.jpg" alt="The Weisweiler lignite power plant | dpa" title="The Weisweiler lignite power plant | dpa"></p>
<h1> Nationwide electricity generation Coal is overtaking wind power again </h1>
<p>Status: 06/11/2021 1:53 p.m. </p>
<p> <strong> A spring without storms has led to a decline in wind energy. Coal grew to become the most important energy source in the country in the first quarter. At the same time, the demand for electricity is increasing, says Minister of Economic Affairs Altmaier.</strong> Electricity production using coal in Germany overtook wind power again in the first quarter of 2021. According to the Federal Statistical Office, a &#8220;windless spring&#8221; resulted in almost a third less electricity from wind power. According to the authorities, the gap has been filled by increasing electricity generation from coal and natural gas power plants. From January to March inclusive, a total of 138.2 billion kilowatt hours of electricity was generated and fed into the grid. According to preliminary results from the Federal Office, that was 2.6 percent less than in the first quarter of 2020.</p>
<h2> Coal, gas and nuclear power dominate</h2>
<p>While the electricity in the same period last year came mainly from renewable energy sources such as wind power, biogas and sun (51.4 percent), coal, gas and nuclear energy dominated at the beginning of this year (59.3 percent). With a share of 28.9 percent of the total amount of electricity fed into the grid, coal was the most important energy source for electricity generation in Germany in the first quarter of this year. The amount of electricity generated in coal-fired power plants increased by more than a quarter (26.8 percent) to almost 40 billion kilowatt hours compared to the same period in the previous year. The amount of electricity from natural gas increased by 24 percent to 22.5 billion kilowatt hours. In contrast, there was a strong minus of almost a third (32.4 percent) in wind power: The feed-in of 33.5 billion kilowatt hours was the lowest value for this energy source for a first quarter since 2018. In the two previous years, there was wind power significantly higher values ​​achieved due to strong spring storms.</p>
<h2> Altmaier sees increased demand for electricity</h2>
<p>Meanwhile, Federal Minister of Economics Peter Altmaier admitted that his department had so far underestimated how much the demand for electricity in Germany is likely to increase in the course of the energy transition. &#8220;Due to the more stringent climate targets in Germany and the EU, we have to assume a significantly higher electricity demand than was previously assumed,&#8221; said the CDU politician to Wirtschaftswoche. &#8220;My house will submit new calculations for this.&#8221; Altmaier said that more energy must be produced, &#8220;from all available renewable sources: wind power and photovoltaics&#8221;. Altmaier said that he would present specific proposals on how offshore wind power on the high seas and other renewable energies could be expanded more than previously planned. For &#8220;green hydrogen&#8221; for use in the steel industry or the expansion of electromobility, many experts believe that significantly more electricity will be required in the coming years, which should come from renewable energies.</p>
<h2> SPD puts pressure on</h2>
<p>The SPD criticized Altmaier: &#8220;For months now, the SPD and the entire German industry and energy sector have been calling on the Federal Minister of Economics in vain to anchor realistic electricity requirements and a correspondingly ambitious expansion of wind power and photovoltaics in the EEG,&#8221; said parliamentary group vice-president Matthias Miersch of the dpa news agency. If Altmaier now announces new proposals, which can only then be implemented by the next federal government, it is &#8220;poor&#8221; and unworthy of a federal minister of economics, according to Miersch. The SPD had already submitted proposals months ago which, based on realistic electricity consumption, determine the associated expansion paths for green electricity up to 2030 and contain funds for acquiring space and accelerating it. &#8220;We could implement this next week,&#8221; said the politician.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24293</post-id>	</item>
		<item>
		<title>Focusing on propagandizing economical use of electricity in hot weather</title>
		<link>https://en.spress.net/focusing-on-propagandizing-economical-use-of-electricity-in-hot-weather/</link>
		
		<dc:creator><![CDATA[Tùy Phong]]></dc:creator>
		<pubDate>Wed, 16 Jun 2021 12:20:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[app]]></category>
		<category><![CDATA[Dry season]]></category>
		<category><![CDATA[economical]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity bill]]></category>
		<category><![CDATA[EVNCPC CSKH]]></category>
		<category><![CDATA[Focusing]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Hoang Hieu Trung]]></category>
		<category><![CDATA[hot]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[PC Quang Binh]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power off]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Propaganda]]></category>
		<category><![CDATA[propagandizing]]></category>
		<category><![CDATA[Quang Binh]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[Saving]]></category>
		<category><![CDATA[Wattage]]></category>
		<category><![CDATA[weather]]></category>
		<guid isPermaLink="false">https://en.spress.net/focusing-on-propagandizing-economical-use-of-electricity-in-hot-weather/</guid>

					<description><![CDATA[Although just entering the dry season, the hot weather lasted for a long time, the demand for electricity of the people increased, causing the load capacity to increase dramatically. In order to provide stable electricity to customers, Quang Binh Power Company (PC) has actively implemented many measures to ensure safe operation and improve the reliability [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Although just entering the dry season, the hot weather lasted for a long time, the demand for electricity of the people increased, causing the load capacity to increase dramatically. In order to provide stable electricity to customers, Quang Binh Power Company (PC) has actively implemented many measures to ensure safe operation and improve the reliability of power supply; at the same time promoting propaganda on economical and efficient use of electricity.</strong><br />
<span id="more-23766"></span> The peak power consumption in recent days is 186.8 MW and the electricity output is over 3.7 million kWh/day. According to PC Quang Binh&#8217;s forecast, commercial electricity output in June may reach 109 million kWh, up 23% compared to May.</p>
<p> Hoang Hieu Trung, Director of Quang Binh PC said, to ensure stable power supply, the unit will continue to invest in completing the power grid, improving power supply capacity to meet the demand for capacity growth of the load. . The company has also assigned 100% of officers and employees to be on duty, to regularly check the system of transmission lines and substations; mobilize vehicles and machinery to promptly handle incidents in the fastest time. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_10_446_39142529/556c97f49ab673e82aa7.jpg" width="625" height="441"> <em> Instructing customers to install the EVNCPC CSKH app to monitor electricity consumption.</em> Due to extreme hot weather, the frequency of using air conditioners, cooling devices, and electronic devices for family activities will be more. This leads to the risk of overloading, power failure, even increased risk of fire and explosion, unsafe operation of the power system. Therefore, in order to save electricity costs effectively and ensure enough electricity for socio-economic development, national defense &#8211; security and daily life, production and business of people in the province, PC Quang Binh recommends that customers use electricity safely and economically. Specifically, for businesses, PC Quang Binh recommends balancing and arranging production schedules in the direction of reducing electricity use during peak hours, increasing electricity use during off-peak hours; at the same time, enterprises invest in energy-saving production equipment and coordinate with the Electricity sector to monitor and control power quality. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_10_446_39142529/19ba21222c60c53e9c71.jpg" width="625" height="419"> <em> &#8220;Hot repair&#8221; is one of the solutions to minimize the power outage time of customers in hot weather.</em> In addition, Quang Binh PC requires the electricity companies to actively answer customers about problems in calculating electricity bills, and advise people on how to use electricity economically and efficiently. The affiliated units must well control the index recording and index review to promptly detect and handle abnormal cases, avoiding possible errors. In particular, the Company propagates to customers to use tools and utilities of the electricity industry to actively monitor electricity consumption and control high electricity bills in the hot season such as the EVNCPC Customer Service application on devices. mobile phone or a tool to estimate electricity consumption in daily life for electricity users nationwide at website: https://uoctinhdiennang.evn.com.vn/.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">23766</post-id>	</item>
		<item>
		<title>Technical maintenance on the top floor of Landmark 81 building</title>
		<link>https://en.spress.net/technical-maintenance-on-the-top-floor-of-landmark-81-building/</link>
		
		<dc:creator><![CDATA[Phạm Ngôn]]></dc:creator>
		<pubDate>Fri, 11 Jun 2021 04:05:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Briefings]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Conductor]]></category>
		<category><![CDATA[Cooling system]]></category>
		<category><![CDATA[Dedicated]]></category>
		<category><![CDATA[Elevator]]></category>
		<category><![CDATA[Floor]]></category>
		<category><![CDATA[Gauge]]></category>
		<category><![CDATA[High floor]]></category>
		<category><![CDATA[Landmark]]></category>
		<category><![CDATA[Landmark 81]]></category>
		<category><![CDATA[Lunch break]]></category>
		<category><![CDATA[Maintenance]]></category>
		<category><![CDATA[Mr Vu]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Skill]]></category>
		<category><![CDATA[specifications]]></category>
		<category><![CDATA[technical]]></category>
		<category><![CDATA[Technical inspection]]></category>
		<category><![CDATA[Technical staff]]></category>
		<category><![CDATA[Top]]></category>
		<category><![CDATA[Unintended]]></category>
		<category><![CDATA[Worker]]></category>
		<guid isPermaLink="false">https://en.spress.net/technical-maintenance-on-the-top-floor-of-landmark-81-building/</guid>

					<description><![CDATA[Every day, a team of technical workers maintains professional work on the highest floors of the Landmark 81 building. All are absolutely safe. Landmark 81 has a total of 81 floors, 461 m high. This is the tallest building in Vietnam, located in the center of Binh Thanh District, Ho Chi Minh City. The maintenance [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Every day, a team of technical workers maintains professional work on the highest floors of the Landmark 81 building. All are absolutely safe.</strong><br />
<span id="more-22602"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/22de907183336a6d3322.jpg" width="625" height="1018"> </p>
<p> <em> Landmark 81 has a total of 81 floors, 461 m high. This is the tallest building in Vietnam, located in the center of Binh Thanh District, Ho Chi Minh City. The maintenance and technical maintenance of the entire building is performed daily by the management team and staff. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/de4c6fe37ca195ffccb0.jpg" width="625" height="408"> <em> Anh Vu &#8211; the technical manager of the Landmark 81 building, said that the technical team often had quick briefings early in the morning to determine the arising work to do during the day. At the same time, the technical status of the building, the work done in the previous day must be reported in detail. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/8894383b2b79c2279b68.jpg" width="625" height="416"> <em> After that, the group of employees moved to the 79th floor of the building. This is the highest floor accessible by elevator. After that, people will walk up to the 80th and 81st floors (top floor) of the building to do their assigned work. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/e9445eeb4da9a4f7fdb8.jpg" width="625" height="416"> <em> Check the building&#8217;s power supply system. All electrical specifications must ensure safety conditions in accordance with regulations. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/43d3f57ce63e0f60562f.jpg" width="625" height="460"> <em> Technical staff use specialized temperature gauges to check the heat at conductor structures and power-using equipment on the 80th floor. This is a routine job to promptly detect problems and limit problems. minimize the risk of accidental fire or explosion. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/8d0738a82beac2b49bfb.jpg" width="625" height="416"> <em> A group of workers periodically maintain the glass. To do this, the worker must move on specialized rigs, in turn, check all the glass panes. The outer glass of the building is reinforced with special materials, ensuring safety and durability. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/6d3ed991cad3238d7ac2.jpg" width="625" height="416"> <em> Workers check a building&#8217;s cooling system. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/5050ebfff8bd11e348ac.jpg" width="625" height="416"> <em> The staff checks the operating parameters of the elevator. &#8220;The building is tall, the elevator is an indispensable element in the operation. We understand this, so we should pay attention to the daily maintenance and technical maintenance, so that the elevator does not cause problems,&#8221; said Mr. Vu. to speak. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/59fde352f010194e4001.jpg" width="625" height="432"> <em> The elevator of Landmark 81 building has a pulling force of 12,500 kg, each car has a load of 2,000 kg, a speed of 5m/s &#8211; is one of the fastest elevators in Vietnam. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/26dc9f738c31656f3c20.jpg" width="625" height="412"> <em> &#8220;Working on high-rise buildings requires us to have good health and overcome specific limitations. For example, when it comes to glass maintenance, every worker must overcome fear, focus on work and comply with all protection principles to ensure safety,&#8221; said Quang Trung, a technical staff member. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/c50c7da36ee187bfdef0.jpg" width="625" height="435"> <em> Periodic inspection and technical maintenance is carried out in the early morning hours, or when people take a lunch break. Troubleshooting was also implemented urgently. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/faaf45005642bf1ce653.jpg" width="625" height="424"> <em> This helps the building operate in a safe condition, and at the same time does not affect the activities of residents, merchants and visitors. In the photo is a visitor visiting the observatory on the 81st floor of the building on April 11. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_119_39097307/c8d1767e653c8c62d52d.jpg" width="625" height="273"> <em> When put into operation in July 2018, the Landmark 81 building has become one of the symbols of Ho Chi Minh City. Inside the building, service-commercial activities take place quite bustling, contributing to the driving force to promote the development of the city in the direction of civilization and modernity. </em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">22602</post-id>	</item>
		<item>
		<title>Good power saving will contribute to ensuring power supply</title>
		<link>https://en.spress.net/good-power-saving-will-contribute-to-ensuring-power-supply/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Mon, 31 May 2021 01:52:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Actively exercise]]></category>
		<category><![CDATA[Confusion]]></category>
		<category><![CDATA[Contribute]]></category>
		<category><![CDATA[Dry season]]></category>
		<category><![CDATA[Electrical equipment]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[FLYCAM]]></category>
		<category><![CDATA[good]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Heater]]></category>
		<category><![CDATA[Iron]]></category>
		<category><![CDATA[Meaning]]></category>
		<category><![CDATA[My home]]></category>
		<category><![CDATA[Nguyen Nghiem]]></category>
		<category><![CDATA[PC Quang Ngai]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power saving]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Quang Ngai]]></category>
		<category><![CDATA[Save electricity]]></category>
		<category><![CDATA[Saving]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Wire]]></category>
		<guid isPermaLink="false">https://en.spress.net/good-power-saving-will-contribute-to-ensuring-power-supply/</guid>

					<description><![CDATA[Quang Ngai is entering the hot hot days. Due to the epidemic, people rarely go out at this time, mainly at home, so the demand for electricity increases. The province&#8217;s electricity output is maintained at nearly 6.2 million kWh/day. PC Quang Ngai forecasts the weather situation and the coming demand for electricity, the electricity consumption [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><em> Quang Ngai is entering the hot hot days. Due to the epidemic, people rarely go out at this time, mainly at home, so the demand for electricity increases. The province&#8217;s electricity output is maintained at nearly 6.2 million kWh/day. PC Quang Ngai forecasts the weather situation and the coming demand for electricity, the electricity consumption in Quang Ngai will be in the range of 6.3-6.5 million kWh/day. Therefore, Quang Ngai PC actively mobilizes businesses and people to use electricity economically to contribute to stabilizing and ensuring electricity supply for production and daily life in the dry season of 2021.</em> </p>
<p> Changing habits of saving electricity not only reduces costs for the family but also contributes to saving electricity in general. Although there are not many electrical appliances in the home, only using them in accordance with the needs and reasonable time will contribute to saving a lot of electricity. In addition, customers need to check and maintain the indoor wiring system to ensure reasonable science because if the wiring is confused, it will cause power consumption to be lost in the transmission process; at the same time properly use appliances that consume large electricity such as water heaters, irons, refrigerators, etc. Customer Le Diep Lai in Nguyen Nghiem ward &#8211; Quang Ngai city said: &#8220;My house has never left the air conditioner below 25 degrees, usually around 26-27 degrees. I find that to be appropriate, not much different from the outside, both protecting health and saving electricity. I also educate my children to turn off electrical appliances in the house when they do not need to use them. Vu Ha Ty customer in Nghia Dung commune &#8211; Quang Ngai city only uses the air conditioner when absolutely necessary and usually adjusts the temperature not too low to save energy. Ms. Ty shared: “My house is not located in the center, there are many gaps around, so I often use the wind and natural light in the house, minimizing the use of electricity to operate the cooling equipment. lighting&#8221;. Changing the habit of using electricity will save electricity, reduce costs for the family and contribute to saving electricity in general. Although there are not many electrical appliances in the home, only using them in accordance with the needs and reasonable time will contribute to saving a lot of electricity. Currently, customers can use the monthly electricity consumption estimator https://uoctinhdiennang.evn.com.vn to calculate the monthly electricity consumption of the family, thereby adjusting the usage. Use electricity in the most efficient and economical way. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_173_38992753/3eec7daf6bed82b3dbfc.jpg" width="625" height="469"> <em> Propagate the use of electricity to the people.</em> Huynh Trong Nguyen &#8211; Quang Ngai PC Business City recommended: &#8220;In addition to daily-life customers, manufacturing enterprises need to review and arrange reasonable production plans, minimizing the simultaneous mobilization of devices. consume large electricity capacity during peak hours and do not leave electrical equipment idle. This is the necessary coordination to ensure the stability of the infrastructure, and to ensure the supply of electricity for production and daily life in the dry season of 2021.&#8221;<br />
In addition, to prevent local overload due to high demand for electricity, from the beginning of the second quarter of 2021, PC Quang Ngai also directed its affiliated units to regularly check lines and substations. Thanks to the initiative in the plan and the use of modern equipment such as thermal cameras, flycams, Quang Ngai PC was able to immediately detect and detect abnormal signs occurring with the equipment, preventing problems. can happen.<br />
The economical and efficient use of electricity by customers is also one of the important solutions to help Quang Ngai PCs fight overload, reduce &#8220;heat&#8221; for the power grid system; thereby contributing to helping PC Quang Ngai perform well the management and operation of the power grid safely and effectively, improving the quality of power supply for customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19419</post-id>	</item>
		<item>
		<title>&#8216;One touch&#8217; to control power consumption indicators</title>
		<link>https://en.spress.net/one-touch-to-control-power-consumption-indicators/</link>
		
		<dc:creator><![CDATA[Tuệ Mỹ -]]></dc:creator>
		<pubDate>Sun, 30 May 2021 00:00:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[app]]></category>
		<category><![CDATA[App EVNHANOI]]></category>
		<category><![CDATA[App store]]></category>
		<category><![CDATA[Bill]]></category>
		<category><![CDATA[Clever]]></category>
		<category><![CDATA[Consumption]]></category>
		<category><![CDATA[Control]]></category>
		<category><![CDATA[Customer]]></category>
		<category><![CDATA[Device]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity bill]]></category>
		<category><![CDATA[EVNHANOI]]></category>
		<category><![CDATA[Follow]]></category>
		<category><![CDATA[Google Play]]></category>
		<category><![CDATA[Index]]></category>
		<category><![CDATA[indicators]]></category>
		<category><![CDATA[IOS]]></category>
		<category><![CDATA[meters]]></category>
		<category><![CDATA[Mobile]]></category>
		<category><![CDATA[Operating system]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Search]]></category>
		<category><![CDATA[Touch]]></category>
		<guid isPermaLink="false">https://en.spress.net/one-touch-to-control-power-consumption-indicators/</guid>

					<description><![CDATA[This smartphone application also has many preeminent features, from bill payment, to utility for phone users&#8230; This App is for customers in Hanoi and uses electronic meters to directly send real-time data. Every summer &#8211; the peak season for electricity use, many consumers have many doubts and questions about the sudden increase in monthly electricity [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>This smartphone application also has many preeminent features, from bill payment, to utility for phone users&#8230;</strong><br />
<span id="more-19138"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_27_3_38988297/1b7802ea14a8fdf6a4b9.jpg" width="625" height="427"> </p>
<p> This App is for customers in Hanoi and uses electronic meters to directly send real-time data. Every summer &#8211; the peak season for electricity use, many consumers have many doubts and questions about the sudden increase in monthly electricity bills. Now, the information about electricity index and electricity bill of each household will be more transparent than ever, and consumers can also limit their own electricity consumption, all thanks to a tool has just been posted to the app store With the desire to bring a completely new experience with outstanding utilities and features, Hanoi Electricity Corporation (EVNHANOI) has launched a mobile application for customers using electricity. . With just &#8220;one touch&#8221; right on a smart mobile device, consumers can look up and manage all information about electricity, especially, can actively monitor the daily power consumption index, set threshold of electricity usage warning, self-calculation of electricity bills&#8230; <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_27_3_38988297/15ef777d613f8861d12e.jpg" width="625" height="1352"> Consumers can look up and manage all information about electricity, especially actively monitoring the daily power consumption index. The Covid-19 epidemic broke out again right at the time when the capital Hanoi entered the hot season of 2021, along with that, people&#8217;s restriction of going out to prevent and control the epidemic caused the demand for electricity. activity increased. It can be said that at this moment, the newly launched application of the Hanoi Electricity Corporation is one of the &#8220;revolutionary&#8221; features when electricity users can know exactly every day their family. How much electricity has been used, thereby planning the optimal and more economical use of electricity. With the EVNHANOI App, customers can look up all information about electricity, from the schedule of meter readings, the schedule of power interruption, to being able to send requests and track the progress of electricity services right away. on applications such as new power supply services, electricity purchase and sale contract services (signing, changing, supplementing information,&#8230;); services on measuring equipment (testing, testing)… Besides, the EVNHANOI application also helps consumers to monitor the daily and monthly electricity consumption index and compare with the same period in the previous period. In particular, in the &#8220;Power consumption&#8221; feature, households can also set a warning threshold for electricity use. Simply Select “Warning Output Threshold (kWh)” or “Proportion of power output increased from last month” and the customer can set the desired number (kWh) or rate (%) to be alerted. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_27_3_38988297/793516a700e5e9bbb0f4.jpg" width="625" height="1352"> Thanks to this mobile application, each household will plan to use electricity optimally and more economically. EVNHANOI App not only helps to control electricity consumption, but through two features &#8220;Essential power consumption of equipment&#8221; and &#8220;Billing tool&#8221;, consumers can also estimate the monthly cost of electricity. Approximately how much electricity will be used up by the family based on entering information about the quantity, type, frequency of use of electrical appliances in the household in use and checking the family&#8217;s electricity bill has the industry. whether the calculation is correct or not. Consumers only need to search for the keyword &#8220;EVNHANOI&#8221; on the App Store (for iOS operating system) and Google Play (for Android operating system) data stores to be able to download and use the EVNHANOI application right on their devices. smart mobile device.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19138</post-id>	</item>
		<item>
		<title>Summer electricity consumption increased by 12%, Nghe An is committed to ensuring enough electricity</title>
		<link>https://en.spress.net/summer-electricity-consumption-increased-by-12-nghe-an-is-committed-to-ensuring-enough-electricity/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sun, 16 May 2021 17:06:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[committed]]></category>
		<category><![CDATA[Consumption]]></category>
		<category><![CDATA[Cope with]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Elevate]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[hot]]></category>
		<category><![CDATA[increased]]></category>
		<category><![CDATA[line]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Low voltage]]></category>
		<category><![CDATA[Nghe]]></category>
		<category><![CDATA[Nghe An]]></category>
		<category><![CDATA[Power consumption]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Quy Hop]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[summer]]></category>
		<category><![CDATA[Wattage]]></category>
		<guid isPermaLink="false">https://en.spress.net/summer-electricity-consumption-increased-by-12-nghe-an-is-committed-to-ensuring-enough-electricity/</guid>

					<description><![CDATA[With always having load forecast, with short and long-term solutions to respond; investing in many new substations as well as increasing the capacity of substations, this year&#8217;s hot season electricity in the city as well as localities in Nghe An will be guaranteed, and remote areas will also be provided with electricity. safe electricity. Build [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>With always having load forecast, with short and long-term solutions to respond; investing in many new substations as well as increasing the capacity of substations, this year&#8217;s hot season electricity in the city as well as localities in Nghe An will be guaranteed, and remote areas will also be provided with electricity. safe electricity.</strong><br />
<span id="more-15042"></span> <strong> Build multiple response scenarios</strong> </p>
<p> In order to prepare for the heat wave in 2021, Nghe An Power Company (Nghe An PC) has directed its units to quickly deploy the proposed solutions and scenarios to ensure electricity supply for the whole country. Nghe An province. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_35_38819191/d5caa8d1b6935fcd0682.jpg" width="625" height="440"> <em> Nghe An PC workers check outdoor equipment at Hung Hoa Substation (Nghe An)</em> PC Nghe An information, during this year&#8217;s hot season in Nghe An, there will be many prolonged heat waves, leading to an increase in the demand for electricity for cooling than in previous years. It is expected that power output will increase, with an estimated capacity of about 820 MW. In order to ensure stable power supply in the face of increasing electricity demand in the summer of 2021, Nghe An PC has prepared a &#8220;scenario&#8221; carefully, with many solutions to supply electricity to people and businesses. Mr. Le Quang Thanh &#8211; Deputy Director of PC Nghe An said that 2021 is not expected to be as hot as the previous year, but despite the prolonged epidemic, most businesses in the area are operating stably again. power consumption is expected to increase. Regarding the load forecast, this year&#8217;s output growth will be higher than last year&#8217;s at over 12%. The most important and basic solution identified by the unit is to increase the power supply capacity, with the rapid completion of construction of substations and power lines for areas in the province. Accordingly, from the end of 2020 until now, Nghe An PC has built and installed hundreds of large and small projects, including: Raising the capacity of 110kV substation in Cua Lo route, increasing the capacity of 110kV Quynh Luu substation, completing upgrading the transmission line. 110kV from Quynh Luu &#8211; Quy Hop. Along with that, renovating and upgrading low-voltage trunk roads; replace the meter periodically; strengthening overhaul, cleaning of transmission lines and transformers; replacing the name plate number of the road, pole number, safety sign of the substation transmission line&#8230; and is implementing the plan to energize and put into operation 110kV Con Cuong substation, increasing the capacity of 110kV Hung Nguyen and Quy Hop substations in the month. 6/2021. After energizing, the station will power on in time to serve the people&#8217;s demand for electricity in the summer months; support stable and safe power supply in the area. However, according to PC Nghe An, the case of an unexpected increase in output through monitoring is unlikely and in fact, if it happens, the power infrastructure including medium voltage transmission lines, substations and power grids. low voltage will still be able to meet. Alternating power cuts to reduce capacity as announced by EVN will not happen, however, it does not exclude some cases such as: The power supply of the whole system is malfunctioning, incidents such as the breakdown of hydroelectric power units , the North &#8211; South 500kV transmission fault leading to failure to mobilize the grid capacity of the whole system will be automatically laid off. In addition, there is a problem of maintenance schedules of power plants (thermal power plants, hydroelectric plants) which can also lead to lack of power, requiring capacity regulation between regions. In the coming period, the vicinity of Nghe An will record a sudden increase in load, especially in Thanh Hoa area, and in Nghe An will also have a sudden increase at the end of 2021 when Hoang Mai 1 and Hoang Mai IPs WHA Industrial Park comes into operation. This is not only a problem for the electricity industry in Nghe An but also for the power system in the North as well as in the whole country. To solve it, EVN will have capacity coordination solutions to meet demand. Power supply scenarios have been developed at the transmission grid level (220kV, 500kV) in order to mobilize and balance capacity in the North &#8211; Central &#8211; South region. Thus, in the short term, the stable and continuous power supply for Nghe An will be ensured. <strong> PC </strong> <strong> Attention Nghe An </strong> <strong> Use electricity in hot weather</strong> PC Nghe An also noted that, in order for the power grid to operate stably during the peak of heat, it is necessary to coordinate and propagate propaganda at all levels of the government, local and central media agencies on the appropriate use of content. , saving. This content is very important for the national power system and grid, will avoid unnecessary grid overload due to unreasonable use, reduce the greenhouse effect, help limit environmental pollution, have a enough electricity to serve economic development for production and also save living costs for electricity users themselves. PC Nghe An continuously advises customers to avoid being subjective, negligent, not to misunderstand between electricity price and electricity consumption; Use electricity in the most efficient and economical way when entering the hot season. Just small actions from the people such as turning off electrical appliances when not in use, not using many large-capacity devices at the same time, using low-power consumption equipment labeled energy-saving by the Ministry of Industry and Trade. Industry and Trade inspection will help save electricity. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_35_38819191/0a4a73516d13844ddd02.jpg" width="625" height="469"> <em> PC Nghe An has prepared scenarios for electricity growth in hot weather</em> Families should use air conditioners at a reasonable level of 26-27 degrees Celsius or higher and use fans in combination to reduce power consumption. When using a cold room, do not open the door often, do not use electrical appliances with heat-generating features in the room such as irons, ovens, electric kettles, and hot water heaters. Families have many rooms, when watching TV should focus on watching together, turn off all devices in neighboring rooms. Use electricity only when absolutely necessary, avoid using devices simultaneously during peak hours… For factories, make sure to use the correct capacity and load chart. Along with that, implementing a reasonable production plan, minimizing the mobilization of equipment and machinery with large electricity consumption capacity at peak hours. To minimize electrical equipment operating at no-load, key energy-using establishments must save at least 2% of electricity consumed per product unit per year. Advise customers to use electricity as committed to the electricity industry in terms of registered load and time frame, or reduce capacity when required by the electricity industry due to sudden increase in load&#8230; When purchasing new equipment, pay attention to use equipment with energy-saving certification label of the Ministry of Industry and Trade. Responding to the electricity sector, coordinating propaganda and recommending surrounding households to save together.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15042</post-id>	</item>
		<item>
		<title>Central Region &#8211; Central Highlands: Ensuring a stable power supply on the occasion of April 30 and May 1</title>
		<link>https://en.spress.net/central-region-central-highlands-ensuring-a-stable-power-supply-on-the-occasion-of-april-30-and-may-1/</link>
		
		<dc:creator><![CDATA[Đình Tăng]]></dc:creator>
		<pubDate>Fri, 07 May 2021 21:25:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensuring]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[In the area]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[occasion]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[stable]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/central-region-central-highlands-ensuring-a-stable-power-supply-on-the-occasion-of-april-30-and-may-1/</guid>

					<description><![CDATA[This is the affirmation of the representative of Central Power Corporation (EVNCPC) when talking about the forecast of electricity demand during the holidays of April 30 and May 1 this year as well as the efforts of this unit and other companies. Member power companies in the Central-Central Highlands aim to provide safe and continuous [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>This is the affirmation of the representative of Central Power Corporation (EVNCPC) when talking about the forecast of electricity demand during the holidays of April 30 and May 1 this year as well as the efforts of this unit and other companies. Member power companies in the Central-Central Highlands aim to provide safe and continuous electricity to over 4.3 million customers in the region.</strong><br />
<span id="more-12242"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_115_38615582/cb7f52d774959dcbc484.jpg" width="625" height="390"> </p>
<p> <em> EVNCPC strengthens the inspection and repair of the power grid to ensure that customers do not cut off electricity during the holidays of April 30 and May 1 this year. (Photo: Tel).</em> Mr. Nguyen Thanh &#8211; Deputy General Director of EVNCPC said that on the occasion of April 30 and May 1 this year, employees are entitled to 4 days off, so EVNCPC forecasts the demand for electricity for domestic activities and public holidays. This will also increase. In order to ensure safe and continuous electricity supply to over 4.3 million customers in the Central region &#8211; Central Highlands, in addition to focusing on power sources for political events in 13 provinces and cities in the region, EVNCPC has a specific plan to not cut the power from 0:00 to 24h00 on April 30 and May 1, 2021. At the same time, from the time before the holiday, 13 Electricity Companies under EVNCPC have also actively worked with the local authorities to grasp the time and venue of festivals, festivals, and arrange the mode of power supply. reasonable for safe operation, reliable power, grid under normal conditions and flexible switching in fault situations. In particular, the units give priority to electricity assurance at the locations where the local political and cultural activities take place. With venues where major and important political and cultural events take place, in addition to the national grid, EVNCPC also directs its affiliated Power Companies to consider and arrange backup diesel generators; re-established the duty shift at 110kV substations without personnel on duty. The units strengthen inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent incidents. in electrical system operation. During this time, the units throughout EVNCPC arranged to strengthen the organization of leaders, mobile operators, operation, power repair, troubleshooting of private telecommunications network system. ; At the same time, fully preparing supplies, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires its affiliated Power Companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the line causing violations. grid safety corridor; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity. Especially on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requirements and problems of customers./.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12242</post-id>	</item>
		<item>
		<title>EVNCPC guarantees to provide electricity for the holidays April 30 and May 1</title>
		<link>https://en.spress.net/evncpc-guarantees-to-provide-electricity-for-the-holidays-april-30-and-may-1-2/</link>
		
		<dc:creator><![CDATA[Thế Phong]]></dc:creator>
		<pubDate>Fri, 07 May 2021 19:35:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central Highlands]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Guaranteed]]></category>
		<category><![CDATA[guarantees]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Preventive]]></category>
		<category><![CDATA[provide]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[Safety corridors]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Trouble]]></category>
		<guid isPermaLink="false">https://en.spress.net/evncpc-guarantees-to-provide-electricity-for-the-holidays-april-30-and-may-1-2/</guid>

					<description><![CDATA[On the afternoon of April 23, the Central Power Corporation (EVNCPC) said it would provide electricity to 13 provinces and cities in the Central and Central Highlands continuously on April 30 and May 1. Illustration According to EVNCPC, on the occasion of April 30 and May 1 this year, employees are entitled to 4 days [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the afternoon of April 23, the Central Power Corporation (EVNCPC) said it would provide electricity to 13 provinces and cities in the Central and Central Highlands continuously on April 30 and May 1.</strong><br />
<span id="more-12224"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_146_38615650/081f36b710f5f9aba0e4.jpg" width="625" height="390"> </p>
<p> <em> Illustration </em> According to EVNCPC, on the occasion of April 30 and May 1 this year, employees are entitled to 4 days off, so the demand for electricity for daily life and service will also increase. In addition to focusing on electricity sources for political events in 13 provinces and cities in the Central and Central Highlands, EVNCPC has specifically planned to not cut off power from 0:00 to 24h00 on April 30 and May 1 to provide providing safe and continuous electricity to over 4.3 million customers in the region. Mr. Nguyen Thanh, Deputy General Director of EVNCPC, said that before the holiday, 13 power companies under EVNCPC have actively worked with local authorities to grasp the time and location of festivals, festivals, and fathers. reasonable power supply mode for safe and reliable operation of the source, the power grid under normal conditions and flexible switching in the event of an incident. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. For venues of major and important political and cultural events, in addition to the national grid, EVNCPC directs power companies to consider arranging backup d iesel generators; re-established the duty shift at 110kV substations without personnel on duty. The units strengthened the inspection, detection and timely treatment of defects of source equipment, power grids, unmanned 110 kV substations, SCADA systems, and luminescence to ensure safety of the corridor to prevent the trouble in operating the power system. During this time, the units throughout EVNCPC organize increased duty for leaders, mobile operators, operation, power repair, troubleshooting of private and copper telecommunication network systems. sufficiently prepared materials, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires electricity companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the lines that cause a corridor violation. grid safety; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity. In particular, on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requirements and problems of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12224</post-id>	</item>
		<item>
		<title>EVNCPC provides safe electricity, continuously during the holidays April 30 and May 1-5</title>
		<link>https://en.spress.net/evncpc-provides-safe-electricity-continuously-during-the-holidays-april-30-and-may-1-5/</link>
		
		<dc:creator><![CDATA[Tin, ảnh: VĂN CHUNG]]></dc:creator>
		<pubDate>Fri, 07 May 2021 10:50:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[continuously]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[Holidays]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[Politic]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Provided]]></category>
		<category><![CDATA[safe]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://en.spress.net/evncpc-provides-safe-electricity-continuously-during-the-holidays-april-30-and-may-1-5/</guid>

					<description><![CDATA[On the occasion of April 30 and May 1, in addition to focusing on electricity sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, the Central Power Corporation (EVNCPC) has made a specific plan. to not cut off electricity from 0 hours to 24 hours on April 30 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the occasion of April 30 and May 1, in addition to focusing on electricity sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, the Central Power Corporation (EVNCPC) has made a specific plan. to not cut off electricity from 0 hours to 24 hours on April 30 and May 1-5 to provide safe and continuous electricity to over 4.3 million customers in the region.</strong><br />
<span id="more-12150"></span> On April 23, Mr. Nguyen Thanh, Deputy General Director of EVNCPC, said that before the holidays of April 30 and May 1, 13 power companies under EVNCPC actively worked with local authorities to grasp the time. time and venue for festivals and festivals, and arrange reasonable power supply methods to safely and reliably operate the power source and grid in normal conditions and flexibly change in the event of an incident. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. In places where major political and cultural events take place, in addition to the national grid, EVNCPC directs Power companies to consider and arrange standby diesel generators; re-established the duty shift at 110kV substations without personnel on duty.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_16_38616584/59f2b8509e12774c2e03.jpg" width="625" height="389"> <em> EVNCPC increased the use of grid repair technology that did not cut off customers&#8217; power. </em> The units strengthen inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent incidents. in electrical system operation. During this time, the units throughout the EVNCPC organize increased duty for leaders, mobile operators, operation, power repair, troubleshooting of private telecommunications network system; At the same time, fully preparing supplies, backup equipment, fuel, communication systems and vehicles, ready to quickly handle damage and incidents. EVNCPC requires electricity companies to promote propaganda among the people to prevent kites flying near electric lines, metal-coated paper fireworks and throwing objects on the lines, causing a corridor violation. grid safety &#8230; Especially on this occasion, the Center for Customer Care in Central Vietnam strengthened the call center force 19001909 to receive and well handle information related to the power supply in the area, promptly responding to requests. requirements and problems of customers.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12150</post-id>	</item>
		<item>
		<title>No power cuts on the occasion of April 30 and May 1 in the Central region and the Central Highlands</title>
		<link>https://en.spress.net/no-power-cuts-on-the-occasion-of-april-30-and-may-1-in-the-central-region-and-the-central-highlands/</link>
		
		<dc:creator><![CDATA[Đ.Hoàng]]></dc:creator>
		<pubDate>Wed, 05 May 2021 14:20:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[110kV substation]]></category>
		<category><![CDATA[April]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[cuts]]></category>
		<category><![CDATA[Diesel]]></category>
		<category><![CDATA[Electrical company]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Electricity supply]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Fire]]></category>
		<category><![CDATA[Fly a kite]]></category>
		<category><![CDATA[Generator]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Highlands]]></category>
		<category><![CDATA[In the area]]></category>
		<category><![CDATA[Luminescent]]></category>
		<category><![CDATA[Nguyen Thanh]]></category>
		<category><![CDATA[occasion]]></category>
		<category><![CDATA[Plan]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power cut]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://en.spress.net/no-power-cuts-on-the-occasion-of-april-30-and-may-1-in-the-central-region-and-the-central-highlands/</guid>

					<description><![CDATA[Central Power Corporation has specifically planned to not cut off electricity from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide safe and continuous electricity to over 4.3 million customers. Central Vietnam Power Corporation has specifically planned to not cut off the power from 0:00 to 24h00 on April 30 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Central Power Corporation has specifically planned to not cut off electricity from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide safe and continuous electricity to over 4.3 million customers. Central Vietnam Power Corporation has specifically planned to not cut off the power from 0:00 to 24h00 on April 30 and May 1, 2021, in order to provide power safely and continuously for more than 4, 3 million customers in the region.</strong><br />
<span id="more-11727"></span> On the afternoon of April 24, Mr. Nguyen Thanh, Deputy General Director of Central Power Corporation (EVNCPC) said that on the occasion of April 30 and May 1 of this year, employees have 4 days off, the demand for electricity. for subsistence, service will also increase. Therefore, in addition to focusing on power sources for political events in 13 provinces and cities in the Central Region &#8211; Central Highlands, EVNCPC has made a specific plan to not cut the power from 0:00 to 24h00 on April 30 and January 1. 5/2021, to provide safe and continuous electricity to over 4.3 million customers in the region.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_101_38624624/e9d13c971ad5f38baac4.jpg" width="625" height="390"> <em> EVNCPC increased the use of grid repair technology that did not cut off customers&#8217; power.</em> According to Mr. Thanh, before the holiday, 13 Electricity Companies under EVNCPC have actively worked with local authorities to grasp the time and location of festivals and festivals, and arrange reasonable power supply methods to safe operation, reliable power, grid under normal conditions and flexible switching in the event of a breakdown. In particular, the unit gives priority to ensuring electricity at the locations where political and cultural activities take place. With venues of major and important political and cultural events, in addition to the national grid, EVNCPC directs Power Companies to consider and arrange standby diesel generators; re-established the duty shift at 110kV substations without personnel on duty. &#8220;The units enhance inspection, detect and promptly handle defects of source equipment, power grids, unmanned 110kV substations, SCADA systems, luminescence to ensure safety of the corridor to prevent trying to operate the power system &#8220;, Mr. Thanh said. It is known that EVNCPC requires Power Companies to promote propaganda among the people to prevent kites flying near power lines, metal-coated paper fireworks and throwing objects on the line causing violations. grid safety corridor; coordinate with localities and information agencies in organizing propaganda and widely dissemination of measures to use electricity safely, economically and effectively to customers using electricity.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11727</post-id>	</item>
		<item>
		<title>Engineer Tran Nien Thuy benefits the electricity industry billions of dong</title>
		<link>https://en.spress.net/engineer-tran-nien-thuy-benefits-the-electricity-industry-billions-of-dong/</link>
		
		<dc:creator><![CDATA[Bài và ảnh: CÔNG HIỀN]]></dc:creator>
		<pubDate>Thu, 29 Apr 2021 00:53:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[benefits]]></category>
		<category><![CDATA[billions]]></category>
		<category><![CDATA[Bring]]></category>
		<category><![CDATA[Creation]]></category>
		<category><![CDATA[Devoted]]></category>
		<category><![CDATA[Distribution]]></category>
		<category><![CDATA[Do my best]]></category>
		<category><![CDATA[dong]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Emulation soldiers]]></category>
		<category><![CDATA[Engineer]]></category>
		<category><![CDATA[Go to work]]></category>
		<category><![CDATA[Graduate]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Le Quang Truong]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Method]]></category>
		<category><![CDATA[Moderate]]></category>
		<category><![CDATA[Moderate room]]></category>
		<category><![CDATA[Nien]]></category>
		<category><![CDATA[Passion]]></category>
		<category><![CDATA[Power industry]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Reactive power]]></category>
		<category><![CDATA[Relays]]></category>
		<category><![CDATA[Thuy]]></category>
		<category><![CDATA[Tran]]></category>
		<guid isPermaLink="false">https://en.spress.net/engineer-tran-nien-thuy-benefits-the-electricity-industry-billions-of-dong/</guid>

					<description><![CDATA[Passionate about creativity, responsibility, dedication, wholeheartedly in the work that brought many successes for Mr. Tran Nien Thuy, modal engineer, dispatcher of the provincial distribution grid (Gia Lai Power Company) and benefit the electricity industry billions of dong. In 2004, after graduating from university, Mr. Thuy was recruited to work in the Dispatch Department (Gia [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Passionate about creativity, responsibility, dedication, wholeheartedly in the work that brought many successes for Mr. Tran Nien Thuy, modal engineer, dispatcher of the provincial distribution grid (Gia Lai Power Company) and benefit the electricity industry billions of dong.</strong><br />
<span id="more-10032"></span> In 2004, after graduating from university, Mr. Thuy was recruited to work in the Dispatch Department (Gia Lai Electricity Company). That was the time when the new Dispatch Department was established with many difficulties and challenges. To ensure a safe and stable electricity supply, to meet the requirements of socio-economic development and people&#8217;s life in the area, Mr. Thuy and his colleagues each have to work with two or three degrees, especially receive and process customer information that reflects and fix electrical problems in outdated technology; communication system, programs and applications of the industry are incomplete. Many jobs must be done manually, with great time and pressure.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_24_16_38621086/1b20354d130ffa51a31e.jpg" width="625" height="540"> <em> Engineer Tran Nien Thuy. </em> In 2017, the Control Center was established and officially put into operation. The 110kV grid system was transferred to the provincial distribution grid, and Mr. Tran Nien Thuy continues to be trusted with the responsibility of the company&#8217;s leaders to assign the responsibility of modal staff of the department. Directly in charge of many jobs that require deep expertise, such as: Calculation of operating modes and grid reactive capacity; forecast load demand serving assessment of electricity system security; make cards according to plans and irregularities; basic wiring diagrams of the system; calculation of automatic relay protection correction; calculating the loss of medium voltage and 110kV grid &#8230; At this time, in order to fulfill the task well, in addition to responsibility, the dedication must also be constantly innovating, mastering advanced technology and techniques. Mr. Le Quang Truong, Deputy Technical Director of Gia Lai Power Company affirmed: “Mr. Thuy has met that expectation, not only good at expertise, he also has many valuable initiatives, contributing to development of the power sector, typically as initiatives: Grid power loss reporting program; the program synthesizes the daily operating parameters report and manages the operation sheet; The initiative to connect the MCAP capacitor to the ABB SYS600 system &#8230; benefits the power industry billions of dong. Mr. Thuy was awarded many certificates of merit, certificates of merit by the Central Power Corporation and Gia Lai Electricity Company, the title of Grassroots Emulation Soldier &#8220;&#8230;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">10032</post-id>	</item>
		<item>
		<title>Da Nang: Increasing reliability of power supply for industrial parks and hi-tech parks</title>
		<link>https://en.spress.net/da-nang-increasing-reliability-of-power-supply-for-industrial-parks-and-hi-tech-parks/</link>
		
		<dc:creator><![CDATA[Vũ Lê]]></dc:creator>
		<pubDate>Fri, 23 Apr 2021 00:48:11 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[40MVA]]></category>
		<category><![CDATA[An Don Industrial Park]]></category>
		<category><![CDATA[Cau Do Station]]></category>
		<category><![CDATA[CPC]]></category>
		<category><![CDATA[DA NANG ELECTRICITY]]></category>
		<category><![CDATA[Danang]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[High tech Zone]]></category>
		<category><![CDATA[hitech]]></category>
		<category><![CDATA[Hoa Cam industrial park]]></category>
		<category><![CDATA[Hoa Xuan urban area]]></category>
		<category><![CDATA[increasing]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Industrial and commercial facilities]]></category>
		<category><![CDATA[industrial area]]></category>
		<category><![CDATA[Le Hong Cuong]]></category>
		<category><![CDATA[Lien chieu industrial park]]></category>
		<category><![CDATA[Nang]]></category>
		<category><![CDATA[Nguyen Van Quang]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[PC Danang]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[RMU]]></category>
		<category><![CDATA[Supply]]></category>
		<guid isPermaLink="false">https://en.spress.net/da-nang-increasing-reliability-of-power-supply-for-industrial-parks-and-hi-tech-parks/</guid>

					<description><![CDATA[&#8216;One of the contents that investors always pay attention to when investing in Da Nang hi-tech park is the ability to meet the power quality. Only facilitating land is not enough, but electricity quality is a very important factor to attract investment. &#8216; That is the opinion of the Secretary of the Da Nang City [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>&#8216;One of the contents that investors always pay attention to when investing in Da Nang hi-tech park is the ability to meet the power quality. Only facilitating land is not enough, but electricity quality is a very important factor to attract investment. &#8216;</strong><br />
<span id="more-6149"></span> That is the opinion of the Secretary of the Da Nang City Party Committee &#8211; Mr. Nguyen Van Quang to the Department of Industry and Trade and Da Nang Power One Member Company Limited (Da Nang PC) when referring to the issue of stable power supply to industrial zones. and Da Nang high-tech park.</p>
<p> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_35_38606494/11c763ca4688afd6f699.jpg" width="625" height="416"> <em> Each year, the electricity industry invests nearly 1,000 billion VND to invest, renovate and upgrade the power grid for the city. Danang</em> <strong> Continuously invest in and upgrade the power grid to supply electricity stably and continuously for businesses</strong> According to Director of Electricity of Da Nang &#8211; Mr. Le Hong Cuong, in recent years, the PC of Da Nang annually invests 400 billion VND to invest, renovate and upgrade the power grid to ensure power supply for the city. Including the investment of Central Power Corporation (CPC) and Power Transmission Company 2, the total investment each year is about 1,000 billion VND. City grid. Da Nang has many good functions as a smart grid. Da Nang PC is also the first unit in the country that will basically complete the automation of the grid, the substation without any personnel on duty &#8230;. In particular, Da Nang PC is always interested in ensuring to improve the quality of electricity for industrial parks (IZs) and High-Tech (CNC) zones. Currently, in Da Nang there are main industrial zones, stable electricity supply from 110kV substations in the area including: An Don Industrial Park (power supply via An Don 110kV substation), Lien Chieu Industrial Park (Lien Chieu Station), Industrial Park Hoa Khanh (Hoa Khanh 1 Station, Hoa Khanh 2), Hoa Cam Industrial Park (Cau Do Station), High-Tech Park and Information Technology Park (Hoa Lien Station). Notably, the high-tech park and the IT zone have great potential for expansion, attracting many domestic and foreign enterprises to invest in production. In recent years, the Company has invested in building a power grid according to N-1 criteria to improve the reliability of power supply for this area. In the year 2021, the Company continues to invest in implementing key projects: Installation of 2 more substations 110kV Hoa Lien (40MVA); Exploit 22kV transmission line from Hoa Khanh 2 substation to high-tech park and other projects to improve reliability of power supply. After completion, projects will ensure safe and continuous power supply for businesses and the ability to expand the scale of the High-Tech Park in the coming time. Along with that, Da Nang PC is also implementing many power grid projects in parallel with the construction progress of a number of key projects in Da Nang to be ready for power to serve when the project is completed and put into operation as Construction works of 22kV lines along Bach Dang-Nhu Nguyet street with the scale of 3.5km underground cable, 10 RMU cabinets, serving power supply of Software Park No.2 (ICT Building Block 01 will complete the power supply in October 2021 and by August 2022, completing the whole project); 22kV Exploitation Project after 110kV Khue Trung substation with expected scale of 3.7Km underground cable, 05 RMU cabinets for power supply in Hoa Xuan urban area and Hoa Xuan creative space. The completed works will contribute to the city&#8217;s development goals, especially the development of information technology, electronics and telecommunications industries in the industrial era 4.0. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_35_38606494/bebce4f0d8b231ec68a3.jpg" width="625" height="416"> <em> Manufacturing in high-tech industries requires very high reliability of power supply</em> <strong> High-tech industries require very high power supply reliability</strong> Mr. Pham Truong Son &#8211; Head of Management Board of Da Nang Hi-Tech and Industrial Zones, said that in 2017 and 2018, the Management Board regularly received recommendations from businesses related to power outages and power supply. Stable in production. Da Nang Department of Industry and Trade is assigned by the City People&#8217;s Committee for state management in electricity development; Based on receiving feedback from businesses, the Management Board and the Department of Industry and Trade of the city, Da Nang PC has closely coordinated to resolve difficulties and problems for businesses related to electrical connection as well as other problems in the power supply such as troubleshooting for the business; installation of electronic relays…. Thanks to that, in the past 2 years, the supply of electricity to serve the production of enterprises in industrial parks and hi-tech zones has been very good. Compared with the common ground there is more progress, the power quality is relatively. However, according to Mr. Son, in the coming time, CNC production and supporting industries require very high power quality and greater stability of electricity. Therefore, it is necessary to have measures and solutions to support investors and manufacturers to ensure the quality of electricity supply. “Power outages and power outages in the past have been greatly strengthened. However, in the coming time, with industrial development, the power source is a very important issue. Especially in the high-tech zone, production needs very high and stable power quality, requiring Da Nang PC to provide reliable power ”, Mr. Son said, at the same time proposing that Da Nang PC will have criteria in the near future. and an underground roadmap for the power transmission system to serve the industrial parks and the city&#8217;s high-tech zones to ensure aesthetics, aesthetics, and facilitate maintenance. Commenting on this issue, Secretary of the Da Nang City Party Committee &#8211; Mr. Nguyen Van Quang said that one of the contents that investors are always interested in when investing in high-tech zones is the ability to meet the quality. electricity of the city. “Calling for investment in the city is not only favorable land conditions, but electricity quality is a very important factor. Therefore, the Industry and Trade industry is concerned with Da Nang PC and CPC to ensure a stable, constant and quality power supply for production ”, Mr. Quang emphasized.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">6149</post-id>	</item>
		<item>
		<title>Minh Hoa Electricity: Efforts to ensure electricity supply</title>
		<link>https://en.spress.net/minh-hoa-electricity-efforts-to-ensure-electricity-supply/</link>
		
		<dc:creator><![CDATA[Nguyễn Hoàng]]></dc:creator>
		<pubDate>Wed, 21 Apr 2021 11:31:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Dan Hoa]]></category>
		<category><![CDATA[Efforts]]></category>
		<category><![CDATA[Electrical Power]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[ensure]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Guaranteed]]></category>
		<category><![CDATA[Hoa]]></category>
		<category><![CDATA[Isotopes]]></category>
		<category><![CDATA[KVA]]></category>
		<category><![CDATA[Load]]></category>
		<category><![CDATA[Minh]]></category>
		<category><![CDATA[Minh Hoa]]></category>
		<category><![CDATA[Minh Hoa Electricity]]></category>
		<category><![CDATA[Nguyen Hoang]]></category>
		<category><![CDATA[Overhaul]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[Proportion]]></category>
		<category><![CDATA[Reliability]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Thuong Hoa]]></category>
		<category><![CDATA[Transfer]]></category>
		<guid isPermaLink="false">https://en.spress.net/minh-hoa-electricity-efforts-to-ensure-electricity-supply/</guid>

					<description><![CDATA[Minh Hoa district is now stepping up economic restructuring in the direction of gradually increasing the proportion of industry-construction and trade-services, reducing the proportion of agriculture-forestry. In particular, many new residential areas and businesses have formed the increasing demand for sufficient electricity to serve production, business and daily life of customers. Facing that fact, Minh [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Minh Hoa district is now stepping up economic restructuring in the direction of gradually increasing the proportion of industry-construction and trade-services, reducing the proportion of agriculture-forestry. In particular, many new residential areas and businesses have formed the increasing demand for sufficient electricity to serve production, business and daily life of customers. Facing that fact, Minh Hoa Electricity has brought into play its pioneering role, accompanying, and promoting socio-economic development in the area.</strong><br />
<span id="more-5601"></span> Clearly defining the tasks in the new period, Minh Hoa Electricity has closely followed the local socio-economic development orientation to advise and mobilize resources for synchronous investment in the electrical technical infrastructure system in the direction of focus, key point. For the capital of the electricity industry, Minh Hoa Electricity has planned and implemented periodic overhaul and repair of the power system, ensuring both quantity and quality, gradually modernizing the power grid according to direction of automation and application of science, technology and technology to management and operation.</p>
<p> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_446_38568687/24dd570173439a1dc352.jpg" width="625" height="416"> <em> Minh Hoa Electricity Worker constructs and renovates the medium voltage grid.</em> Mr. Nguyen Hoang, Minh Hoa Electricity Director, said that in 2020, Minh Hoa Electricity is one of the units in charge of the construction of many works under the major repair and construction investment source of Quang Binh Power Company. including the work of overhaul of the Minh Hoa medium voltage electrical network in 2020, the work to improve the reliability of electricity supply in Quang Binh province by 2020; works to reduce power loss of medium voltage electrical network in Quang Binh province by 2020. All works are constructed with the highest sense of responsibility, ensure on schedule, complete and put into use, making an important contribution to recovering operating capacity, saving investment capital and supplying electricity safely and continuously, improving the reliability of power supply in the area. Minh Hoa Electricity currently manages an intermediate transformer station (TBA) with a capacity of 8,000kVA; 18.36km of 35kV line; 189,97 kilometers of the 22 kV transmission line, and 153 TBA with the capacity of 21,027kVA. In order to ensure the safe operation of the power grid, and at the same time supply enough electricity to meet the growing demand in the area, Minh Hoa Electricity has strengthened the on-duty force at the line management team and the substation; consolidate and well organize the information receiving and processing system to promptly handle incidents and improve customer care services; Regularly deploying the inspection of the grid with the temperature camera, promptly preventing and detecting a number of locations at risk. Up to now, Minh Hoa Electricity has the ability to remotely control 14/14 recloser of various types on the grid; at the same time, deploying the outgoing phase isotope 481 substation 110kV Tuyen Hoa with the busbar C41 Quy Dat intermediate substation to ensure the safe and continuous power supply when the incident occurs. Currently, the unit has been focusing on implementing the closed circuit of Vè-Si to ensure more optimal power supply in the coming time. Along with that, thanks to the foreign capital funding to supply electricity to the villages and hamlets that do not have electricity, so far most of the poor and difficult border communes, such as Thuong Hoa and Dan Hoa have been &#8220;covered&#8221;. national grid. With efforts to invest in the development of power sources and grids aiming to improve the quality of electricity services, Minh Hoa Electricity always ensures to meet the needs of electricity loads for the people as well as effectively implement the generation target. socio-economic development, ensuring national defense and security in the area. According to Mr. Nguyen Hoang, in the coming years, the demand for electricity of customers will increase, inevitably will create supply pressure on the grid power generation and management unit, requiring management. , forecasts of load demand must be detailed and close. Therefore, Minh Hoa Electricity determined that the concentration of management, operation, investment in construction and repair of the power system must be implemented according to a long-term and regular plan to increase supply reliability and quality. Electrical Power. “The goal of Minh Hoa Electricity is to strive to achieve an annual average commercial electricity growth rate of over 10% by 2022; the rate used to transmit and distribute electricity reached the plan assigned by Quang Binh Power Company; Average electricity price is 1,895 VND / kWh; electricity bill collection coefficient> 100% &#8230; Therefore, each employee of the whole Electricity must have the highest solidarity, unanimity, striving to comprehensively complete political tasks and economic and technical targets. art, steadfastly accompany the constant growth of heroic Minh Hoa homeland in the process of industrialization and modernization ”-ong Nguyen Hoang shared more.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5601</post-id>	</item>
		<item>
		<title>To install rooftop solar PV, your home must meet this requirement</title>
		<link>https://en.spress.net/to-install-rooftop-solar-pv-your-home-must-meet-this-requirement/</link>
		
		<dc:creator><![CDATA[Sơn Hà]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 13:05:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[connection]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Family]]></category>
		<category><![CDATA[Fitting]]></category>
		<category><![CDATA[Grid]]></category>
		<category><![CDATA[Home]]></category>
		<category><![CDATA[Install]]></category>
		<category><![CDATA[Installation]]></category>
		<category><![CDATA[INVERTER]]></category>
		<category><![CDATA[meet]]></category>
		<category><![CDATA[Optical power]]></category>
		<category><![CDATA[Photoelectricity]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Power system]]></category>
		<category><![CDATA[Radiation]]></category>
		<category><![CDATA[requirement]]></category>
		<category><![CDATA[Roof]]></category>
		<category><![CDATA[Rooftop]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Vietnam Electricity Corporation]]></category>
		<category><![CDATA[VTV24]]></category>
		<category><![CDATA[Wattage]]></category>
		<guid isPermaLink="false">https://en.spress.net/to-install-rooftop-solar-pv-your-home-must-meet-this-requirement/</guid>

					<description><![CDATA[Rooftop solar PV is an attractive solution for households, especially in the summer. However, when installing, you must note: the ground is sturdy, the area is large enough &#8230; for installation, Ms. Tran Vu Diem Hang, Green Development Innovation Center, said that the rooftop solar power system is a solar power system with photovoltaic panels [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Rooftop solar PV is an attractive solution for households, especially in the summer. However, when installing, you must note: the ground is sturdy, the area is large enough &#8230; for installation,</strong><br />
<span id="more-4904"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/d4fbc50dee4f07115e5e.jpg" width="625" height="326"> </p>
<p> <em> Ms. Tran Vu Diem Hang, Green Development Innovation Center, said that the rooftop solar power system is a solar power system with photovoltaic panels installed on the roof of a building, with capacity? exceeding 1 MW, directly or indirectly connected to the electricity grid with a voltage of 35 kV or less of the buyer.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/72c664304f72a62cff63.jpg" width="625" height="351"> <em> Every region in our country has potential for solar power. For example, in Hanoi, the radiation intensity and total radiation are not small, the installation of grid-connected solar power brings high efficiency. The Northwest region also has solar energy potential &#8230; So, no matter where you live, people can install rooftop solar PV.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/203635c01e82f7dcae93.jpg" width="625" height="335"> <em> For households, rooftop solar power saves electricity costs, reduces the pressure of paying high-tier electricity bills for households using a lot of electricity; increase household income because it is possible to sell excess electricity after it is used to EVN; help protect the roof to cool the roof, especially in the summer &#8230;</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/014d15bb3ef9d7a78ee8.jpg" width="625" height="375"> <em> A rooftop solar PV system consists of photovoltaic panels, power converters (inverters) and wires as well as a lightning protection system.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/6f6c649a4fd8a686ffc9.jpg" width="625" height="413"> <em> Currently, the cost of installing a rooftop solar power system is not too expensive: the current investment price of 01 kWp ranges from 13-18 million VND depending on the size and origin of the equipment.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/b8e7b2119953700d2942.jpg" width="625" height="351"> <em> However, in order to install solar power on the roof, people must pay attention to a number of points. First, the area must be large enough for installation. Accordingly, the roof area must be at least 6 &#8211; 7 m2 / kWp and 3 kWp should have a roof area of ​​21 square meters.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/ed61e497cfd5268b7fc4.jpg" width="625" height="351"> <em> You also need to make sure the roof is sturdy enough to place the mechanical system, the battery plate on top.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/502158d773959acbc384.jpg" width="625" height="351"> <em> In addition, the installation space must be ensured that there is no shade obscured by trees or other construction works.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_180_38545809/72c664304f72a62cff63.jpg" width="625" height="351"> <em> In particular, you must test the construction unit&#8217;s capabilities. Currently, each unit has its own capabilities, experience and standards leading to very different quality and price. Therefore, people should choose units with good capacity and years of experience.</em> <em> Invite readers to watch the video: Spontaneous gas sales are rampant. Source: VTV24 </em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4904</post-id>	</item>
		<item>
		<title>The Tesla Cybertruck-mounted mobile home costs the same as the car</title>
		<link>https://en.spress.net/the-tesla-cybertruck-mounted-mobile-home-costs-the-same-as-the-car/</link>
		
		<dc:creator><![CDATA[Hoàng Tuấn]]></dc:creator>
		<pubDate>Sat, 17 Apr 2021 10:31:10 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Basic demand]]></category>
		<category><![CDATA[bed]]></category>
		<category><![CDATA[Camp]]></category>
		<category><![CDATA[car]]></category>
		<category><![CDATA[Car owner]]></category>
		<category><![CDATA[Clean]]></category>
		<category><![CDATA[Convenient]]></category>
		<category><![CDATA[costs]]></category>
		<category><![CDATA[Cybertruckmounted]]></category>
		<category><![CDATA[Electrical load]]></category>
		<category><![CDATA[Electromagnetic stove]]></category>
		<category><![CDATA[Fitting]]></category>
		<category><![CDATA[Home]]></category>
		<category><![CDATA[Internet connection]]></category>
		<category><![CDATA[Mini]]></category>
		<category><![CDATA[Mobile]]></category>
		<category><![CDATA[Picnic]]></category>
		<category><![CDATA[Power supply]]></category>
		<category><![CDATA[Shower]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[Special point]]></category>
		<category><![CDATA[Tesla]]></category>
		<category><![CDATA[Tesla Cybertruck]]></category>
		<category><![CDATA[Valuable]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-tesla-cybertruck-mounted-mobile-home-costs-the-same-as-the-car/</guid>

					<description><![CDATA[CyberLandr is a mobile home model that can be folded and mounted on the box of Tesla Cybertruck for picnics and camping. CyberLandr company in the US has introduced a smart mobile home model for Tesla Cybertruck owners who love to picnic and explore. The price of this product is $ 49,995 and CyberLandr has [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>CyberLandr is a mobile home model that can be folded and mounted on the box of Tesla Cybertruck for picnics and camping.</strong><br />
<span id="more-3786"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/0ddbabc085826cdc3593.jpg" width="625" height="351"> </p>
<p> <em> CyberLandr company in the US has introduced a smart mobile home model for Tesla Cybertruck owners who love to picnic and explore. The price of this product is $ 49,995 and CyberLandr has started taking pre-orders. Meanwhile, Tesla&#8217;s electric pickup is expected to be delivered by the end of this year. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/5f67fa7cd43e3d60642f.gif" width="625" height="351"> <em> A special feature of this mobile home model is the ability to stow the Cybertruck cargo box, helping the electric pickup to move easily without affecting the car&#8217;s aerodynamics. Upon reaching the campsite, the user can &#8220;open&#8221; CyberLandr to its full size and use it. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/942c35371b75f22bab64.jpg" width="625" height="351"> <em> According to the manufacturer, CyberLandr has a weight of about 540-620 kg depending on the equipment inside. The power supply for this mini house is a 20 kWh battery that can be charged by the solar panel on the roof. CyberLandr&#8217;s battery pack can be used to power Cybertruck when needed. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/fbab20b00ef2e7acbee3.jpg" width="625" height="351"> <em> When in full use, CyberLandr has 2 main spaces for living and toilets. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/509c8487aac5439b1ad4.jpg" width="625" height="351"> <em> The main room of CyberLandr has amenities such as 32 inch TV, satellite Internet connection of Starlink, sink, magnetic kitchen, mini fridge &#8230; Here, users can eat, drink, work, rest or entertainment. </em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/53e780fcaebe47e01eaf.jpg" width="625" height="351"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/53039d18b35a5a04034b.jpg" width="625" height="351"> <em> Two seats on CyberLandr can be arranged into a double bed, enough room for 2 adults to use.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_07_119_38450893/52599d42b3005a5e0311.jpg" width="625" height="351"> <em> CyberLandr&#8217;s bathroom is not too spacious but can still serve the basic needs of users with showers, toilets, mirrors &#8230; CyberLandr can bring 150 liters of water for daily use. </em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">3786</post-id>	</item>
	</channel>
</rss>