<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	>

<channel>
	<title>Project &#8211; Spress</title>
	<atom:link href="https://en.spress.net/tag/project/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.spress.net</link>
	<description>Spress is a general newspaper in English which is updated 24 hours a day.</description>
	<lastBuildDate>Sun, 20 Jun 2021 12:20:11 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">191965906</site>	<item>
		<title>The role of a bridge in the project to develop three-size nano products</title>
		<link>https://en.spress.net/the-role-of-a-bridge-in-the-project-to-develop-three-size-nano-products/</link>
		
		<dc:creator><![CDATA[Thái Hoàng]]></dc:creator>
		<pubDate>Sun, 20 Jun 2021 12:20:11 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Commercialization]]></category>
		<category><![CDATA[develop]]></category>
		<category><![CDATA[Functional foods]]></category>
		<category><![CDATA[Ha Phuong Thu]]></category>
		<category><![CDATA[Institute of Materials Science]]></category>
		<category><![CDATA[Market Development Department]]></category>
		<category><![CDATA[Ministry of Science and Technology]]></category>
		<category><![CDATA[Nano]]></category>
		<category><![CDATA[Pham Duc Nghiem]]></category>
		<category><![CDATA[Phan Ke Son]]></category>
		<category><![CDATA[Pharmacist]]></category>
		<category><![CDATA[pharmacy]]></category>
		<category><![CDATA[products]]></category>
		<category><![CDATA[Program 2075]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Researchers]]></category>
		<category><![CDATA[role]]></category>
		<category><![CDATA[Science and technology]]></category>
		<category><![CDATA[ST]]></category>
		<category><![CDATA[The scientist]]></category>
		<category><![CDATA[Three sizes]]></category>
		<category><![CDATA[threesize]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-role-of-a-bridge-in-the-project-to-develop-three-size-nano-products/</guid>

					<description><![CDATA[During the process of researching and realizing the dream of turning a holly into a nano product for human health care, the Department of Market Development and Science and Technology Enterprise (Ministry of Science and Technology) played an important role, creating the best conditions for scientists to connect with science and technology enterprises to commercialize [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>During the process of researching and realizing the dream of turning a holly into a nano product for human health care, the Department of Market Development and Science and Technology Enterprise (Ministry of Science and Technology) played an important role, creating the best conditions for scientists to connect with science and technology enterprises to commercialize products.</strong><br />
<span id="more-25888"></span> In order to increase the value of the current Ba kich tree, in early 2019, the research team of Pharmacist Phan Ke Son and Assoc. Dr. Ha Phuong Thu (Center for Advanced Medical Materials, affiliated to Institute of Materials Science, Vietnam Academy of Science and Technology) has embarked on the implementation of the State-level project: &#8220;Process commercialization&#8221; production technology of functional foods to support osteoporosis prevention from “Quang Ninh Ba Kich purple” under the Science and Technology Market Development Program to 2020 (Program 2075), Ministry of Science and Technology.</p>
<p> This is a program approved by the Prime Minister in 2013, in order to focus on developing synchronously the infrastructure system, human resources and intermediary institutions of the science and technology market in order to improve operational efficiency. application and technology transfer; promote supply and demand relationships for science and technology products and services. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_14_5_39184132/964af401fb43121d4b52.jpg" width="625" height="393"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_14_5_39184132/455b1b101452fd0ca443.jpg" width="625" height="468"> <em> Mr. Pham Duc Nghiem &#8211; Deputy Director of the Department of Market Development and Science and Technology Enterprises (Ministry of Science and Technology), in charge of Program 2075 &#8211; visited the exhibition booth of the research team including Pharmacist Phan Ke Son and Assoc. Dr. Ha Phuong Thu (Institute of Materials Science). </em> This commercialization project is chaired and implemented by the Institute of Materials Science, in collaboration with CVI Cosmetics Pharmaceutical Joint Stock Company with funding from the State Budget and reciprocal funding from enterprises &#8211; companies. CVI company for raw materials, machinery and equipment. The close cooperation between scientists and enterprises not only helps the successful research of the project but also transfers the research results into commercial products to the market. However, during the implementation of the project, the Department of Market Development and Science and Technology Enterprises of the Ministry of Science and Technology &#8211; the focal unit to implement the 2075 Program &#8211; played an important bridging role. , while actively following the project&#8217;s tasks, completing the legal environment, improving the efficiency of state management of the S&#038;T market; promote S&#038;T market service activities as well as technology demand and improve technology transfer capacity. Through the 2075 program, with the support of the Department of Market Development and science and technology enterprises, the project has completed the technological process of manufacturing functional foods from three-size nanomaterials and commercializing them. successful technological process as well as functional food products. In addition, the 2075 Program has helped promote the connection between state agencies and agencies, science and technology enterprises, innovative start-ups and intermediaries and thereby improve effective commercialization of technology, contributing to attracting stakeholders to the S&amp;T market.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">25888</post-id>	</item>
		<item>
		<title>Tran Hoang Na bridge construction project (Can Tho): The risk of breaking the schedule because the project owner causes difficulties</title>
		<link>https://en.spress.net/tran-hoang-na-bridge-construction-project-can-tho-the-risk-of-breaking-the-schedule-because-the-project-owner-causes-difficulties/</link>
		
		<dc:creator><![CDATA[Bảo Như]]></dc:creator>
		<pubDate>Fri, 18 Jun 2021 09:20:16 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[bidding documents]]></category>
		<category><![CDATA[BREAKING]]></category>
		<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Bui Thai Thuong]]></category>
		<category><![CDATA[Can Tho]]></category>
		<category><![CDATA[CIENCO 1]]></category>
		<category><![CDATA[CIENCO1]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[Contractors]]></category>
		<category><![CDATA[CT3]]></category>
		<category><![CDATA[difficulties]]></category>
		<category><![CDATA[Dinh Ngoc Vuong]]></category>
		<category><![CDATA[Hoang]]></category>
		<category><![CDATA[Nam Anh Company]]></category>
		<category><![CDATA[ODA TP]]></category>
		<category><![CDATA[owner]]></category>
		<category><![CDATA[Owner of Project]]></category>
		<category><![CDATA[Package]]></category>
		<category><![CDATA[Procurement Administration Department]]></category>
		<category><![CDATA[Progress]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[risk]]></category>
		<category><![CDATA[Roof]]></category>
		<category><![CDATA[schedule]]></category>
		<category><![CDATA[Steel structure]]></category>
		<category><![CDATA[Subcontractors]]></category>
		<category><![CDATA[thở]]></category>
		<category><![CDATA[Tran]]></category>
		<category><![CDATA[Tran Hoang Na]]></category>
		<category><![CDATA[Tran Hoang Na Bridge]]></category>
		<category><![CDATA[VINAWACO]]></category>
		<guid isPermaLink="false">https://en.spress.net/tran-hoang-na-bridge-construction-project-can-tho-the-risk-of-breaking-the-schedule-because-the-project-owner-causes-difficulties/</guid>

					<description><![CDATA[If the proposal to replace the subcontractor is not approved, the progress of Package CT3 &#8211; PW &#8211; 2.4, construction of Tran Hoang Na bridge cannot be completed by the end of June 2022. Tran Hoang Na Bridge is in danger of breaking the schedule. Reasonable proposal Up to this point, Traffic Construction Corporation 1 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>If the proposal to replace the subcontractor is not approved, the progress of Package CT3 &#8211; PW &#8211; 2.4, construction of Tran Hoang Na bridge cannot be completed by the end of June 2022.</strong><br />
<span id="more-24946"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_18_72_39223011/11ea7da774e59dbbc4f4.jpg" width="625" height="380"> </p>
<p> Tran Hoang Na Bridge is in danger of breaking the schedule. <strong> Reasonable proposal</strong> Up to this point, Traffic Construction Corporation 1 (Cienco1), the main contractor for the construction of Package CT3 &#8211; PW &#8211; 2.4, construction of Tran Hoang Na Bridge under the City Development Project. Can Tho and enhancing urban adaptability, using World Bank (WB) loans are still waiting for a response from the City&#8217;s ODA Construction Investment Project Management Board. Can Tho City (PMU ODA Can Tho City) on the proposal to replace the subcontractor for the steel beam structure of the main Tran Hoang Na bridge. <em> <strong> The Department of Construction Management and Quality of Traffic Works (Ministry of Transport) said that the addition of construction subcontractors is very normal in traffic projects and is within the authority of the main contractor if the contractor additional contractors to meet the capacity and experience of construction. </strong> </em> Previously, on June 7, 2021, Mr. Dinh Ngoc Vuong, Chairman of the Board of Directors of Cienco1, term 2019 &#8211; 2024 had Document No. 341/2021/CV &#8211; TCT sent to PMU ODA City. Can Tho would like to replace the subcontractor performing steel structure processing in Package CT3 &#8211; PW &#8211; 2.4, building Tran Hoang Na bridge. Cienco1 said that in the process of negotiating the contract for Package CT3 &#8211; PW &#8211; 2.4 between Cienco1&#8217;s Board of Directors, term 2014 &#8211; 2019 and PMU ODA City. Can Tho, the main contractor has proposed Nam Anh Technology Construction Equipment Co., Ltd. to assume the role of a subcontractor to supply and manufacture steel arches and steel beams. However, through the actual inspection, the incumbent leader of Cienco1 discovered that Nam Anh Company is just an intermediary (commercial) unit without factories, engineers and technical workers with direct production experience. , as well as do not own construction machinery and equipment. “In order to ensure the quality of the work and the progress of the project, the main contractor consortium would like to replace Nam Anh Company with a unit with real experience and capacity in the field of beam structure production and construction. steel bridge Tran Hoang Na. This is a necessary job to ensure the progress and quality of the work,&#8221; Vuong emphasized. It is known that the bidding package CT3 &#8211; PW &#8211; 2.4 has the goal of building Tran Hoang Na bridge crossing the Can Tho river, 586.9 m long, 23 m wide at the main span (4 lanes), of which the main bridge is built. arch bridge design includes 3 spans of steel structure, span diagram 49.25+150+49.25m. Cienco1 &#8211; Bridge 14 Joint Stock Company is the winning contractor for construction with the winning bid price of VND 791.4 billion. According to the agreement with the leaders of Cienco1 for the 2014 &#8211; 2019 term, Nam Anh Company was assigned to process and install the main bridge steel arch with a value of about VND 99 billion. According to the original plan, Package CT3 &#8211; PW &#8211; 2.4, construction time of Tran Hoang Na bridge took 34.4 months, but to be in line with the agreement to borrow PMU ODA capital in Ho Chi Minh City. Can Tho negotiated with the contractor to shorten the construction schedule with the completion time of 22 months. In order to meet the schedule that has been shortened by nearly one third compared to the bidding documents, at the beginning of August 2020, Cienco1 had Document No. 646/TCT &#8211; KH requesting PMU ODA TP. Can Tho considers adding 3 subcontractors to the Package CT3 &#8211; PW &#8211; 2.4, to build Tran Hoang Na Bridge, which are Thanh Long Group Joint Stock Company, Van Cuong &#8211; Vinawaco, and Waterway Maintenance Management Joint Stock Company. No. 12. In which, Thanh Long is recommended to additionally undertake the processing of 40% of the volume of steel arch structure. All main materials and erection are still undertaken by Cienco1. &#8220;The addition of Thanh Long is necessary to shorten the construction schedule of the Package&#8221;, Document No. 646 of Cienco1 said. <strong> Concerns of pmu oda TP. need poetry without foundation</strong> Talking to a reporter of the Investment Newspaper, a leader of the Department of Construction and Quality Management of Traffic Works (Ministry of Transport) said that the addition of construction subcontractors is very normal in traffic projects. and is within the competence of the main contractor if the additional contractor is capable of construction experience; the subcontractor&#8217;s volume does not exceed the contract rate. Previously, the Procurement Management Department (Ministry of Planning and Investment) also had an opinion that the addition of a subcontractor of Cienco 1 was not against the law. In Document No. 201/QLDT-CS dated February 22, 2021, the Procurement Management Department said: If there are no prohibitions in the donor&#8217;s instructions, bidding documents, and contracts signed between the parties. Regarding the change in the percentage of the subcontractor&#8217;s workload, the addition of the subcontractor after the contract has been signed, the main contractor&#8217;s request to add more subcontractors, increase the rate of using subcontractors from 40.81% to 49.57% (not exceeding the maximum rate of using subcontractors specified in the bidding documents as 50%) to implement the bidding package to ensure shortening the contract schedule from 34 months down to 22 months is not against the sponsor&#8217;s regulations. It is known that in the documents rejecting the proposal to add subcontractors to the construction of steel structure fabrication items of Cienco1, PMU ODA TP. According to Can Tho, the arch and steel beam structure system of Tran Hoang Na bridge is a complex structural system with seamless requirements, high mechanical precision, and strict and concentrated quality management requirements. Therefore, if the processing is done by 2 units, it will give rise to technical risks such as not ensuring the synchronization; does not guarantee compliance with the test installation procedure. However, Cienco1 said that the above concern of PMU ODA City. Can Tho is unfounded, because the main contractor has specifically divided each detailed scope of work for two subcontractors, Nam Anh and Thanh Long, to ensure the construction meets the schedule as well as the synchronization. of texture. “With experience in management, operation and quality control, art through many similar projects, Cienco1 is committed to completing the bidding package to ensure the quality of art according to the standards of the project”, representative of the contractor. main said. By PMU ODA City. Can Tho continues to have concerns about uniformity, Cienco1 has decided to replace subcontractor Nam Anh with another unit with experience in manufacturing and installing traffic and civil steel beam structures. It is worth mentioning that the current PMU ODA City. Can Tho has not yet responded to the proposal to replace Nam Anh subcontractor while the construction progress of Package CT3 &#8211; PW &#8211; 2.4, construction of Tran Hoang Na bridge is very urgent. Investment Newspaper also contacted Mr. Bui Thai Thuong, Deputy Director of PMU ODA City. Can Tho, who is directly in charge of Package CT3 &#8211; PW &#8211; 2.4 but also did not receive a response.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24946</post-id>	</item>
		<item>
		<title>Controversial project passed Bundestag passes supply chain law In the future, large German companies will have to pay more attention to compliance with human rights and environmental standards by their suppliers &#8211; otherwise they face fines. The opposition criticized the Bundestag resolution.</title>
		<link>https://en.spress.net/controversial-project-passed-bundestag-passes-supply-chain-law-in-the-future-large-german-companies-will-have-to-pay-more-attention-to-compliance-with-human-rights-and-environmental-standards-by-thei/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 17 Jun 2021 07:15:07 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[attention]]></category>
		<category><![CDATA[Bundestag]]></category>
		<category><![CDATA[Chain]]></category>
		<category><![CDATA[COMPANIES]]></category>
		<category><![CDATA[Compliance]]></category>
		<category><![CDATA[Controversial]]></category>
		<category><![CDATA[criticized]]></category>
		<category><![CDATA[environmental]]></category>
		<category><![CDATA[face]]></category>
		<category><![CDATA[Fines]]></category>
		<category><![CDATA[future]]></category>
		<category><![CDATA[German]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[human]]></category>
		<category><![CDATA[Human right]]></category>
		<category><![CDATA[LARGE]]></category>
		<category><![CDATA[law]]></category>
		<category><![CDATA[Opposition]]></category>
		<category><![CDATA[Passed]]></category>
		<category><![CDATA[passes]]></category>
		<category><![CDATA[pay]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Resolution]]></category>
		<category><![CDATA[rights]]></category>
		<category><![CDATA[standards]]></category>
		<category><![CDATA[suppliers]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Supply Chain Act]]></category>
		<guid isPermaLink="false">https://en.spress.net/?p=24269</guid>

					<description><![CDATA[Controversial project passed Bundestag decides Supply Chain Act Status: 11.06.2021 11:58 a.m. In the future, large German companies will have to pay more attention to compliance with human rights and environmental standards by their suppliers &#8211; otherwise they face fines. The opposition criticized the Bundestag resolution. The Bundestag has passed the Supply Chain Act, which [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" class="ts-image" src="https://www.tagesschau.de/multimedia/bilder/naeherin-101https://www.tagesschau.de/https://www.tagesschau.de/~_v-videowebm.jpg" srcset="https://www.tagesschau.de/https://www.tagesschau.de/~_v-videowebm.jpg" alt="A woman works in a textile factory. | dpa" title="A woman works in a textile factory. | dpa"></p>
<h1> Controversial project passed Bundestag decides Supply Chain Act </h1>
<p>Status: 11.06.2021 11:58 a.m. </p>
<p> <strong> In the future, large German companies will have to pay more attention to compliance with human rights and environmental standards by their suppliers &#8211; otherwise they face fines. The opposition criticized the Bundestag resolution.</strong> The Bundestag has passed the Supply Chain Act, which makes large companies more responsible than before for conditions at their global suppliers. 412 MPs voted for the law, 159 voted against it and 59 abstained. During the final deliberations in parliament, the Greens announced that they would vote with the government factions of the CDU / CSU and SPD. The FDP and AfD spoke out against it, the left wanted to abstain. The controversial project had been wrestled for a long time.</p>
<h2> There is a risk of fines of two percent of sales</h2>
<p>From 2023, large companies in Germany will be obliged to take action against human rights violations and environmental violations at their suppliers. Failure to do so can result in fines of up to two percent of annual sales. It initially applies to corporations with more than 3000 employees. According to the coalition, there are more than 925 companies. From 2024, companies with more than 1000 employees are also to be included, which would be around 4800 companies.</p>
<h2> &#8220;Children belong in schools and not in mines&#8221;</h2>
<p>Federal Labor Minister Hubertus Heil (SPD) said that politics must take action against child labor. &#8220;Children belong in schools and not in mines,&#8221; he said. Around 160 million children are currently working around the world, half of them in particularly dangerous conditions. That is why we need clear standards.</p>
<p><img fifu-featured="1" decoding="async" class="ts-image js-image" src="https://www.tagesschau.de/multimedia/bilder/gerd-mueller-115~_v-videowebl.jpg" alt="" title="" title="Development Aid Minister Gerd Müller | dpa"> For Development Aid Minister Müller it is &#8220;the most important law for more justice between rich and poor&#8221;. Image: dpa Development Aid Minister Gerd Müller (CSU) said the law was &#8220;certainly the most important law for more justice between rich and poor&#8221;. He emphasized that it came about against strong lobby pressure. In the interests of business, the Union had enforced that there is no additional civil liability for companies. Corporations would have legal and planning security, so representatives of the Union parliamentary group.</p>
<h2> AfD: Law harms German economy</h2>
<p>The FDP and AfD, however, accused the regulation of harming the German economy. The AfD criticized that competitors of German companies were the winners of the law. Greens and leftists welcomed the law as a first step, but criticized it as inadequate. The left argued that because there was no civil liability, the law was too weak and made too few companies accountable.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24269</post-id>	</item>
		<item>
		<title>Criticism of China&#8217;s economic project headwind on the &#8220;New Silk Road&#8221; China is expanding its influence worldwide, the &#8220;New Silk Road&#8221; is intended to further strengthen the country. But the criticism of the project is growing. At the G7 meeting, the Australian head of government wants to report on his experiences. From Steffen Wurzel.</title>
		<link>https://en.spress.net/criticism-of-chinas-economic-project-headwind-on-the-new-silk-road-china-is-expanding-its-influence-worldwide-the-new-silk-road-is-intended-to-further-strengthen-the-country-but-the-critic/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 17 Jun 2021 04:30:09 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Australian]]></category>
		<category><![CDATA[China]]></category>
		<category><![CDATA[Chinas]]></category>
		<category><![CDATA[Country]]></category>
		<category><![CDATA[Criticism]]></category>
		<category><![CDATA[Economic]]></category>
		<category><![CDATA[expanding]]></category>
		<category><![CDATA[experiences]]></category>
		<category><![CDATA[G7 Summit]]></category>
		<category><![CDATA[German]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[Government]]></category>
		<category><![CDATA[growing]]></category>
		<category><![CDATA[Headwind]]></category>
		<category><![CDATA[In debt]]></category>
		<category><![CDATA[influence]]></category>
		<category><![CDATA[Intended]]></category>
		<category><![CDATA[Meeting]]></category>
		<category><![CDATA[New silk road]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Report]]></category>
		<category><![CDATA[Road]]></category>
		<category><![CDATA[Silk]]></category>
		<category><![CDATA[Silk Road]]></category>
		<category><![CDATA[Sri Lanka]]></category>
		<category><![CDATA[Steffen]]></category>
		<category><![CDATA[strengthen]]></category>
		<category><![CDATA[Worldwide]]></category>
		<category><![CDATA[Wurzel]]></category>
		<guid isPermaLink="false">https://en.spress.net/?p=24207</guid>

					<description><![CDATA[Criticism of China&#8217;s economic project Headwind on the &#8220;New Silk Road&#8221; Status: 06/11/2021 12:58 p.m. China is expanding its influence worldwide, and the &#8220;New Silk Road&#8221; is intended to further strengthen the country. But the criticism of the project is growing. At the G7 meeting, the Australian head of government wants to report on his [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" class="ts-image" src="https://www.tagesschau.de/multimedia/bilder/sri-lanka-colombo-neue-seidenstrasse-101https://www.tagesschau.de/https://www.tagesschau.de/~_v-videowebm.jpg" srcset="https://www.tagesschau.de/https://www.tagesschau.de/~_v-videowebm.jpg" alt="A Chinese construction worker stands in the port of Colombo, the capital of Sri Lanka. | AP" title="A Chinese construction worker stands in the port of Colombo, the capital of Sri Lanka. | AP"></p>
<h1> Criticism of China&#8217;s economic project Headwind on the &#8220;New Silk Road&#8221; </h1>
<p>Status: 06/11/2021 12:58 p.m. </p>
<p> <strong> China is expanding its influence worldwide, and the &#8220;New Silk Road&#8221; is intended to further strengthen the country. But the criticism of the project is growing. At the G7 meeting, the Australian head of government wants to report on his experiences.</strong> From Steffen Wurzel, ARD studio Shanghai Ding Laisong from the customs authority of the Chinese port city of Ningbo was satisfied at the beginning of the week: Trade with the states of the so-called &#8220;New Silk Road&#8221; had increased by 30 percent, he said on the Chinese state television broadcaster CCTV. In the case of trade with the particularly committed Silk Road countries in Central and East Asia, the plus is even 50 percent.</p>
<h2> Sri Lanka regrets cooperation</h2>
<p>China&#8217;s state and party leadership continues to sell its controversial strategy and trade project &#8220;New Silk Road&#8221; within the People&#8217;s Republic as a great success. In numerous partner countries, however, the initial enthusiasm for the project has given way to sober insight. China&#8217;s state and party leadership has nothing to give away with the Silk Road. On the contrary: in many cases, the Silk Road partner countries have borrowed considerably &#8211; with Chinese state banks. This sometimes creates considerable dependencies. One example is the Hambantota port project in Sri Lanka. According to media reports, the expensive Silk Road port project has hardly brought the island state anything economically. Sri Lanka&#8217;s Foreign Minister Dinesh Gunawardena now openly speaks of a mistake in leasing the port on the southern tip of the country to China for 99 years.</p>
<h2> One billion euros in debt for Montenegro</h2>
<p>In Europe, too, it is now becoming clear what the Silk Road critics have been calling a debt trap for years: the Balkan state of Montenegro, for example, had borrowed around one billion euros in China for the construction of a nearly 180-kilometer-long motorway. The autobahn is far from finished. But now the repayment is due &#8211; and the EU accession candidate lacks the money. The mood has also changed in large industrialized countries: In Italy, Prime Minister Mario Draghi put the Silk Road cooperation with China on hold, and the government in Canberra has also completed two projects in Australia. Only smaller, more symbolic projects were affected, but China&#8217;s communist leadership reacted angrily. She described Australia&#8217;s decision as &#8220;unreasonable and provocative&#8221;.</p>
<h2> Australia accuses China of &#8220;extortionate behavior&#8221;</h2>
<p>It is becoming clear that the communist leadership sees itself increasingly on the defensive in the Silk Road project, officially known as &#8220;Yi Dai Yi Lu&#8221;. Australian Prime Minister Scott Morrison complained at an economic conference in Perth &#8220;blackmailing behavior&#8221; by states like China. &#8220;Where compulsive acts have no consequences, there is little incentive to restrain,&#8221; said Morrison. Australia&#8217;s prime minister called for the sanctioning mechanisms of the World Trade Organization to be strengthened. Because if blackmailing behavior has no consequences, there is no reason for the corresponding states to hold back.</p>
<p>The G7 summit in Cornwall The heads of state and government of the seven leading industrialized countries (G7) will meet from June 11th to 13th in Cornwall, southwest England. For the first time in two years, they will meet again in person in the afternoon. In addition to climate change, the conference will also focus on trade issues and investments as well as the fight against the corona pandemic. In addition, the meeting will focus on the positioning towards Russia and China.<br />
The G7 group includes the USA, Germany, Great Britain, Canada, France, Italy and Japan. Like-minded democratic states such as South Korea, South Africa, Australia and India are invited to the summit as guests. After the government in Canberra demanded a complete clarification of the origin of the Covid 19 pandemic around a year ago, Australia was de facto covered with an economic war by China&#8217;s leadership. The Australian Prime Minister Scott Morrison wants to share this experience with the G7 countries. He will be a guest at the summit in England.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24207</post-id>	</item>
		<item>
		<title>The ancient town of Jiangnan with strong artistic flavor is called the &#8220;Hometown of Art&#8221; with the World Irrigation Project Heritage</title>
		<link>https://en.spress.net/the-ancient-town-of-jiangnan-with-strong-artistic-flavor-is-called-the-hometown-of-art-with-the-world-irrigation-project-heritage/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Wed, 16 Jun 2021 04:16:06 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Ancient]]></category>
		<category><![CDATA[Art]]></category>
		<category><![CDATA[artistic]]></category>
		<category><![CDATA[called]]></category>
		<category><![CDATA[Flavor]]></category>
		<category><![CDATA[heritage]]></category>
		<category><![CDATA[Hometown]]></category>
		<category><![CDATA[Irrigation]]></category>
		<category><![CDATA[Jiangnan]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[strong]]></category>
		<category><![CDATA[Town]]></category>
		<category><![CDATA[World]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-ancient-town-of-jiangnan-with-strong-artistic-flavor-is-called-the-hometown-of-art-with-the-world-irrigation-project-heritage/</guid>

					<description><![CDATA[I believe that there will be more or less &#8220;art students&#8221; who have studied painting related to us. Many of them have experience of going out and sketching during their professional studies, and the one who has gone the most must be the reputation of &#8220;Chinese painting in the countryside&#8221; Of Anhui Hongcun. In fact, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>I believe that there will be more or less &#8220;art students&#8221; who have studied painting related to us. Many of them have experience of going out and sketching during their professional studies, and the one who has gone the most must be the reputation of &#8220;Chinese painting in the countryside&#8221; Of Anhui Hongcun. In fact, in addition to Hongcun, there are many places that are favored by art creators, such as the ancient village of Chaji, which is also known as the &#8220;first village of Chinese sketching&#8221; in southern Anhui, and Linzhou, Anyang, known as &#8220;the scenic spot of sketching.&#8221; , And &#8220;China&#8217;s most beautiful village&#8221; Wuyuan and so on. Today we will talk about an ancient town with a strong artistic flavor in Zhejiang. It is known as the &#8220;land of art&#8221;. It not only has the scenery and scenery like ink paintings, but also has a poetic and picturesque name. It is Guyan Painting Village.</strong><br />
<span id="more-23393"></span> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892980/1000"> </p>
<p> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892975/1000"> The Guyan Painting Township is located in Bihu Town and Dagangtou Town, Liandu District, Lishui City, Zhejiang Province. It is only 20 kilometers away from the downtown area of ​​Lishui. It consists of two parts, the &#8220;Guyan&#8221; and the &#8220;Painting Township&#8221; on both sides of Daxi. We know that Lishui is the prefecture-level city with the largest land area in Zhejiang Province. It is known as the &#8220;No. 1 City in the National Ecological Environment&#8221; and is known as the &#8220;Zhejiang Green Valley&#8221;. As the cultural epitome of ecology and humanity in Lishui, Guyan Painting Town, this ancient town can be said to be beautiful and wonderful. It is a typical representative of the Jiangnan water town. It has the most magnificent scenery of the eight hundred miles of Ou River. It attracts every year. A large number of art lovers come here to sketch and create. Nowadays, Guyan Painting Village has become a well-known art hometown in China, and it is a base for art sketching, artistic creation, oil painting production and photography creation. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892962/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892972/1000"> How can you miss the glorious and heroic beauty of Tongjiyan when you come to Guyan Painting Village. It was built in the Southern Dynasties and is one of the five major water conservancy irrigation projects in ancient my country. It has a history of more than 1,500 years. It is composed of arched dams, Tongji sluices, stone letters, leaf caves, channels, pole sluices, lake ponds, etc. Part of the composition is a bamboo-like water conservancy irrigation system that focuses on attracting the public and taking into account the storage and drainage. It is the first batch of selected World Irrigation Project Heritage in China and the only World Irrigation Project Heritage in Zhejiang Province. It was even selected a few years earlier than the famous Zheng Guoqu and Dujiangyan. The entire water conservancy project has set two &#8220;world&#8217;s best&#8221;, namely, the world&#8217;s earliest arched dam and the world&#8217;s earliest overpass. Together with related ancient roads, inscriptions, buildings, etc., they are both precious and important cultural relics. Study precious materials of ancient water conservancy projects in my country. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892956/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892958/1000"> Since we talked about Tongji Weir, Yantou Village, a thousand-year-old village built around the weir, naturally has to be mentioned. It is named after the weir and is the core area of ​​the ancient weir painting village landscape. Not only is the historical environment long and unique, but the natural scenery is also extremely beautiful. The neatly arranged courtyard courtyard and the exquisitely carved horse head wall show an antique charm against the backdrop of the towering ancient weir. It is one of the birthplaces of the famous &#8220;Barbizon Oil Painting&#8221; and the creative base of the hometown of Chinese photography. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892994/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892965/1000"> Dagangtou Village, the &#8220;land of painting&#8221; across the river, has small bridges and flowing water, stone alleys, ancient houses and ancient streets, as well as Pinghu Qiuyue, Lanyan Misty, and Lonely Fishing Boat. The ancient camphor tree of thousands of years old, lush and luxuriant, witnessed the long history of the ancient village, the century-old streets full of fireworks, gentle and poetic, isolated from the chaos and hustle and bustle. There is no extreme prosperity here, only the drunk years and the intoxicating warm wind. Wandering between the ancient villages, whether it is the scene or the painter, it is the most beautiful scenery in the ancient town. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892963/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13492892957/1000"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">23393</post-id>	</item>
		<item>
		<title>Continue to complete the project to ensure national water security</title>
		<link>https://en.spress.net/continue-to-complete-the-project-to-ensure-national-water-security/</link>
		
		<dc:creator><![CDATA[Diệu Thúy (TTXVN)]]></dc:creator>
		<pubDate>Tue, 15 Jun 2021 17:55:07 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[BOO Phu Ninh]]></category>
		<category><![CDATA[Chair]]></category>
		<category><![CDATA[Clean water]]></category>
		<category><![CDATA[Complete]]></category>
		<category><![CDATA[Continue]]></category>
		<category><![CDATA[Deputy]]></category>
		<category><![CDATA[ensure]]></category>
		<category><![CDATA[Guaranteed]]></category>
		<category><![CDATA[Lack of water]]></category>
		<category><![CDATA[Le Cong Thanh]]></category>
		<category><![CDATA[Meeting]]></category>
		<category><![CDATA[Ministry of Natural Resources and Environment]]></category>
		<category><![CDATA[National]]></category>
		<category><![CDATA[Objective reasons]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Resources]]></category>
		<category><![CDATA[Scheme]]></category>
		<category><![CDATA[Science Committee]]></category>
		<category><![CDATA[Security]]></category>
		<category><![CDATA[Technology and Environment]]></category>
		<category><![CDATA[Tran Hong Ha]]></category>
		<category><![CDATA[Tran Vinh]]></category>
		<category><![CDATA[water]]></category>
		<category><![CDATA[Water source]]></category>
		<category><![CDATA[World bank]]></category>
		<guid isPermaLink="false">https://en.spress.net/continue-to-complete-the-project-to-ensure-national-water-security/</guid>

					<description><![CDATA[On June 15, in Hanoi, Minister of Natural Resources and Environment Tran Hong Ha and Deputy Minister of Natural Resources and Environment Le Cong Thanh chaired an online meeting on the situation of building a security scheme. national water source. Overview of BOO Phu Ninh clean water plant (phase 1A). Illustration: Tran Tinh/VNA Speaking at [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On June 15, in Hanoi, Minister of Natural Resources and Environment Tran Hong Ha and Deputy Minister of Natural Resources and Environment Le Cong Thanh chaired an online meeting on the situation of building a security scheme. national water source.</strong><br />
<span id="more-22797"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_15_294_39197148/beaceb730f35e66bbf24.jpg" width="625" height="351"> </p>
<p> <em> Overview of BOO Phu Ninh clean water plant (phase 1A). Illustration: Tran Tinh/VNA</em> Speaking at the meeting, Minister Tran Hong Ha emphasized that developing a scheme to ensure national water security is a very important task to describe the overall picture of Vietnam&#8217;s water resources. Accordingly, the development of the Scheme should point out the objective and subjective reasons; at the same time, assessing the shortcomings, challenges and forecasting problems of water resources in the future; from there, set out views, goals, guidelines, major policies, solutions to solve water resource problems. Reporting at the meeting, Director of the Department of Water Resources Management Chau Tran Vinh said that, performing the assigned tasks, the Department has coordinated with units in the field of water resources of the Ministry of Natural Resources and Environment to build The content of the Scheme is built on the basis of the monitoring report of the National Assembly&#8217;s Committee on Science, Technology and Environment, the water governance assessment report of the World Bank (WB) and other contents. Water resources have been summarized and reviewed by the Department in recent years. Accordingly, the specific goal of the Project to 2030 is to minimize dependence and optimize the benefits brought by water from inter-national water sources; proactively regulate water, prevent and respond to incidents of pollution, degradation, depletion of water sources, drought, water shortage, and saltwater intrusion; effectively and sustainably overcome the situation of drought and water shortage in the dry season in the South Central region, the Central Highlands, the Mekong River Delta, remote areas and islands&#8230; In addition, it is necessary to improve access to clean and safe water sources for people and water-using industries; basically control 90% of water exploitation and use activities, ensure economical, efficient, sustainable, safe, fair and reasonable use, associated with protection and development of water resources and environment environment and adaptation to climate change; controlling over 90% of discharges into water sources that play an important role in supplying treated water up to environmental standards; improve and restore seriously polluted and degraded water sources; conservation and sustainable development of important wetland ecosystems. At the same time, it is necessary to improve the provision of water supply services in urban and rural areas, raising the rate of using clean water and hygienic water of urban residents to about 95-100%, and about 93-95 in rural areas. %; ensure food security through efficient operation of irrigation works in the context of climate change&#8230; Representatives of the units said that in order to continue completing the National Water Security Assurance Scheme, it is necessary to add groups of implementation solutions that create a breakthrough in the management of water resources of the Ministry of Finance. environment and resources in the next 5 years such as: promoting digital transformation, building an online water resource database, building a common index on integrated water resources management, digitizing management data Water quality, quantity of water as the basis for regulation and allocation of water resources&#8230; Concluding the meeting, Deputy Minister Le Cong Thanh requested the Water Resources Management Department to absorb the comments, continue to review and add contents to the Scheme accordingly. Deputy Minister Le Cong Thanh emphasized that the development of the National Water Security Assurance Scheme is to identify the risks of water security and the problems, tasks and solutions to solve fundamental problems. version of national water security. Accordingly, by 2030, Vietnam needs to focus resources on implementing tasks and solutions to fulfill the set goals as soon as possible, ensuring national water security in association with sustainable development. economic, social, and environmental.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">22797</post-id>	</item>
		<item>
		<title>Which enterprise won the bidding package of 1,114 billion VND at the Highway 45 &#8211; Nghi Son Expressway Project?</title>
		<link>https://en.spress.net/which-enterprise-won-the-bidding-package-of-1114-billion-vnd-at-the-highway-45-nghi-son-expressway-project/</link>
		
		<dc:creator><![CDATA[Anh Minh]]></dc:creator>
		<pubDate>Tue, 15 Jun 2021 17:48:09 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Bidding]]></category>
		<category><![CDATA[billion]]></category>
		<category><![CDATA[build]]></category>
		<category><![CDATA[Construction unit]]></category>
		<category><![CDATA[Drawing]]></category>
		<category><![CDATA[East]]></category>
		<category><![CDATA[Enterprise]]></category>
		<category><![CDATA[Expressway]]></category>
		<category><![CDATA[F 1]]></category>
		<category><![CDATA[Fixed price]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Highway 45]]></category>
		<category><![CDATA[Hit]]></category>
		<category><![CDATA[Import Export and Construction Corporation]]></category>
		<category><![CDATA[Ingredient]]></category>
		<category><![CDATA[Joint venture]]></category>
		<category><![CDATA[KM380]]></category>
		<category><![CDATA[Nghi]]></category>
		<category><![CDATA[Nghi Son]]></category>
		<category><![CDATA[Nghi Son town]]></category>
		<category><![CDATA[North Expressway]]></category>
		<category><![CDATA[Package]]></category>
		<category><![CDATA[PMU2]]></category>
		<category><![CDATA[PPP]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Són]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[VND]]></category>
		<category><![CDATA[won]]></category>
		<guid isPermaLink="false">https://en.spress.net/which-enterprise-won-the-bidding-package-of-1114-billion-vnd-at-the-highway-45-nghi-son-expressway-project/</guid>

					<description><![CDATA[Package XL3 &#8211; construction, survey, design section Km364+410.75 &#8211; Km380+000, North &#8211; South expressway project section National Highway 45 &#8211; Nghi Son has identified the construction unit. Vinaconex is the unit that won the most construction and installation packages in the East North-South Expressway Construction Project. On the afternoon of June 15, the Project Management [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Package XL3 &#8211; construction, survey, design section Km364+410.75 &#8211; Km380+000, North &#8211; South expressway project section National Highway 45 &#8211; Nghi Son has identified the construction unit.</strong><br />
<span id="more-22789"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_15_72_39197009/9b9a8d39857b6c25356a.jpg" width="625" height="351"> </p>
<p> Vinaconex is the unit that won the most construction and installation packages in the East North-South Expressway Construction Project. On the afternoon of June 15, the Project Management Board 2 (Ministry of Transport) and the joint venture between Mien Trung Construction Group Joint Stock Company &#8211; Vietnam Construction and Import-Export Corporation (Vinaconex) signed a contract for the package. XL3 contractor: Construction and surveying, construction drawing design for section Km364+410.75 – Km380+000, Construction investment component project of Highway 45 – Nghi Son section of the project to build some road sections expressway on the East North-South route in the period 2017-2020. Accordingly, the contract for Package XL3 has a winning price of VND 1,144.4 billion, which is a mixed type of contract, in which the survey is performed at a fixed unit price; construction drawing design is implemented in a package; construction and installation shall be carried out at the adjusted unit price. Contract Package XL3 has a contract execution time of 720 days, funded by the state budget. The construction investment project of the National Highway 45 &#8211; Nghi Son section is one of 11 component projects of the project to build a number of expressway sections on the East North-South route in the period 2017-2020. This is a project. converted from PPP investment to public investment. This project has a length of 43.28 km, passing through the territory of Nong Cong district and Nghi Son town (Thanh Hoa), investment is phased according to the scale of 4 lanes, width of road bed 17m, design speed 80 km/h. The total investment of the project is VND 5,534.4 billion, of which the cost of construction and equipment is VND 3,193 billion, construction time is 2 years, completion in 2023. The project is divided into 3 construction and installation bidding packages, 3 supervision consultancy packages. Currently, PMU2 is asking the consortium of Mien Trung Construction Group &#8211; Vinaconex to urgently complete the preparation work to be able to start the bidding package at the end of June 2021. Currently, Vinaconex is the contractor winning the most packages in the Project to build some expressways on the East North-South route in the period 2017-2020. If including the XL3 package, Vinaconex has directly participated or participated in the project. in the form of a consortium of 4 construction and installation bidding packages with a total value of about VND 10,000 billion.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">22789</post-id>	</item>
		<item>
		<title>Signing a contract for a comprehensive digital transformation project worth 5 million USD</title>
		<link>https://en.spress.net/signing-a-contract-for-a-comprehensive-digital-transformation-project-worth-5-million-usd/</link>
		
		<dc:creator><![CDATA[Gia Cư]]></dc:creator>
		<pubDate>Wed, 09 Jun 2021 19:20:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[administration]]></category>
		<category><![CDATA[Comprehensive]]></category>
		<category><![CDATA[Comprehensive Digital Conversion]]></category>
		<category><![CDATA[Contract]]></category>
		<category><![CDATA[Convert]]></category>
		<category><![CDATA[Digital]]></category>
		<category><![CDATA[Digitizing]]></category>
		<category><![CDATA[Erp]]></category>
		<category><![CDATA[FPT Corporation]]></category>
		<category><![CDATA[Kim Tin]]></category>
		<category><![CDATA[Kim Tin Group]]></category>
		<category><![CDATA[MES]]></category>
		<category><![CDATA[million]]></category>
		<category><![CDATA[Nguyen Tien Hai]]></category>
		<category><![CDATA[Non state enterprises]]></category>
		<category><![CDATA[Operating system]]></category>
		<category><![CDATA[Overview]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Resultant]]></category>
		<category><![CDATA[SAP]]></category>
		<category><![CDATA[SAP S 4HANA]]></category>
		<category><![CDATA[Signed]]></category>
		<category><![CDATA[signing]]></category>
		<category><![CDATA[START UP]]></category>
		<category><![CDATA[transformation]]></category>
		<category><![CDATA[USD]]></category>
		<category><![CDATA[Value]]></category>
		<category><![CDATA[worth]]></category>
		<guid isPermaLink="false">https://en.spress.net/signing-a-contract-for-a-comprehensive-digital-transformation-project-worth-5-million-usd/</guid>

					<description><![CDATA[In the city. In Ho Chi Minh City, Kim Tin Group and FPT Corporation officially signed a contract and launched a comprehensive digital transformation project with a total value of 5 million USD. Kim Tin Group and FPT Corporation officially signed the contract and launched the comprehensive Digital Transformation project. Photo: Housing The cooperation project [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>In the city. In Ho Chi Minh City, Kim Tin Group and FPT Corporation officially signed a contract and launched a comprehensive digital transformation project with a total value of 5 million USD.</strong><br />
<span id="more-21877"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_05_578_39085232/8dbffce4eea607f85eb7.jpg" width="625" height="418"> </p>
<p> <em> Kim Tin Group and FPT Corporation officially signed the contract and launched the comprehensive Digital Transformation project. Photo: Housing</em> The cooperation project between Kim Tin Group and FPT Corporation is considered one of the largest and most comprehensive digital transformation projects among non-state enterprises in Vietnam today. The goal of the project is that Kim Tin Group&#8217;s apparatus operates uniformly and optimizes supply chain management throughout the system, intelligent production management, transparent and effective financial management, and process digitization. working to increase labor productivity and support the operating system to make quick and timely decisions on a centralized data platform. Mr. Nguyen Tien Hai &#8211; Chairman of Kim Tin Group, shared: “Over the past 21 years, the group has been one of the enterprises that have applied the ERP management system since 2008. However, up to now, The old software cannot meet the needs of use and rapid development of the whole system, so we decided to invest in the SAP system to serve the current and future development needs.&#8221; Kim Tin Group determines that digital transformation and technology application in all management, production and business activities will be the foundation for creating synergistic strength for the group; At the same time, it is expected that this investment, with the companion of FPT Corporation, will quickly bring Kim Tin into successful operation of SAP S/4HANA, S&amp;OP and MES intelligent production management, digitizing methods operating method, increasing customer experience, thereby making Kim Tin a market leader and serving society”.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">21877</post-id>	</item>
		<item>
		<title>The Opera Residence project &#8216;stripped a hat-trick&#8217; with three 5-star awards at Asia Pacific Property Awards 2021</title>
		<link>https://en.spress.net/the-opera-residence-project-stripped-a-hat-trick-with-three-5-star-awards-at-asia-pacific-property-awards-2021/</link>
		
		<dc:creator><![CDATA[Thanh Sơn - Ngọc Diễn]]></dc:creator>
		<pubDate>Sat, 05 Jun 2021 16:45:08 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[5 stars]]></category>
		<category><![CDATA[5star]]></category>
		<category><![CDATA[Andy Han Suk Jung]]></category>
		<category><![CDATA[Apartment]]></category>
		<category><![CDATA[Asia]]></category>
		<category><![CDATA[Asia Pacific]]></category>
		<category><![CDATA[Asia Pacific Property Awards]]></category>
		<category><![CDATA[Asia Pacific Property Awards 2021]]></category>
		<category><![CDATA[Awards]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Central Plaza]]></category>
		<category><![CDATA[complex]]></category>
		<category><![CDATA[General Director of SonKim Land]]></category>
		<category><![CDATA[hattrick]]></category>
		<category><![CDATA[Honor]]></category>
		<category><![CDATA[land]]></category>
		<category><![CDATA[Of project]]></category>
		<category><![CDATA[Opera]]></category>
		<category><![CDATA[Pacific]]></category>
		<category><![CDATA[Prize]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Property]]></category>
		<category><![CDATA[residence]]></category>
		<category><![CDATA[Round Avenue]]></category>
		<category><![CDATA[SCALA]]></category>
		<category><![CDATA[SONKIM]]></category>
		<category><![CDATA[SonKim Land]]></category>
		<category><![CDATA[Stripped]]></category>
		<category><![CDATA[The Metropole Thu Thiem]]></category>
		<category><![CDATA[The Opera Residence]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-opera-residence-project-stripped-a-hat-trick-with-three-5-star-awards-at-asia-pacific-property-awards-2021/</guid>

					<description><![CDATA[The Opera Residence, phase 3 of The Metropole Thu Thiem project by SonKim Land has just won a &#8216;hat-trick&#8217; with three prestigious 5-star awards including: Typical high-rise building architecture in Vietnam, Project Typical apartment in Vietnam, Typical complex project in Vietnam at Asia Pacific Property Awards &#8211; Asia &#8211; Pacific Real Estate Awards 2021. The [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Opera Residence, phase 3 of The Metropole Thu Thiem project by SonKim Land has just won a &#8216;hat-trick&#8217; with three prestigious 5-star awards including: Typical high-rise building architecture in Vietnam, Project Typical apartment in Vietnam, Typical complex project in Vietnam at Asia Pacific Property Awards &#8211; Asia &#8211; Pacific Real Estate Awards 2021.</strong><br />
<span id="more-20872"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_01_241_39038725/c12daf65bf2756790f36.jpg" width="625" height="351"> </p>
<p> <em> The Opera Residence project has a great view towards the Saigon River. Photo: SonKim Land</em> Asia Pacific Property Awards is one of the largest and oldest awards in the real estate industry with more than 900 candidates each year from countries in the region. This is the 4th time in a row SonKim Land has won this award, a recognition of the strategy of &#8220;SonKim Land&#8217;s imprint&#8221; in creating architectural icons, high-standard lifestyle, and continuing to raise the bar. high reputation of SonKim Land in the region. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_01_241_39038725/230a57424700ae5ef711.jpg" width="625" height="351"> The Opera Residence project. Photo: SonKim Land Andy Han Suk Jung &#8211; General Director of SonKim Land shared: “With high-end projects built to international standards, we are delighted to win the Asia-Pacific Real Estate Awards. four years in a row. SonKim Land&#8217;s projects have a strategic location, high quality, bring a fresh, modern and dynamic environment, always attach great importance to sustainable development and responsibility to the community. The Opera Residence is not only a luxury project with unique design, the most advanced technology, but also provides a quality of life according to international standards to customers. Especially, during this global pandemic, we work even harder to build even better homes for our customers.” Located in the most prime location of The Metropole Thu Thiem, The Opera Residence is the most beautiful subdivision with perfect view, ensuring almost 100% river view for apartments. The project includes 2 towers named Scala and Massimo, named after the two oldest famous Opera houses of Northern and Southern Italy. The whole project has 646 apartments, 3 basements, 24 floors of apartments and 4 floors of commercial podium. The Opera Residence is not only located adjacent to the City Opera and Ballet Theater with a great view of the Saigon River, the project is also surrounded by new iconic works of the City such as the convention center, square Central Plaza, riverside park and Arc Avenue. The design concept of The Opera Residence is inspired by musical symphonies, designed with reflective materials, making the building almost invisible when viewed from a distance. Glass walls help the building not only take advantage of natural light, soundproofing and thermal insulation, but also allow The Opera Residence to capture the colorful movements of the day&#8217;s moments. The apartments at The Opera Residence are equipped with smart interior equipment system with the most modern technology, in order to bring the best living experience to residents such as: double security door lock system via mold recognition Face, fingerprint and self-opening without force, air purifier, wine cabinet, air washer dryer, smart bathroom and private elevator are equipped to ensure an isolated space for homeowners. from the hall to the door. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_01_241_39038725/c262b52aa5684c361579.jpg" width="625" height="313"> The Opera Residence project. Photo: SonKim Land The Opera Residence will be equipped with various facilities such as a collection of swimming pools (swimming pool, family pool, children&#8217;s pool, hot spring and outdoor spa pool), gym with equipment Modern equipment and professional coaches, golf simulator, outdoor sauna&#8230; The Opera Residence is a perfect masterpiece between human rhythms with art and nature, promising to bring not only a living space but also a place to inspire homeowners and become a legacy for those who live there. future generation.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20872</post-id>	</item>
		<item>
		<title>&#8216;No project has been designed with lighting like Park Hyatt Phu Quoc&#8217;</title>
		<link>https://en.spress.net/no-project-has-been-designed-with-lighting-like-park-hyatt-phu-quoc/</link>
		
		<dc:creator><![CDATA[Lương Nhuệ Giang]]></dc:creator>
		<pubDate>Tue, 01 Jun 2021 09:46:09 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[ASA]]></category>
		<category><![CDATA[ASA Lighting Design Studios]]></category>
		<category><![CDATA[Autumn equinox]]></category>
		<category><![CDATA[BIM Group]]></category>
		<category><![CDATA[BIM Land]]></category>
		<category><![CDATA[Design]]></category>
		<category><![CDATA[designed]]></category>
		<category><![CDATA[Dynamic]]></category>
		<category><![CDATA[German House]]></category>
		<category><![CDATA[Hyatt]]></category>
		<category><![CDATA[light]]></category>
		<category><![CDATA[Lighting]]></category>
		<category><![CDATA[Mansion]]></category>
		<category><![CDATA[PARK]]></category>
		<category><![CDATA[Park Hyatt]]></category>
		<category><![CDATA[Park Hyatt Phu Quoc]]></category>
		<category><![CDATA[Phu]]></category>
		<category><![CDATA[Phu Quoc]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Quoc]]></category>
		<category><![CDATA[Resort]]></category>
		<category><![CDATA[scenes]]></category>
		<category><![CDATA[SUITE]]></category>
		<category><![CDATA[The light]]></category>
		<category><![CDATA[Tran Van Thanh]]></category>
		<category><![CDATA[Winter Solstice]]></category>
		<guid isPermaLink="false">https://en.spress.net/no-project-has-been-designed-with-lighting-like-park-hyatt-phu-quoc/</guid>

					<description><![CDATA[According to Creative Director of ASA Lighting Design Studios, the lighting design at Park Hyatt Phu Quoc is perfect from concept, execution to technology and financial investment. “In Vietnam, I have never seen a project with such a high level of investment in lighting as this project,” said Dr. Tran Van Thanh, co-founder and design [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>According to Creative Director of ASA Lighting Design Studios, the lighting design at Park Hyatt Phu Quoc is perfect from concept, execution to technology and financial investment.</strong><br />
<span id="more-19751"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/22e016a400e6e9b8b0f7.jpg" width="625" height="351"> </p>
<p> “In Vietnam, I have never seen a project with such a high level of investment in lighting as this project,” said Dr. Tran Van Thanh, co-founder and design director of ASA Lighting Design Studios. Having cooperated with many large resort corporations, he was still surprised by the scale of the project in this pearl island. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/010433402502cc5c9513.jpg" width="625" height="217"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/5a2d69697f2b9675cf3a.jpg" width="625" height="128"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/b68186c5908779d92096.jpg" width="625" height="51"> &#8211; The design of the Park Hyatt Phu Quoc project bears the mark of Nathan Thompson &#8211; the founder of The Flaming Beacon. He participated in most of the meetings to discuss lighting design for the project. Not only that, he also brought to this project many lighting techniques and effects from the perspective of an expert. It must be added that he is one of the people with extensive experience in the field of stage lighting. Therefore, the idea of ​​lighting design for each area in the Park Hyatt Phu Quoc project is like arranging for each scene of a play. Here, the light not only needs to be beautifully designed, but also has to bring a &#8220;dramatic&#8221; feeling. The space is staged with many layers of metaphorical corridors to evoke a strong impression for visitors to stay. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/e855d611c053290d7042.jpg" width="625" height="54"> &#8211; As far as I know, this is the first project in Vietnam that applies dynamic lighting technology in the entire construction process. This technology is not only used in luxurious public areas, but also appears in each mansion. This is the first time in a resort where each bedroom is individually programmed with multiple lighting scenes, allowing to transform the atmosphere of each suite. The luxury of this project is also reflected in the fact that every area has a calibrated scenario, even the swimming pool and garden are programmed with many different lighting scenarios. Lighting solutions are designed to suit the time of day. If the morning light is gentle and elegant, the afternoon is romantic, then the evening brings a feeling of warmth and relaxation. These sensations are all adjusted through the brightness and tone of the light, from bright white to warm. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/76714a355c77b529ec66.jpg" width="625" height="218"> The meticulous attention to detail is also reflected in the fact that we have a separate scenario for the sunset, which happens only 15 minutes. Designers had to calibrate at the scene, making sure the moment appeared just as the sun was about to set, and the transition matched when the last rays of sunlight disappeared. This process requires engineers to calculate the correct solar orbit whether it is the summer solstice, winter solstice, spring or autumn equinox. At the end of the romantic 15 minutes of sunset, the lighting is changed, setting the scene for the late afternoon when guests are about to leave the room for dinner, and will automatically activate to welcome the owner back to rest. . <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/c225f961ef23067d5f32.jpg" width="625" height="260"> In addition, safety and comfort factors are also put on top. We have sensors all over the resort. Light sensor system, landscape lights will react to the weather environment to automatically activate when it&#8217;s raining, cloudy, low light&#8230; Thus, occupants will always feel safe and comfortable in every situation. time. These are just a few examples of the meticulous care in design that promises to bring an unforgettable experience to visitors at Park Hyatt Phu Quoc. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/8cb38bf79db574eb2da4.jpg" width="625" height="384"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/226126253067d9398076.jpg" width="625" height="52"> &#8211; With such a unique design and technological requirements, the project had to use many custom-made decorative lights. These are unique lighting tools for the project, inspired by fisheries, fishing villages, moonlight&#8230; creating a poetic scene of Phu Quoc but also luxurious enough with the stature of Park Hyatt. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/c77bc53fd37d3a23636c.jpg" width="625" height="351"> I am especially interested in the design of the lights in the garden, they are accented with round spheres, giving off a very interesting amber light. The light of each sphere is filtered through a layer of ivory silk fabric, creating a magical golden color that cannot be reproduced with modern lights. This is also a bold experiment, combining modern design and traditional Vietnamese techniques. Besides, the lamps that project plants meticulously hidden in brown glazed crockery are also a very Vietnamese mark. Or a pair of seemingly simple night lights, but inside use LED chips with turnable white technology from 3,000K to super warm 2,200K colors, to almost accurately simulate the magical light of the candles only in the palace. old. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/fd31fe75e83701695826.jpg" width="625" height="217"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/8b628b269d64743a2d75.jpg" width="625" height="61"> &#8211; In order to have many lighting scenes for each space in the resort villa, tree, lake, etc., the control system must be invested with modern scale. That requirement also includes fine-tuning every detail, the lighting scene is smooth, the colors are synchronized, and the light quality is pure. So, behind those lighting experiences must be the equipment system invested, in this case, from BIM Land investor of BIM Group. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/21d4209036d2df8c86c3.jpg" width="625" height="309"> Besides, the project also has the participation of The Flaming Beacon, a very famous name in the field of hotel and resort lighting design in the world. This company is based in Australia and has implemented many projects in 36 countries, which are highly appreciated by professionals and customers. In Vietnam, The Flaming Beacon is no stranger to being a partner of two high-end resorts, which can be said to be the names that set the standard of luxury resorts in Vietnam. The participation of The Flaming Beacon in the Park Hyatt Phu Quoc project is a proof that this will be the next luxury resort in Vietnam in the near future. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/8a64842092627b3c2273.jpg" width="625" height="793"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/62156d517b13924dcb02.jpg" width="625" height="465"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/315e3d1a2b58c2069b49.jpg" width="625" height="297"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/e065ed21fb63123d4b72.jpg" width="625" height="831"> Meanwhile, ASA Lighting Design Studios is a familiar name to investors, large and high-end customers in Vietnam. In more than 100 projects implemented, ASA has had projects of international stature such as Dragon Bridge (Da Nang), Nha Duc (Ho Chi Minh City). Park Hyatt Phu Quoc is the seventh project that ASA works with BIM Group. We are long-time partners, partners with many years of great cooperation to create quality projects. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/f1c7fb83edc1049f5dd0.jpg" width="625" height="68"> &#8211; The combination of two big-name companies in the industry will ensure the quality of the project&#8217;s lighting design. With ASA&#8217;s deep, strong expertise and understanding of Vietnamese culture and people, plus international quality design from The Flaming Beacon, I can confidently say that the Park Hyatt Phu Quoc lighting project will Perfect in both function and aesthetic quality. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_28_119_38992248/f0d5fb91edd3048d5dc2.jpg" width="625" height="433"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19751</post-id>	</item>
		<item>
		<title>Germany and Norway inaugurate the project of an undersea power exchange cable</title>
		<link>https://en.spress.net/germany-and-norway-inaugurate-the-project-of-an-undersea-power-exchange-cable/</link>
		
		<dc:creator><![CDATA[Mạnh Hùng (TTXVN)]]></dc:creator>
		<pubDate>Sun, 30 May 2021 10:37:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Angela Merkel]]></category>
		<category><![CDATA[Cable]]></category>
		<category><![CDATA[Charcoal]]></category>
		<category><![CDATA[Constitutional Court]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Emissions]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[Exchange]]></category>
		<category><![CDATA[German Government]]></category>
		<category><![CDATA[German Prime Minister]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[inaugurate]]></category>
		<category><![CDATA[Norway]]></category>
		<category><![CDATA[Nuclear power]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power production]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Recycled energy]]></category>
		<category><![CDATA[Removed]]></category>
		<category><![CDATA[River Elbe]]></category>
		<category><![CDATA[undersea]]></category>
		<category><![CDATA[Ups and downs]]></category>
		<category><![CDATA[Wind energy]]></category>
		<guid isPermaLink="false">https://en.spress.net/germany-and-norway-inaugurate-the-project-of-an-undersea-power-exchange-cable/</guid>

					<description><![CDATA[Germany and Norway on May 27 inaugurated NordLink &#8211; an undersea electric cable built to facilitate the exchange of renewable energy, in the context of Europe&#8217;s largest economy gradually phasing out. abandon coal and nuclear power in the coming years. Germany and Norway inaugurated the NordLink undersea cable line. Photo: DW With a total length [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Germany and Norway on May 27 inaugurated NordLink &#8211; an undersea electric cable built to facilitate the exchange of renewable energy, in the context of Europe&#8217;s largest economy gradually phasing out. abandon coal and nuclear power in the coming years.</strong><br />
<span id="more-19264"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_27_294_38989679/95ec2a8f3ccdd5938cdc.jpg" width="625" height="351"> </p>
<p> <em> Germany and Norway inaugurated the NordLink undersea cable line. Photo: DW</em> With a total length of 623 km, NordLink is one of the longest undersea cables in the world, connecting the town of Tonstad in southern Norway to the mouth of the Elbe river in northern Germany. This cable route helps to exchange wind and solar energy produced in Germany for hydroelectric power produced in Norway, helping the two countries make up for the shortfall in electricity production due to fluctuations in the amount of wind and sun. The project is expected to help provide electricity for about 3.6 million households, which has been in operation since April, but officially opened on May 27. According to German Chancellor Angela Merkel, the project is really a big step towards a sustainable and future-friendly energy supply for Germany. The project also helps to balance electricity production, which is an important part of the country&#8217;s growing efforts to expand renewable energy sources. Thorsten Lenck of the Agora Energy Transition research organization considers the NordLink project an important step in Germany&#8217;s energy transition and integration into the European power system. According to the plan, Germany will gradually phase out nuclear power by 2022 and coal power by 2038. Recently, Germany has also set many ambitious targets to reduce CO2 emissions after the Constitutional Court &#8211; a court Supreme Court in Germany, ruled that the current climate protection law was &#8220;not enough&#8221;, demanding an amendment to the law. With ambitious targets, the German government plans to cut emissions by 65% ​​by 2030 compared with 1990 levels, further than the 55% reduction target set earlier. The reduction will then reach 88% by 2040, with the goal of making Germany carbon neutral by 2045, five years earlier than originally planned. For the first time ever, renewables in Germany will account for half of electricity production, compared with 25% less than 10 years ago, data from the Fraunhofer Research Institute shows. Interaction and exchange between different countries is also one of the pillars of the European Union&#8217;s climate strategy. To date, a number of cross-border projects have been operating between Norway and the Netherlands; Netherlands and Great Britain; Denmark and the Netherlands.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19264</post-id>	</item>
		<item>
		<title>Super wind power project floating off the coast of Iceland provides green electricity for the UK worth 30 billion USD</title>
		<link>https://en.spress.net/super-wind-power-project-floating-off-the-coast-of-iceland-provides-green-electricity-for-the-uk-worth-30-billion-usd/</link>
		
		<dc:creator><![CDATA[Thanh Bình]]></dc:creator>
		<pubDate>Fri, 28 May 2021 02:40:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[billion]]></category>
		<category><![CDATA[Blue]]></category>
		<category><![CDATA[Bottom of the sea]]></category>
		<category><![CDATA[Cable line]]></category>
		<category><![CDATA[Chicago]]></category>
		<category><![CDATA[Coast]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[England]]></category>
		<category><![CDATA[Farm]]></category>
		<category><![CDATA[floating]]></category>
		<category><![CDATA[green]]></category>
		<category><![CDATA[Iceland]]></category>
		<category><![CDATA[IPC]]></category>
		<category><![CDATA[Joint venture]]></category>
		<category><![CDATA[North Sea]]></category>
		<category><![CDATA[Offshore]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Power batteries]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Super]]></category>
		<category><![CDATA[Turbine]]></category>
		<category><![CDATA[Upstream]]></category>
		<category><![CDATA[USD]]></category>
		<category><![CDATA[Value]]></category>
		<category><![CDATA[Water area]]></category>
		<category><![CDATA[Wind]]></category>
		<category><![CDATA[Wind electricity]]></category>
		<category><![CDATA[Wind energy]]></category>
		<category><![CDATA[worth]]></category>
		<guid isPermaLink="false">https://en.spress.net/super-wind-power-project-floating-off-the-coast-of-iceland-provides-green-electricity-for-the-uk-worth-30-billion-usd/</guid>

					<description><![CDATA[Upstream news website reported on May 21 that Hecate Wind Corporation, based in Chicago, USA and Independent Power Corporation (IPC) &#8211; UK, cooperated to implement the Hecate Independent Power Atlantic (HIP Atlantic) project with a total value of £30 billion (£21 billion) to build a floating wind farm in the North Sea to supply Britain [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Upstream news website reported on May 21 that Hecate Wind Corporation, based in Chicago, USA and Independent Power Corporation (IPC) &#8211; UK, cooperated to implement the Hecate Independent Power Atlantic (HIP Atlantic) project with a total value of £30 billion (£21 billion) to build a floating wind farm in the North Sea to supply Britain with electricity via an undersea cable. This is the most ambitious megaproject ever in the global offshore wind energy sector.</strong><br />
<span id="more-18717"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_26_232_38982466/1269c6c7d08539db6094.jpg" width="625" height="416"> </p>
<p> <em> Super wind power project floating off the coast of Iceland provides green electricity to the UK worth 30 billion USD. Photo: North Coast of England/Documentary.</em> The HIP Atlantic project, which aims to deploy 10 GW turbines offshore the UK, is a joint venture involving Spanish oil and gas company Repsol. This project is the result of cooperation between two groups of UK and US. IPC Group is an Anglo-American joint venture based in the UK, specializing in the development of international gas plants. Hecate Wind is part of Hecate Energy, a company owned by Hecate Holdings that develops solar and electric batteries, in which Spanish oil and gas company Repsol has just acquired a 40% stake to increase its footprint in the industry. renewable energy sector. The press release about the mega-project says that HIP Atlantic will be &#8220;completely under the control of the UK electricity system operator&#8221;, being &#8220;the first wind farm on overseas waters&#8221;. According to the plan, the first phase is to build a 4 GW wind farm connected to the UK electricity grid and two single 1 GW wind farms, hundreds of kilometers south of British waters. and in the east of Iceland. The investors of the HIP Atlantic project said that the first 2 GW could be put into operation from 2025. HIP Atlantic expects the first phase of the project to create 15,000 new jobs in the UK and 500 new jobs in the UK. Iceland. <strong> Expand the offshore wind energy area.</strong> Project Chairman Tony Baldry, former UK Energy Secretary, said the HIP Atlantic project implements British Prime Minister Boris Johnson&#8217;s vision to attract investment and create jobs in the North of England, as part of of the ambitious policy of making Britain a world leader in offshore wind energy; We will expand the UK wind power sector beyond traditional water, extending the frontiers of current cable technology for power generation within 1,000km of land-based grid points. his&#8221;. Floating offshore wind farms are the British agenda. The UK has set a target of 1 GW of energy from floating offshore wind farms by 2030, as part of the 30 GW target plan for offshore and seabed wind.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18717</post-id>	</item>
		<item>
		<title>The $32 million scam cryptocurrency project provokes investors</title>
		<link>https://en.spress.net/the-32-million-scam-cryptocurrency-project-provokes-investors/</link>
		
		<dc:creator><![CDATA[Thùy Trang]]></dc:creator>
		<pubDate>Tue, 25 May 2021 05:29:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Binance Smart Chain]]></category>
		<category><![CDATA[Cheat]]></category>
		<category><![CDATA[Code]]></category>
		<category><![CDATA[cryptocurrency]]></category>
		<category><![CDATA[D100]]></category>
		<category><![CDATA[Decentralized]]></category>
		<category><![CDATA[DeFi]]></category>
		<category><![CDATA[emulator]]></category>
		<category><![CDATA[Encode]]></category>
		<category><![CDATA[escape]]></category>
		<category><![CDATA[Financial market]]></category>
		<category><![CDATA[investors]]></category>
		<category><![CDATA[million]]></category>
		<category><![CDATA[Money scam]]></category>
		<category><![CDATA[Pool]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Provocative]]></category>
		<category><![CDATA[provokes]]></category>
		<category><![CDATA[Public sale]]></category>
		<category><![CDATA[Pull]]></category>
		<category><![CDATA[scam]]></category>
		<category><![CDATA[sign]]></category>
		<category><![CDATA[Tom]]></category>
		<category><![CDATA[trick]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-32-million-scam-cryptocurrency-project-provokes-investors/</guid>

					<description><![CDATA[After fleeing, the leaders of this project also left provocative messages for those who were scammed. The DeFi100 cryptocurrency project, which went public this past February, appears to have turned into a $32 million scam. On the evening of May 22, many visitors to the DeFi100 website received a message that they had been scammed. [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>After fleeing, the leaders of this project also left provocative messages for those who were scammed.</strong><br />
<span id="more-18043"></span> The DeFi100 cryptocurrency project, which went public this past February, appears to have turned into a $32 million scam. On the evening of May 22, many visitors to the DeFi100 website received a message that they had been scammed.</p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_23_119_38941870/8e2ab34da70f4e51171e.jpg" width="625" height="378"> <em> Scam notice on DeFi100 website. Screenshots. </em> &#8220;We fooled everyone and nobody could do anything about it,&#8221; said the statement, signed by Devsin, who is said to be the head of the DeFi100 project. According to the above information <em> Coinmarketcap</em> , DeFi100 is a project to create a simulated value fund, that is, the value of D100 issued will depend on the total value of the decentralized financial market (DeFi). The team that developed this project took the name Wrapp3D, but all members hid their true identities. This project&#8217;s D100 coin has been released on the Binance Smart Chain network since February. After that, some users warned about the dangers of DeFi100. On Twitter, user Tom suggested that DeFi100 was originally intended to issue a token with a price-adjusted supply (rebase token). However, when this plan failed, they planned to switch to the liquidity pool model. &#8220;This whole project is a scam. Devsin manipulates and deceives investors,&#8221; user Tom asserts. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_23_119_38941870/87078c609822717c2833.jpg" width="625" height="375"> <em> The price of D100 coin has been decreasing steadily over the past week, and dropped sharply after the scam information. Screenshots.</em> According to the account Mr. Whale on Twitter, who claims to be a crypto analyst, total scams from the DeFi100 project amounted to $32 million. &#8220;When the market is no longer going up, many projects will disappear. Don&#8217;t be surprised that many scam projects will be reported in the next few months. Never invest in projects that are too new, with development teams. anonymous development, created as a joke and has no real purpose&#8221;, account Mr. Whale warned. According to the <em> CoinDesk</em> , does not rule out the possibility that DeFi100&#8217;s website was hacked to post the aforementioned notice. By the morning of May 23, the notice on the DeFi100 website had been removed. The value of the D100 coin has fallen nearly three times in the past week, from $0.2 to $0.077. DeFi100&#8217;s Twitter account has had no new announcements since March. In the crypto world, a developer scam is also known as a &#8220;rug pull&#8221;. This is a fairly common form of fraud, especially with decentralized finance (DeFi) projects, when all transactions are conducted by code, not by an organization.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18043</post-id>	</item>
		<item>
		<title>Little is known about the future Challenger 3 main tank project of the British army</title>
		<link>https://en.spress.net/little-is-known-about-the-future-challenger-3-main-tank-project-of-the-british-army-2/</link>
		
		<dc:creator><![CDATA[Theo Minh Tuấn/Quân đội nhân dân]]></dc:creator>
		<pubDate>Sat, 22 May 2021 01:50:12 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Army]]></category>
		<category><![CDATA[British]]></category>
		<category><![CDATA[British Army]]></category>
		<category><![CDATA[British Ministry of Defense]]></category>
		<category><![CDATA[Challenger]]></category>
		<category><![CDATA[Challenger 2]]></category>
		<category><![CDATA[Challenger 3]]></category>
		<category><![CDATA[Contractors]]></category>
		<category><![CDATA[Dead]]></category>
		<category><![CDATA[DM11]]></category>
		<category><![CDATA[future]]></category>
		<category><![CDATA[LEP]]></category>
		<category><![CDATA[Little known]]></category>
		<category><![CDATA[machine]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[Main force]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Nato]]></category>
		<category><![CDATA[Of project]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Rheinmetall BAE Systems Land]]></category>
		<category><![CDATA[TANK]]></category>
		<category><![CDATA[Venture]]></category>
		<category><![CDATA[World class]]></category>
		<guid isPermaLink="false">https://en.spress.net/little-is-known-about-the-future-challenger-3-main-tank-project-of-the-british-army-2/</guid>

					<description><![CDATA[The British Army is accelerating its main tank modernization program, aiming to create a &#8216;world-class&#8217; Challenger 3 that will become &#8216;NATO&#8217;s deadliest machine&#8217; by 2030. The British Army has just approved plans to upgrade its Challenger 2 main tank force. Rheinmetall BAE Systems Land Joint Venture Rheinmetall BAE Systems Land is the main contractor implementing [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The British Army is accelerating its main tank modernization program, aiming to create a &#8216;world-class&#8217; Challenger 3 that will become &#8216;NATO&#8217;s deadliest machine&#8217; by 2030.</strong><br />
<span id="more-17202"></span> The British Army has just approved plans to upgrade its Challenger 2 main tank force. Rheinmetall BAE Systems Land Joint Venture Rheinmetall BAE Systems Land is the main contractor implementing the upgrade program and carrying out the necessary work for the important project. this in the last years of this decade.</p>
<p> <strong> Modernization plan</strong> The production of the Challenger 2 main tank began in 1994 and lasted until 2002. The tank was officially commissioned in 1998. Immediately after that, the search for a way to modernize the equipment. of Challenger 2 began to be implemented, but until recently, all the ideas were not developed, for various reasons. However, the basic reason for refusing to modernize the Challenger 2 tank was lack of finance. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_21_304_38922496/c3badcd3c7912ecf7780.jpg" width="625" height="468"> <em> RBLS introduces the tank model of the Challenger 2 Life Extension Project project in 2019.</em> At the end of 2015, the British Ministry of Defense launched the Challenger Life Extension Project 2 (LEP), to upgrade its existing tank fleet. The project was originally planned to follow a &#8220;small&#8221; modernization, focusing only on instrumentation. The project was then completed in 2019. However, in 2019, the LEP program was relaunched, with new requirements. Proposals are currently being made for a larger modernization, focusing on weapons systems, power plant complexes, turrets and other structures. In addition, the project also considers modifying the volume and cost of the modernization process. In 2019, the German-British joint venture Rheinmetall BAE Systems Land (RBSL) proposed the Challenger-2 modernization project. In September of the same year, the new experimental tank of the project appeared at an exhibition. Then the necessary tests are carried out, in order to determine the actual characteristics and compare with other competing development projects. As a result, RBSL&#8217;s project was recognized as the most successful and recommended for full-scale implementation. On May 7, 2021, the British Ministry of Defense announced the signing of a contract for the project. Some contents of the proposed modernization program have been reported in detail. Accordingly, the project will upgrade the Challenger-2 main tank into the Challenger 3 version. <strong> Main tank for the future</strong> Between 1994 and 2002, the British Army purchased 386 Challenger-2 tanks and 22 training vehicles. By 2010, the number of equipment in the lineup was reduced to 225 and has remained at that level to this day. According to previous plans, such a main tank force would be maintained until 2035. However, now the plan has been revised, regarding the Challenger 3 project. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_21_304_38922496/bf92a2fbb9b950e709a8.jpg" width="625" height="292"> <em> He started implementing the Challenger 2 Tank Life Extension Project since 2015.</em> In March 2021, a new assessment of defense and security was published, which made a request to reduce the tank fleet. Accordingly, only 148 tanks will be used in the future and will be repaired and modernized. This allows them to remain in service until the 2040s. The remaining 77 vehicles will be retired from service. The new contract between the British Ministry of Defense and RBSL accepts this option and begins implementation. The main work of the Challenger 3 project will be carried out at the RBSL plant in Telford (UK). This project will provide 200 jobs, including 130 vacancies for engineers. Individual units will be provided by other companies, where another 450 jobs will be created. In the coming years, contractors will have to complete the project development and prepare the production line. The first tanks to be upgraded are scheduled to arrive in 2027. The last of 148 main battle tanks will return to service in 2030. The total cost of this modernization project, according to the contract. , would be £800 million (about £5.4 million/tank). The British Ministry of Defense highly appreciates the prospects of the new project. The country&#8217;s military expects the Challenger 3 to become a &#8220;world-class tank&#8221; and &#8220;NATO&#8217;s deadliest machine&#8221;. In addition, new weapons and other modern systems will allow the British Challenger-3 to surpass modern Russian main battle tanks. <strong> Comprehensive upgrade </strong> RBLS&#8217;s Challenger 3 project involves extensive modernization of the existing tank line, with the replacement of most major systems and equipment. As a result, the new tank will enhance mobility, increase protection, firepower and other important stats. In addition, the upgraded tank can function as part of a command combat system, along with a modern control system and easy data exchange. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_21_304_38922496/ac11bd78a63a4f64162b.jpg" width="625" height="292"> <em> The main changes of the Challenger 3 project.</em> During the upgrade process, the tank shell will receive new modular front armor. Its composition and properties are not specified, but the degree of protection is reported to be significantly increased. To replace the old tower, a new hood was developed with reinforced armor and the volume required to install new equipment. In the future, tanks will also receive active defense complexes. Challenger-3&#8217;s weapon system is equipped with a 120mm smoothbore gun Rheinmetall Rh 120 L55A1 manually loaded. Cannons can use a full range of existing and new ammunition for different purposes. In particular, the tank&#8217;s ammunition base will include new high-explosive fragmentation ammunition, with a DM11 programmable fuse. Additional weapons will include a remotely controlled machine gun combat module. RBSL intends to carry out a radical overhaul of the fire control system and other equipment on the tank. The lens system, control computer and other components of the tank will be selected new, without using the standard equipment of the Challenger 2. The fire control system will be combined with the associated vehicles. modern communication, providing the exchange of data on the tactical situation. <strong> Project outlook</strong> The Challenger 2 Life Extension Project (LEP) program has passed its first phase and is entering a new phase. In the coming years, the joint venture Rheinmetall BAE Systems Land and related companies will have to organize new content and kick-start work on a series of equipment modernization. According to the general plan, by 2030, the British army will completely renew its main tank force. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_21_304_38922496/5246422f596db033e97c.jpg" width="625" height="292"> <em> Challenger 3 will be the main tank of the British army in the future.</em> Due to a lack of funding, the British army could not afford to maintain a large tank fleet, and currently has only 225 main tanks. The modernization of all these equipment also becomes impossible and about a third of the tanks will have to be decommissioned due to lack of funds to restore. Besides, the increase in the capabilities of upgraded tanks is not only due to the benefit of new equipment and weapons. It is also based on the objective limitations and shortcomings of existing tanks. Accordingly, the Challenger-2 has not undergone a major upgrade and its characteristics remain at the level of the late 1990s. This fact led to the need to develop an entirely new combat unit. However, from a technical point of view, experts say that Rheinmetall BAE Systems Land&#8217;s Challenger 3 project seems quite successful. The proposed solutions are indeed capable of improving the technical characteristics and increasing the combat capabilities of existing tanks. In addition, all the necessary capabilities of a modern main tank are provided.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">17202</post-id>	</item>
		<item>
		<title>Little is known about the future Challenger 3 main tank project of the British army</title>
		<link>https://en.spress.net/little-is-known-about-the-future-challenger-3-main-tank-project-of-the-british-army/</link>
		
		<dc:creator><![CDATA[MINH TUẤN (Theo Topwar)]]></dc:creator>
		<pubDate>Tue, 18 May 2021 02:59:12 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Army]]></category>
		<category><![CDATA[British]]></category>
		<category><![CDATA[British Army]]></category>
		<category><![CDATA[British Ministry of Defense]]></category>
		<category><![CDATA[Cannons]]></category>
		<category><![CDATA[Challenger]]></category>
		<category><![CDATA[Challenger 2]]></category>
		<category><![CDATA[Challenger 3]]></category>
		<category><![CDATA[Dead]]></category>
		<category><![CDATA[DM11]]></category>
		<category><![CDATA[future]]></category>
		<category><![CDATA[LEP]]></category>
		<category><![CDATA[Little known]]></category>
		<category><![CDATA[machine]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[Main force]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Nato]]></category>
		<category><![CDATA[Of project]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Rheinmetall BAE Systems Land]]></category>
		<category><![CDATA[TANK]]></category>
		<category><![CDATA[Upgrade]]></category>
		<category><![CDATA[Venture]]></category>
		<category><![CDATA[World class]]></category>
		<guid isPermaLink="false">https://en.spress.net/little-is-known-about-the-future-challenger-3-main-tank-project-of-the-british-army/</guid>

					<description><![CDATA[The British Army is accelerating its main tank modernization program, aiming to create a &#8216;world-class&#8217; Challenger 3 that will become &#8216;NATO&#8217;s deadliest machine&#8217; by 2030. The British Army has just approved plans to upgrade its Challenger 2 main tank force. Rheinmetall BAE Systems Land Joint Venture Rheinmetall BAE Systems Land is the main contractor implementing [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The British Army is accelerating its main tank modernization program, aiming to create a &#8216;world-class&#8217; Challenger 3 that will become &#8216;NATO&#8217;s deadliest machine&#8217; by 2030.</strong><br />
<span id="more-15708"></span> The British Army has just approved plans to upgrade its Challenger 2 main tank force. Rheinmetall BAE Systems Land Joint Venture Rheinmetall BAE Systems Land is the main contractor implementing the upgrade program and carrying out the necessary work for the important project. this in the last years of this decade.</p>
<p> <strong> Modernization plan</strong> The production of the Challenger 2 main tank began in 1994 and lasted until 2002. The tank was officially commissioned in 1998. Immediately after that, the search for a way to modernize the equipment. of Challenger 2 began to be implemented, but until recently, all the ideas were not developed, for various reasons. However, the basic reason for refusing to modernize the Challenger 2 tank was lack of finance. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_16_38811092/5969061a1858f106a849.jpg" width="625" height="468"> <em> RBLS introduces the tank model of the Challenger 2 Life Extension Project project in 2019. </em> At the end of 2015, the British Ministry of Defense launched the Challenger Life Extension Project 2 (LEP), to upgrade its existing tank fleet. The project was originally planned to follow a &#8220;small&#8221; modernization, focusing only on instrumentation. The project was then completed in 2019. However, in 2019, the LEP program was relaunched, with new requirements. Proposals are currently being made for a larger modernization, focusing on weapons systems, power plant complexes, turrets and other structures. In addition, the project also considers modifying the volume and cost of the modernization process. In 2019, the German-British joint venture Rheinmetall BAE Systems Land (RBSL) proposed the Challenger-2 modernization project. In September of the same year, the new experimental tank of the project appeared at an exhibition. Then the necessary tests are carried out, in order to determine the actual characteristics and compare with other competing development projects. As a result, RBSL&#8217;s project was recognized as the most successful and recommended for full-scale implementation. On May 7, 2021, the British Ministry of Defense announced the signing of a contract for the project. Some contents of the proposed modernization program have been reported in detail. Accordingly, the project will upgrade the Challenger-2 main tank into the Challenger 3 version. <strong> Main tank for the future</strong> Between 1994 and 2002, the British Army purchased 386 Challenger-2 tanks and 22 training vehicles. By 2010, the number of equipment in the lineup was reduced to 225 and has remained at that level to this day. According to previous plans, such a main tank force would be maintained until 2035. However, now the plan has been revised, regarding the Challenger 3 project. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_16_38811092/f722ac51b2135b4d0202.jpg" width="625" height="292"> <em> He started implementing the Challenger 2 Tank Life Extension Project since 2015. </em> In March 2021, a new assessment of defense and security was published, which included a request to reduce the tank fleet. Accordingly, only 148 tanks will be used in the future and will be repaired and modernized. This allows them to remain in service until the 2040s. The remaining 77 vehicles will be retired from service. The new contract between the British Ministry of Defense and RBSL accepts this option and begins implementation. The main work of the Challenger 3 project will be carried out at the RBSL plant in Telford (UK). This project will provide 200 jobs, including 130 vacancies for engineers. Individual units will be provided by other companies, where another 450 jobs will be created. In the coming years, contractors will have to complete the project development and prepare the production line. The first tanks to be upgraded are scheduled to arrive in 2027. The last of 148 main battle tanks will return to service in 2030. The total cost of this modernization project, according to the contract. , would be £800 million (about £5.4 million/tank). The British Ministry of Defense highly appreciates the prospects of the new project. The country&#8217;s military expects the Challenger 3 to become a &#8220;world-class tank&#8221; and &#8220;NATO&#8217;s deadliest machine&#8221;. In addition, new weapons and other modern systems will allow the British Challenger-3 to surpass modern Russian main battle tanks. <strong> Comprehensive upgrade </strong> RBLS&#8217;s Challenger 3 project involves extensive modernization of the existing tank line, with the replacement of most major systems and equipment. As a result, the new tank will enhance mobility, increase protection, firepower and other important stats. In addition, the upgraded tank can function as part of a command combat system, along with a modern control system and easy data exchange. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_16_38811092/6c9235e12ba3c2fd9bb2.jpg" width="625" height="292"> <em> The main changes of the Challenger 3 project.</em> During the upgrade process, the tank shell will receive new modular front armor. Its composition and properties are not specified, but the degree of protection is reported to be significantly increased. To replace the old tower, a new hood was developed with reinforced armor and the volume required to install new equipment. In the future, tanks will also receive active defense complexes. Challenger-3&#8217;s weapon system is equipped with a 120mm smoothbore gun Rheinmetall Rh 120 L55A1 manually loaded. Cannons can use a full range of existing and new ammunition for different purposes. In particular, the tank&#8217;s ammunition base will include new high-explosive fragmentation ammunition, with a DM11 programmable fuse. Additional weapons will include a remotely controlled machine gun combat module. RBSL intends to carry out a radical overhaul of the fire control system and other equipment on the tank. The lens system, control computer and other components of the tank will be selected new, without using the standard equipment of the Challenger 2. The fire control system will be combined with the associated vehicles. modern communication, providing the exchange of data on the tactical situation. <strong> Project outlook</strong> The Challenger 2 Life Extension Project (LEP) program has passed its first phase and is entering a new phase. In the coming years, the joint venture Rheinmetall BAE Systems Land and related companies will have to organize new content and kick-start work on a series of equipment modernization. According to the general plan, by 2030, the British army will completely renew its main tank force. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_16_38811092/11e0479359d1b08fe9c0.jpg" width="625" height="292"> <em> Challenger 3 will be the main tank of the British army in the future.</em> Due to a lack of funding, the British army could not afford to maintain a large tank fleet, and currently has only 225 main tanks. The modernization of all these equipment also becomes impossible and about a third of the tanks will have to be decommissioned due to lack of funds to restore. Besides, the increase in the capabilities of the upgraded tank is not only due to the benefit of new equipment and weapons. It is also based on the objective limitations and shortcomings of existing tanks. Accordingly, the Challenger-2 has not undergone a major upgrade and its characteristics are still at the level of the late 1990s. This fact led to the urgent need to develop a completely new combat unit. However, from a technical point of view, experts say that Rheinmetall BAE Systems Land&#8217;s Challenger 3 project seems quite successful. The proposed solutions are indeed capable of improving the technical characteristics and increasing the combat capabilities of existing tanks. In addition, all the necessary capabilities of a modern main tank are provided.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15708</post-id>	</item>
		<item>
		<title>Why does the multi-level coin project need Nam Thu and Ngoc Trinh to advertise?</title>
		<link>https://en.spress.net/why-does-the-multi-level-coin-project-need-nam-thu-and-ngoc-trinh-to-advertise/</link>
		
		<dc:creator><![CDATA[Phúc Thịnh]]></dc:creator>
		<pubDate>Mon, 17 May 2021 04:57:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[account]]></category>
		<category><![CDATA[advertise]]></category>
		<category><![CDATA[advertisement]]></category>
		<category><![CDATA[Artist]]></category>
		<category><![CDATA[Cheat]]></category>
		<category><![CDATA[COIN]]></category>
		<category><![CDATA[coins]]></category>
		<category><![CDATA[DOGECOIN]]></category>
		<category><![CDATA[Encode]]></category>
		<category><![CDATA[FXT Token]]></category>
		<category><![CDATA[Huy]]></category>
		<category><![CDATA[Kieu Minh Tuan]]></category>
		<category><![CDATA[manipulation]]></category>
		<category><![CDATA[Multilevel]]></category>
		<category><![CDATA[Nam]]></category>
		<category><![CDATA[Nam Thu]]></category>
		<category><![CDATA[Ngoc]]></category>
		<category><![CDATA[Ngoc Trinh]]></category>
		<category><![CDATA[Post]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[SHIB]]></category>
		<category><![CDATA[SHIBA]]></category>
		<category><![CDATA[Shiba Inu]]></category>
		<category><![CDATA[Thu]]></category>
		<category><![CDATA[Trader]]></category>
		<category><![CDATA[Trinh]]></category>
		<category><![CDATA[Vague]]></category>
		<guid isPermaLink="false">https://en.spress.net/why-does-the-multi-level-coin-project-need-nam-thu-and-ngoc-trinh-to-advertise/</guid>

					<description><![CDATA[Unclear about the origin, multi-level coin projects often use celebrity reputation to attract investment and manipulate the price of cryptocurrencies. On the evening of May 11, the personal pages of some Vietnamese artists such as Gin Tuan Kiet, Nam Thu, Le Duong Bao Lam, Kieu Minh Tuan, Ngoc Trinh posted articles mentioning Dogecoin, Shiba Inu, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Unclear about the origin, multi-level coin projects often use celebrity reputation to attract investment and manipulate the price of cryptocurrencies.</strong><br />
<span id="more-15298"></span> On the evening of May 11, the personal pages of some Vietnamese artists such as Gin Tuan Kiet, Nam Thu, Le Duong Bao Lam, Kieu Minh Tuan, Ngoc Trinh posted articles mentioning Dogecoin, Shiba Inu, FXT Token and many cryptocurrencies. chemical.</p>
<p> However, in the comments section, the artists showed a lack of basic knowledge about cryptocurrencies. After receiving many reactions, on the morning of May 12, the posts on the website simultaneously &#8220;evaporated&#8221;. <strong> &#8220;This is an advertising campaign&#8221;</strong> Duong Nguyen Huy, owner of a cryptocurrency trading community in Vietnam, said that the series of artists posting about cryptocurrencies is an advertising campaign, because the shared content is the same. both the image and the spelling, no different from a semicolon. &#8220;Artist&#8217;s posts have started to have an impact. From official accounts (with green ticks), information is widely spread on the Internet, becoming a topic of discussion at offices and cafes. coffee after only a few hours&#8221;, Mr. Huy said that this campaign has attracted the attention of many people. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_119_38818651/1dfe57e349a1a0fff9b0.jpg" width="625" height="625"> <em> Posts promoting cryptocurrencies by many famous people in Vietnam. Photo: Huynh Loc.</em> Not only Dogecoin, Shiba Inu also increased in price thanks to Tesla CEO. On May 7, responding to a Twitter user&#8217;s comment, Musk said &#8220;looking for a Shiba dog&#8221;. Immediately after this statement, the Shiba Inu (SHIB) coin rose sharply. After just a few days, the price of Shiba Inu has increased by almost 40 times. With nearly 400,000 billion SHIB coins in circulation, the market capitalization at one point surpassed the 20 billion USD mark. Besides, according to Mr. Huy, the cryptocurrency market has many potential risks. For example, the cryptocurrency market has experienced a sharp decline in the period from 2018 to early 2020 regardless of whether it is Bitcoin or Ethereum. However, the artist&#8217;s posts on the evening of May 11 did not have any risk warnings. <strong> Because of the ambiguity, need the prestige of the celebrity</strong> In the list of cryptocurrencies posted by the artists, in addition to the animal names, there is a different coin, placed in the middle of the list is FXT Token. Unlike the other cryptocurrencies on the list advertised by the artists, FXT Token is an anonymous coin. &#8220;Anonymous is because it is not listed by big and reputable exchanges, but can only be purchased through small exchanges. The total transaction volume of this coin is only about 500,000 USD/day. That means anyone with about 200,000 USD will also can manipulate its price,&#8221; analyzed Dinh Tran, co-founder of a blockchain investment fund in Ho Chi Minh City. Meanwhile, other coins on the list of artists listed have daily transactions from a few hundred million to several billion dollars a day. &#8220;Putting FXT Token into the list of worth investing in is very ignorant. It is this ambiguity that makes FXT Token need to rely on celebrity advertising,&#8221; said Mr. Dinh. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_119_38818651/1ed259cf478daed3f79c.jpg" width="625" height="468"> <em> The artist&#8217;s post is then captured, shared immediately in multi-level groups, calling for investment.</em> Talk to <em> Zing</em> , the founder of the largest Crypto information platform in Vietnam, said that FXT Token is trying to borrow the influence of celebrities to reassure investors and create fear of missing out (FOMO) to blow. price of this currency. As a result, screenshots of posts by Vietnamese artists were widely shared by the FXT Token community in hundreds of online earning groups. &#8220;To Ngoc Trinh, Kieu Minh Tuan, Kha Nhu&#8230; still participating, what are you waiting for?&#8221;, the content of the status line reposted the screenshot of the person claiming to be the leader Lio****. This shows the significant influence of using artist reputation to promote &#8220;junk&#8221; cryptocurrency. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_119_38818651/fad179cd678f8ed1d79e.jpg" width="625" height="281"> <em> The predecessor of FXT Token is a binary exchange, similar to the gambling model. Screenshots.</em> The fact that artists have no knowledge, but still promote Dogecoin, Shiba Inu or FXT Token can be misleading, even causing many people to participate in scam projects. The above articles can also have a negative impact on the capital investment sector, which has many things that are not properly understood. &#8220;Celebrities have no expertise, knowledge and experience in the field of cryptocurrencies&#8230; This sector is easily fooled by bad projects, created just to make money, selling &#8216;junk&#8217; to homes. investment,&#8221; said Mr. Huy. Before the invitation to invest in cryptocurrencies, Mr. Huy advised participants to carefully research information on official sources, absolutely do not invest if invited by friends, or join invitation groups. rich prospect when &#8220;playing&#8221; coin. <em> <strong> Do apps that promise big profits help you get rich?</strong> </em> <em> Thanks to the development of technology, new type of multi-level fraud models easily raise capital and disappear faster, leaving no trace.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15298</post-id>	</item>
		<item>
		<title>Signing agreement to arrange capital for 1x600MW Cong Thanh coal-fired clean energy project</title>
		<link>https://en.spress.net/signing-agreement-to-arrange-capital-for-1x600mw-cong-thanh-coal-fired-clean-energy-project/</link>
		
		<dc:creator><![CDATA[Quốc Hương]]></dc:creator>
		<pubDate>Mon, 17 May 2021 02:20:07 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[1x600MW]]></category>
		<category><![CDATA[Again The Nguyen]]></category>
		<category><![CDATA[Agreement]]></category>
		<category><![CDATA[Arrange]]></category>
		<category><![CDATA[Capital]]></category>
		<category><![CDATA[Charcoal]]></category>
		<category><![CDATA[Clean]]></category>
		<category><![CDATA[Clean energy]]></category>
		<category><![CDATA[Clean technology]]></category>
		<category><![CDATA[coalfired]]></category>
		<category><![CDATA[Commercial loan]]></category>
		<category><![CDATA[Cong]]></category>
		<category><![CDATA[Cong Thanh]]></category>
		<category><![CDATA[Cong Thanh Group]]></category>
		<category><![CDATA[Deflation]]></category>
		<category><![CDATA[due]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[Lai The Nguyen Provincial Party Committee]]></category>
		<category><![CDATA[Nghi Son economic zone]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Provincial Commissioner]]></category>
		<category><![CDATA[Punctuation]]></category>
		<category><![CDATA[Signed]]></category>
		<category><![CDATA[signing]]></category>
		<category><![CDATA[Thanh]]></category>
		<category><![CDATA[Thanh Hoa]]></category>
		<category><![CDATA[Thanh Tung s head]]></category>
		<category><![CDATA[Thermal]]></category>
		<category><![CDATA[Thermal power project]]></category>
		<category><![CDATA[Wuhan]]></category>
		<guid isPermaLink="false">https://en.spress.net/signing-agreement-to-arrange-capital-for-1x600mw-cong-thanh-coal-fired-clean-energy-project/</guid>

					<description><![CDATA[On the afternoon of May 12, Trung Nam Electricity Design Institute, China and Cong Thanh Group (Vietnam) held a signing ceremony to arrange capital for the 1x600MW Cong Thanh coal-fired clean energy project. The signing ceremony was held in the form of online in Wuhan city, China and in Thanh Hoa city to ensure safety [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On the afternoon of May 12, Trung Nam Electricity Design Institute, China and Cong Thanh Group (Vietnam) held a signing ceremony to arrange capital for the 1x600MW Cong Thanh coal-fired clean energy project. The signing ceremony was held in the form of online in Wuhan city, China and in Thanh Hoa city to ensure safety against COVID-19 epidemic.</strong><br />
<span id="more-15225"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_361_38818126/92422b433501dc5f8510.jpg" width="625" height="416"> </p>
<p> Mr. Lai The Nguyen, Standing Deputy Secretary of the Provincial Party Committee and Mr. Dau Thanh Tung, Provincial Member, Vice Chairman of the Provincial People&#8217;s Committee witnessed the signing ceremony. Attending and witnessing the signing ceremony at the bridgehead of Thanh Hoa city were comrades: Lai The Nguyen, Standing Deputy Secretary of the Provincial Party Committee; Head Thanh Tung, Member of Provincial Party Committee, Vice Chairman of Provincial People&#8217;s Committee; representatives of relevant departments. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_361_38818126/5293e592fbd0128e4bc1.jpg" width="625" height="416"> Delegates attended the signing ceremony at the bridgehead of Thanh Hoa city. Cong Thanh 1x600MW coal-fired clean energy project, designed according to supercritical technology to improve power generation efficiency and reduce CO2 emissions. According to the cooperation agreement, Trung Nam Electricity Design Institute will arrange for a commercial loan of about 1 billion USD to Cong Thanh Group to implement the project. With this cooperation agreement, the two sides expect that Cong Thanh 1x600MW Coal-fired clean energy project will be a green, clean, advanced thermal power project in harmony with nature; become a bridge for the two sides to cooperate in business, share and develop together. Trung Nam Electricity Design Institute is committed to focusing resources and techniques to implement the Project, meeting the requirements of a thermal power project using supercritical clean technology. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_361_38818126/1ed8acd9b29b5bc5028a.jpg" width="625" height="416"> Overview of the signing ceremony in Thanh Hoa. Speaking at the ceremony, Mr. Lai The Nguyen, Standing Deputy Secretary of the Provincial Party Committee congratulated Trung Nam Institute of Electricity Design and Cong Thanh Group on reaching capital arrangement agreements, creating an important first step to develop the project. deploying 1x600MW Cong Thanh coal-fired clean energy project. This is one of the important projects for the development of Nghi Son Economic Zone in particular and Thanh Hoa in general. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_361_38818126/f59445955bd7b289ebc6.jpg" width="625" height="416"> Comrade Lai The Nguyen, Standing Deputy Secretary of the Provincial Party Committee spoke at the signing ceremony. Standing Deputy Secretary of the Provincial Party Committee Lai The Nguyen expressed his hope that the parties would reach further cooperation agreements to soon implement the project in reality. Thanh Hoa will create all the most favorable conditions for the parties to implement the project according to the plan, contributing to the common development.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15225</post-id>	</item>
		<item>
		<title>Hoa Binh Group established a subsidiary to implement the project of 900 billion VND</title>
		<link>https://en.spress.net/hoa-binh-group-established-a-subsidiary-to-implement-the-project-of-900-billion-vnd/</link>
		
		<dc:creator><![CDATA[Anh Nhi]]></dc:creator>
		<pubDate>Sun, 16 May 2021 19:18:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Administrative Council]]></category>
		<category><![CDATA[area]]></category>
		<category><![CDATA[billion]]></category>
		<category><![CDATA[Binh]]></category>
		<category><![CDATA[Biotechnology]]></category>
		<category><![CDATA[Deployment]]></category>
		<category><![CDATA[District 9]]></category>
		<category><![CDATA[Establish]]></category>
		<category><![CDATA[established]]></category>
		<category><![CDATA[Group]]></category>
		<category><![CDATA[HBC]]></category>
		<category><![CDATA[High tech Zone]]></category>
		<category><![CDATA[Hoa]]></category>
		<category><![CDATA[Hoa Binh Group]]></category>
		<category><![CDATA[implement]]></category>
		<category><![CDATA[Incubate]]></category>
		<category><![CDATA[Investment certificates]]></category>
		<category><![CDATA[Le Viet Hai]]></category>
		<category><![CDATA[Long Thanh My]]></category>
		<category><![CDATA[Material technology]]></category>
		<category><![CDATA[pharmacy]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Research and Development]]></category>
		<category><![CDATA[Subsidiaries]]></category>
		<category><![CDATA[subsidiary]]></category>
		<category><![CDATA[total investment]]></category>
		<category><![CDATA[Undertakings]]></category>
		<category><![CDATA[VND]]></category>
		<guid isPermaLink="false">https://en.spress.net/hoa-binh-group-established-a-subsidiary-to-implement-the-project-of-900-billion-vnd/</guid>

					<description><![CDATA[The Board of Directors of Hoa Binh Construction Group (HBC) has just approved the policy of establishing a 100% owned subsidiary named HBIC One Member State Bank Company. This company was established to implement the Hoa Binh Innovation Center (HBIC) project at the land lot No. E2a-9, E2a-11, Hi-Tech Park, Long Thanh My Ward, District [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Board of Directors of Hoa Binh Construction Group (HBC) has just approved the policy of establishing a 100% owned subsidiary named HBIC One Member State Bank Company.</strong><br />
<span id="more-15080"></span> This company was established to implement the Hoa Binh Innovation Center (HBIC) project at the land lot No. E2a-9, E2a-11, Hi-Tech Park, Long Thanh My Ward, District 9, City. HCM.</p>
<p> Hoa Binh said, with the expanded project scope, the Board of Directors of the Company also approved to increase the total investment capital for the HBIC project from 750 billion VND to 900 billion VND, an increase of 20%. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_522_38819405/19c899dc879e6ec0378f.jpg" width="625" height="407"> Accordingly, Hoa Binh assigned Mr. Le Viet Hai, Chairman of the Board of Directors to be the legal representative and Chairman of the Members&#8217; Council of HBIC One Member Limited Liability Company. Mr. Hai was able to actively organize and adjust the company&#8217;s organizational model in order to improve production and business efficiency during the implementation process. About Hoa Binh Innovation Center (HBIC), this project has been awarded the investment certificate since February 2016. The project will focus on research and development in 6 areas including new material technology, information technology, biotechnology &#8211; medicine, technical development of construction technology and automated industry on the ground floor. about 2.5 hectares. HBC&#8217;s goal will be to build a center that is the leading place for incubators, start-ups, R&amp;D, innovation and high-tech transfer in the country, and in Southeast Asia.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15080</post-id>	</item>
		<item>
		<title>Facebook&#8217;s digital currency project abandons global ambitions, focuses on the US</title>
		<link>https://en.spress.net/facebooks-digital-currency-project-abandons-global-ambitions-focuses-on-the-us/</link>
		
		<dc:creator><![CDATA[Vinh Trang]]></dc:creator>
		<pubDate>Sat, 15 May 2021 02:39:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[abandons]]></category>
		<category><![CDATA[ambitions]]></category>
		<category><![CDATA[Ambitious]]></category>
		<category><![CDATA[application]]></category>
		<category><![CDATA[currency]]></category>
		<category><![CDATA[DIEM]]></category>
		<category><![CDATA[Digital]]></category>
		<category><![CDATA[Ebay]]></category>
		<category><![CDATA[Facebook]]></category>
		<category><![CDATA[Facebooks]]></category>
		<category><![CDATA[focuses]]></category>
		<category><![CDATA[Give up]]></category>
		<category><![CDATA[global]]></category>
		<category><![CDATA[Libra]]></category>
		<category><![CDATA[Master Card]]></category>
		<category><![CDATA[Narrow]]></category>
		<category><![CDATA[Nonprofit]]></category>
		<category><![CDATA[Paypal]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Switzerland]]></category>
		<guid isPermaLink="false">https://en.spress.net/facebooks-digital-currency-project-abandons-global-ambitions-focuses-on-the-us/</guid>

					<description><![CDATA[Project abandons Swiss license application after shrinking global ambitions Illustration. FT montage Facebook-led digital currency project Diem (originally called Libra) is moving operations to the US and will partner with a local bank to issue US dollar-backed stablecoins. The project, which is supported by 26 businesses and non-profit organizations, has also dropped its application with [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Project abandons Swiss license application after shrinking global ambitions</strong><br />
<span id="more-14502"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_318_38826183/8fcb0f661024f97aa035.jpg" width="625" height="351"> </p>
<p> <em> Illustration. FT montage</em> Facebook-led digital currency project Diem (originally called Libra) is moving operations to the US and will partner with a local bank to issue US dollar-backed stablecoins. The project, which is supported by 26 businesses and non-profit organizations, has also dropped its application with the Swiss Financial Market Supervisory Authority to operate as a payment service, and will instead post registered as a money services business with the U.S. Department of the Treasury. The initiative was formerly known as Libra but was renamed late last year due to pressure from global regulators, who were concerned that it could threaten monetary stability and become a moot point. hot for money laundering. Some of its founding members — including PayPal, Mastercard, Vodafone and eBay — have dropped out because of similar reputational fears and concerns. Initially, Diem sought to create a synthetic coin backed by a basket of currencies, before narrowing his vision to focusing on launching a single coin backed by a single coin. USD. On Wednesday, May 12, Diem said it planned to run a “blockchain-based payment system that facilitates the real-time transfer of Diem stablecoins between approved network participants browsing”, called the Diem Payments Network. It said it was moving its headquarters from Switzerland to the US. Silvergate, a San Francisco-based bank, will become the exclusive issuer of Diem&#8217;s ​​stablecoin token and will manage the reserve, it said. “Our plans bring the project fully into the scope of US regulation and no longer require a license from Finma,” said Stuart Levey, chief executive officer of Diem and former chief legal officer of HSBC. &#8220;. “We are committed to creating a secure payment system for consumers and businesses, paying faster and cheaper, and taking advantage of blockchain technology to the benefit of the financial system. to more people around the world,” he added.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14502</post-id>	</item>
		<item>
		<title>In the middle of the epidemic season, Ly Nha Ky performed a lavish project, Le Quyen showed a close-up of her property in the US</title>
		<link>https://en.spress.net/in-the-middle-of-the-epidemic-season-ly-nha-ky-performed-a-lavish-project-le-quyen-showed-a-close-up-of-her-property-in-the-us/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Fri, 14 May 2021 18:16:07 +0000</pubDate>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Close]]></category>
		<category><![CDATA[Closeup]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[Creep]]></category>
		<category><![CDATA[Diamond]]></category>
		<category><![CDATA[epidemic]]></category>
		<category><![CDATA[Exhausted]]></category>
		<category><![CDATA[FBNV]]></category>
		<category><![CDATA[Lament]]></category>
		<category><![CDATA[lavish]]></category>
		<category><![CDATA[Le Quyen]]></category>
		<category><![CDATA[Luxurious]]></category>
		<category><![CDATA[Luxury]]></category>
		<category><![CDATA[Ly Nha Ky]]></category>
		<category><![CDATA[Middle]]></category>
		<category><![CDATA[nhà]]></category>
		<category><![CDATA[performed]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Property]]></category>
		<category><![CDATA[Queen]]></category>
		<category><![CDATA[Quyen]]></category>
		<category><![CDATA[season]]></category>
		<category><![CDATA[showed]]></category>
		<category><![CDATA[Showing off]]></category>
		<category><![CDATA[Space inside]]></category>
		<category><![CDATA[Temporarily put aside]]></category>
		<category><![CDATA[Translate]]></category>
		<category><![CDATA[Villa]]></category>
		<category><![CDATA[Wished]]></category>
		<category><![CDATA[Wow]]></category>
		<guid isPermaLink="false">https://en.spress.net/in-the-middle-of-the-epidemic-season-ly-nha-ky-performed-a-lavish-project-le-quyen-showed-a-close-up-of-her-property-in-the-us/</guid>

					<description><![CDATA[Both are the &#8216;diamond queens&#8217; of V-Biz, the real estate properties of Ly Nha Ky and Le Quyen, admiring the fans. Ly Nha Ky is famous for her luxury in the past, she is considered a &#8220;diamond giant&#8221; and has a close relationship with many international stars and businessmen. During the complicated situation of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Both are the &#8216;diamond queens&#8217; of V-Biz, the real estate properties of Ly Nha Ky and Le Quyen, admiring the fans.</strong><br />
<span id="more-14326"></span> Ly Nha Ky is famous for her luxury in the past, she is considered a &#8220;diamond giant&#8221; and has a close relationship with many international stars and businessmen. During the complicated situation of the epidemic, many artists lamented that they had to temporarily put their plans on hold, but Ly Nha Ky took advantage of this time to build a new villa.</p>
<p> Specifically, Ly Nha Ky has just posted the entire design image for the new villa, in which the luxurious and classy interior of the project quickly received the attention of netizens. Through the design, it can be seen that Ly Nha Ky chose white as the main color, delicately arranging each small space in the house. <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/1799790c664e8f10d65f.jpg" width="625" height="359"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/07306ea571e798b9c1f6.jpg" width="625" height="520"> Interior space of Ly Nha Ky&#8217;s new villa. &#8220;<em> From childhood to adulthood, there was only 1 disease: sore throat, cold, cold fever. Especially every time I go to the construction stage to decorate and finish the details, I always get sick of 2-4 like that. But this time the house is quite big and it has exhausted Mong. Haven&#8217;t finished any living corners yet, but have been feverish since yesterday. Tried to drag the body to the construction site this afternoon and now the cold fever is not over yet. I wish there was a holy potion that will be healthy to drink</em> &#8220;, she shared. Cast <em> The beauty and the rich</em> Tell me more about my new project called<em> Lynk Tower</em> (abbreviation of Ly Nha Ky), she is focusing all her energy to complete this project. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/735c16c9098be0d5b99a.jpg" width="625" height="520"> The beauty&#8217;s photo is hung in the house to &#8220;assert sovereignty&#8221;. On the same day, Le Quyen attracted attention when posting a series of pictures of her villa in the US. &#8220;<em> COVID messed up the world. Sitting and watching every corner that I take care of, that feeling of relaxation and tranquility. How do you remember that. As soon as the translation stops, the flight ticket book immediately</em> <em> &#8220;</em> , she expressed. This is the first time that the property in the land of flags has been shared by the singer close-up. It is known that the house has an area of ​​more than 400m2, the vocalist <em> Fate</em> bought in 2017 with a value of up to millions of dollars, is a place for her to rest while touring in the US. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/b408d59dcadf23817ace.jpg" width="625" height="1081"> Le Quyen lamented the living space in America. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/4ac635532a11c34f9a00.jpg" width="625" height="783"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/fe5384c69b8472da2b95.jpg" width="625" height="468"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/13e16b7474369d68c427.jpg" width="625" height="833"> Photos shared by Le Quyen on every occasion to tour in the US. Not too picky about the design, she chose white &#8211; gray tones for her villa. The interior is delicately arranged and creates absolute comfort for the female singer. Because of the great influence of the epidemic, it is not possible to go back and forth between Vietnam and the US, the voice <em> To </em> Mind<em> A Time I Loved </em> have to ask relatives to look after. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_13_105_38829975/886d15050b47e219bb56.jpg" width="625" height="237"> <strong> Thanh Phuong</strong> According to FBNV</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14326</post-id>	</item>
		<item>
		<title>What&#8217;s special about the electric bicycle project that Shark Phu committed to invest in?</title>
		<link>https://en.spress.net/whats-special-about-the-electric-bicycle-project-that-shark-phu-committed-to-invest-in/</link>
		
		<dc:creator><![CDATA[Yến Chi]]></dc:creator>
		<pubDate>Thu, 13 May 2021 23:50:13 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Bicycle]]></category>
		<category><![CDATA[Bike]]></category>
		<category><![CDATA[Call for capital]]></category>
		<category><![CDATA[CEO]]></category>
		<category><![CDATA[commitment]]></category>
		<category><![CDATA[committed]]></category>
		<category><![CDATA[Electric]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Helpful solution]]></category>
		<category><![CDATA[Invest]]></category>
		<category><![CDATA[KIT]]></category>
		<category><![CDATA[Lithium ion battery]]></category>
		<category><![CDATA[Main product]]></category>
		<category><![CDATA[Make]]></category>
		<category><![CDATA[Nguyen Thi Thu Hang]]></category>
		<category><![CDATA[Phu]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[SHARE]]></category>
		<category><![CDATA[Shark]]></category>
		<category><![CDATA[Shark Hung]]></category>
		<category><![CDATA[Shark Phu]]></category>
		<category><![CDATA[special]]></category>
		<category><![CDATA[START UP]]></category>
		<category><![CDATA[Support]]></category>
		<category><![CDATA[The frame of the car]]></category>
		<category><![CDATA[Thu Hang]]></category>
		<category><![CDATA[Whats]]></category>
		<guid isPermaLink="false">https://en.spress.net/whats-special-about-the-electric-bicycle-project-that-shark-phu-committed-to-invest-in/</guid>

					<description><![CDATA[Shark Phu invested 1.5 billion VND in the Wiibike electric bicycle project and committed to payback this year to increase its investment 10 times. Wiibike electric bicycles can quickly turn an ordinary bicycle into an electric bike by installing a kit made by the company itself. In the recent broadcast of &#8220;Silver billion deal&#8221;, the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Shark Phu invested 1.5 billion VND in the Wiibike electric bicycle project and committed to payback this year to increase its investment 10 times.</strong><br />
<span id="more-13997"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_326_38816264/ce8d39b927fbcea597ea.jpg" width="625" height="416"> </p>
<p> Wiibike electric bicycles can quickly turn an ordinary bicycle into an electric bike by installing a kit made by the company itself. In the recent broadcast of &#8220;Silver billion deal&#8221;, the Wiibike electric bicycle project brought by CEO Nguyen Thi Thu Hang has received the investment of Shark Phu with 1.5 billion VND for 10% of the stock. part. And committed if the payback this year will increase the investment by 10 times. Wiibike is a science and technology startup in the green transport sector with the main product of complete electric bicycle, using lithium batteries. Notably, Wiibike&#8217;s chassis is made from a variety of materials, including one that uses bamboo, an environmentally friendly renewable material. In addition, Wiibike also offers a Wiibike kit to turn a regular bike into an electric power bike within 15 minutes. According to Mr. Lai Thai Phong &#8211; product development specialist of Wiibike, these are Make in Vietnam kits manufactured by the company. This kit comes with a sizing mechanism that can be mounted on any bike, including models with different wheel sizes. “The most important thing about the kit is how the battery is in it. To achieve high performance, the kit must use high capacity cells and good connectivity. This idea is researched and learned from technologies available in the world. ”, Mr. Phong shared. However, this enterprise is only in the consulting process to register for invention copyrights. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_326_38816264/c27e374a2908c0569919.jpg" width="625" height="350"> The Wiibike electric power bicycle project received an investment of 1.5 billion VND for a 10% stake from Shark Phu According to Ms. Nguyen Thi Thu Hang &#8211; co-founder and operator of Wiibike, this start-up has a trial product since 2017. Currently, Wiibike is at 51% gross profit with revenue of 2.3 billion VND in 9 months, starting from July last year. &#8220;Although not yet implemented any traditional promotional campaigns, the project has attracted 300 customers to buy this car&#8221;, the project&#8217;s CEO shared. However, according to Shark Hung, this is not a new business model, it is difficult to approve that this is an invention that only stops at industrial designs or useful solutions. Vehicle design is not beautiful, does not show style, the numbers are not convincing. Therefore, the &#8220;real estate shark&#8221; has decided to ignore this deal. However, CEO Nguyen Thi Thu Hang maintains her stance when asserting that what she does will contribute to the value and make a great impact on the lifestyle and living environment of the Vietnamese people. Whether or not the capital is successfully raised, Thu Hang affirms that she will continue to fulfill this dream. &#8220;Wiibike&#8217;s orientation is not only at the product, but also to offer green transport solutions to really contribute to the transport system in Vietnam&#8221;, said founder of Wiibike. Finally, this start-up successfully raised capital from Shark Phu with an investment of 1.5 billion VND for a 10% stake.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13997</post-id>	</item>
		<item>
		<title>America through the project to build the largest wind farm in this country</title>
		<link>https://en.spress.net/america-through-the-project-to-build-the-largest-wind-farm-in-this-country/</link>
		
		<dc:creator><![CDATA[Thảo Anh]]></dc:creator>
		<pubDate>Thu, 13 May 2021 14:33:06 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[America]]></category>
		<category><![CDATA[block]]></category>
		<category><![CDATA[build]]></category>
		<category><![CDATA[Construction investment projects]]></category>
		<category><![CDATA[Country]]></category>
		<category><![CDATA[Deb Haaland s Interior]]></category>
		<category><![CDATA[Delay]]></category>
		<category><![CDATA[East]]></category>
		<category><![CDATA[Electromagnetism]]></category>
		<category><![CDATA[Farm]]></category>
		<category><![CDATA[Federal]]></category>
		<category><![CDATA[Joe Biden]]></category>
		<category><![CDATA[Large scale]]></category>
		<category><![CDATA[largest]]></category>
		<category><![CDATA[New york times]]></category>
		<category><![CDATA[Offshore]]></category>
		<category><![CDATA[Power generation]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Seaside]]></category>
		<category><![CDATA[State of Massachusetts]]></category>
		<category><![CDATA[Turbines]]></category>
		<category><![CDATA[US Department of the Interior]]></category>
		<category><![CDATA[Virginia]]></category>
		<category><![CDATA[Wind]]></category>
		<category><![CDATA[Wind electricity]]></category>
		<guid isPermaLink="false">https://en.spress.net/america-through-the-project-to-build-the-largest-wind-farm-in-this-country/</guid>

					<description><![CDATA[The US on May 11 approved the project to build the country&#8217;s largest wind farm on the coast of Massachusetts in the East. Source: NYT After years of delays, the federal government approved the third offshore wind project in the US &#8211; and the biggest to date. The &#8220;Vineyard Wind&#8221; project consists of 84 giant [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The US on May 11 approved the project to build the country&#8217;s largest wind farm on the coast of Massachusetts in the East.</strong><br />
<span id="more-13814"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_12_207_38814304/4f61cb4ed50c3c52651d.jpg" width="625" height="353"> </p>
<p> <em> Source: NYT</em> After years of delays, the federal government approved the third offshore wind project in the US &#8211; and the biggest to date. The &#8220;Vineyard Wind&#8221; project consists of 84 giant turbines that will be built about 19 km from the Vineyard and Nantucket islands off the coast of Massachusetts. Vineyard Wind will have 800 Megawatts of generating capacity, outperforming Block Island Wind&#8217;s 30 MW and output from two test turbines installed in Virginia. According to the US Department of the Interior, this project, after going into operation in 2023, will generate enough energy to supply 400,000 homes and businesses. &#8220;Vineyard Wind&#8221; is a joint project between the energy company Avangrid Renewables and the Copenhagen Infrastructure Construction Company. It is expected that, when operating at full capacity, the Vineyard Wind farm has a total investment of 2 billion USD, can generate 800 MW of electricity / day. The Joe Biden government has a target by 2030 to generate 30 gigawatts of wind power. Interior Minister Deb Haaland evaluated the US licensing for this project as an important step to achieve the set goals of creating more jobs, combating climate change and strengthening the country. The US currently operates a number of small-scale wind farms off the coast of Virginia and Rhode islands.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13814</post-id>	</item>
		<item>
		<title>Amazon raised $ 1 billion in long-term bonds for environmental projects</title>
		<link>https://en.spress.net/amazon-raised-1-billion-in-long-term-bonds-for-environmental-projects/</link>
		
		<dc:creator><![CDATA[Lê Minh Hoàng]]></dc:creator>
		<pubDate>Wed, 12 May 2021 13:20:08 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Amazon]]></category>
		<category><![CDATA[ARLINGTON]]></category>
		<category><![CDATA[billion]]></category>
		<category><![CDATA[Blue]]></category>
		<category><![CDATA[Bonds]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Carbon]]></category>
		<category><![CDATA[Delivery]]></category>
		<category><![CDATA[environmental]]></category>
		<category><![CDATA[Environmental protection]]></category>
		<category><![CDATA[Friendly]]></category>
		<category><![CDATA[Long term]]></category>
		<category><![CDATA[longterm]]></category>
		<category><![CDATA[Mobilization]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[raised]]></category>
		<category><![CDATA[Recycled energy]]></category>
		<category><![CDATA[released]]></category>
		<category><![CDATA[Staff]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[Tram]]></category>
		<category><![CDATA[Transportation team]]></category>
		<category><![CDATA[Virginia]]></category>
		<category><![CDATA[Warm]]></category>
		<guid isPermaLink="false">https://en.spress.net/amazon-raised-1-billion-in-long-term-bonds-for-environmental-projects/</guid>

					<description><![CDATA[Amazon has issued bonds to raise $ 1 billion to invest in renewable energy, clean transportation, and green buildings. According to the Climate Bonds Initiative, green bond issuance globally has hit a record high of $ 270 billion by the end of 2020 and could reach $ 450 billion this year. The amount raised through [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Amazon has issued bonds to raise $ 1 billion to invest in renewable energy, clean transportation, and green buildings.</strong><br />
<span id="more-13366"></span> According to the Climate Bonds Initiative, green bond issuance globally has hit a record high of $ 270 billion by the end of 2020 and could reach $ 450 billion this year.</p>
<p> The amount raised through long-term bonds is only a small portion of the total debt that Amazon has issued, estimated at about 18.5 billion USD. The company says it can use these funds to invest in clean transportation and carbon-free buildings. Amazon&#8217;s projects will include purchasing electric vehicles for fleets, as well as other electric delivery vehicles. In addition, Amazon said it will also use electric heating and cooling systems powered by renewable energy at the company&#8217;s new headquarters in Arlington, Virginia. In one pledge, Amazon will cut all carbon emissions by 2040 and power all renewable energy operations by 2030. Amazon&#8217;s decision to raise funds for social projects comes when the company faced criticism around the labor issue. In addition to being charged with unsafe procedures and affecting employees&#8217; health, Amazon has also been criticized for illegally firing workers and forcing them not to unionize. However, Amazon has denied these allegations and said it has always supported employees&#8217; equal rights. According to Reuters According to Reuters</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13366</post-id>	</item>
		<item>
		<title>Miracle in the &#8220;super&#8221; project of Long Thanh Airport</title>
		<link>https://en.spress.net/miracle-in-the-super-project-of-long-thanh-airport/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Wed, 28 Apr 2021 19:09:15 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[airport]]></category>
		<category><![CDATA[Binh Son]]></category>
		<category><![CDATA[Clearance]]></category>
		<category><![CDATA[Current Status]]></category>
		<category><![CDATA[Do the work]]></category>
		<category><![CDATA[errors]]></category>
		<category><![CDATA[H Nhon Trach]]></category>
		<category><![CDATA[House ownership certificate]]></category>
		<category><![CDATA[Indemnify]]></category>
		<category><![CDATA[International Airport]]></category>
		<category><![CDATA[Le Van Tiep]]></category>
		<category><![CDATA[long]]></category>
		<category><![CDATA[Long Thanh Airport]]></category>
		<category><![CDATA[Measurement]]></category>
		<category><![CDATA[Miracle]]></category>
		<category><![CDATA[People s Committee of Long Thanh District]]></category>
		<category><![CDATA[Phuoc Zen]]></category>
		<category><![CDATA[Print as]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Special group]]></category>
		<category><![CDATA[Super]]></category>
		<category><![CDATA[Thanh]]></category>
		<category><![CDATA[Tran Van Huu]]></category>
		<category><![CDATA[Withdrawal]]></category>
		<guid isPermaLink="false">https://en.spress.net/miracle-in-the-super-project-of-long-thanh-airport/</guid>

					<description><![CDATA[In more than 2 years, nearly 4 thousand hectares of land out of a total of 5,000 hectares of land to be acquired to serve the construction of Long Thanh International Airport (Airport) project has been completed and cleared by the authorities. equal. A miracle has been attempted by Dong Nai in the &#8220;super&#8221; project [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>In more than 2 years, nearly 4 thousand hectares of land out of a total of 5,000 hectares of land to be acquired to serve the construction of Long Thanh International Airport (Airport) project has been completed and cleared by the authorities. equal. A miracle has been attempted by Dong Nai in the &#8220;super&#8221; project of Long Thanh Airport.</strong><br />
<span id="more-9921"></span> <strong> Lesson 1: Those who are &#8216;behind&#8217; the miracle</strong> </p>
<p> <em> <strong> The land data source with a &#8216;age&#8217; of nearly 20 years and a series of errors compared to the actual land use situation makes the compensation workers at the Long Thanh Airport project always face the risk. engine &#8216;do it wrong&#8217;.</strong> </em> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_27_423_38656938/fe57b9a999eb70b529fa.jpg" width="625" height="416"> <em> Officer working in compensation at Long Thanh Airport project measured to determine the level of compensation and support for a house of a household in Binh Son commune. Photo: Pham Tung</em> <strong> * &#8220;Thrilled&#8221; with each profile</strong> According to the land use right certificate (now collectively referred to as the pink book) issued to Mr. Tran Van Huu (living in Phuoc Thien commune, H. Nhon Trach) in 1999 by the People&#8217;s Committee of H. Long Thanh, in 1999, Mr. Tran Van Huu is a person. have use rights to 15 land plots with a total area of ​​more than 2.1 ha in Binh Son commune, Long Thanh district. However, in 2019, when measuring and updating current land use to implement the policy of compensation and support under the project of Land Acquisition, Compensation, Support and Resettlement at Long Thanh Airport, Counting Team No. 1, belonging to the Compensation Team of Long Thanh Airport project, discovered that 2 of the 15 land plots that have been issued pink books are not under the use right of Mr. Tran Van Huu. This is just one of many cases where the error between the pink book has been issued to the people and the actual land use situation in the project area of ​​Long Thanh Airport. Mr. Le Van Tiep, Acting Chairman of People&#8217;s Committee of Long Thanh District, said that if in normal projects, the work of compensation and site clearance is only about 14 steps, in the project of Long Thanh Airport, due to the If the land is old, it must take 20 steps to ensure accuracy and coherence. Mr. Bui The Su, a second officer of the Department of Natural Resources and Environment, to work at the Counting Team No. 1, under the Project Compensation Team of Long Thanh Airport, said that the Long Thanh Airport project had a very strong planning policy. After a long &#8220;waiting&#8221; period, data on land in the project area is not updated or supplemented, making errors in the origin and current land use occur very common. “From 2003 onwards, pink books issued to people were often written by hand instead of printed today. At the same time, the technology system for land data management was also outdated, so the overlapping and wrong allocation of land plots happened a lot ”- Mr. Bui The Su said. Seconded to support the implementation of land acquisition and site clearance for the Long Thanh Airport project from March 2019, over a year of working, Mr. Bui The Su said that there were errors in land data. Belt still occurs frequently in projects, however, large numbers such as in the Long Thanh Airport project are very few. &#8220;The reason, apart from outdated land data, is also due to the area of ​​land to be acquired, the number of affected households in the Long Thanh Airport project is also very large&#8221;. Many errors in land data put pressure on the compensation workers at the Long Thanh Airport project. In particular, the heaviest pressure is the risk of incorrectly confirming the current land use status, leading to the implementation of the policy of compensation and support for the wrong subjects. &#8220;Although I have done the verification and verification very carefully, each time I put a pen to sign to confirm the record, I still feel nervous&#8221; &#8211; Mr. Bui The Su shared. Both ensuring the progress of the compensation work and avoiding errors in the verification and confirmation of the file is the biggest challenge that the team of cadres and civil servants doing the compensation work at the Long Thanh Airport project. must face to face. Mr. Le Nguyen Hoang An, Head of Compensation Team of Long Thanh Airport project, said that for dossiers with a discrepancy between the pink book and current land use, the settlement usually takes a lot of time. Accordingly, the enumeration teams must coordinate with the Commune People&#8217;s Committee to accurately verify the current land use status. After that, the parties will invite the person whose name is on the pink book and the actual land user to work and negotiate the current land use status. When completed, the authorities must withdraw the issued pink book and decide to notify the land acquisition previously issued to issue a new decision on land acquisition in accordance with the current status. “In each case as above, the implementation process takes from 8 months to 1 year. Meanwhile, the pressure on site clearance progress to hand over land to investors is huge. Therefore, the compensation team has to work almost non-stop for more than 2 years ”- Mr. Le Nguyen Hoang An said. <strong> * Mobilizing people to consensus</strong> One of the biggest challenges facing the compensation workers at the Long Thanh Airport project is the discrepancy in land area on the pink book of the people and the actual situation. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_27_423_38656938/0c2546db66998fc7d688.jpg" width="625" height="416"> <em> Mr. Bui The Su (left) and Mr. Le Nguyen Hoai An exchange to process a claim file of Long Thanh Airport project. Photo: Pham Tung</em> The main reason for the difference in land area also comes from the &#8220;old&#8221; land data system in the project area of ​​Long Thanh Airport. The project area of ​​Long Thanh Airport has been planned for a long time, so the cadastral map is still a map that was made nearly 20 years ago. Specifically, the cadastral map in the planning area of ​​Long Thanh airport was made in 1996 according to the old aerial image measurement technology, the accuracy is not high. Meanwhile, according to the 2013 Land Law, the implementation of the policy of compensation and support when the State recovers land must be based on the actual area being used. Therefore, to carry out the compensation work, the entire land area of ​​the Long Thanh Airport project must be re-measured according to the current new technologies to ensure accuracy. Through the measurement process, the misalignment of the land area in the project area occurs a lot. &#8220;The number of dossiers for the difference in the area issued on the pink book compared to the current land use situation is up to hundreds of cases&#8221; &#8211; said Mr. Le Nguyen Hoai An. According to Mr. Le Nguyen Hoai An, if the land area on the pink book is equal to or larger than the actual land area, it is easy, but if it is smaller, it is extremely complicated. Because, people always base on the issued pink book to determine the area of ​​land under their use rights. Explaining and mobilizing people to accept &#8220;losing land&#8221; to correct the current land use situation is very arduous. “An inch of land. Therefore, in addition to the implementation of the compensation work, the people doing the compensation work in the project of Long Thanh Airport also have to also work on the civil service ”- Mr. An shared. Taking the evidence for the &#8220;double&#8221; task that the compensation workers have to perform in the Long Thanh Airport project, Mr. Le Nguyen Hoai An said that up to now, the Compensation Team of Long Thanh Airport project has recognized the most likely case of &#8220;losing&#8221; land is that of a household in Hamlet 7, Binh Son Commune when the actual land area decreases by 2 thousand m2 compared to the area granted on the pink book. Therefore, it took nearly a year with dozens of meetings between the authorities and the people. Just presenting the actual evidence after measurement, combined with propaganda and advocacy, the above households agree to complete the dossier. &#8220;Accepting to reduce 2 thousand m2 of land is accepting to lose hundreds of millions of money in compensation and support, so it is not easy for people to agree&#8221; &#8211; Mr. Le Nguyen Hoai An shared. Dong Nai has mobilized a contingent of cadres, civil servants and public employees up to 142 people to participate in the work of compensation and site clearance for the Long Thanh Airport project. Among these, there are 86 cadres, civil servants and public employees, who are seconded from agencies, departments, branches of the province and districts in the province; 7 cadres, civil servants and officials from the land fund development centers of districts and 49 cadres, civil servants and employees of the Hong Thanh Land Fund Development Center. <strong> Pham Tung</strong> <strong> Lesson 2:</strong> <strong> <em> Historical &#8220;immigration&#8221;</em> </strong></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9921</post-id>	</item>
		<item>
		<title>Germany reaffirmed its support for the Northern Flow project 2</title>
		<link>https://en.spress.net/germany-reaffirmed-its-support-for-the-northern-flow-project-2/</link>
		
		<dc:creator><![CDATA[Nguyễn Phương (Theo Tass)]]></dc:creator>
		<pubDate>Tue, 27 Apr 2021 20:45:10 +0000</pubDate>
				<category><![CDATA[World]]></category>
		<category><![CDATA[Berlin]]></category>
		<category><![CDATA[coal]]></category>
		<category><![CDATA[Denmark]]></category>
		<category><![CDATA[Flow]]></category>
		<category><![CDATA[Foreign Minister]]></category>
		<category><![CDATA[FORTUNA]]></category>
		<category><![CDATA[Gas]]></category>
		<category><![CDATA[German Government]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[Heiko Maas]]></category>
		<category><![CDATA[Importance]]></category>
		<category><![CDATA[Maas]]></category>
		<category><![CDATA[Nord Stream 2 AG]]></category>
		<category><![CDATA[Northern]]></category>
		<category><![CDATA[Northern currents 2]]></category>
		<category><![CDATA[Nuclear energy]]></category>
		<category><![CDATA[Of project]]></category>
		<category><![CDATA[Opinion]]></category>
		<category><![CDATA[Pipeline]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[reaffirmed]]></category>
		<category><![CDATA[Spread]]></category>
		<category><![CDATA[Support]]></category>
		<category><![CDATA[Territorial border]]></category>
		<category><![CDATA[Unfinished]]></category>
		<guid isPermaLink="false">https://en.spress.net/germany-reaffirmed-its-support-for-the-northern-flow-project-2/</guid>

					<description><![CDATA[German Foreign Minister Heiko Maas has continued to affirm the importance of the Northern Flow 2 project to Berlin. In an interview with Germany&#8217;s T-online website on April 26, German Foreign Minister Heiko Maas emphasized that, from the German point of view, the Russian Northern Flow 2 project plays an important role in terms of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>German Foreign Minister Heiko Maas has continued to affirm the importance of the Northern Flow 2 project to Berlin.</strong><br />
<span id="more-9582"></span> In an interview with Germany&#8217;s T-online website on April 26, German Foreign Minister Heiko Maas emphasized that, from the German point of view, the Russian Northern Flow 2 project plays an important role in terms of energy security. Europe in general and Germany in particular.</p>
<p> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_27_11_38656449/c63e97ddb79f5ec1078e.jpg" width="625" height="416"> <em> On April 27, Russia&#8217;s Akademic Chersky pipe-laying vessel began installing the unfinished pipeline in Danish territorial waters.</em> According to Foreign Minister Maas, it is impractical to consider the project to bring gas from Russia to Germany as a political lever of Russia. &#8220;Based on our previous assessment, the Northern Flow 2 project is purely related to energy policy. Therefore, Germany should not see this project as a move to influence the Russia ”- German Foreign Minister said. German officials have repeatedly asserted that they consider completion of the Northern Flow 2 project construction as essential. Berlin considers this project an economic one. However, the German government maintains that Ukraine should play the role of transshipment of gas from Russia to Europe, after the Northern Flow 2 pipeline becomes operational. Germany is now abandoning coal and nuclear power to convert to renewable sources that do not pose a problem for its industry, which needs more gas. In a related development, the project operator Nord Stream 2 AG announced on April 27 that Russia&#8217;s Akademic Chersky pipe-laying vessel began to install the unfinished pipeline in Danish territorial waters. &#8220;After conducting sea trials, the Akademic Chersky has begun work on the installation of the pipeline in the Danish exclusive economic zone from today,&#8221; said Nord Stream 2 AG on Tuesday. Meanwhile, Fortuna &#8211; another Russian pipe-laying vessel also continues to carry out the construction of the project in Danish territorial waters under license. Up to now, the Northern Flow 2 project is 95% complete, only the final 121km of the pipeline have to be installed.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9582</post-id>	</item>
		<item>
		<title>Starting the school without rubbish school project at University of Economics, Ho Chi Minh City</title>
		<link>https://en.spress.net/starting-the-school-without-rubbish-school-project-at-university-of-economics-ho-chi-minh-city/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Mon, 26 Apr 2021 14:55:09 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Bui Quang Hung]]></category>
		<category><![CDATA[Chi]]></category>
		<category><![CDATA[City]]></category>
		<category><![CDATA[City University of Economics]]></category>
		<category><![CDATA[Differential]]></category>
		<category><![CDATA[Economics]]></category>
		<category><![CDATA[Garbage]]></category>
		<category><![CDATA[green]]></category>
		<category><![CDATA[Head from]]></category>
		<category><![CDATA[Ho Chi Minh]]></category>
		<category><![CDATA[Ho Chi Minh City]]></category>
		<category><![CDATA[Ho Chi Minh city University of Economy]]></category>
		<category><![CDATA[Incubation]]></category>
		<category><![CDATA[Minh]]></category>
		<category><![CDATA[Nguyen Van Linh]]></category>
		<category><![CDATA[Of project]]></category>
		<category><![CDATA[Organic fertilizers]]></category>
		<category><![CDATA[Paradigm]]></category>
		<category><![CDATA[Plastic]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Recycling]]></category>
		<category><![CDATA[rubbish]]></category>
		<category><![CDATA[School]]></category>
		<category><![CDATA[Schools]]></category>
		<category><![CDATA[Starting]]></category>
		<category><![CDATA[Starting up]]></category>
		<category><![CDATA[Trash]]></category>
		<category><![CDATA[UEH]]></category>
		<category><![CDATA[University]]></category>
		<category><![CDATA[VZWA]]></category>
		<guid isPermaLink="false">https://en.spress.net/starting-the-school-without-rubbish-school-project-at-university-of-economics-ho-chi-minh-city/</guid>

					<description><![CDATA[University of Economics Ho Chi Minh City (UEH) in collaboration with the Vietnam Zero Waste Alliance (VZWA) has officially launched the Zero Waste Campus Project. UEH students gather and classify garbage before carrying it to destruction. The main goal of the project is to build a model of school without rubbish, apply a zero-garbage solution [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>University of Economics Ho Chi Minh City (UEH) in collaboration with the Vietnam Zero Waste Alliance (VZWA) has officially launched the Zero Waste Campus Project.</strong><br />
<span id="more-9034"></span> <img decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_181_38601271/da56151c305ed900804f.jpg" width="625" height="351"> </p>
<p> <em> UEH students gather and classify garbage before carrying it to destruction.</em> The main goal of the project is to build a model of school without rubbish, apply a zero-garbage solution in school waste management, and prioritize the refusal &#8211; minimizing &#8211; reuse of single-use plastic products. The product is not required, or cannot be composted. The program will be implemented in the first phase from April to the end of October 2021 at UEH Campus &#8211; Nguyen Van Linh. With the concept &#8220;just recycling is not enough&#8221;, while recycling plastic is also causing many consequences for human health and the environment, the Vietnam Zero Waste Alliance (VZWA) * for that &#8220;Practice without rubbish&#8221; is the most sustainable solution and create a circular economy for society. In particular, schools play an important role in raising awareness of young people about environmental protection. This is the premise for the idea of ​​implementing UEH &#8211; Zero Waste Campus project. The project is part of a strategy to build a No Spam model in the community, as a pilot at the University of Economics, HCMC. Ho Chi Minh City &#8211; Nguyen Van Linh campus with cooperation, consultancy and technical support from the Vietnam Spam Free Alliance. The specific objective of the project is that at least 70% of the total post-project surveyed people understand what it means to be No Spam; the amount of general waste going to landfills decreased by about 40%; persistent waste (including disposable plastic, unnecessary products, organic composting) reduced by about 30%; Organic waste is processed to become compost, recycled waste is collected and taken to the recycling facility; Reducing the use of unnecessary, disposable or non-compostable plastic products. In order to realize action goals, City University of Economics. Ho Chi Minh City (UEH) and the Vietnam Spam Free Alliance signed a cooperation agreement (MOU). The signed content of the two parties aims to jointly design, consult and plan the UEH &#8211; Zero Waste Campus project, including the development of measures to manage and reduce waste in the school and campaigns. improve waste awareness, adopt a No-Garbage lifestyle and turn waste into a resource. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_181_38601271/2d4ce506c044291a7055.jpg" width="625" height="351"> <em> UEH students in class</em> Mr. Bui Quang Hung &#8211; UEH Vice Rector shared: “Towards the model of“ Green University ”, HCMC University of Economics. Ho Chi Minh is actively cooperating with the Vietnam No Trash Alliance in activities of managing, minimizing and turning waste into resources; communicating and implementing a roadmap to build the No-Garbage School. The project expects all staff, students and stakeholders at the University to increase awareness of waste issues, and understand and practice the &#8220;No Spam&#8221; lifestyle. Accordingly, the Vietnam Non-Garbage Alliance initially surveyed students&#8217; perceptions, assessed the current situation of waste at UEH campus &#8211; Nguyen Van Linh and will continue to coordinate with the school to implement specific activities. project roadmap. Ms. Quach Thi Xuan, Coordinator of the Vietnam Spam Free Alliance said: “The Zero Waste Campus project marks a new turning point in the partnership between UEH and the Vietnam Spam Free Alliance. This is a &#8220;long-term&#8221; program with special meaning to raise awareness of environmental protection with practical actions &#8220;. The project helps to limit plastic waste, protects the health of students and staff from the harmful effects of plastic waste, and at the same time contributes to building UEH &#8211; Nguyen Van Linh Campus in the direction of &#8220;Green University&#8221; &#8211; Green School , Environmental friendliness.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9034</post-id>	</item>
		<item>
		<title>The seven prestigious schools that have good strength but missed the 211 Project, each of them is very good for employment</title>
		<link>https://en.spress.net/the-seven-prestigious-schools-that-have-good-strength-but-missed-the-211-project-each-of-them-is-very-good-for-employment/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 23:15:07 +0000</pubDate>
				<category><![CDATA[World]]></category>
		<category><![CDATA[employment]]></category>
		<category><![CDATA[good]]></category>
		<category><![CDATA[Missed]]></category>
		<category><![CDATA[prestigious]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Schools]]></category>
		<category><![CDATA[strength]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-seven-prestigious-schools-that-have-good-strength-but-missed-the-211-project-each-of-them-is-very-good-for-employment/</guid>

					<description><![CDATA[Although key construction projects such as &#8220;211 Project&#8221; and &#8220;985 Project&#8221; are now being coordinated as &#8220;Double First-Class&#8221; construction. However, people still habitually use &#8220;211&#8221; and &#8220;985&#8221; to evaluate schools, and their impression is deeply rooted. However, there are also a large number of strong universities that have not been able to enter the 211 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Although key construction projects such as &#8220;211 Project&#8221; and &#8220;985 Project&#8221; are now being coordinated as &#8220;Double First-Class&#8221; construction. However, people still habitually use &#8220;211&#8221; and &#8220;985&#8221; to evaluate schools, and their impression is deeply rooted. However, there are also a large number of strong universities that have not been able to enter the 211 project. For example, the University of Chinese Academy of Sciences, Southern University of Science and Technology, University of Chinese Academy of Social Sciences, Shanghai University of Science and Technology, etc., are established late; the School of Foreign Affairs and International Relations is too small; there are also some established key universities and well-known universities in the industry. , For various reasons, finally missed the opportunity of this key construction. Today, I will give you a list of seven well-known universities that regret to miss the 211 Project.</strong></p>
<p><span id="more-8044"></span> Dongbei University of Finance and Economics</p>
<p>When many Yunnan candidates apply for the school area voluntarily, they exclude the three provinces of Northeast China at the first time. Then you may have missed such a beautiful school. Dongbei University of Finance and Economics is located in the city center of Dalian, which can be said to be in a prime location. , You can go to any place in Dalian as fast as you can by bus here. This is a beautiful coastal city.</p>
<p>The school is not 985, not 211, not double first-class, but the college entrance examination score is no less than the average 211. Colleges and universities focusing on finance and economics, it goes without saying that the strongest subject is economics and management. In the fourth round of subject evaluation ,<strong> Applied economics is assessed as A, which is at the same level as the University of International Business and Economics and Shanghai University of Finance and Economics.Statistics and business management assessment is A-, the same level as Shanghai Finance and China Finance</strong> , It can be seen that Dongbei University of Finance and Economics has excellent discipline strength.</p>
<p>The school has enrolled students in one book and national special projects.<strong> In recent years, Chinese-foreign cooperative education programs have been added, which undoubtedly gives middle school students a chance to attend a good school.</strong> As long as the general direction is good when applying for volunteers, in such a school with a strong scope of economics and management, you don&#8217;t have to pay too much attention to the professional subdivision during the undergraduate period, and you will learn the same.</p>
<p><strong> Diversification of employment</strong> , Public institutions, government units, state-owned enterprises, foreign companies, financial securities, Internet companies, banks, not only foreign trade, teaching and research in the field of international trade, government department management, business work in trade institutions, etc. , Specifically, you can engage in customs declaration, inspection declaration, logistics (money loan) and other tasks. Judging from the employment situation over the years, there are also some graduate students majoring in international trade in some schools who are employed in institutions such as management consulting and investment banking, and the employment prospects are broad.</p>
<p><img fifu-featured="1" decoding="async" src="https://p5.itc.cn/images01/20210423/7fa3889c054344a8931fadefb6f8a0b7.jpeg" max-width="600"></p>
<p>Army Medical University</p>
<p><strong> Chinese People&#8217;s Liberation Army Army Medical University</strong> Located in the beautiful landscape city of China—Chongqing, a municipality directly under the Central Government, it is a military medical university with a glorious history and distinctive military characteristics. It is one of the first batch of national key universities after the founding of the People’s Republic of China, and one of the key construction institutions of the military’s &#8220;2110 Project&#8221;. One, the deputy army level establishment.One of the famous &#8220;Four Major Military Medical Universities&#8221;</p>
<p>In 2017, based on the Third Military Medical University, the Army Military Medical University integrated the Bethune Medical Officer School, the Military Medical Training Brigade of the Army Urumqi Comprehensive Training Base of the Western Theater Command and the 8th Hospital of the Tibet Military Region to form a school structure in Chongqing, Shijiazhuang, Hutubi, and Xigaze. , The headquarters of the school was set in Chongqing, and it was renamed the Army Military Medical University, and the name of the Third Military Medical University was retained.</p>
<p> The Third Military Medical University admits military candidates in advance, and recruits non-military candidates in batches. In recent years, it only recruits science students. Admitted by one line, but the Army Military Medical University’s scores for science are all above 600, so the score requirements of this school are still relatively high. If you can enter this school, as long as you are not a lazy person, it is easy to find a job.</p>
<p><img decoding="async" src="https://p6.itc.cn/images01/20210423/e31c173c9eae47eabb2fbe61393c26c9.jpeg" max-width="600"></p>
<p>Capital Normal University</p>
<p>Secondly, Capital Normal University has always received strong support from Beijing&#8217;s finances. The amount of investment in the school is comparable to that of the National People&#8217;s Congress of China. After the Beijing government strongly supported Beijing University of Technology to enter the 211 nationwide, the Beijing Normal University became the university with the largest investment by the Beijing government and strived to become the next 211. Unfortunately, 211 was cancelled and it could win double first-class universities.</p>
<p>Thirdly, Beijing Normal University is located in the West Third Ring Road of Beijing, with a superior geographical location, strong teaching staff and a broad job market. It is a university with a high sex ratio. At last,<strong> Capital Normal University is one of the top ten famous normal universities in China. The power of development now has caught up with or surpassed Shaanxi Normal University, South China Normal University and Hunan Normal University, second only to Central China Normal University.</strong> However, the special policy support gives Capital Normal University more advantages than Central China Normal University. With superior geographical conditions, strong faculty, strong support from the finance and economics government, and a good learning atmosphere, should we only consider those who have enough scores? This year, the scores have risen year by year, and girls are especially supported to read.</p>
<p><img decoding="async" src="https://p8.itc.cn/images01/20210423/458cb81f7a0f46f0a6cb19f47350e0ef.jpeg" max-width="600"></p>
<p>East China University of Political Science and Law</p>
<p>In Shanghai, law Huazheng is the boss. Although it is not 985 or 211, this does not seem to affect Huazheng&#8217;s position in the Shanghai legal circle. Huazheng is the boss in East China. Whether it is public security, legal affairs, or Huazheng, both occupy a dominant position. The school is a key university in Shanghai with the main disciplines of law and the disciplines of economics, management, literature, and science. It is known as &#8220;<strong> The Oriental Pearl of Legal Education</strong> &#8220;As a veteran college, whether it is teachers or dormitories, the usual management is somewhat dominant.</p>
<p>In the fourth round of subject evaluation,<strong> Jurisprudence is assessed as A, at the same level as Tsinghua University and Peking University</strong> It can be seen that law is not built. There are 9 classes in the Law School alone. In terms of the total number of law practitioners, only two or three classes like Xiamen University are not in the same order of magnitude, and the alumni accumulated over so many years are relatively concentrated. In the legal industry, there is a lot of room for alumni resources to explore whether it is for professional exchanges or providing some help within their capacity.</p>
<p><img decoding="async" src="https://p8.itc.cn/images01/20210423/1736324b7ac4497db1653d2e94876efa.jpeg" max-width="600"></p>
<p>Jiangsu University</p>
<p><strong> Jiangsu University</strong> It is a comprehensive university focusing on engineering. Although it does not have a 211 title, it has a good atmosphere and is suitable for research. Jiangsu University is located in Zhenjiang City, Jiangsu Province, a national historical and cultural city. It was approved by the Ministry of Education in August 2001 and was approved by the former Jiangsu A key comprehensive research university with engineering as its characteristics, formed by the merger of the University of Science and Technology, Zhenjiang Medical College, and Zhenjiang Teachers College, is the first batch of high-level universities in Jiangsu Province to build universities jointly built by the People&#8217;s Government of Jiangsu Province and the Ministry of Agriculture and Rural Affairs.</p>
<p>The school is still good in engineering, especially in machinery manufacturing and automation, fluid machinery and engineering, agricultural electrification and automation, agricultural engineering, mechanical engineering and other majors that rank first in the country. Because of their strong majors, employment The situation is better, and you can basically find a job. It is more suitable for boys to apply for the exam. In recent years, the admission score has been on the rise.</p>
<p>Chinese People&#8217;s Public Security University</p>
<p><strong> Chinese People&#8217;s Public Security University</strong> , Referred to as Public Security University, is located in Beijing. It is a regular college directly under the Ministry of Public Security and Senior Police Academy of the Ministry of Public Security, a national &#8220;double first-rate&#8221; world-class discipline construction university, and a pilot university for the &#8220;Excellent Legal Talent Education and Training Program&#8221;. The People’s Public Security University of China was founded in July 1948 as a training course for North China security cadres organized by the Central Committee of the Communist Party of China in Jianping County (now Pingshan County), the liberated area of ​​Hebei. After going through the development stages of North China Public Security Cadre School, Central Public Security Cadre School, Central People’s Public Security Academy, Central Political and Law Cadre School, and the restoration of the Central People’s Public Security Academy.</p>
<p>As the highest school in the police industry in China, the OUHK carries the future of the police industry in China, and it also entrusts the dream of no mathematics police.<strong> The school is directly under the Ministry of Public Security and has a very high employment rate</strong> , Most public security jobs are employed. If you don’t like this profession, it is not recommended to apply for this school. The study pressure is small, and the exam is easy. Affected by the policy is relatively large. Divided into two campuses, one is in Tuanhe and the other is in Muxidi, the score exceeds one level, which belongs to the early approval and is an opportunity to apply for the exam. After all, a good study is not necessarily a good health. However, there are advantages and disadvantages. Because it is a public security college with strict management and hard daily training, it is not suitable for future academic students. Don&#8217;t think that you will try the attitude when you approve admissions in advance. Candidates who consider work after graduation are very suitable. , Employment is not a problem.</p>
<p><img decoding="async" src="https://p8.itc.cn/images01/20210423/0f8ad1c996f24762844292d87c6cc16b.jpeg" max-width="600"></p>
<p>Southwest University of Political Science and Law</p>
<p><strong> Southwest University of Political Science and Law</strong> , Abbreviated as &#8220;Xizheng&#8221;, is located in Chongqing. It is a university jointly established by the Ministry of Education and the Chongqing Municipal People’s Government. It is the earliest political and legal institution of higher learning established in New China. It is the first batch of national key universities after the reform and opening up. It is known as the new China’s law education &#8220;Southwest Associated University&#8221;. One of the famous &#8220;five academies and four departments&#8221; of law. Xizheng is the Whampoa Military Academy in the field of law, and law is undoubtedly the most powerful. Xizheng has six law schools. About half of the students in the school are studying law. This has caused a phenomenon. The school is a school that focuses on liberal arts. Most of the majors in liberal arts are to be memorized, so you can often see that many people in the university are studying anytime and anywhere, including the library, which is full at all times. If you are a person who does not like to learn People, you will be affected by this atmosphere when you come here.</p>
<p>Xizheng&#8217;s Investigation (Public Security) major is approved for undergraduate recruitment in advance (cannot participate in the public security exam). The school does not separately organize interviews and physical fitness tests. It is relatively easy to refer to the physical examination results of the college entrance examination. The school’s ace law majors are enrolled in one batch, and the Sino-foreign cooperation batches have enrollment. It should be noted that the Chinese-foreign cooperatively-run law majors have requirements for English scores. In principle, the scores of English majors in foreign languages ​​must not be less than 100 points (full score is 150 points) ).</p>
<p><img decoding="async" src="https://p1.itc.cn/images01/20210423/46be99208db24347a4538972cee6160b.jpeg" max-width="600"></p>
<p>The school released a report on the employment quality of graduates: the employment rate was 92%, and the number of employed people in the western region totaled 3,454, accounting for 60.07%, which was an increase from the previous year. Law firms and civil servants are still hot spots in the employment choices of graduates. Compared with the previous year, there was a significant increase. There were 814 people in law firms, accounting for 13.01% of the total employment; 761 people in party and government agencies, accounting for 12.19%.</p>
<p>Comprehensively organized from the network</p>
<p>The copyright belongs to the original author, if there is any infringement, please contact us to delete</p>
<p>Liu Yi, Communications Evaluation Expert of the Degree Center of the Ministry of Education, Sohu Education&#8217;s most trusted college entrance examination volunteer planner, China Education Online College Entrance Examination Volunteer Filling Outstanding Consultant, Vice President of China College Entrance Examination Planning Industry Alliance, President of Northeast College Entrance Examination Planning Industry Alliance, Professor of economics at provincial key universities, doctor of management, career planning of more than 70 key domestic high schools, college entrance examination volunteers, and study abroad guidance experts. Editor-in-chief of &#8220;Gao Kao Volunteer Filling Guide and Big Data&#8221;, &#8220;High School Student Career Planning&#8221; and other series, providing advanced education concepts, software and books, sincerely recruiting partners from various provinces in China, please follow the WeChat public platform &#8220;liuyizixun&#8221; or WeChat account for details &#8220;Liuyizhulik&#8221;.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">8044</post-id>	</item>
		<item>
		<title>Progress of Poly&#8217;s Future City Project &#124; Grow to the sun and grow strong!</title>
		<link>https://en.spress.net/progress-of-polys-future-city-project-grow-to-the-sun-and-grow-strong/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 16:43:07 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[City]]></category>
		<category><![CDATA[future]]></category>
		<category><![CDATA[Grow]]></category>
		<category><![CDATA[Polys]]></category>
		<category><![CDATA[Progress]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[strong]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[The Sun]]></category>
		<guid isPermaLink="false">https://en.spress.net/progress-of-polys-future-city-project-grow-to-the-sun-and-grow-strong/</guid>

					<description><![CDATA[©Qianku Network Project progress report in April Sunflowers, born to the sun, are always actively facing life! We will turn our love of life into fine craftsmanship, and pour it into this brick and tile. The new home you look forward to is becoming a reality step by step! 〖Clouds〗 Building No. 13: The main [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://p8.itc.cn/q_70/images03/20210423/b8685b605e5c406c8515e8e254c0ad14.png"></p>
<p>©Qianku Network</p>
<p>Project progress report in April</p>
<p>Sunflowers, born to the sun, are always actively facing life! We will turn our love of life into fine craftsmanship, and pour it into this brick and tile. The new home you look forward to is becoming a reality step by step!</p>
<p>〖Clouds〗</p>
<p><img decoding="async" src="https://p6.itc.cn/q_70/images03/20210423/668251dcb09a4c2aaeeae0347efeb384.png"></p>
<p>Building No. 13: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p9.itc.cn/q_70/images03/20210423/5a89cd03ff694f42920f7d53a36f5582.png"> </p>
<p> Building 14: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p2.itc.cn/q_70/images03/20210423/e3328dac4f784842966d5c65cc83d3eb.png"></p>
<p>Building 15: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p0.itc.cn/q_70/images03/20210423/c8503be6ed35405fb9f39c97659414fe.png"></p>
<p>Building No. 16: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p4.itc.cn/q_70/images03/20210423/1acae863ad8f42c49262376c14a859b9.png"></p>
<p>Building 17: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p8.itc.cn/q_70/images03/20210423/d36a8fbc486a4095ac36dd1fb2e16b38.png"></p>
<p>Building 18: the main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p0.itc.cn/q_70/images03/20210423/852c40b872294b0b8e0892cfce8ffa32.png"></p>
<p>Building 19: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p7.itc.cn/q_70/images03/20210423/a43f2d7b6bd44aa29ba8eeb792cb3a2d.png"></p>
<p>Building 20: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p1.itc.cn/q_70/images03/20210423/399a2e2f61fd45c696c978687e851bb5.png"></p>
<p>Building 21: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p3.itc.cn/q_70/images03/20210423/7e962eb6620043d19694cc964ccdfba2.png"></p>
<p>Building 22: the main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p9.itc.cn/q_70/images03/20210423/fa6dc664fe6d41aaaa42c7174c015125.png"></p>
<p>Building 23: The main structure and railings are all completed;</p>
<p><img decoding="async" src="https://p4.itc.cn/q_70/images03/20210423/ae01bdda28f349858793bbb311121f26.png"></p>
<p>Building 24: The main structure and railings are all completed;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7831</post-id>	</item>
		<item>
		<title>The greatest project in ancient China was not the Great Wall, but Dujiangyan, which was characterized by non-dam diversion.</title>
		<link>https://en.spress.net/the-greatest-project-in-ancient-china-was-not-the-great-wall-but-dujiangyan-which-was-characterized-by-non-dam-diversion/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 12:20:07 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Ancient]]></category>
		<category><![CDATA[characterized]]></category>
		<category><![CDATA[China]]></category>
		<category><![CDATA[diversion]]></category>
		<category><![CDATA[Dujiangyan]]></category>
		<category><![CDATA[Great]]></category>
		<category><![CDATA[greatest]]></category>
		<category><![CDATA[nondam]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[wall]]></category>
		<guid isPermaLink="false">https://en.spress.net/the-greatest-project-in-ancient-china-was-not-the-great-wall-but-dujiangyan-which-was-characterized-by-non-dam-diversion/</guid>

					<description><![CDATA[After reading Yu Qiuyu’s prose &#8220;Dujiangyan&#8221;, Yu Qiuyu commented: &#8220;I think the most exciting project in Chinese history is not the Great Wall, but Dujiangyan.&#8221; And moved, this time I went to Northwest Sichuan and came to Dujiangyan to see this. It is a famous water conservancy project in ancient times. Dujiangyan was built in [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>After reading Yu Qiuyu’s prose &#8220;Dujiangyan&#8221;, Yu Qiuyu commented: &#8220;I think the most exciting project in Chinese history is not the Great Wall, but Dujiangyan.&#8221; And moved, this time I went to Northwest Sichuan and came to Dujiangyan to see this. It is a famous water conservancy project in ancient times. Dujiangyan was built in the third century BC. It is a large-scale water conservancy project built by Li Bing, the governor of Shu County in the Warring States Period of China, and his disciples. Water conservancy project. After more than 2,000 years, it still exerts tremendous benefits.</strong><br />
<span id="more-7682"></span> <img fifu-featured="1" decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069374/1000"> </p>
<p> The Chengdu Plain, known as the &#8220;land of abundance&#8221;, was a place with severe floods and droughts in ancient times. The reason for this situation is formed by the &#8220;bad&#8221; natural conditions of the Minjiang River and the Chengdu Plain. The Minjiang River flows out from the Minshan Mountains and flows southward through the west side of the Chengdu Plain. For the entire Chengdu Plain, this is an out-and-out suspended river above the ground, and it hangs very strongly. The Minjiang River slopes to the southeast from Yulei Mountain at the exit of the mountain. The distance from Dujiangyan to Chengdu is only 50 kilometers, but the drop is as high as 273 meters. Whenever the Minjiang River is flooded, the Chengdu Plain becomes a vast ocean; when there is a drought, the land is red, and there is no harvest. The Minjiang River floods have long harmed Xichuan, swallowed fertile land and disturbed the people&#8217;s livelihood. It has become a major obstacle to the survival and development of the ancient Shu Kingdom. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069371/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069370/1000"> At the same time, the establishment of the Dujiangyan Water Conservancy Project has its specific historical roots. During the Warring States Period, wars continued and the swordsmen rose. The people who suffered from the wars longed for China&#8217;s reunification as soon as possible. At that time, the State of Qin, which was engaged in the reform of Shang Yang, became more and more powerful due to the reform, and people of knowledge came out in large numbers. &#8220;If you get Shu, you will get Chu, and if Chu loses, you will get the world together.&#8221; Under this historical background, King Qin Zhao appointed Li Bing, who knew astronomy, geography, and lived in Min&#8217;e, as the governor of Shu Kingdom at the end of the Warring States Period. After Li Bing took office, he first made up his mind to eradicate the Minjiang flood, develop agriculture in western Sichuan, benefit the Chengdu Plain, and create an economic foundation for the Qin State to unify China. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069378/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069373/1000"> In fact, two or three hundred years ago before the completion of the Dujiangyan Water Conservancy Project, King Du Yu of the ancient Shu Kingdom followed the advice of people of wisdom and excavated an artificial river at the outflow of the Minjiang River to drain the water from the Minjiang River into the Tuojiang River and partially eliminate the water damage. Li Bing’s creative Dujiangyan project is the main achievement in the eradication of this flood. This magnificent project has been benefiting the water and soil of the Chengdu Plain for more than 2000 years, and it has given the people here a foundation for living and working in peace and contentment. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069379/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069376/1000"> Dujiangyan is a grand water conservancy project featuring the wisdom of the ancients and featuring diversion without a dam. At that time, the crude production tools made full use of the characteristics of water flow and terrain to create an epic great project. The most important part of the Dujiangyan Water Conservancy Project is the Dujiangyan Canal Head Project, which is a key facility in the Dujiangyan Irrigation System. The ancients skillfully used and excavated the three major projects, namely the Yuzui diversion dike, the Baopingkou water diversion project and the spillway of Feishayan. Through water diversion, flow limitation, sand discharge, and flood discharge, the floods of the Minjiang River are effectively controlled, and the Chengdu Plain has truly become the &#8220;land of abundance&#8221;, a land of fish and rice. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069386/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069377/1000"> On the surface, the Great Wall of China is a magnificent and magnificent project. With the tenacious willpower of the Chinese nation, it has left a proud and magnificent project for our living planet. But the great Dujiangyan project is even more admirable in terms of benefiting future generations for millennia and tens of thousands of years. What&#8217;s more, the Dujiangyan water conservancy project is decades before Qin Shihuang ordered the construction of the Great Wall. With Dujiangyan, the Sichuan Plain has become a livable place in the rear of China. Whenever our nation encounters a major disaster, the land of abundance always provides a steady stream of shelter and nourish the Chinese descendants. It is no exaggeration to say that it has permanently irrigated the Chinese nation, giving the rise of China a guarantee from the rear. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069383/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069387/1000"> Nowadays, water conservancy projects mainly focus on the establishment of dams to reduce flow and divert floods, and at the same time provide a steady stream of clean resources for hydropower. Therefore, as an ordinary tourist coming to Dujiangyan, you may not understand the mystery of this project. It is recommended to ask a tour guide. If there are few people, it is recommended to listen to it, so that you can clearly understand the wisdom of this dam-free water diversion project and conquer the creativity of the ancients. Talent. <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069375/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069369/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069382/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069381/1000"> <img decoding="async" class="content-picture" src="https://inews.gtimg.com/newsapp_bt/0/13430069372/1000"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7682</post-id>	</item>
		<item>
		<title>Short film project CJ season 3 is launched to seek young movie talent</title>
		<link>https://en.spress.net/short-film-project-cj-season-3-is-launched-to-seek-young-movie-talent/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 03:26:12 +0000</pubDate>
				<category><![CDATA[Cinema & TV]]></category>
		<category><![CDATA[CJ Cultural Foundation]]></category>
		<category><![CDATA[Directors]]></category>
		<category><![CDATA[Duong Dieu Linh]]></category>
		<category><![CDATA[Film]]></category>
		<category><![CDATA[Film festival]]></category>
		<category><![CDATA[Illy]]></category>
		<category><![CDATA[Launched]]></category>
		<category><![CDATA[Movie]]></category>
		<category><![CDATA[Nguyen Hoang Diep]]></category>
		<category><![CDATA[Orizzonti Short]]></category>
		<category><![CDATA[Pham Hoang Minh Thy]]></category>
		<category><![CDATA[Pham Ngoc Lan]]></category>
		<category><![CDATA[Pham Quoc Dung]]></category>
		<category><![CDATA[Pham Thien An]]></category>
		<category><![CDATA[Phan Dang Di]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[season]]></category>
		<category><![CDATA[seek]]></category>
		<category><![CDATA[short]]></category>
		<category><![CDATA[Short film]]></category>
		<category><![CDATA[Talent]]></category>
		<category><![CDATA[Tran Nhat Hoang]]></category>
		<category><![CDATA[Tran Thanh Huy]]></category>
		<category><![CDATA[Tran Thi Bich Ngoc]]></category>
		<category><![CDATA[Trinh Dinh Le Minh]]></category>
		<category><![CDATA[Vu Minh Nghia]]></category>
		<category><![CDATA[Wide angle]]></category>
		<category><![CDATA[Young]]></category>
		<guid isPermaLink="false">https://en.spress.net/short-film-project-cj-season-3-is-launched-to-seek-young-movie-talent/</guid>

					<description><![CDATA[After the success of the previous two seasons, season 3 of the &#8216;short film project CJ&#8217; season 3 by CJ Cultural Foundation and CJ CGV Vietnam (CGV) officially returned from April 2021 to 1/2022. The program aims to find and nurture young film talents, sponsor a movie-making budget of up to 1.5 billion VND and [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>After the success of the previous two seasons, season 3 of the &#8216;short film project CJ&#8217; season 3 by CJ Cultural Foundation and CJ CGV Vietnam (CGV) officially returned from April 2021 to 1/2022. The program aims to find and nurture young film talents, sponsor a movie-making budget of up to 1.5 billion VND and support funding to bring completed works to the prestigious International Film Festival .</strong><br />
<span id="more-7352"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_523_38612912/74d65e1d785f9101c84e.jpg" width="625" height="416"> </p>
<p> <em> Appraisal Council and representatives of CGV Vietnam.</em> Launched in 2018, after two competitive seasons, the CJ Short Film Project has received more than 500 entries sent back with many genres, diverse themes and deep, bold stories. humanistic about the slices of life. <strong> Success beyond expectations</strong> The complete short films have been selected to screen and compete at more than 50 large and small film festivals around the world. In particular, the short film &#8220;A Good Land&#8221; directed by Pham Ngoc Lan (season 1) was selected for the competition at the Berlin Film Festival 2019 (Germany), director Pham Thien An&#8217;s &#8220;Be Awake and Ready&#8221; (season 1) excellent award-winning Illy at Director&#8217;s Week in the framework of Cannes Film Festival 2019 (France) and the movie &#8220;Clouds But Not Rain&#8221; directed by Vu Minh Nghia and Pham Hoang Minh Thy (season 2) reached the top 12 short films contending for the Orizzonti Short category at Venice 2020 Film Festival. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_523_38612912/7e85294e0f0ce652bf1d.jpg" width="625" height="417"> <em> Mr. Tran Nhat Hoang, Deputy Director of Department of International Cooperation, Ministry of Culture, Sports and Tourism spoke.</em> In addition, the short films &#8220;Sweet, Salty&#8221; directed by Duong Dieu Linh (season 1) and &#8220;Binh&#8221; by director Pham Quoc Dung (season 2) had a World Premiere (World Premiere) and competition. Short film category Wide Angle at Busan International Film Festival (Korea) in 2019 and 2020. At the press conference to introduce the CJ Short Film Project 2021, Mr. Ko Jae Soo &#8211; General Director of CJ CGV Vietnam enthusiastically shared: <em> “The unexpected successes of the above short films in general and the efforts and creativity of young Vietnamese movie talents in particular have empowered the programmers who we are working on in the fifth year project. 3. With the attention and direction from the Ministry of Culture, Sports and Tourism, the Cinema Department, the Department of International Cooperation and the enthusiastic support of prestigious filmmakers of Vietnamese cinema, we hope will continue to implement the contest to become an annual playground for young talents to hit the movie lane. ”</em> Mr. Tran Nhat Hoang, Deputy Director of International Cooperation Department, Ministry of Culture, Sports and Tourism said: <em> “The CJ short film project, carried out by CGV Vietnam in collaboration with CJ Cultural Foundation, Korea, is back at a time when the film industry is in need of restart, thousands of young people in the filmmaking industry are in need of a playground. to train my talent and also write my dream film. That is enough to show the great significance of the CJ Short Film Project as well as the fervent expectations from Saturday art enthusiasts for this competition.</em> &#8221; <strong> Experienced evaluation board</strong> In addition to the familiar faces such as director Phan Dang Di, director Nguyen Hoang Diep and director Trinh Dinh Le Minh, this year&#8217;s Appraisal Council also has the participation of producer Tran Thi Bich Ngoc and director Tran. Thanh Huy. Independent filmmakers with a lot of experience participate in international &#8220;arenas&#8221;, promising to find the best projects, in accordance with the criteria of international film festivals. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_523_38612912/551201d9279bcec5978a.jpg" width="625" height="416"> <em> Mr. Ko Jae Soo, General Director of CJ CGV Vietnam.</em> Director Trinh Dinh Le Minh, a member of the Appraisal Council shared: <em> “After a year full of turmoil due to the epidemic, the filmmaking community in Vietnam can now continue to participate in a rewarding playground like the CJ Short Film Project. I am very happy that CJ Cultural Foundation and CGV are able to bring the contest back on time. With the practical financial and professional support, I think film talents can go further and locate the position of Vietnamese cinema on the world map. ”</em> Joining for the first time as a member of the Appraisal Council, &#8220;Rom&#8221; film director Tran Thanh Huy said: &#8220;<em> As an indie filmmaker, going through the tough times of being a toddler, I understand how challenging filmmaking is. I hope with my experience I can support the contestants in this contest as much as possible. &#8220;</em> The short film project CJ 2021 is for Vietnamese citizens aged 18 to 40 years old, aimed at young people who are working in the creative field, who are passionate about cinema but do not have the budget to make their own short films. . <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_523_38612912/a79af551d3133a4d6302.jpg" width="625" height="416"> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_523_38612912/e435b4fe92bc7be222ad.jpg" width="625" height="416"> The program is part of the series of social responsibility activities of CJ Cultural Foundation and CGV, demonstrating the efforts of businesses and directors and producers in their journey to support, accompany movie talents, and bring movies. Vietnam integrates into the world.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7352</post-id>	</item>
		<item>
		<title>Through the project assessing the current status of antibodies to diphtheria toxins in the community of Khanh Hoa province</title>
		<link>https://en.spress.net/through-the-project-assessing-the-current-status-of-antibodies-to-diphtheria-toxins-in-the-community-of-khanh-hoa-province/</link>
		
		<dc:creator><![CDATA[THÁI THỊNH]]></dc:creator>
		<pubDate>Sat, 24 Apr 2021 02:37:11 +0000</pubDate>
				<category><![CDATA[Health]]></category>
		<category><![CDATA[age]]></category>
		<category><![CDATA[antibodies]]></category>
		<category><![CDATA[Antibody]]></category>
		<category><![CDATA[Antitoxin]]></category>
		<category><![CDATA[assessing]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[current]]></category>
		<category><![CDATA[Detoxify]]></category>
		<category><![CDATA[Diphtheria]]></category>
		<category><![CDATA[Disease case]]></category>
		<category><![CDATA[health]]></category>
		<category><![CDATA[Hoa]]></category>
		<category><![CDATA[Immunization]]></category>
		<category><![CDATA[Khanh]]></category>
		<category><![CDATA[Khanh Hoa]]></category>
		<category><![CDATA[Nha Trang Pasteur Institute]]></category>
		<category><![CDATA[Outline]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Province]]></category>
		<category><![CDATA[Reality]]></category>
		<category><![CDATA[Residential]]></category>
		<category><![CDATA[Respiratory]]></category>
		<category><![CDATA[Status]]></category>
		<category><![CDATA[Tetanus]]></category>
		<category><![CDATA[Topic]]></category>
		<category><![CDATA[toxins]]></category>
		<category><![CDATA[Translate]]></category>
		<category><![CDATA[Vaccines]]></category>
		<category><![CDATA[Whooping cough]]></category>
		<guid isPermaLink="false">https://en.spress.net/through-the-project-assessing-the-current-status-of-antibodies-to-diphtheria-toxins-in-the-community-of-khanh-hoa-province/</guid>

					<description><![CDATA[On April 23, the Council of Science and Technology (Department of Science and Technology of Khanh Hoa province) held a meeting to evaluate the proposal of a provincial scientific research project on &#8216;Assessment of the current status of antitoxin residues. Diphtheria factor at the age from 5 to 40 in the population of Khanh Hoa [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On April 23, the Council of Science and Technology (Department of Science and Technology of Khanh Hoa province) held a meeting to evaluate the proposal of a provincial scientific research project on &#8216;Assessment of the current status of antitoxin residues. Diphtheria factor at the age from 5 to 40 in the population of Khanh Hoa province &#8216;. The project is chaired by Pasteur Institute Nha Trang.</strong><br />
<span id="more-7325"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_435_38613085/d0f2e537c3752a2b7364.jpg" width="625" height="416"> </p>
<p> <img fifu-featured="1" decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_435_38613085/d0f2e537c3752a2b7364.jpg" width="625" height="416"> <em> Around the meeting.</em> Accordingly, diphtheria is an infectious disease, acute poisoning, respiratory transmission and potentially epidemic. In Vietnam, diphtheria &#8211; pertussis &#8211; tetanus vaccination has been included in the expanded vaccination since 1984 with 3 basic doses for children aged 2-4 months. However, now diphtheria epidemic has returned and is a public health problem of concern; 93.2% of cases recorded in the Central region are between the ages of 5-40 years old, and cases occur in children who have been vaccinated with 3-4 doses of vaccine containing ingredients. previously detoxified diphtheria. Therefore, the determination of antibodies to diphtheria toxins and factors related to antibody retention in the 5-40 year old target group is necessary for the implementation of appropriate epidemic response activities. , effective. Especially, Khanh Hoa is a province with developed tourism and large trade, bordering provinces with epidemic circulation, so it is necessary to conduct research on the topic. From the above practice, the topic has focused on researching contents such as: determining the residue of antibodies to diphtheria toxin at the age from 5-40 years old in the provincial community; describe a number of factors related to the persistence of antibodies to diphtheria toxin; propose solutions to prevent and control diphtheria &#8230; The results of this research topic will contribute to the development of policies and solutions for the preventive medicine sector of Khanh Hoa in particular and provinces and cities in general in the strategic orientation of the prevention and control of leukemia. almost. Along with that, assessing the current situation of the residue of diphtheria toxin antibodies in the province, helping to have an overall view of the status of immunity to diphtheria in the community; From there, help us to recognize, evaluate and improve the effectiveness of immunization in the future &#8230; Explanation of topics approved by the Council of Science and Technology of Khanh Hoa province, allowing Nha Trang Pasteur Institute to implement; Expected implementation time is from 7-2021 to 12-2022.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7325</post-id>	</item>
		<item>
		<title>Hung Yen: Planning 11 ha, to promote the value of the relics of Den Mau Temple, Temple of Tran and Water Park of Ho Ban Nguyet</title>
		<link>https://en.spress.net/hung-yen-planning-11-ha-to-promote-the-value-of-the-relics-of-den-mau-temple-temple-of-tran-and-water-park-of-ho-ban-nguyet/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Fri, 23 Apr 2021 07:20:15 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Bai Say Road]]></category>
		<category><![CDATA[ban]]></category>
		<category><![CDATA[Crescent Park]]></category>
		<category><![CDATA[Den]]></category>
		<category><![CDATA[Embellished]]></category>
		<category><![CDATA[Hung]]></category>
		<category><![CDATA[hung Yen]]></category>
		<category><![CDATA[In the past]]></category>
		<category><![CDATA[Mau]]></category>
		<category><![CDATA[Mau Temple Hung Yen]]></category>
		<category><![CDATA[Nguyet]]></category>
		<category><![CDATA[PARK]]></category>
		<category><![CDATA[Pho Hien]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Promote]]></category>
		<category><![CDATA[Promoting]]></category>
		<category><![CDATA[Relics]]></category>
		<category><![CDATA[semicircle lake]]></category>
		<category><![CDATA[Spirituality]]></category>
		<category><![CDATA[Temple]]></category>
		<category><![CDATA[Temple of Mother]]></category>
		<category><![CDATA[Tran]]></category>
		<category><![CDATA[Tran Temple]]></category>
		<category><![CDATA[Tran Temple relic area]]></category>
		<category><![CDATA[Value]]></category>
		<category><![CDATA[View]]></category>
		<category><![CDATA[water]]></category>
		<category><![CDATA[Water park]]></category>
		<category><![CDATA[Xuan Control]]></category>
		<category><![CDATA[Yen]]></category>
		<category><![CDATA[Zoning]]></category>
		<guid isPermaLink="false">https://en.spress.net/hung-yen-planning-11-ha-to-promote-the-value-of-the-relics-of-den-mau-temple-temple-of-tran-and-water-park-of-ho-ban-nguyet/</guid>

					<description><![CDATA[In order to contribute to preserving, embellishing and promoting the great value of Pho Hien old urban area worthy of a special national monument. To concretize the target to 2030, to completely develop Pho Hien National tourist site according to the master plan on tourism development of Hung Yen province up to 2025 and a [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong> In order to contribute to preserving, embellishing and promoting the great value of Pho Hien old urban area worthy of a special national monument. To concretize the target to 2030, to completely develop Pho Hien National tourist site according to the master plan on tourism development of Hung Yen province up to 2025 and a vision to 2030.</strong> </p>
<p> <strong> The urgency of the project</strong> Hung Yen city is the political, administrative, economic, cultural and social center of Hung Yen province. After more than 20 years of re-establishment, the province has grown into a dynamic, developed, civilized and modern city. Along with the steps of development and urbanization, the city is the place to preserve the culture of the old Pho Hien. Going back to the time, there are still cultural and spiritual vestiges of Pho Hien in the past, with relic works ranked in Pho Hien relic complex and a place where cultural and spiritual activities are inside and outside. known country. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_188_38611926/29b6e141c7032e5d7712.jpg" width="625" height="244"> <em> Singing mandarins on Crescent Lake.</em> Amidst the noise of the city, the city still retains valuable static landscape spaces with green parks and lakes associated with architectural works bearing the identity of Pho Hien. Typical of which are the park area of ​​Ban Nguyet lake, Tran Temple, Temple of Mau. Located on Bai Say street in Quang Trung ward and Minh Khai ward, Hung Yen city. The Crescent Lake is a highlight of the city&#8217;s landscape, with a poetic beauty. This is also a place for community activities, walking around the lake, sightseeing of the local residents and tourists coming to the city. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_188_38611926/b29e7b695d2bb475ed3a.jpg" width="625" height="350"> <em> Tran Temple &#8211; Hien Hung Yen Street</em> However, over time, there are architectural works and landscapes that have deteriorated and are not suitable, and need to be renovated and embellished. On the other hand, opposite Ban Nguyet lake across Bai Say street, in Quang Trung ward is the famous relic area of ​​the city: Tran Temple, Mau Temple; About 500m from Nguyen Du street is the relic of Ba Chua Kho Temple. A place that any visitor to Hung Yen would like to visit once because the ancient beauty is preserved over the years and is a place that attracts a huge number of domestic and foreign tourists to visit and give birth. active spiritual culture. Visitors coming to Pho Hien after admiring the beauty of ancient, mossy temples and pagodas, looking for high and beautiful spiritual values ​​can stroll around Crescent Lake to relax in harmony with nature. grass, feel the quiet, peaceful space of an ancient land once famous for the song: &#8220;First Kinh Ky, second Pho Hien&#8221;. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_188_38611926/fe7a088d2ecfc7919ede.jpg" width="625" height="466"> <em> Mau Temple Hung Yen</em> On festival days such as Mau Temple Festival, Tran Temple, Pho Hien folk festival &#8230; often organize swimming competitions, boat races, fireworks, and singing of graceful knives at the Crescent Lake. Every year, the relics of Tran Temple, Mau Temple and Ban Nguyet Lake all attract a large number of people and tourists coming to offer incense and worship. With great historical significance and available potentials, the relics of Tran Temple, Mau Temple and Ban Nguyet Lake have become an attractive cultural and spiritual tourist destination for every visitor when visiting Pho Hien &#8211; Hung Yen. . <strong> Direction for planning</strong> According to the reporter, the complex of Pho Hien National Monument, although has important historical, artistic, landscape, cultural and spiritual values. However, at present, the values ​​of the relics of Tran and Mau temples have not been exploited effectively and commensurate with their potential. The relic area has been repeatedly repaired and restored, but in terms of planning, landscape and traffic organization there are still many shortcomings. On the other hand, along with the festival are cultural and service activities such as parking area, going to ceremony, eating and drinking, and shopping for souvenirs that have not yet been invested in infrastructure to organize. , arranged scientifically to cause many shortcomings in cultural and spiritual activities as well as in the process of organizing festivals. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_188_38611926/b072448562c78b99d2d6.jpg" width="625" height="432"> <em> The idyllic and peaceful features on the Crescent lake</em> Historical and cultural relic area of ​​Tran Temple &#8211; Temple of Mau need to elaborate a detailed construction plan at the scale of 1/500 on the surrounding landscape, traffic connection and space for tourism, service development, orientations. embellish and promote the value of the relic associated with the landscape of Ho Ban Nguyet park and also create a foundation for exploiting the spiritual and cultural tourism values ​​of Hung Yen city. Therefore, the detailed construction planning of 1/500 scale promoting the value of the relics of Tran Temple, Mau Temple and Ho Ban Nguyet Park is essential to solve the remaining problems. stagnate, expand, and improve the cultural and spiritual value with the aim of embellishing and promoting the value of the relic in the education of cultural traditions, historical traditions, exploiting potentials for tourism development. calendar. Thereby, raising the pride and sense of responsibility of the people for the preservation and inheritance of the national cultural traditions and identity, so that “Culture is really the spiritual foundation of the society. is the target and the driving force of socio-economic development &#8220;in the new period. Talking and sharing with the press, Ms. Nguyen Thi Hoa &#8211; Head of the management board of Pho Hien National Monument, said “<em> The size of the planned study area and the projected population size have been approved according to Decision No. 1321 / UBND of Hung Yen People&#8217;s Committee dated June 14, 2019 on approving the task of detailed construction planning. 1/500 to promote the value of the relics of Tran Temple, Temple of Mau and the Park of Sale Nguyet ”.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_23_188_38611926/dc5829af0fede6b3bffc.jpg" width="625" height="468"> <em> Ho Ban Nguyet, the green lung of Hung Yen city</em> Accordingly, with the total land area in the planning study scope: 12.95 ha, of which the land area for planning is about 11.25ha. Surveyed measurement area is about 13.38 ha (Measurement boundary has an extended distance compared to the planned boundary and includes the planning study boundary of Ba Chua Kho Temple area). On January 27, Hung Yen City People&#8217;s Committee announced a detailed construction planning project of 1/500 scale to promote the relic of Tran temple, Mau temple and Ban Nguyet lake park. The detailed construction planning project of 1/500 scale promoting the value of relics of Tran temple, Mau temple and Ban Nguyet lake park approved by the Provincial People&#8217;s Committee on December 3, 2020 has scope of implementation in Quang Trung ward and Minh Khai ward. Planning projects with implementation scale of over 112,000 m2 (of which land for relic works accounts for 6.44%; land for public works accounts for 14.42%; land for green parks, sports, and sports accounts for 25 , 78%; water surface area accounts for 28.67%; the rest are parking lots, traffic land and other technical infrastructure). The project aims to contribute to preserving, embellishing and promoting the great value of Pho Hien ancient urban area, commensurate with the national relic, especially associated with tourism development, building relics associated with exploiting spiritual values ​​and beliefs, becoming an attractive tourist attraction of Pho Hien National Monument. Accordingly, the investor of the planning project to preserve, embellish and promote the value of Pho Hien National Monument is the People&#8217;s Committee of Hung Yen city, used by capital from the merit of the Temple. Tran, Temple of the Mother. The cost estimate for implementation is over 700 million VND. <strong> Xuan Control</strong></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">6343</post-id>	</item>
		<item>
		<title>Mr. Vu Huy Hoang: &#8216;Golden land&#8217; Sabeco is not an important project</title>
		<link>https://en.spress.net/mr-vu-huy-hoang-golden-land-sabeco-is-not-an-important-project/</link>
		
		<dc:creator><![CDATA[Minh Tuệ]]></dc:creator>
		<pubDate>Thu, 22 Apr 2021 20:23:11 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Accused]]></category>
		<category><![CDATA[area]]></category>
		<category><![CDATA[case]]></category>
		<category><![CDATA[court]]></category>
		<category><![CDATA[Former Minister]]></category>
		<category><![CDATA[GOLDEN]]></category>
		<category><![CDATA[Golden Land]]></category>
		<category><![CDATA[Hai Ba Trung]]></category>
		<category><![CDATA[Ho Thi Kim Thoa]]></category>
		<category><![CDATA[Hoang]]></category>
		<category><![CDATA[Huy]]></category>
		<category><![CDATA[important]]></category>
		<category><![CDATA[Industry and Trade]]></category>
		<category><![CDATA[Judge]]></category>
		<category><![CDATA[land]]></category>
		<category><![CDATA[Loss]]></category>
		<category><![CDATA[Ministry of Industry and Trade]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Sabeco]]></category>
		<category><![CDATA[Sabeco Land]]></category>
		<category><![CDATA[Sabeco Pear]]></category>
		<category><![CDATA[Sabeco Pearl]]></category>
		<category><![CDATA[Saigon Beer Alcohol Beverage Corporation]]></category>
		<category><![CDATA[The court]]></category>
		<category><![CDATA[Trial panel]]></category>
		<category><![CDATA[Vu Huy Hoang]]></category>
		<guid isPermaLink="false">https://en.spress.net/mr-vu-huy-hoang-golden-land-sabeco-is-not-an-important-project/</guid>

					<description><![CDATA[Defendant Vu Huy Hoang said that the project in the &#8216;golden land&#8217; area 2-4-6 Hai Ba Trung is not an important project of the Ministry, so the Minister cannot grasp all. On the afternoon of April 22, the Hanoi City People&#8217;s Court continued the first instance trial of former Minister of Industry and Trade Vu [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Defendant Vu Huy Hoang said that the project in the &#8216;golden land&#8217; area 2-4-6 Hai Ba Trung is not an important project of the Ministry, so the Minister cannot grasp all.</strong><br />
<span id="more-6071"></span> On the afternoon of April 22, the Hanoi City People&#8217;s Court continued the first instance trial of former Minister of Industry and Trade Vu Huy Hoang and 9 other defendants in the case &#8220;Violation of regulations on the management and use of state property causes losses. escape, waste &#8220;and&#8221; Violation of land management regulations &#8220;occurred at the Ministry of Industry and Trade and Ho Chi Minh City.</p>
<p> <strong> Former Minister Vu Huy Hoang denied the blame on his subordinates</strong> Responding to the Panel&#8217;s question, the reason for having autographs signed by former Deputy Minister Ho Thi Kim Thoa, the defendant Vu Huy Hoang said that the Ministry of Industry and Trade has a working regulation, specifying each field and each consensus. director in charge. When handling related cases, the person in charge directly responsible, in case the person in charge is absent, can consult with the leader to handle it instead. <em> &#8220;Although the assigned people take initiative in their field, if they consider it necessary to consult with members of the board of directors and leaders like me, they actively consult with me. I can only consult when I am. I was asked to attend. Likewise, in important meetings, the person in charge who is away can ask someone else to hold the meeting. &#8220;</em> , the defendant Vu Huy Hoang explained. <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_22_83_38607549/fc25b4239161783f2170.jpg" width="625" height="475"> <em> Former Minister of Industry and Trade Vu Huy Hoang and his accomplices in court. (Photo: VNA)</em> In court, the former Minister of Industry and Trade also denied that he blamed his subordinates. <em> &#8220;I apologize to VKS, reading the indictment this morning saying that I do not accept responsibility within my scope, I reaffirm before the Panel, I have no opinion to blame, blame other individuals for the What is happening if I am the person directly in charge. I am personally responsible for the things I am in charge of, directing and being consulted. for others, including subordinates &#8220;</em> , the defendant Vu Huy Hoang explained. Talking about the responsibility for the damage to the State property, the defendant Vu Huy Hoang still affirmed that, according to the regulations, the head is responsible for general but the tasks are clearly assigned to each leader. <em> &#8220;Me and the other members are in general management, can not find out. The enterprise is proactive in production and business, Sabeco has been equitized, the management is through the assistant department. Today after listening to the news. believe, I see this project is not an important work of the Ministry, not to say of the State, the Minister cannot grasp all &#8220;, </em> Mr. Hoang presented. <strong> &#8220;Golden land&#8221; falls into private hands because the Ministry of Industry and Trade pressured?</strong> In this case, Mr. Phan Dang Tuat, former Chairman of the Board of Directors, State Capital Management Board for the period 2012-2015, signed a number of investor selection documents. Mr. Tuat was not examined for penal liability and attended the trial as a person with related rights and obligations. Previously, in 2007, Sabeco cooperated with Sabeco Land to implement the project at 2-4-6 Hai Ba Trung (District 1, Ho Chi Minh City), but it was not financial enough because the amount of land use fee was 1,236 billion. copper. Although in 2012, the Government issued a Resolution 26 on divestment from outside the industry, but Mr. Vu Huy Hoang (former Minister of Industry and Trade), Ho Thi Kim Thoa (former Deputy Minister of Industry and Trade, was in hiding) continued to direct Sabeco invests in real estate projects. On April 23, 2014, Sabeco issued official dispatch No. 10 proposing for Sabeco to implement the project with a group of new investors to establish Sabeco Pearl, Sabeco also transferred the above land use right to Sabeco Pearl. In the process of implementing mistakes, Sabeco divested cheap capital, leading to gold land falling into private hands, the state suffered more than 2,700 billion VND losses. In response to the panel, Mr. Tuat admitted that Sabeco is the only corporation known as rich but has no office and has to hire. Rent is also budgetary. Sabeco considers its responsibility to quickly get an office. When Sabeco Land withdrew from the 2-4-6 Hai Ba Trung project, new investors were excited. Mr. Tuat signed the official letter No. 10 with reference to other companies in the industry and trade. After the approval of the Ministry of Industry and Trade, Sabeco meets with investors, drafting the contract. <em> &#8220;I only attended the first time when the parties greeted each other, then discussed the implementation of the contract, conditions, terms &#8230; The negotiation of the project is based on the old project&#8221;</em> Mr. Tuan said. Referring to the document sent to the People&#8217;s Committee of Ho Chi Minh City to agree to Sabeco Pear to fulfill financial obligations, Mr. Tuat said that after completing the dossier with the investor, Sabeco made a joint venture cooperation contract and submitted it to the People&#8217;s Committee for project implementation. Mr. Tuat admitted that signing the official letter was not authorized because at that time, the legal representative was absent.<em> “Sabeco submitted the application but more than a month later, there is no reply. The Ministry of Industry and Trade urged us to quickly implement the project &#8230; &#8220;</em> Mr. Tuat explained. Mr. Tuat added: <em> “In Sabeco it is customary to just go to meetings about land and call me. All the city documents sent to Sabeco on land are sent to me, I attend ”.</em> Mr. Tuat also said that before issuing an official letter to Sabeco Pear to fulfill its financial obligations, Sabeco had to report to the Ministry of Industry and Trade. In response to the judge&#8217;s questions about his responsibilities related to the case, Mr. Tuat replied: <em> “I think in the process of working, the only mistake is being too aggressive and enthusiastic. Should have waited time. Because the Ministry of Industry and Trade pressured. The Ministry also urged the late payment fines of 18.5 billion each year. After 1 month of submitting the application, we did not respond, we were in a hurry… ”.</em> Present at the court, the representative of Me Linh Square Joint Stock Company (formerly Sabeco Pearl) said that the unit is currently managing the &#8220;golden land&#8221; above. Shareholders participating in the company since April 2017 have not been prosecuted for the case for less than 1 year, since then the land has been vacant, not deployed, causing great damage to the company. <em> “We consider the records, all documents of the state are true, true, we believe in them. When we attended court, it was discovered that there were many incidents happening between different regulatory agencies, not related to us. Ask the court to look and protect our rights ”</em> This taste added.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">6071</post-id>	</item>
		<item>
		<title>Sunac lost Hainan: Boss Sun Hongbin was very optimistic, the Riyuewan project was demolished</title>
		<link>https://en.spress.net/sunac-lost-hainan-boss-sun-hongbin-was-very-optimistic-the-riyuewan-project-was-demolished/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Tue, 20 Apr 2021 07:55:09 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Boss]]></category>
		<category><![CDATA[demolished]]></category>
		<category><![CDATA[Hainan]]></category>
		<category><![CDATA[Hongbin]]></category>
		<category><![CDATA[lost]]></category>
		<category><![CDATA[Optimistic]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Riyuewan]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Sunac]]></category>
		<guid isPermaLink="false">https://en.spress.net/sunac-lost-hainan-boss-sun-hongbin-was-very-optimistic-the-riyuewan-project-was-demolished/</guid>

					<description><![CDATA[Source: Interface Riyue Bay, Hainan, China, a famous surfing destination. One morning in mid-March, the sun covered the entire sea, and the waves pushed toward the beach. People wearing bikinis and holding surfboards of all colors walked towards the waves. The waves are rolling, some people are grabbing the waves to stand on the board, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Source: Interface</p>
<p>Riyue Bay, Hainan, China, a famous surfing destination.</p>
<p>One morning in mid-March, the sun covered the entire sea, and the waves pushed toward the beach. People wearing bikinis and holding surfboards of all colors walked towards the waves. The waves are rolling, some people are grabbing the waves to stand on the board, and some are galloping on the top of the waves.</p>
<p>A brown Beijing brand car followed the road along the coast towards the entrance of Sunac Sun Moon Bay. The owner from Beijing was stopped by the guard at the station and asked to report the license plate number to his homeowner consultant so that the homeowner consultant could apply for the passage of the car.</p>
<p>The security guard told the owner that at present Riyuewan implements strict access control, and the sales office is no longer open to the public. Only the staff and some villa owners who have already acquired the house can pass through, including prospective owners and others. It must be approved by superiors before it can pass.</p>
<p><img fifu-featured="1" decoding="async" src="https://p7.itc.cn/images01/20210415/adf6428d902a4d8ab42a381e6623efef.jpeg" max-width="600"></p>
<p>Riyuewan implements strict access control. Picture source: Jiemian News</p>
<p>While waiting for passage, the owner communicated with people about the current situation of Riyue Bay on WeChat, &#8220;Yuedao is being demolished. It is said that they are in a lawsuit with related parties and want to return to the construction right.&#8221;</p>
<p>The follow-up direction of Riyue Bay has become one of the most concerned issues for prospective owners, which is directly related to the future residential experience and property value. Compared with the waves in Riyue Bay, Hainan&#8217;s environmental protection storm is longer and more powerful, and the demolition of Moon Island is a foregone conclusion.</p>
<p><img decoding="async" src="https://p9.itc.cn/images01/20210415/715f3b16007c4444a93313df474a32f7.png" max-width="600"> </p>
<p> This project, named Sunac Sunyue Bay, is Sunac’s masterpiece of entering Hainan. In 2015, Sunac flexed its muscles and successfully deployed multiple core cities in South China and Central China. In Hainan, Sunac acquired the Hainan project through the acquisition of a real estate subsidiary of Nanshan Group.</p>
<p>The business of Nanshan Group, a private enterprise in Shandong, covers industry, finance, aviation, real estate, education, tourism and other sectors. Its real estate platform Yantai Haiji Real Estate Co., Ltd. has developed a number of large-scale tourism and vacation complexes, such as Hainan Wanning Ridao and Yuedao, Qingdao Longdao and Fengdao.</p>
<p>At that time, Sunac acquired 50% of the shares of Hainan Wanning Hongji Real Estate Co., Ltd. and 50% of the shares of Nanshan (Hainan Wanning) Real Estate Co., Ltd. under Yantai Haiji, and established a subsidiary, Wanning Nanshan Sunac Industrial Co., Ltd., Responsible for project development.</p>
<p>Wanning Riyue Bay is a 3A-level scenic spot. According to the government’s plan, 26 billion yuan will be invested here to build a coastal tourist area and an international surfing base. The total planned land area of ​​the Bay project is about 34,500 mu, and the total construction area is about 4 million square meters.</p>
<p>There are two main parts of Sunac&#8217;s involvement in the trader-part of the land parcels and the Sunyue Island reclamation project. Riyue Artificial Island is the core landmark project of Riyue Bay. It covers an area of ​​1 million square meters and is formed by reclamation.</p>
<p>At that time, Zhu Hong, the person in charge of Sunac Riyue Bay project, said to the public, &#8220;We want to build Sunac Riyue Bay into a world-renowned tourism brand, not just a real estate project.&#8221;</p>
<p>After Sun Moon Bay officially entered Hainan with Riyue Bay, Sunac began to attach importance to the tourism and vacation market in order to increase its efforts in Hainan.</p>
<p>In August 2016, Hainan Sunac and Hangzhou Jinhan entered into an equity transfer framework agreement to acquire 50% of the equity and creditor&#8217;s rights of the target company to obtain the Boao Golden Bay project.</p>
<p>Boao Golden Bay is located between Boao and Tanmen in Hainan, adjacent to the permanent site of the Boao Forum for Asia. The project includes residential and commercial uses, with a total area of ​​approximately 1.6475 million square meters and a total saleable area of ​​approximately 1.6475 million square meters. It is the first Hainan project to contribute to Sunac.</p>
<p>Also in the same year, Sunac established the Hainan area, and in December released its 6 projects in Hainan, namely Riyue Bay, Boao Golden Bay, Mission Hills, Sunshine Town, Blue Cube and Nanyan Bay. Most of them are tourism real estate projects that Sunac had rarely operated before.</p>
<p>In the first few years when the most severe &#8220;environmental protection storm&#8221; and &#8220;purchase restrictions&#8221; swept Hainan, Sunac&#8217;s development in Hainan was in full swing.</p>
<p>According to the financial report, as the eighth deep-growing area, the Hainan market brought 12.65 billion yuan in sales to Sunac in 2017. Sunac used this to surpass some real estate companies that have been in business for many years and squeeze into the top five in Hainan&#8217;s sales that year.</p>
<p>In the first half of 2018, Sunac&#8217;s deployment of projects in Hainan further increased, reaching nearly 20. They were deployed in Sanya, Haikou, Chengmai, Ding&#8217;an, Qionghai, Wanning, Lingshui and other places, forming a trend of enclosing Hainan. At the end of 2018, Sunac&#8217;s land reserves in Hainan reached 3,883,200 square meters, and its saleable/leasable building area reached 4,241,800 square meters.</p>
<p>This is the brightest moment of Sunac&#8217;s deployment in Hainan. At the 2018 interim results meeting, Sunac’s boss Sun Hongbin was also very optimistic about the Hainan market. He said, &#8220;We are particularly optimistic about Hainan, because places like China have very few choices. Policies will be good with or without policies. Good policies will definitely be better. We hope that Hainan will have particularly good development.&#8221;</p>
<p>But the good times didn&#8217;t last long. The environmental protection storm that began at the end of 2017 has swept across the country and has a particularly far-reaching impact on Hainan. The Central Environmental Protection Supervision Team severely criticized Hainan for “the finances of coastal cities and counties are overly dependent on real estate, and the situation is serious for the important land and the coastal land. A large number of real estate and tourism real estate are concentrated on the beautiful coastal line, which is very important to the marine ecology and the natural scenery of the coastline. &#8220;Causing damage&#8221; and other issues, and put forward opinions on environmental protection issues of many large-scale reclamation projects in Hainan, and gradually gave suggestions on rectification and punishment.</p>
<p>These projects are all hot star projects in the past, such as Ruyi Island in Haikou City, Southern Pearl, Phoenix Island in Sanya City, Haihua Island in Danzhou City, and Riyue Bay in Wanning City.</p>
<p>The environmental storm has put Hainan&#8217;s real estate on fire. Hainan has to get rid of its dependence on the real estate economy and seek a balanced development of ecological and economic construction. In 2018, Hainan issued the most stringent purchase restriction new policy in its history, and implemented strict controls on real estate. The property market in Hainan Island is frozen, &#8220;migratory birds&#8221; cannot fly in, and all real estate companies in Hainan are affected. They have begun to shrink the Hainan front, and Sunac is no exception.</p>
<p>The most intuitive manifestation is that Sunac abolished the Hainan region in October 2019 and merged with the Guangzhou-Shenzhen region to form the South China region. The new regional president is Huang Shuping, the former president of the Guangzhou-Shenzhen region, and Zhong Liansheng, the general manager of the Hainan region, was transferred. from.</p>
<p>It took about three years from the establishment of Sunac Hainan area to the merger. Under the combined effect of internal and external factors, Sunac&#8217;s new investment in Hainan has since decreased, and the corresponding land reserves have also declined year by year.</p>
<p>As of the end of 2020, among Sunac&#8217;s 258 million square meters of land bank, Hainan has a total area of ​​only 1,967,900 square meters, with a saleable and leaseable building area of ​​3,448,700 square meters. Compared with the peak in 2018, land reserves have fallen by nearly 50%.</p>
<p>In the last round of the most stringent purchase restrictions and environmental protection storm in history, Sunac, the Riyue Bay project was hit hard.</p>
<p>Hainan Wanning Riyue Bay Comprehensive Tourism Resort is a key project in Hainan, including the benchmarking sun and moon artificial island, and the total reclaimed area of ​​the project is 97 hectares. The sea area used for land reclamation and land reclamation on Rishima is about 48 hectares, the sea area for land reclamation and land reclamation on Tsukishima is about 493,000 square meters, and the land area formed by Tsukishima is about 435,000 square meters.</p>
<p><img decoding="async" src="https://p9.itc.cn/images01/20210415/310f369b34dc4203a6947b92bf590ae9.png" max-width="600"></p>
<p>Photo source: Demonstration report on the use of the sea area of ​​the temporary construction temporary bridge project of Wanning Yuedao Project</p>
<p>According to public information from the Wanning Municipal Government, the Yuedaowei reclamation project started construction at the end of 2013, and the steel bridge behind Yuedao was completed in December 2013 (it was demolished on December 6, 2018).</p>
<p>In 2015, without the approval of the marine environmental impact report, Yuedao started construction, which intensified the erosion of 1.7 kilometers of beaches on its southwest side. The erosion reached 22 meters at its widest point, which affected the provincial Qingpilin Nature Reserve. Cause a certain impact.</p>
<p>In 2016, Yuedao started the cofferdam. As of February 27, 2017, when the Hainan Provincial Department of Oceans and Fisheries ordered its construction unit to stop construction, the external cofferdam of the Yuedao Reclamation Project has been fully formed. Moreover, Yuedao did not actually stop illegal reclamation until the inspector was stationed. A large area of ​​siltation has occurred on the surrounding beaches and island-connected sand dams have been formed, which has greatly damaged the natural features of the ocean.</p>
<p><img decoding="async" src="https://p3.itc.cn/images01/20210415/429d7d0e6816420282dc89729bbd6115.png" max-width="600"></p>
<p>Yuedao Reclamation and Cofferdam Picture Source: Wanning Yuedao Project Demolition Project Temporary Construction Temporary Bridge Project Sea Area Use Demonstration Report</p>
<p>On October 19, 2020, the Hainan Provincial People’s Government website announced the &#8220;Rectification Plan for the Implementation of the Inspection Report of the Third Central Ecological and Environmental Protection Supervision Team in Hainan Province&#8221; (hereinafter referred to as the &#8220;Plan&#8221;), proposing that the nine major encirclement and reclamation projects will be carried out. Project classification and disposal.</p>
<p>Regarding the renovation of Riyue Island, the &#8220;Plan&#8221; requires that by the end of 2020, the implementation plan for the demolition of the Yuedao project and the ecological environment assessment report should be prepared, and the demolition process, demolition material disposal, demolition construction period and other contents should be clarified, and expert review should be organized. Before the end of February 2021, the sea area use right of the Yuedao Project shall be withdrawn in accordance with the law, and the sea area use right certificate shall be cancelled. According to the law, the owner unit of the Yuedao project is ordered to demolish within a time limit in accordance with the implementation plan of the demolition project, and the Yuedao project will be demolished before the end of May 2022.</p>
<p>Jiemian News visited Riyue Bay in mid-March and found that the entrance to Moon Island was also banned, and the blue background and white characters all showed the determination of ecological protection-&#8220;Green water and green mountains are the golden mountains and silver mountains, fully implement environmental protection policies, and strengthen the ecological environment. protection&#8221;.</p>
<p>Entering the interior of the project through the cross-sea bridge, you can see that the bridge between Ridao and Yuedao has stopped abruptly in the sea. Excavators are digging through the ground and cofferdam of Yuedao, and Yuedao has begun to be demolished. An internal staff member of the project told Jiemian News that the demolition work started last week.</p>
<p><img decoding="async" src="https://p1.itc.cn/images01/20210415/cd04543c160f49c1abff91285d25da28.jpeg" max-width="600"></p>
<p>Image source of the junction of Ridao and Yuedao: Jiemian News</p>
<p><img decoding="async" src="https://p3.itc.cn/images01/20210415/9410efbae1c243b58b8e04b2a9b6db6e.jpeg" max-width="600"></p>
<p>Moon Island is being demolished Image source: Jiemian News</p>
<p>In terms of input and output, there is undoubtedly a loss in the construction of the Riyuewan project. According to a previous report by China Business News, the total investment on the island is between 4 billion and 5 billion yuan, and nearly 1 billion yuan has been invested in the Yuedao project. But for this entire project, Sunac only sold the first and second phases of the island, and the return of funds was obviously not enough to cover the investment.</p>
<p>According to public information, Sunac delisted 9 plots of Ridao in 2015 for 1.328 billion yuan, with a total of 344,200 square meters, and planned a total of five phases of residential and island business districts.</p>
<p>The Riyuewan project opened in March 2017. The average price of high-rise apartments in the first phase of Ridao was 23,000 per square meter, and the average price of sky villas was 28,000 per square meter. After September 2017, the average price of the second-phase apartment is about 25,000/sqm, and the sea-view villa is 16-18 million/set. According to Sunac&#8217;s 2017 financial report, this project contributed 3.17 billion yuan in sales to Sunac that year.</p>
<p>An interview with Jiemian News found that the business district in the heart of Ridao Island has been built, but the investment promotion work has not been completed, and only a few merchants have settled in. In terms of residential housing, the remaining two-bedroom and three-bedroom houses in Phase II are sold in the form of commercial apartments, some buildings in Phase III are under construction, and Phase IV and Phase V have not yet been planned. The houses sold in the first and second phases are in the state of overdue delivery.</p>
<p><img decoding="async" src="https://p7.itc.cn/images01/20210415/55b75e643b1e4da88ea127f558cf98ae.jpeg" max-width="600"></p>
<p>Image source of Nishima Island Center Business District: Jiemian News</p>
<p>An owner told Jiemian News that some villas have been delivered in the first and second phases, and the rest will be delivered by the end of June this year.</p>
<p>The Wanning Municipal Government’s “Announcement on the Implementation of the Rectification and Rectification Tasks of the National Marine Inspectorate (Serial No. 78)” stated that the type of sea used and approved for the Wanning Riyue Bay Sun Island Project is for tourism and entertainment, and clearly requires it &#8220;It is forbidden to reclaim land to develop ordinary real estate projects&#8221; However, after the completion and acceptance of the project, the Wanning Municipal Government changed the use of 5.6 hectares of reclamation for tourism for real estate construction.</p>
<p>At the same time, the &#8220;Publicity&#8221; pointed out that for the part of the built residential buildings on the island of Japan, the current project construction unit has signed a house trusteeship management agreement with Hainan Kaisheng Real Estate Co., Ltd., and Hainan Kaisheng Real Estate Co., Ltd. will carry out the construction of the completed residential products. Entrusted operation and management, changing residential products into quasi-operating products.</p>
<p>Quasi-operating products refer to the sale of commercial apartments to avoid the impact of purchase restrictions.</p>
<p>Regarding the rectification of the 3# residential building project that has been approved and not built on Ridao, the &#8220;Publicity&#8221; pointed out that the Municipal Assets Planning Bureau is going through the above-mentioned residential land use change procedures, and the modification plan for the single building of the 03 building on the 03 plot has not passed the expert review. .</p>
<p>With the beginning of the demolition of Moon Island and the change in the nature of the subsequent real estate projects on Ri Island, it is difficult for the Riyue Bay Project to resume its previous sales conditions, and the value of the properties sold will also be greatly reduced.</p>
<p>Compared with other developers who have been impacted by the environmental storm, the impact on Sunac is obviously greater. Danzhou Haihua Island, which was also required to rectify in 2017, paid the fines before the end of 2020. More than 30 commercial houses did not get the pre-sale certificates and were changed to self-owned. The rectification work has been basically completed.</p>
<p>At present, Haihua Island has sold 60,000 homes and is still launching new houses, with the average price rising to 20,000 yuan per square meter. For Evergrande, this super-large artificial tourist island has now started its trial operation after rectification, and will officially open its doors this year.</p>
<p>Vanke, the leading real estate company, has only Forest City and Maritime Metropolis on sale in Sanya, and Maritime Metropolis is close to the liquidation stage. However, Country Garden still has a large number of projects on sale in Hainan. Because they are far away from the coastline, they have not been affected by environmental storms. Currently, they are selling such projects as Country Garden Poly House, Country Garden Maritime Metropolis, Country Garden Xinglong Lakeside in Sanya Central CBD.</p>
<p>With inventory digestion and the Hainan land market shifting to the industrial and residential market, compared with Sunac&#8217;s passive digestion of real estate inventory, Vanke and Country Garden cater to the new direction of Hainan and have begun to shift to residential projects and commercial and industrial projects.</p>
<p>For example, in Sanya, in the past year, there were 47 land sales in Sanya, with a total transaction area of ​​1.461 million square meters and a total transaction volume of 14.77 billion yuan. Among them, the total land area for commercial use land accounted for the highest proportion, reaching 49.1%. Residential land accounted for 23%. The 7 parcels of land sold were all residential projects. Vanke took 2 cases and Country Garden took 1 case.</p>
<p>For Sunac, Riyuewan, the well-known travel brand dream they wanted to build at the beginning, has been impossible to realize, and what remains will be just an incompletely planned project that runs counter to the original idea.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5196</post-id>	</item>
		<item>
		<title>Apple announced a $ 200 million fund for forestry projects</title>
		<link>https://en.spress.net/apple-announced-a-200-million-fund-for-forestry-projects/</link>
		
		<dc:creator><![CDATA[Trà My (Theo THX)]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 09:15:31 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Announced]]></category>
		<category><![CDATA[Apple]]></category>
		<category><![CDATA[Carbon]]></category>
		<category><![CDATA[Change]]></category>
		<category><![CDATA[CO2]]></category>
		<category><![CDATA[Conserve]]></category>
		<category><![CDATA[Emissions]]></category>
		<category><![CDATA[Environment]]></category>
		<category><![CDATA[Equivalent]]></category>
		<category><![CDATA[Forest]]></category>
		<category><![CDATA[forestry]]></category>
		<category><![CDATA[fund]]></category>
		<category><![CDATA[Goldman Sachs]]></category>
		<category><![CDATA[Lisa Jackson]]></category>
		<category><![CDATA[million]]></category>
		<category><![CDATA[nature]]></category>
		<category><![CDATA[Neutral]]></category>
		<category><![CDATA[Ozone]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Rehibilitate]]></category>
		<category><![CDATA[Supply]]></category>
		<category><![CDATA[Target]]></category>
		<category><![CDATA[tools]]></category>
		<category><![CDATA[Vehicle]]></category>
		<guid isPermaLink="false">https://en.spress.net/apple-announced-a-200-million-fund-for-forestry-projects/</guid>

					<description><![CDATA[Together with Conservation International and Goldman Sachs, Apple&#8217;s $ 200 million fund aims to remove at least 1 million tons of CO2 annually from the atmosphere. Apple logo in San Francisco, California, USA. Photo: AFP / VNA On April 15, Apple announced an initiative to reduce carbon emissions with the Recovery Fund (RF), which aims [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Together with Conservation International and Goldman Sachs, Apple&#8217;s $ 200 million fund aims to remove at least 1 million tons of CO2 annually from the atmosphere.</strong><br />
<span id="more-4843"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_324_38545522/6b33a2b127f2ceac97e3.jpg" width="625" height="416"> </p>
<p> <em> Apple logo in San Francisco, California, USA. Photo: AFP / VNA</em> On April 15, Apple announced an initiative to reduce carbon emissions with the Recovery Fund (RF), which aims to invest in forestry projects to reduce carbon emissions from the atmosphere while generating profits. for financial investors. Together with Conservation International and Goldman Sachs, Apple&#8217;s $ 200 million fund aims to remove at least 1 million tons of CO2 annually from the atmosphere, equivalent to the emissions of more than 200,000 passenger vehicles. According to the company &#8220;Apples Defect&#8221;, RF can help expand the scale of investment in forest rehabilitation. Conservation International will co-invest in RF while Goldman Sachs will take on the role of fund manager. Apple said the three sides will identify new projects later this year. Nature offers one of the best tools for removing carbon from the atmosphere, says Lisa Jackson, Apple&#8217;s vice president of environmental, policy and social initiatives. By setting up a fund that generates both financial returns as well as helping to reduce emissions, Apple seeks to promote broader change in the future, by encouraging investments in carbon removal across the country. bridge. Apple hopes that others will share its goals and contribute resources to support and protect ecosystems. In July 2020, Apple announced its goal of neutralizing 100% of its entire supply chain and product lifecycle by 2030 and directly eliminating 75% of its supply chain and product emissions. 2030. It is expected that RF will help solve the remaining 25% of Apple&#8217;s emissions by removing carbon from the atmosphere. During the past year, 15 Apple suppliers in China pledged to join the plan and shift Apple&#8217;s manufacturing operations to 100% renewable energy. Apple Vice President and CEO of Apple in China Isabel Ge Mahe said that as early as 2015, Apple has launched a long-term cooperation plan for many years with the World Natural Foundation to build more than 400,000 hectares of forests in China. to 2020./.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4843</post-id>	</item>
		<item>
		<title>Planning for 4 inner districts of Hanoi: Will increasing buildings cause congestion?</title>
		<link>https://en.spress.net/planning-for-4-inner-districts-of-hanoi-will-increasing-buildings-cause-congestion/</link>
		
		<dc:creator><![CDATA[HIỂU MINH]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 03:19:21 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Afferent]]></category>
		<category><![CDATA[Ba Dinh]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[buildings]]></category>
		<category><![CDATA[Congestion]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[districts]]></category>
		<category><![CDATA[Dong Da]]></category>
		<category><![CDATA[H1 3]]></category>
		<category><![CDATA[Hai Ba Trung]]></category>
		<category><![CDATA[Hanoi]]></category>
		<category><![CDATA[High level]]></category>
		<category><![CDATA[High rise building structure]]></category>
		<category><![CDATA[history]]></category>
		<category><![CDATA[Hoan Kiem]]></category>
		<category><![CDATA[increasing]]></category>
		<category><![CDATA[Inner capital city]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[Population]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Public]]></category>
		<category><![CDATA[Reconstruction]]></category>
		<category><![CDATA[Ring road]]></category>
		<category><![CDATA[Subdivision]]></category>
		<category><![CDATA[Urban space]]></category>
		<category><![CDATA[Zoning]]></category>
		<guid isPermaLink="false">https://en.spress.net/planning-for-4-inner-districts-of-hanoi-will-increasing-buildings-cause-congestion/</guid>

					<description><![CDATA[The Urban Subdivision Planning Project (historic inner city) in 4 districts (Hoan Kiem, Ba Dinh, Dong Da, Hai Ba Trung) allows the construction of many high-rise buildings along the main roads and around the houses. Do urban railway stations cause additional traffic pressure? A series of old apartments in Ba Dinh district (Hanoi) will be [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Urban Subdivision Planning Project (historic inner city) in 4 districts (Hoan Kiem, Ba Dinh, Dong Da, Hai Ba Trung) allows the construction of many high-rise buildings along the main roads and around the houses. Do urban railway stations cause additional traffic pressure?</strong><br />
<span id="more-4614"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_20_38567470/9582014b2509cc579518.jpg" width="625" height="416"> </p>
<p> <em> A series of old apartments in Ba Dinh district (Hanoi) will be planned in the direction of increasing height. Photo: PV</em> <strong> Reduce population density</strong> Hanoi City has just announced 6 urban subdivision planning projects: H1-1A, H1-1B, H1-1C, H1-2, H1-3, H1-4, the rate of 1 / 2,000 in Hoan districts. Kiem, Ba Dinh, Dong Da and Hai Ba Trung; The main requirement is to control population in 4 counties. The projects aim to reduce the population from 1.2 million people (2009) to 672,000 people. Notably, in the urban subdivision planning project H1-2 in the administrative boundary of Ba Dinh district, the renovation of old apartment buildings and apartments will reduce the construction density, increase the height, and to prioritize the addition of urban infrastructure systems, public works, green spaces, and improve the environment. Urban space is established mainly as low-rise buildings. High-rise buildings in accordance with architectural management regulations along belt roads, radial roads, urban reconstruction areas, urban highlight areas such as: around Giang Vo lake, digital land 29 Lieu Giai, 148 Giang Vo, the areas around the urban railway station &#8230; Architect Dao Ngoc Nghiem &#8211; Vice Chairman of Vietnam Urban Planning Association said, in the zoning plans and management regulations has identified existence and change. If we had stretched people in the past to only solve the housing problem, this time there was improvement in space. Specifically, in the past, Hanoi was just a city with one central pole, now Hanoi is a cluster of cities, including satellite towns. Currently, the city only focuses on Hoa Lac urban development. If the remaining urban areas are developed further, the land potential will be solved. When there is an ecological and favorable environment for people, they will naturally become attached to a new place. Mr. Nguyen Do Dung (General Director of EnCity Consulting Company &#8211; the unit that won the first prize for the planning idea of ​​Thu Duc City) commented: “One bright spot of the project is clearly defining development priorities. In spite of the general policy of population control and restriction of tall buildings, the project does not “take it easy” but encourages high-density development along major roads and near urban railway stations. . This is very reasonable because we still need to renovate the urban area and effectively exploit the newly invested transport infrastructure ”. <strong> It is necessary to realize and manage well the plan</strong> Mr. Nguyen Do Dung said that high-rise buildings are not synonymous with high population density because they depend on construction density and the distribution of land use functions. The advantage of high-rise buildings is that it is easy to arrange green spaces and community facilities because the construction density is not more than 50% of the land fund. Meanwhile, the tube house model often occupies 80% &#8211; 100% of the land fund, so there is no room for green space. &#8220;Limiting high-rise buildings is only a situational solution when we do not have an effective mechanism to convert a huge number of low-rise houses into high-rise buildings,&#8221; Dung said. Commenting on the population relaxation progress, Mr. Nguyen Do Dung proposed, the city should have a more complete tax regime for real estate like in developed countries. The city can benefit from the rise in real estate prices due to public investment (opening roads, building parks) and having the resources to accelerate the acquisition of land for infrastructure construction. For public offices and facilities, many of which are under the management of central agencies, have to be relocated outside of the historic inner city, there is a need for regulations to allow partial conversion of land funds to do public works for the city instead of converting the entire land bank for other purposes such as commercial or residential, leading to population growth and continued pressure on infrastructure. Architect Tran Huy Anh (Hanoi Architects Association) emphasizes the element of resources to realize the project. The same planning is the completion of a system of regulations from management, ownership to technical regulations for this type of work. That is the basic resource for synchronous development, avoiding the situation of planning hanging. Another concern is that the local planning adjustment is quite arbitrary. Originally planned 20 floors, but after a few adjustments to &#8220;create a highlight&#8221;, it can be up to 30, even 40-50 floors. So does increasing a building increase the already painful traffic pressure? Architect Anh said that this not only depends on the quality of the initial planning, but also greatly depends on the ability to realize the plan and manage the plan. In fact, in Hanoi, there have been many high-rise projects that have sprung up causing traffic congestion, but it is still described as &#8220;fully meeting the planning targets&#8221;. The reason is that a series of roads and infrastructure are drawn beautifully, but mostly on paper. Meanwhile, the high-rise projects continue to be approved by the city in the direction of &#8220;appropriate planning&#8221;.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4614</post-id>	</item>
		<item>
		<title>Accelerating the project of &#8216;super-delay&#8217; Highway 27, section avoiding Lien Khuong, Lam Dong.</title>
		<link>https://en.spress.net/accelerating-the-project-of-super-delay-highway-27-section-avoiding-lien-khuong-lam-dong/</link>
		
		<dc:creator><![CDATA[Anh Minh]]></dc:creator>
		<pubDate>Mon, 19 Apr 2021 02:20:10 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Accelerating]]></category>
		<category><![CDATA[Avoid]]></category>
		<category><![CDATA[avoiding]]></category>
		<category><![CDATA[BGTVT]]></category>
		<category><![CDATA[Calves late]]></category>
		<category><![CDATA[Category]]></category>
		<category><![CDATA[Clearance]]></category>
		<category><![CDATA[CQLXD]]></category>
		<category><![CDATA[dong]]></category>
		<category><![CDATA[End]]></category>
		<category><![CDATA[Entangled]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Highway 27]]></category>
		<category><![CDATA[Khuong]]></category>
		<category><![CDATA[Lam]]></category>
		<category><![CDATA[Lam Dong]]></category>
		<category><![CDATA[Lam Dong Department of Transport]]></category>
		<category><![CDATA[Lien]]></category>
		<category><![CDATA[Lien Khuong]]></category>
		<category><![CDATA[Lien Khuong Airport]]></category>
		<category><![CDATA[Lien Khuong highway]]></category>
		<category><![CDATA[Package No 01]]></category>
		<category><![CDATA[Progress]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Project progress]]></category>
		<category><![CDATA[Resettlement]]></category>
		<category><![CDATA[Route]]></category>
		<category><![CDATA[section]]></category>
		<category><![CDATA[superdelay]]></category>
		<category><![CDATA[Urgent]]></category>
		<guid isPermaLink="false">https://en.spress.net/accelerating-the-project-of-super-delay-highway-27-section-avoiding-lien-khuong-lam-dong/</guid>

					<description><![CDATA[Highway 27 project, section avoiding Lien Khuong, Lam Dong province, although on the list of important and urgent projects, but progress is very slow due to land clearance problems. Illustration. The Ministry of Transport has just sent an official letter No. 3327 / BGTVT &#8211; CQLXD to the Lam Dong Department of Transport, requesting this [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Highway 27 project, section avoiding Lien Khuong, Lam Dong province, although on the list of important and urgent projects, but progress is very slow due to land clearance problems.</strong><br />
<span id="more-4577"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_19_72_38568693/a28ec752e3100a4e5301.jpg" width="625" height="416"> </p>
<p> Illustration. The Ministry of Transport has just sent an official letter No. 3327 / BGTVT &#8211; CQLXD to the Lam Dong Department of Transport, requesting this unit to speed up the implementation of the 27 Highway Project, the Lien Khuong bypass. Accordingly, the Ministry of Transport requires the Department of Transport of Lam Dong to actively coordinate with the local Site Clearance Council (site clearance) to quickly resolve the difficulties and problems in site clearance work; speed up the construction procedures for the construction of the resettlement area to arrange for households, hand over the entire site to the project before April 30, 2021, organize the construction to meet the required schedule. . Lam Dong Department of Transport is also urgently requested to direct the Project Management Board, the Consultant and the Contractor to strictly control the quality of materials gathered, used at the site, and resolutely remove materials that do not meet the requirements. bridge; strengthening construction quality management to comply with project technical instructions; perform the pre-acceptance test and make payment according to regulations. At the same time, direct the contractor to be proactive, increase the mobilization of machinery, equipment, human resources, materials and materials to speed up the construction progress for the positions with available premises, organize overtime. , increase crew for construction to compensate for the slow progress. For the positions that have the conditions for construction ground, Lam Dong Department of Transport instructs the contractor and related units to focus on completing the completion of each item, each section of the route has been handed over. by, controlling construction to ensure quality, progress, traffic safety, labor safety, and environmental sanitation according to requirements, meeting project progress. In case the locality cannot hand over the entire site according to the set schedule, the Lam Dong Department of Transport and related units will urgently organize the construction of completion of the work items at the locations that have been handed over. by the approved design, report to the Ministry of Transport before May 30, 2021 to consider allowing the determination of technical stops and hand over the status quo of the positions still facing the ground to the local management. “The Ministry of Transport will report to the Prime Minister on the difficulties and problems related to the site clearance, so it has not completed disbursement under the Prime Minister&#8217;s direction and will consider investing in construction and completion. the road sections still have problems with the ground when appropriate funding sources are available ”, stated the dispatch of the Ministry of Transport. Highway 27 project, Lien Khuong bypass is a project with a small investment capital scale (about 121 billion VND according to the initial investment decision and 235 billion VND after the adjustment) but it can be classified in the group. projects with the most &#8220;rubber&#8221; construction period in the transport infrastructure sector. It is known that, on the basis of the proposal of the People&#8217;s Committee of Lam Dong province, in 2008, the Ministry of Transport issued Decision No. 1051 / QD &#8211; BGTVT approving the Project of Highway 27, avoiding Lien Khuong airport, using main bond capital. and assigned to Lam Dong Department of Transport as an investor. According to the original plan, Lam Dong Department of Transport will have to complete 2 construction and installation packages of the Project after 24 months of construction (2010). However, due to the transportation work, there are many problems and the capital arrangement for Highway 27 project, the section to avoid Lien Khuong airport is too scattered and fragmented (2009: 10 billion VND, 2010: 10 billion VND, 2011 : 10 billion VND, 2012: 14 billion VND) so this work was constantly out of breath, failed to meet the set progress and was forced to stop and extend the construction progress from 2012. At the time of starting to extend progress, Package 02 (construction and installation of the flyover and 4 branches intersecting with Lien Khuong highway &#8211; Da Lat) has just completed 2 abutments, 2/3 pillars and two-span girder installation. record. Package No. 01 (construction of 6 km of road) has not been executed yet. Due to the important role of the project and at the request of the locality, in January 2019, the Ministry of Transport approved the adjustment of the 27th Highway Lien Khuong bypass project and prioritized it to be included in the list of 14 traffic projects. The most urgent matter is decided by the Standing Committee of the National Assembly to approve the plan to use VND 15,000 billion from the contingency capital of the medium-term public investment plan with state budget capital in the 2016-2020 period. After this adjustment, in addition to the total project investment increased twice; The work completion progress is also extended to the end of December 2020. Although sufficient capital has been allocated to restart the project, but by November 2020), the volume value of Package 01 has only reached about 10.5 billion (reaching 16% of the contract value). Due to the slow clearance work, especially the construction of the resettlement area to arrange for about 40 households to be resettled, many procedures have not been completed, so the Ministry of Transport is forced to extend the progress. to April 30, 2021. However, according to the report of Lam Dong Department of Transport and field inspection results on April 10, 2021, there are still 26 households (0.8km) on the route that have not yet handed over the site and about 0, 8km has handed over the site but cannot approach the project for construction due to problems at the beginning of the route which have not been handed over the site; The project must arrange resettlement for 40 households, Duc Trong District People&#8217;s Committee is currently preparing construction drawing design documents to implement and hand over the resettlement rate. Currently, Lam Dong province has started in the rainy season, so in case the volume of the problem is not handed over early to the contractor to speed up the construction progress, the completion of the project will not be guaranteed. judgment according to the required progress. On the other hand, the project uses the medium-term excess capital in the 2016-2020 period, so it must be fully disbursed in 2021, otherwise the project is not zoned to transfer capital to other projects to meet the disbursement schedule. in accordance with the direction of the Prime Minister.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">4577</post-id>	</item>
		<item>
		<title>Transfer and apply the results of scientific and technological research projects and topics at the provincial level</title>
		<link>https://en.spress.net/transfer-and-apply-the-results-of-scientific-and-technological-research-projects-and-topics-at-the-provincial-level/</link>
		
		<dc:creator><![CDATA[H.Trà]]></dc:creator>
		<pubDate>Sat, 17 Apr 2021 18:49:20 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[application]]></category>
		<category><![CDATA[Apply]]></category>
		<category><![CDATA[Cock]]></category>
		<category><![CDATA[Department of Science and Technology]]></category>
		<category><![CDATA[Fresh vegetable]]></category>
		<category><![CDATA[Health service Dept]]></category>
		<category><![CDATA[Hepatitis B]]></category>
		<category><![CDATA[Inspector of Quang Binh province]]></category>
		<category><![CDATA[Internal main]]></category>
		<category><![CDATA[level]]></category>
		<category><![CDATA[Locality]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Provincial]]></category>
		<category><![CDATA[Provincial level]]></category>
		<category><![CDATA[Quang Binh]]></category>
		<category><![CDATA[Quang Binh province police]]></category>
		<category><![CDATA[Quang Trach]]></category>
		<category><![CDATA[Research]]></category>
		<category><![CDATA[results]]></category>
		<category><![CDATA[Science and technology]]></category>
		<category><![CDATA[Scientific]]></category>
		<category><![CDATA[Signed]]></category>
		<category><![CDATA[technological]]></category>
		<category><![CDATA[Topic]]></category>
		<category><![CDATA[topics]]></category>
		<category><![CDATA[Transfer]]></category>
		<guid isPermaLink="false">https://en.spress.net/transfer-and-apply-the-results-of-scientific-and-technological-research-projects-and-topics-at-the-provincial-level/</guid>

					<description><![CDATA[The Department of Science and Technology (S&#38;T) of Quang Binh has just signed a contract to transfer the topics and research projects of science and technology at the provincial level to 30 departments, departments and branches in the area. Department of Science and Technology transfer and apply the results of scientific and technological research projects [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The Department of Science and Technology (S&amp;T) of Quang Binh has just signed a contract to transfer the topics and research projects of science and technology at the provincial level to 30 departments, departments and branches in the area.</strong><br />
<span id="more-3975"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_446_38535854/f9a074e95eabb7f5eeba.jpg" width="625" height="424"> </p>
<p> <em> Department of Science and Technology transfer and apply the results of scientific and technological research projects and projects at the provincial level to units in the province.</em> Specifically, on the transfer of results of topics, provincial projects have 22 subjects and projects. In which, typically the topics and projects: “Evaluate the effectiveness of a number of interventions to improve knowledge and practice attitudes about prevention of hepatitis B virus infection in mountainous and suburban communities. Quang Binh province sea &#8220;was transferred to the Department of Health and the Center for Disease Control in Quang Binh province; &#8220;Researching the current situation and proposing a number of solutions to improve the effectiveness of anti-corruption in Quang Binh province in the new situation&#8221; was transferred to the Internal Affairs Committee of the Provincial Party Committee and Inspectorate of Quang Binh province; &#8220;Research on solutions to improve the efficiency of tourism security in Quang Binh province in the current situation&#8221; was transferred to the police of Quang Binh province and the Department of Tourism of Quang Binh province; &#8230; Part of transferring results of model, career tasks of science and technology includes 14 models and tasks, such as: “Surveying, analyzing the quality of food safety and hygiene on vegetables, tubers and fruits at the a clean vegetable business in Quang Binh province ”the units being transferred are the Technical Center for Test Measurement and the Quality Management Department of Agriculture, Forestry and Fisheries of Quang Binh; &#8220;Building a model of wild chicken raising in Quang Trach district&#8221;, the unit transferred is Lam Ha General Construction Company Limited and Department of Agriculture and Rural Development of Quang Trach district &#8230; In the coming time, the Department of Science and Technology will continue to transfer the highly applicable scientific research and technological development results to departments, agencies and localities in the province to serve the development in the provinces. socio-economic field.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">3975</post-id>	</item>
		<item>
		<title>Which company is Vinaincon introduced by the Ministry of Industry and Trade as a subcontractor for Thai Nguyen Iron and Steel project phase 2?</title>
		<link>https://en.spress.net/which-company-is-vinaincon-introduced-by-the-ministry-of-industry-and-trade-as-a-subcontractor-for-thai-nguyen-iron-and-steel-project-phase-2/</link>
		
		<dc:creator><![CDATA[Đỗ Mến]]></dc:creator>
		<pubDate>Sat, 17 Apr 2021 01:30:08 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Accused]]></category>
		<category><![CDATA[China MCC]]></category>
		<category><![CDATA[Company]]></category>
		<category><![CDATA[Cure]]></category>
		<category><![CDATA[EPC]]></category>
		<category><![CDATA[general manager]]></category>
		<category><![CDATA[Hoang Chi Cuong]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[introduced]]></category>
		<category><![CDATA[Iron]]></category>
		<category><![CDATA[Lawyer]]></category>
		<category><![CDATA[Loan interest]]></category>
		<category><![CDATA[Loss]]></category>
		<category><![CDATA[Mai Van Tinh]]></category>
		<category><![CDATA[MCC]]></category>
		<category><![CDATA[Ministry]]></category>
		<category><![CDATA[Ministry of Industry and Trade]]></category>
		<category><![CDATA[Nguyen]]></category>
		<category><![CDATA[phase]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Real name]]></category>
		<category><![CDATA[Steel]]></category>
		<category><![CDATA[subcontractor]]></category>
		<category><![CDATA[Subcontractors]]></category>
		<category><![CDATA[Thai]]></category>
		<category><![CDATA[Thai Nguyen Iron and Steel]]></category>
		<category><![CDATA[Thai Nguyen Iron and Steel Joint Stock Company]]></category>
		<category><![CDATA[Trade]]></category>
		<category><![CDATA[Tran Trong Mung]]></category>
		<category><![CDATA[VINAINCON]]></category>
		<category><![CDATA[VNS]]></category>
		<category><![CDATA[VVN]]></category>
		<guid isPermaLink="false">https://en.spress.net/which-company-is-vinaincon-introduced-by-the-ministry-of-industry-and-trade-as-a-subcontractor-for-thai-nguyen-iron-and-steel-project-phase-2/</guid>

					<description><![CDATA[How does Vinaincon &#8211; an enterprise introduced only by the Ministry of Industry and Trade as a subcontractor of Thai Nguyen Iron and Steel project? Internet photo Losing money for many years Vietnam Industrial Construction Joint Stock Corporation (Vinaincon, VVN code &#8211; UPCoM transaction) was established in 1998, with charter capital of 550 billion VND, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>How does Vinaincon &#8211; an enterprise introduced only by the Ministry of Industry and Trade as a subcontractor of Thai Nguyen Iron and Steel project?</strong><br />
<span id="more-3502"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_95_38546947/fbb8607d4b3fa261fb2e.jpg" width="625" height="263"></p>
<p><em>Internet photo</em></p>
<p><strong>Losing money for many years</strong></p>
<p>Vietnam Industrial Construction Joint Stock Corporation (Vinaincon, VVN code &#8211; UPCoM transaction) was established in 1998, with charter capital of 550 billion VND, and 82.75% of state capital represented by the Ministry of Industry and Trade. The company specializes in construction and installation, basic construction.</p>
<p>The audited financial statements of the parent company 2020 have just been announced by VVN, showing that the total assets of the company is 987 billion VND. Revenue from goods sold and service provision in 2020 will reach 313 billion VND but COGS is 314 billion VND, so gross profit is negative 724 million VND.</p>
<p>Revenue from financial activities is 48.4 billion VND. The cost of business management is 30 billion. Net profit reached 9.3 billion. Thereby, after-tax profit reached 13.2 billion.</p>
<p>According to the note, the revenue from financial activities mainly comes from deposit interest, interest of 18.4 billion dong, and dividend of 29.9 billion dong.</p>
<p>It is known that VVN invests in many subsidiaries and associates. These companies are mostly profitable, the highest profit is from Thu Duc Centrifugal Concrete JSC (13 billion VND) and An Giang Centrifugal Joint Stock Company (6.1 billion VND).</p>
<p>Up to this point, VVN has not yet released its 2020 consolidated financial statements. In early April 2021, VVN also submitted a request to extend the time to hold the 2021 Annual General Meeting of Shareholders for the reason that results were summarized. The Corporation&#8217;s production and business have not been completed yet because the work-in-progress valuation and debt comparison with the investors are difficult and prolonged.</p>
<p>According to the annual report of 2019, although the total revenue and other income in 2019 increased by 126.7% compared to 2018, reaching more than 4,443 billion VND, but the cost of goods sold was high. In addition, the investment from Quang Son Cement Company Limited lost a loss (minus 126 billion VND), making the company&#8217;s profit in 2018 and 2019 all negative numbers.</p>
<p>In 2020, the company has a decision to dismiss Mr. Hoang Chi Cuong &#8211; General Director, instead appointing Mr. Do Chi Nguyen.</p>
<p><strong>Please clarify the role of Vinaincon</strong></p>
<p>From April 12, Hanoi City People&#8217;s Court brought to trial with 19 defendants who are leaders of Vietnam Steel Corporation &#8211; VNS, Thai Nguyen Iron and Steel Joint Stock Company &#8211; TISCO on wrongdoing in this project with behavior like Adjusting the investment structure, signing the contract appendix, separating part c from the EPC contract, signing subcontracting contract with Vinaincon according to unit price, leading to breaking the EPC contract principles &#8230;</p>
<p>Vinaincon is a subcontractor involved in Thai Nguyen Iron and Steel Phase 2 project. In 2009, the EPC contract between Thai Nguyen Iron and Steel Joint Stock Company &#8211; TISCO and Chinese contractor MCC had problems due to consecutive MCC. contract breaking.</p>
<p>On April 29, 2009, Vinaincon sent a document to the Ministry of Industry and Trade, Vietnam Steel Corporation &#8211; VNS (granting investment decision) and TISCO to register as a subcontractor.</p>
<p>On May 14, 2009, on the basis of the request of Vinaincon, the Ministry of Industry and Trade sent a document 4320 to VNS, TISCO with the content that the Ministry of Industry and Trade commented, “Vinaincon is a capable and experienced unit in the field. construction and installation of industrial construction works. Request VNS, TISCO to consider and approve Vinaincon to be the subcontractor to perform Part C ”.</p>
<p>On June 26, 2009, Mr. Mai Van Tinh &#8211; former Chairman of the Board of Directors of VNS signed a written agreement to allow Vinaincon to be a subcontractor. After that, TISCO, Vinaincon and MCC signed the contract.</p>
<p>However, in 2010, Vinaincon returned his job to TISCO due to insufficient capacity. TISCO had to subcontract with 13 other companies, but the project was still incomplete, capitalized and caused a loss of more than VND 830 billion to the state.</p>
<p>Some defendants admitted that they accepted Vinaincon because of the above document from the Ministry of Industry and Trade.</p>
<p>Defending defendant Tran Trong Mung (former General Director of TISCO), lawyer Truong Anh Tu said that in the conclusion of the project, the Government Inspector has determined that the Ministry of Industry and Trade has introduced and proposed VNS, TISCO to accept It is not the right authority for Vinaincon to be a subcontractor.</p>
<p>Lawyer Nguyen Thi Minh Yen, defending defendant Dong Quang Duong (former deputy director of TISCO), stated that: TISCO&#8217;s approval of Vinainco as a subcontractor for MCC must first mention the responsibility of the Ministry of Industry and Trade in the issue of introducing Vinainco and confirming Vinainco&#8217;s capacity to lead to a tripartite contract between TISCO &#8211; MCC and Vinaincon. Next, the fact that Vinainco voluntarily stopped implementing part c was due to the subjectivity of Vinaincon.</p>
<p>Therefore, the lawyer proposed to return the file to investigate and review the responsibility of the Ministry of Industry and Trade; Collect documents and evidence of Vinaincon&#8217;s performance of the contract, clarify how Vinaincon appoints 13 subcontractors? &#8230;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">3502</post-id>	</item>
		<item>
		<title>Prepare to start the North-South Expressway through the Central region</title>
		<link>https://en.spress.net/prepare-to-start-the-north-south-expressway-through-the-central-region/</link>
		
		<dc:creator><![CDATA[Hà Minh]]></dc:creator>
		<pubDate>Fri, 16 Apr 2021 11:26:07 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[backfill]]></category>
		<category><![CDATA[Bong Son town]]></category>
		<category><![CDATA[Cam Lam]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[East]]></category>
		<category><![CDATA[Embankment]]></category>
		<category><![CDATA[Expressway]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Hoai Nhon]]></category>
		<category><![CDATA[Ingredient]]></category>
		<category><![CDATA[Khanh Hoa Provincial People s Committee]]></category>
		<category><![CDATA[Nguyen Tu Cong Hoang]]></category>
		<category><![CDATA[Nguyen Van Dan]]></category>
		<category><![CDATA[North highway]]></category>
		<category><![CDATA[North South Expressway]]></category>
		<category><![CDATA[NorthSouth]]></category>
		<category><![CDATA[Prepare]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Quang Ngai Department of Transport]]></category>
		<category><![CDATA[Quarry]]></category>
		<category><![CDATA[region]]></category>
		<category><![CDATA[start]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[Ultimately]]></category>
		<guid isPermaLink="false">https://en.spress.net/prepare-to-start-the-north-south-expressway-through-the-central-region/</guid>

					<description><![CDATA[The best preparation of the conditions to start the North-South expressway sections through the Central has completed the site clearance and agreed on the route plan which is determined by the localities to implement. Khanh Hoa prepares building materials Mr. Nguyen Van Dan, Director of the Department of Transport &#8211; Transport (MOT) of Khanh Hoa [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>The best preparation of the conditions to start the North-South expressway sections through the Central has completed the site clearance and agreed on the route plan which is determined by the localities to implement.</strong><br />
<span id="more-2673"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_72_38547524/fe0437ef9eac77f22ebd.jpg" width="625" height="468"></p>
<p><strong>Khanh Hoa prepares building materials</strong></p>
<p>Mr. Nguyen Van Dan, Director of the Department of Transport &#8211; Transport (MOT) of Khanh Hoa province, said that this Department, together with the Department of Natural Resources and Environment and the districts and towns with the highway passing through, are urgently reviewing. , report and propose licensing of material mines for construction as soon as the North &#8211; South expressway section passes Khanh Hoa expected in the second quarter of 2021.</p>
<p>According to calculations, the North &#8211; South expressway project Nha Trang &#8211; Cam Lam section needs more than 3 million cubic meters of land for leveling; the section of Cam Lam &#8211; Vinh Hao, requires 200,000 m3 of soil for embankment. In addition, the project also needs a large amount of stone for the production of hot asphalt concrete on the road surface. With such a great demand, the project investors are worried about the source of materials during the construction process.</p>
<p>To proactively source materials, from March 2020, the Project Management Board of Ho Chi Minh Road sent a document to the People&#8217;s Committee of Khanh Hoa province on the agreement on a material mine, landfill site. According to Mr. Nguyen Van Dan, raw materials for the construction of the North-South expressway through Khanh Hoa are relatively abundant. “The People&#8217;s Committee of Khanh Hoa province has approved the quarries, sand for common building materials and land mines for landfilling, which have been issued with a valid mineral mining license by the PPC. has been approved by the Provincial People&#8217;s Committee, requesting the Project Management Board of Ho Chi Minh Road to update the above mineral mines to implement the regulations &#8220;, Mr. Dan said.</p>
<p>As for the earth, stone, and sand mines used to serve the project without environmental records, the mine owners must make an environmental impact assessment report and submit it to the Provincial People&#8217;s Committee for appraisal and approval; the quarry areas, sand as common building materials and land mines used for leveling have not been licensed for exploitation, assign the Department of Natural Resources and Environment to coordinate with relevant units to review and consult to report to the Provincial People&#8217;s Committee for handling and settlement.</p>
<p>According to Mr. Le Thanh Binh, Deputy Director of the Ho Chi Minh Road Project Management Board (Ministry of Transport), up to this point, the North-South Expressway Project through Khanh Hoa province has basically completed the liberation. ground; Only a few jobs related to the relocation of technical infrastructure are still being carried out.</p>
<p>Recently, in the meeting with the leaders of Khanh Hoa Provincial People&#8217;s Committee, Mr. Le Anh Tuan, Deputy Minister of Transport, also proposed Khanh Hoa Provincial People&#8217;s Committee to create material sources, stabilize material prices during implementation, avoid cases. resources are scarce, prices are pushed up.</p>
<p><strong>Binh Dinh and Quang Ngai have agreed the route plan</strong></p>
<p>While the North-South expressway through Khanh Hoa was about to be started, Quang Ngai and Binh Dinh have completed the route plan.</p>
<p>Mr. Nguyen Phong, Director of Quang Ngai Department of Transport, said that the locality has completed the planning of the route and is agreed by the Ministry of Transport, including the starting point at km130 + 800 expressways of Da Nang &#8211; Quang Ngai, in Nghia Dien commune (district Tu Nghia, Quang Ngai province) and the end point intersects Provincial Highway 629, in Bong Son town (Hoai Nhon, Binh Dinh).</p>
<p>On the Binh Dinh province side, Mr. Nguyen Tu Cong Hoang, Vice Chairman of the Provincial People&#8217;s Committee said that the North-South expressway project through Binh Dinh province was agreed by the Ministry of Transport to be divided into 3 component projects, including: Quang Ngai &#8211; Hoai Nhon Project, Hoai Nhon &#8211; Quy Nhon Project and Quy Nhon &#8211; Tuy Hoa Project (Phu Yen Province).</p>
<p>“There are two directions presented to the leaders of the province and the Ministry of Transport. In which, option 1 builds a route to the east (about 3-4 km from National Highway 1), 110 km long and option 2 builds a western direction (about 12-35 km from National Highway 1) 113 km long. &#8220;, Mr. Hoang said.</p>
<p>Through analysis, the two investment plans have their own advantages and disadvantages. However, if done according to option 1, the distance between the expressway to economic zones, industrial clusters and city center. Quy Nhon will be closer, convenient to connect traffic, promote the development of industries in many fields, create a driving force for socio-economic development.</p>
<p>“Option 1 is in line with the planning and development orientation of Binh Dinh to 2035, with a vision to 2050. Therefore, Binh Dinh chooses the plan to build the North-South expressway across the area according to the direction of the Eastern route &#8220;, Mr. Hoang emphasized.</p>
<p>According to Deputy Minister of Transport Le Anh Tuan, the fact that Quang Ngai has agreed on the route is an important premise for the project to continue the implementation steps. As for Binh Dinh, the Ministry of Transport has asked the province to continue to work closely with the consultant and the Ministry of Transport to survey the entire North-South expressway through the area, at the same time providing more data related to the locality. project selected by the province.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2673</post-id>	</item>
		<item>
		<title>Project of Ha Dong People&#8217;s Court: There is a suspicion that the contractor cheated the application to win the bid</title>
		<link>https://en.spress.net/project-of-ha-dong-peoples-court-there-is-a-suspicion-that-the-contractor-cheated-the-application-to-win-the-bid/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Fri, 16 Apr 2021 09:20:46 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[application]]></category>
		<category><![CDATA[bid]]></category>
		<category><![CDATA[Bidding]]></category>
		<category><![CDATA[bidding documents]]></category>
		<category><![CDATA[Cheat]]></category>
		<category><![CDATA[cheated]]></category>
		<category><![CDATA[Circular No 03 2015 TT BKHDT]]></category>
		<category><![CDATA[Civil]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[Construction investment projects]]></category>
		<category><![CDATA[contractor]]></category>
		<category><![CDATA[Contractors]]></category>
		<category><![CDATA[court]]></category>
		<category><![CDATA[dong]]></category>
		<category><![CDATA[Doubtful]]></category>
		<category><![CDATA[FAKE]]></category>
		<category><![CDATA[file]]></category>
		<category><![CDATA[Headquarters]]></category>
		<category><![CDATA[Luong Thanh Phong]]></category>
		<category><![CDATA[Needle hole]]></category>
		<category><![CDATA[Package]]></category>
		<category><![CDATA[Part of work]]></category>
		<category><![CDATA[Peoples]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[suspicion]]></category>
		<category><![CDATA[Tenderer]]></category>
		<category><![CDATA[VTTB]]></category>
		<category><![CDATA[win]]></category>
		<category><![CDATA[Winning bid]]></category>
		<guid isPermaLink="false">https://en.spress.net/project-of-ha-dong-peoples-court-there-is-a-suspicion-that-the-contractor-cheated-the-application-to-win-the-bid/</guid>

					<description><![CDATA[CID HOLDINGS Joint Stock Company has shown signs of falsifying the capacity documents to win the tender package worth over 27.6 billion VND at the construction project of the People&#8217;s Court of Ha Dong District, Construction Capacity profile fraud Recently, the Education and Times newspaper received feedback from readers about the serious violations of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>CID HOLDINGS Joint Stock Company has shown signs of falsifying the capacity documents to win the tender package worth over 27.6 billion VND at the construction project of the People&#8217;s Court of Ha Dong District,</strong><br />
<span id="more-2358"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_181_38546587/818c0a452107c8599116.jpg" width="625" height="401"></p>
<p><em>Construction</em></p>
<p><strong>Capacity profile fraud</strong></p>
<p>Recently, the Education and Times newspaper received feedback from readers about the serious violations of the Bidding Law in Package 12: Construction, supply and installation of equipment for the whole project (except for the part of Package 13) belonging to the project of headquarters of the People&#8217;s Court of Ha Dong District.</p>
<p>Bidding package is procured by Hanoi Civil and Industrial Construction Investment Project Management Board.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_181_38546587/50d6dd1ff65d1f03464c.jpg" width="625" height="882"></p>
<p><em>The decision on contractor selection is signed by the leader of the Hanoi Civil and Industrial Project Management Board to select the contractor to execute the bidding package.</em></p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_16_181_38546587/ba9f3e561514fc4aa505.jpg" width="625" height="890"></p>
<p><em>The person who signed the Decision is Mr. Luong Thanh Phong &#8211; Deputy Director of Hanoi Civil and Industrial Project Management Board.</em></p>
<p>According to readers, on December 18, 2020, the Management Board of Hanoi&#8217;s civil and industrial construction investment projects had Decision No. 354 / QD-BQLDADD &amp; CN approving the selection results. Select the contractor of Package 12: Construction, supply and installation of equipment for the whole project (except for the part of package 13) belonging to the head office project of the People&#8217;s Court of Ha Dong district.</p>
<p>Accordingly, CID HOLDINGS Joint Stock Company is the winning bidder, the bidding package price is VND 27,607,384,000; Winning bid price is: 27,468,439,000 VND, contract execution time is: 355 days, the form of contractor selection for this package is public bidding.</p>
<p>However, in the finalization of corporate income tax at the Tax Department of Nam Tu Liem district, CID HOLDINGS Joint Stock Company (tax code 0107005836), is located on the 22nd floor of Vinaconex 9 Building, Lot HH2-2 Pham Hung Street, Me Tri Ward, Nam Tu Liem District, Hanoi City in 3 years (2017-2018-2019) only achieved an average annual revenue of 26.9 billion VND.</p>
<p>Specifically, in 2017, the company&#8217;s revenue was only 213,539,301 VND; in 2018 was 39,499,342,800 VND; in 2019 it is 41,216,509,132 dong.</p>
<p>Under the guidance in Circular No. 03/2015 / TT-BKHDT and as required by the bidding documents issued by the Management Board of civil and industrial construction projects of Hanoi City in Section 2.2 of The evaluation criteria table of competence and experience clearly states that the minimum annual average revenue of an enterprise must reach 42 billion (the minimum average revenue meets the requirements of the bidding documents).</p>
<p><strong>The elephant goes through &#8230; the pinhole</strong></p>
<p>Thus, with an average revenue of only 26.9 billion in the last 3 years, it is clear that CID HOLDINGS Joint Stock Company is not eligible to bid. And should be, the bid of CID HOLDINGS Joint Stock Company must be the agency responsible for detecting the above fraud and removed from the beginning, but it is not clear how, this unit is still allowed to attend. bid review and bid winner !?</p>
<p>In addition, in Section 3 of the Criteria for Evaluation of Competency and Experience, there is a requirement that the minimum number of similar contracts must be equal to 3 or different from 3, at least one contract with a minimum value of 20,000. .000.000 VND and total value of all contracts ≥ 60.000.000.000 VND from 1/10/2017 up to the time of bid closing.</p>
<p>It is known that in the past 5 years, CID HOLDINGS Joint Stock Company has been announced to win 4 bidding packages, all of which have low value, including: Package 3 Supply and transportation of VTTB and accessories (winning price is 2 , 7 billion VND; won the bid on May 3, 2019) invited by the Central Region Power Project Management Board; Package No. 03: Construction of the project of Quynh Bao Commune Medical Station, Quynh Phu District, Thai Binh Province (winning bid price is 5.08 billion VND; Winning the bid on 2/2/2020)….</p>
<p>Due to the above-mentioned irregularities, readers suspect that the leaders of CID HOLDINGS Joint Stock Company have falsified the documents to bid and win the bid.</p>
<p>The fact that CID HOLDINGS Joint Stock Company does not meet the financial criteria but still wins the bid, causing public opinion to question: Is the investor deliberately &#8220;creating conditions&#8221; for CID HOLDINGS Joint Stock Company to win? Bid?</p>
<p>With the manifestations of fraud and violation of the Bidding Law of CID HOLDINGS Joint Stock Company that has been mentioned by the public, the leaders of the Hanoi People&#8217;s Committee are requested to direct relevant agencies to enter, investigate, and clarify early. and strictly handle violations according to law provisions (if any).</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2358</post-id>	</item>
		<item>
		<title>Preventing virtual land fever: It is necessary to have transparent information on project planning and progress</title>
		<link>https://en.spress.net/preventing-virtual-land-fever-it-is-necessary-to-have-transparent-information-on-project-planning-and-progress/</link>
					<comments>https://en.spress.net/preventing-virtual-land-fever-it-is-necessary-to-have-transparent-information-on-project-planning-and-progress/#respond</comments>
		
		<dc:creator><![CDATA[Toàn Thắng]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 09:12:12 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Construction Ministry]]></category>
		<category><![CDATA[Deputy]]></category>
		<category><![CDATA[Fever]]></category>
		<category><![CDATA[Gossip]]></category>
		<category><![CDATA[information]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Juridical]]></category>
		<category><![CDATA[land]]></category>
		<category><![CDATA[Local]]></category>
		<category><![CDATA[Nguyen Van Sinh]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[Planning Law 2017]]></category>
		<category><![CDATA[Preventing]]></category>
		<category><![CDATA[Profits]]></category>
		<category><![CDATA[Progress]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Project progress]]></category>
		<category><![CDATA[Real estate]]></category>
		<category><![CDATA[Release the news]]></category>
		<category><![CDATA[Speculative]]></category>
		<category><![CDATA[The ground]]></category>
		<category><![CDATA[transparent]]></category>
		<category><![CDATA[Virtual]]></category>
		<category><![CDATA[Zoning]]></category>
		<guid isPermaLink="false">https://en.spress.net/preventing-virtual-land-fever-it-is-necessary-to-have-transparent-information-on-project-planning-and-progress/</guid>

					<description><![CDATA[Deputy Minister of Construction Nguyen Van Sinh suggested localities focus on completing and approving planning projects, ensuring full legality for projects. At the same time, publicly announcing information about the planning and implementation progress of projects to make information transparent, prevent the spread of rumors, speculation to push prices, to profit from some projects that [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Deputy Minister of Construction Nguyen Van Sinh suggested localities focus on completing and approving planning projects, ensuring full legality for projects. At the same time, publicly announcing information about the planning and implementation progress of projects to make information transparent, prevent the spread of rumors, speculation to push prices, to profit from some projects that happened in last time.</strong><br />
<span id="more-1096"></span> </p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_146_38535098/8dab6ddd479faec1f78e.jpg" width="625" height="430"></p>
<p><em>Deputy Minister of Construction Nguyen Van Sinh. Photo: VGP </em></p>
<p>This is the information emphasized by Deputy Minister of Construction Nguyen Van Sinh during the meeting to provide information to a number of press agencies about the situation of land fever, virtual land fever in some localities in recent years.</p>
<p><strong>There are many &#8220;risks&#8221; in real estate transactions</strong></p>
<p>Deputy Minister Nguyen Van Sinh said that in the first quarter of 2021, the real estate market had many fluctuations, although the volume of real estate transactions under the supervision of the Ministry of Construction, was only about 70% of the transactions in the fourth quarter of 2020.</p>
<p>Real estate prices increased slightly, especially apartments also increased from 5% to 10%. In particular, land prices have had a hot, local phenomenon in some localities across the country such as areas around Hanoi, Quang Ninh, Hai Phong, Bac Ninh, Bac Giang, Hoa Binh, Phu Tho, Ho Chi Minh City, Dong Nai. , Binh Duong, Binh Phuoc, Binh Thuan &#8230;</p>
<p>Many people leave their jobs and production to trade land, creating local land fever phenomenon and risks affecting socio-economic development in the area.</p>
<p>It is worrying that many real estate transactions have emerged problems affecting the interests of people, especially real estate transactions with ineligible legal conditions.</p>
<p>“That is a situation that many projects that have not invested in technical infrastructure have real estate transactions; Many transactions took place with forest land, agricultural land, production and business land that has not been used for investment in real estate projects. It can be said that these transactions do not guarantee legal requirements, potential risks for people when investing in real estate in the past time, &#8220;Deputy Minister Nguyen Van Sinh warned.</p>
<p><strong>Five causes of land fever &#8211; virtual land fever</strong></p>
<p>According to Deputy Minister of Construction Nguyen Van Sinh, in recent years, most localities have been very active in preparing provincial planning according to the provisions of the Law on Planning 2017. At the same time, localities are also interested in the planning investment and development of urban projects, housing projects, and large-scale technical infrastructure projects. Urban upgrading is also happening synchronously.</p>
<p>Deputy Minister Nguyen Van Sinh stated, “The planning and announcement of the local planning has not been made public and transparent for timely orientation for people and businesses, leading to investors and businesses. The real estate has taken advantage of this lack of transparency to push land prices up as in the past &#8220;.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_146_38535098/05b3e2c5c88721d97896.jpg" width="625" height="362"></p>
<p><em>Land fever has occurred in some localities in recent years. Photo: VGP </em></p>
<p>Second, due to the impact of the COVID-19 epidemic, the bank interest rates, including those at commercial banks, are very low. This investment channel is not attractive to people to send money. Therefore, at present, many investors and people with idle money tend to invest in real estate transactions because they think that this transaction is safe, effective and has opportunities for the future.</p>
<p>The third reason, according to Deputy Minister Nguyen Van Sinh, in recent years, the investment in the development of housing, real estate and urban projects has also faced many difficulties, especially legal procedures. Land management, investment and construction are still difficult, leading to a limited supply of real estate.</p>
<p>Next is the investment and development of affordable commercial housing, social housing, for the poor in urban areas as well as workers in industrial zones that have not been given adequate attention by localities. leading to a lack of social housing supply, not meeting the needs and needs of the current people.</p>
<p>Fifth, now some localities have had a policy of increasing land prices according to the roadmap with an increase of 15-20%. Although this land price increase has not affected much real estate transactions today, because real estate transactions have now been allocated land and invested in the past, but the policy of increasing land prices has affected. affecting psychology and the increase in real estate prices in recent times.</p>
<p><strong>Transparency about planning and implementation progress of projects</strong></p>
<p>Deputy Minister Nguyen Van Sinh said that over the past time, the Government and the Prime Minister have focused on directing ministries and localities to drastically step in and take specific solutions to prevent and strictly deal with the phenomenon. virtual land fever in some localities.</p>
<p>Specifically, focus on building and perfecting the legal system related to land, real estate investment, construction and trading to remove difficulties, especially in terms of investment order and procedures.</p>
<p>The Government has submitted and approved by the National Assembly the amended Investment Law, the amended Construction Law, the decrees have also been issued by the Government such as the Decree guiding the Construction Law, the Decree guiding the Investment Law; Amended Decrees related to the Decree on management and development of housing projects and guide the Housing Law and the Decree on social housing development.</p>
<p>Along with that, the Government has also instructed the State Bank of Vietnam to better control credit, especially credit in real estate, to avoid &#8220;double risks&#8221; in this area.</p>
<p>At the same time, to direct localities to focus on investment in developing social housing, cheap commercial housing to meet the housing needs of people, especially workers in industrial zones.</p>
<p>For localities, Deputy Minister of Construction Nguyen Van Sinh suggested that in the coming time, focus on completing and approving planning projects, paying attention to urban development projects, housing projects. ensure synchronous technical infrastructure, social infrastructure and full legal status for real estate projects, control real estate transactions to ensure demand.</p>
<p>Continuing to make public information about the planning and implementation progress of projects in order to make information transparent, prevent the spread of rumors, speculation to push prices and profit from a number of projects that have occurred. out in the past.</p>
<p>In addition, there should be strict measures to prevent the transfer of land use rights, division of plots, sale of land in some areas that have not yet been allowed to invest. Deputy Minister of Construction Nguyen Van Sinh proposed to manage and control the purchase and sale of real estate transactions many times to better control the increase in land prices, especially through management measures. very good organizations and individuals in real estate transactions and brokerage.</p>
<p>At the same time, it is suggested that localities in the coming time strengthen the inspection, examination and strictly handle cases of real estate investment and trading in contravention of regulations, especially ghost projects, projects are not enough. Legal documents, real estate business conditions.</p>
<p>For real estate businesses, it is necessary to strictly comply with the investment order and procedures, especially the procedures for land allocation and construction investment, so that real estate investment and business projects are fully fully legal, complying with regulations on construction investment in real estate projects.</p>
<p>In the coming time, businesses need to pay attention to invest in real estate and housing projects to ensure synchronous technical infrastructure, social infrastructure, legal status and do business, business transactions. to trade real estate in accordance with law.</p>
<p>Deputy Minister Nguyen Van Sinh also recommended that people and businesses who are interested in the real estate field are very calm, wary of rumors, study and carefully consider legal documents of projects. Real estate transactions and real estate transactions only when there is clear legal documents, in accordance with the provisions of the law.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/preventing-virtual-land-fever-it-is-necessary-to-have-transparent-information-on-project-planning-and-progress/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1096</post-id>	</item>
		<item>
		<title>Project Northern Flow 2: Speculation of &#8216;inflated&#8217; data and suspicion of Russian President&#8217;s &#8216;intrigue&#8217; with Ukraine?</title>
		<link>https://en.spress.net/project-northern-flow-2-speculation-of-inflated-data-and-suspicion-of-russian-presidents-intrigue-with-ukraine/</link>
					<comments>https://en.spress.net/project-northern-flow-2-speculation-of-inflated-data-and-suspicion-of-russian-presidents-intrigue-with-ukraine/#respond</comments>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 09:06:12 +0000</pubDate>
				<category><![CDATA[World]]></category>
		<category><![CDATA[Baltic Sea]]></category>
		<category><![CDATA[Blow up]]></category>
		<category><![CDATA[data]]></category>
		<category><![CDATA[Dependent]]></category>
		<category><![CDATA[Doubt]]></category>
		<category><![CDATA[EPP]]></category>
		<category><![CDATA[Europe]]></category>
		<category><![CDATA[European People s Party]]></category>
		<category><![CDATA[Flow]]></category>
		<category><![CDATA[Gas]]></category>
		<category><![CDATA[Gas pipeline]]></category>
		<category><![CDATA[Give up]]></category>
		<category><![CDATA[inflated]]></category>
		<category><![CDATA[Intrigue]]></category>
		<category><![CDATA[Joe Biden]]></category>
		<category><![CDATA[Manfred Weber]]></category>
		<category><![CDATA[Nord Stream 2]]></category>
		<category><![CDATA[Northern]]></category>
		<category><![CDATA[Pipeline]]></category>
		<category><![CDATA[Presidents]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Protest]]></category>
		<category><![CDATA[Punishment]]></category>
		<category><![CDATA[Russian]]></category>
		<category><![CDATA[Russian President]]></category>
		<category><![CDATA[Speculation]]></category>
		<category><![CDATA[suspicion]]></category>
		<category><![CDATA[Ukraine]]></category>
		<guid isPermaLink="false">https://en.spress.net/project-northern-flow-2-speculation-of-inflated-data-and-suspicion-of-russian-presidents-intrigue-with-ukraine/</guid>

					<description><![CDATA[Chairman of the European People&#8217;s Party (EPP) group at the European Parliament Manfred Weber said that the Northern Flow 2 project &#8216;will definitely not be feasible&#8217; if Russian President Vladimir Putin leaves the conflict in the region. East Ukraine escalated. Northern flow 2: Germany receives a request for a building permit, President Biden falls into [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Chairman of the European People&#8217;s Party (EPP) group at the European Parliament Manfred Weber said that the Northern Flow 2 project &#8216;will definitely not be feasible&#8217; if Russian President Vladimir Putin leaves the conflict in the region. East Ukraine escalated.</strong><br />
<span id="more-1088"></span> </p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_194_38535183/859310762c34c56a9c25.jpg" width="625" height="351"></p>
<p><em>Northern flow 2: Germany receives a request for a building permit, President Biden falls into a &#8216;dilemma&#8217;. (Source: The Brussels Times)</em></p>
<p>The website Tagesspiegel.de recently published an article titled &#8220;A guaranteed gas supply even without the Northern Stream 2 project&#8221;.</p>
<p>Accordingly, the Northern Flow 2 gas pipeline project not only supplies gas to Germany and the European Union (EU) but also has strategic implications for the transition of energy, the environment and political geography.</p>
<p>Once again, this has become a central issue in the context of Russia increasing its military forces on the Ukrainian border and US Defense Secretary Lloyd Austin making his first visit to Germany.</p>
<p>The question is, is this piping system really necessary? What would the consequences be if the pipeline didn&#8217;t go into service?</p>
<p><strong>The opinions are mixed</strong></p>
<p>Experts have many different opinions. Some people, like Jens Hobohm from Prognos Institute for Economic Research (Germany), believe that Northern Flow 2 from an energy point of view is necessary and meaningful.</p>
<p>In contrast, expert Claudia Kemfert from the German Institute for Economic Research (DIW) argues that the answer is &#8220;definitely not&#8221;.</p>
<p>According to Kemfert, it is not necessary to have any additional infrastructure for the transportation of natural gas from Russia. In addition, the plan to increase natural gas consumption will conflict with the discussed and agreed climate protection goals.</p>
<p>This expert said that there would be no serious problems if the Northern Flow 2 could not be completed and put into operation. If gas from Russia cannot reach Germany through this pipeline system, Germany and Europe will find other energy solutions.</p>
<p>In this regard, new US President Joe Biden has stated that, like his predecessor, Donald Trump, he wants to prevent the completion of the project through the threat of punishing companies involved in the project. .</p>
<p>Still many EU partners believe that, with the assistance of the Northern Flow 2, Germany is acting against the common interests of Europe.</p>
<p>Chairman of the European People&#8217;s Party (EPP) group at the European Parliament Manfred Weber said that the Northern Flow 2 project &#8220;will definitely not be feasible&#8221; if Russian President Vladimir Putin lets the conflict in the region. East Ukraine escalated.</p>
<p>Will the gas supply be at risk then? To answer this question, the forecasts of the amount of gas that Germany and Europe will need in the coming years are central.</p>
<p>From the outset, critics accused the conglomerates that built the pipeline project &#8220;inflated&#8221; the data on German and European gas demand, making the project indispensable. and completely overwhelmed the opposition.</p>
<p>However, Jens Hobohm believes that this criticism holds true only in previous years, but in recent years, gas consumption in Germany and Europe has increased more than expected due to the need for natural gas. as a bridge for energy transitions.</p>
<p>When countries like Germany give up nuclear power, Poland reduces its dependence on coal, while solar and wind energy are still unable to meet demand, gas is the optimal solution.</p>
<p>According to a study by the Prognos Research Institute, in 2014, the EU consumed 400 billion cubic meters of gas; in 2015, the figure was 419 billion cubic meters and in 2019 it was 470 billion cubic meters.</p>
<p>Consumption figures for 2020 have not been specifically calculated, but according to expert Hobohm, this number is expected to decrease due to the impact of the epidemic of acute respiratory infections Covid-19.</p>
<p>In Germany alone, gas consumption will also increase from 77 billion cubic meters in 2015 to 89 billion cubic meters in 2019, while in 2020 this figure will decrease by about 2.5 percent.</p>
<p>Is that a compelling argument for the construction of the Northern Flow 2 project or would the existing pipes be enough to meet demand?</p>
<p><strong>Is the project really necessary?</strong></p>
<p>If we compare the gas consumption figures for 2019 to 2006, when the first Northern Flow system was planned to be constructed, it can be seen that the consumption volume has never been as high as it was before. Meanwhile, the project construction consortium insists that pipelines are needed as gas consumption will increase continuously. In fact, in 2006, Germany consumed 92 billion cubic meters of gas, while in the EU it was 511 billion cubic meters.</p>
<p>Hobohm adds that Europe&#8217;s gas imports from outside Europe depend on how much the continent can produce and to what extent can it meet its own demand?</p>
<p>Currently, the amount of gas produced internally has decreased, partly due to the Netherlands cutting production share faster than planned.</p>
<p>The key point now, experts say, is that the Northern Flow 2 project is still under construction. And Europe has no problems with gas supplies. Whether this project can go into operation or not and never work is an open question.</p>
<p>The later this pipeline is completed, the less necessary it is to be, as the role of natural gas will decline more and more.</p>
<p>Along with that, security policy risks are also very concerned.</p>
<p>First, it is due to the dependence of Europe and Germany on gas from a Russia.</p>
<p>Second, additional risks come from this project because the pipeline runs from Russia through the Baltic Sea and then directly to Germany, not through intermediate states such as Ukraine, Belarus and Poland.</p>
<p>Critics of the project raise two questionable issues.</p>
<p><em>Firstly</em>Mr. Putin wants free hands to implement his policies with neighboring countries without being afraid to depend on them (when gas exports no longer have to pass through these countries).</p>
<p><em>Monday, </em>the operation of the Northern Flow 2 system leads to a decrease in the amount of gas flowing through the existing pipes, thereby reducing Ukraine&#8217;s income from allowing gas from Russia to transit through its territory. .</p>
<p>The national budget of Kiev will be more than 2 billion euros. Then, the pressure on the EU to increase its aid to Ukraine will grow.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/project-northern-flow-2-speculation-of-inflated-data-and-suspicion-of-russian-presidents-intrigue-with-ukraine/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1088</post-id>	</item>
		<item>
		<title>Northern Currents 2 – Cards to Defuse Eastern Ukraine Tensions?</title>
		<link>https://en.spress.net/northern-currents-2-cards-to-defuse-eastern-ukraine-tensions/</link>
					<comments>https://en.spress.net/northern-currents-2-cards-to-defuse-eastern-ukraine-tensions/#respond</comments>
		
		<dc:creator><![CDATA[]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 06:04:43 +0000</pubDate>
				<category><![CDATA[World]]></category>
		<category><![CDATA[Atlantic]]></category>
		<category><![CDATA[Cards]]></category>
		<category><![CDATA[Currents]]></category>
		<category><![CDATA[Defuse]]></category>
		<category><![CDATA[Disassembly]]></category>
		<category><![CDATA[Eastern]]></category>
		<category><![CDATA[Eastern Ukraine]]></category>
		<category><![CDATA[Europe]]></category>
		<category><![CDATA[Finished]]></category>
		<category><![CDATA[Flow]]></category>
		<category><![CDATA[Gas pipeline]]></category>
		<category><![CDATA[Installation]]></category>
		<category><![CDATA[Mukran Port]]></category>
		<category><![CDATA[Node point]]></category>
		<category><![CDATA[North]]></category>
		<category><![CDATA[Northern]]></category>
		<category><![CDATA[Objection]]></category>
		<category><![CDATA[Pipe]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Punish]]></category>
		<category><![CDATA[Stress]]></category>
		<category><![CDATA[Swiss Allseas]]></category>
		<category><![CDATA[tensions]]></category>
		<category><![CDATA[U.S. Department of State]]></category>
		<category><![CDATA[U.s.a]]></category>
		<category><![CDATA[Ukraine]]></category>
		<guid isPermaLink="false">https://en.spress.net/?p=400</guid>

					<description><![CDATA[The North Stream 2 &#8211; the node point in trans-Atlantic relations and Russia-U.S. tensions, could become a card to be negotiated to defus current tensions in eastern Ukraine. Northern Currents 2 and the situation in eastern Ukraine Escalating tensions in the Donbass region of eastern Ukraine and the construction of the gas pipeline project from [&#8230;]]]></description>
										<content:encoded><![CDATA[<div class="article__sapo">The North Stream 2 &#8211; the node point in trans-Atlantic relations and Russia-U.S. tensions, could become a card to be negotiated to defus current tensions in eastern Ukraine.</div>
<p><span id="more-400"></span><br />
</p>
<div class="article__body">
<p class="body-text"><strong>Northern Currents 2 and the situation in eastern Ukraine</strong></p>
<p class="body-text">Escalating tensions in the Donbass region of eastern Ukraine and the construction of the gas pipeline project from Russia to Germany are the most de disagreements in the security policy of Europe &#8211; the Atlantic today. Each issue has its own stalemate. However, contacting these two issues together will expand the negotiating space and create opportunities for stakeholders, as well as can lead to a solution that is in the interests of all parties.</p>
<p class="body-image"><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_14_65_28945205/d94919e433a6daf883b7.jpg" width="625" height="416"></p>
<p class="body-text media-caption"><em>The pipelines are used for the construction of the Northern Flow 2 project at Mukran Port. Photo: Reuters</em></p>
<p class="body-text">Russia has now strengthened its forces on its border with Ukraine, accusing Kiev of conducting &#8220;not one but many provocative acts.&#8221; Meanwhile, Ukraine urged Russia to withdraw its troops from the border area and end what Kiev called &#8220;military fallacies and misinformation.&#8221; NATO and the US also demanded that Russia stop gathering troops near its border with Ukraine and called the current situation &#8220;deeply concerning.&#8221;</p>
<p class="body-text">Efforts through the Minsk agreement and the progress of the Normandy Quartet (made up of Germany, France, Russia and Ukraine) to resolve the conflict between the parties in eastern Ukraine failed.</p>
<p class="body-text">U.S. sanctions on The North Stream 2 delayed the construction of the project but &#8220;everything has its price.&#8221; The gas pipeline project was a source of tension between the U.S. and Germany at a time when the relationship needed to be strengthened. Of course, the sanctions on the North Stream 2 also deepen the rifts in Russian-American relations.</p>
<p class="body-text">According to The Atlantic Council, the new approach when linking these two issues together can bring many opportunities. Therefore, Northern Flow 2 can be used as a bargaining card to ensure a more important goal: It is to address the current escalating tensions in eastern Ukraine.</p>
<p class="body-text">Russia will not ignore if conflict breaks out in eastern Ukraine. Moscow will not withdraw its troops from the border area until it sees the benefits of this action. Therefore, putting The Northern Flow 2 on the negotiating table can bring the possibility of changing the current situation.</p>
<p class="body-text"><strong>Cards that change the situation in eastern Ukraine?</strong></p>
<p class="body-text">The Northern Flow 2 is an important project for Russia and Germany but it is still an agreement that has not been finalized even though the work has been completed by 95%. Even if construction can be completed by the end of the year as planned, U.S. sanctions in December 2020 when it comes into effect will prevent insurers and inspection companies from carrying out the necessary procedures for this pipeline to actually come into operation.</p>
<p class="body-text">Recently, the European Parliament also called for an end to this project. France&#8217;s Minister for European Issues even suggested it was possible to end the Northern Flow project as a response to the poisoning of opposition figures Navalny.</p>
<p class="body-text">With these developments, observer Colin Cleary suggested that Russia would likely bring an end to the strengthening of its forces on the border with Ukraine in exchange for ensuring the Northern Flow agreement would continue to operate.</p>
<p class="body-text">The Covid-19 epidemic and falling energy prices have increased the financial burden on Russia. However, sanctions alone will not be able to persuade Russia to withdraw from eastern Ukraine. Only the mitigation of sanctions related to the North Stream 2 can make Russia make concessions because the move can be understood as part of an effort to bring about more normal economic relations between Russia and the West.</p>
<p class="body-text">The U.S. has repeatedly opposed the North Stream 2. However, the moment decided it all. If the former Trump administration is really serious about ending the North Stream 2, it should have stopped the project from the summer of 2017, when the Anti-Enemy of America through Sanctions (CAATSA) bill became law and the construction of The Northern Flow 2 has not yet begun. The U.S. missed that moment.</p>
<p class="body-text">Until December 2019, the U.S. Congress passed mandatory sanctions related to ships constructing the Northern Flow 2. Swiss pipeline installation company Allseas immediately withdrew from the project, but by this time the Northern Flow 2 had largely been completed.</p>
<p class="body-text">Meanwhile, Russia demanded that Ukraine respect the &#8220;special status&#8221; with the Eastern region but that would destroy Ukraine&#8217;s status as a country. Unless something is placed on the negotiating table, such as turning on the green lightor the North Stream 2 or economic and trade prospects for Russia, otherwise the Kremlin will not make concessions in this regard.</p>
<p class="body-text">Observer Colin Cleary, who served as Director of European Energy Diplomacy in the U.S. State Department, said the agreement to bring the Northern Flow 2 in exchange for targets in Donbass would serve the interests of all parties. If the Kremlin rejects the offer, the path of &#8220;many sticks, fewer carrots&#8221; will open./.</p>
</p></div>
<p> .</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/northern-currents-2-cards-to-defuse-eastern-ukraine-tensions/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">400</post-id>	</item>
		<item>
		<title>Quang Binh reviewed and considered the withdrawal of delayed projects</title>
		<link>https://en.spress.net/quang-binh-reviewed-and-considered-the-withdrawal-of-delayed-projects/</link>
					<comments>https://en.spress.net/quang-binh-reviewed-and-considered-the-withdrawal-of-delayed-projects/#respond</comments>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 05:46:07 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Binh]]></category>
		<category><![CDATA[Clearance]]></category>
		<category><![CDATA[Consider]]></category>
		<category><![CDATA[considered]]></category>
		<category><![CDATA[delayed]]></category>
		<category><![CDATA[Department of Planning and investment]]></category>
		<category><![CDATA[Economic sector]]></category>
		<category><![CDATA[Environmental resource base]]></category>
		<category><![CDATA[industrial area]]></category>
		<category><![CDATA[Investment Law 2020]]></category>
		<category><![CDATA[Legal proceedings]]></category>
		<category><![CDATA[Objective reasons]]></category>
		<category><![CDATA[People s Committee of Quang Binh province]]></category>
		<category><![CDATA[Problems]]></category>
		<category><![CDATA[Progress]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Quang]]></category>
		<category><![CDATA[Quang Binh]]></category>
		<category><![CDATA[Rent land]]></category>
		<category><![CDATA[Review]]></category>
		<category><![CDATA[reviewed]]></category>
		<category><![CDATA[Slow]]></category>
		<category><![CDATA[Tran Thang]]></category>
		<category><![CDATA[Withdrawal]]></category>
		<category><![CDATA[Working session]]></category>
		<guid isPermaLink="false">https://en.spress.net/quang-binh-reviewed-and-considered-the-withdrawal-of-delayed-projects/</guid>

					<description><![CDATA[Chairman of Quang Binh Provincial People&#8217;s Committee Tran Thang had a meeting with related departments, agencies on reviewing projects with slow progress in the province and asked to review projects with slow progress. Chairman of Quang Binh Provincial People&#8217;s Committee Tran Thang chaired the meeting with relevant departments. According to the report of the People&#8217;s [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Chairman of Quang Binh Provincial People&#8217;s Committee Tran Thang had a meeting with related departments, agencies on reviewing projects with slow progress in the province and asked to review projects with slow progress.</strong><br />
<span id="more-793"></span> </p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_95_38532765/6e0bc167eb25027b5b34.jpg" width="625" height="369"></p>
<p>Chairman of Quang Binh Provincial People&#8217;s Committee Tran Thang chaired the meeting with relevant departments.</p>
<p>According to the report of the People&#8217;s Committee of Quang Binh province, in the period 2016 &#8211; 2019, the Department of Natural Resources and Environment advised the Provincial People&#8217;s Committee to decide on land acquisition of 17 projects with a total land area of ​​606,517 square meters.</p>
<p>Currently, there are 12 projects in the province that are leasing land to implement in highly profitable locations but behind schedule; 39 projects have been granted investment policy decisions but implemented slowly compared with the approval decisions, of which 33 projects had been granted investment policy decisions before 2019; Out of a total of 37 commercial housing projects, in urban areas, there are 11 projects that are behind in construction progress compared to the time limit for implementation of technical infrastructure. Particularly in industrial zones and economic zones, there are 6 projects that are behind schedule.</p>
<p>Accordingly, the main cause of the slow progress of the projects is due to difficulties and problems related to the field of land, land clearance compensation, land valuation. In addition, many projects are affected by epidemics and natural disasters, delayed in implementing legal procedures, complying with tax obligations, lack of investment capital &#8230;</p>
<p>At the meeting, representatives of departments and agencies discussed and gave some directions to be implemented in resolutely handling delayed projects, especially projects that violate legal regulations and commitments. associated with the province.</p>
<p>At the meeting, Chairman of Quang Binh Provincial People&#8217;s Committee Tran Thang emphasized that, over the past time, although the province has created very favorable conditions, there are still quite a few projects behind schedule, especially projects with slow progress. for a very long time; Although there are many objective and subjective reasons leading to this situation, the delay in progress has greatly affected the results of investment in the province, causing waste of land resources &#8230;</p>
<p><strong>To speed up the progress of projects, Chairman of Quang Binh Provincial People&#8217;s Committee requested:</strong></p>
<p>For projects that are behind schedule due to problems in site clearance, problems with legal procedures or other objective reasons and do not owe financial obligations to the State, assigned to departments, sectors, Relevant localities continue to monitor and urge investors to implement; promptly guide and remove difficulties and problems for investors. People&#8217;s Committees of districts, towns and cities with investment projects in the area actively coordinate with investors to support and remove difficulties and problems in site clearance to implement projects.</p>
<p>Regarding projects that have leased land but have been behind schedule for many years that are not in the category of land use extension or beyond the schedule extension, financial obligations have not been fulfilled to the State, Chairman of Quang Binh Provincial People&#8217;s Committee assigns the Department Natural Resources and Environment shall assume the prime responsibility for, and coordinate with the Department of Planning and Investment, the Provincial Tax Department, relevant departments, branches and localities in reviewing the progress of projects; work with investors and request a commitment to project implementation progress; advise the Provincial People&#8217;s Committee to recover land for projects if they do not implement, fail to fulfill tax obligations according to the provisions of the Land Law.</p>
<p>For projects that are behind schedule but still in progress adjustment according to the Law on Investment 2020, the Department of Planning and Investment is assigned to assume the prime responsibility and coordinate with relevant departments, branches and localities in checking inspect and supervise the implementation progress; urge investors to speed up project implementation; urge the implementation of deposit investment in accordance with regulations.</p>
<p>In addition, the Chairman of Quang Binh Provincial People&#8217;s Committee also assigned the Department of Planning and Investment to coordinate with the Department of Natural Resources and Environment, relevant departments, sectors and localities to advise the provincial People&#8217;s Committee to establish a review team for slow projects degree to direct implementation; Concerned departments and branches shall focus on directing to organize a specific review of each group and each type of project; classify specific project groups to advise the Provincial People&#8217;s Committee to consider and report to consult the Standing Committee of the Provincial Party Committee to handle each specific project according to regulations, especially some large projects, major projects. projects with a high commercial advantage position, projects that are of interest to the voters and the people.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/quang-binh-reviewed-and-considered-the-withdrawal-of-delayed-projects/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">793</post-id>	</item>
		<item>
		<title>After 8 years of being &#8216;released to the chicken coop&#8217;, Lady Gaga&#8217;s album project &#8216;ARTPOP 2&#8217; suddenly revived?</title>
		<link>https://en.spress.net/after-8-years-of-being-released-to-the-chicken-coop-lady-gagas-album-project-artpop-2-suddenly-revived/</link>
					<comments>https://en.spress.net/after-8-years-of-being-released-to-the-chicken-coop-lady-gagas-album-project-artpop-2-suddenly-revived/#respond</comments>
		
		<dc:creator><![CDATA[TAYJOES]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 04:57:10 +0000</pubDate>
				<category><![CDATA[Music]]></category>
		<category><![CDATA[Album]]></category>
		<category><![CDATA[ALWAYS]]></category>
		<category><![CDATA[Appreciate]]></category>
		<category><![CDATA[ARTPOP]]></category>
		<category><![CDATA[Chicken]]></category>
		<category><![CDATA[coop]]></category>
		<category><![CDATA[Electronic music]]></category>
		<category><![CDATA[FEARLESS]]></category>
		<category><![CDATA[FLOP]]></category>
		<category><![CDATA[GAGA]]></category>
		<category><![CDATA[Gagas]]></category>
		<category><![CDATA[Henhouse]]></category>
		<category><![CDATA[Hip bone]]></category>
		<category><![CDATA[Instagram Stories]]></category>
		<category><![CDATA[ITunes]]></category>
		<category><![CDATA[Lady]]></category>
		<category><![CDATA[Lady gaga]]></category>
		<category><![CDATA[Little Monsters]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Rain On Me]]></category>
		<category><![CDATA[released]]></category>
		<category><![CDATA[REMEMBER]]></category>
		<category><![CDATA[Revival]]></category>
		<category><![CDATA[revived]]></category>
		<category><![CDATA[suddenly]]></category>
		<category><![CDATA[Taylor s Version]]></category>
		<category><![CDATA[VOL]]></category>
		<category><![CDATA[WISH]]></category>
		<category><![CDATA[Years]]></category>
		<guid isPermaLink="false">https://en.spress.net/after-8-years-of-being-released-to-the-chicken-coop-lady-gagas-album-project-artpop-2-suddenly-revived/</guid>

					<description><![CDATA[Following the spectacular comeback of the 13-year-old album &#8216;Fearless (Taylor&#8217;s Version)&#8217;, another 8-year &#8216;old&#8217; album titled &#8216;ARTPOP&#8217; by Lady Gaga also suddenly &#8216;bounced back&#8217; to lead. ITunes Album chart of many countries. Few days ago, the Little Monsters (Lady Gaga&#8217;s fandom name) has launched a campaign called Buy ARTPOP on iTunes (roughly translated: Buy an [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Following the spectacular comeback of the 13-year-old album &#8216;Fearless (Taylor&#8217;s Version)&#8217;, another 8-year &#8216;old&#8217; album titled &#8216;ARTPOP&#8217; by Lady Gaga also suddenly &#8216;bounced back&#8217; to lead. ITunes Album chart of many countries.</strong><br />
<span id="more-717"></span> </p>
<p>Few days ago, the<em> Little Monsters</em> (Lady Gaga&#8217;s fandom name) has launched a campaign called <em>Buy ARTPOP on iTunes</em> (roughly translated: Buy an album <em>ARTPOP </em>on the iTunes platform). This movement was enthusiastically responded by fans of &#8220;Monster Mother&#8221; and the music-loving community. The <em>hastag</em> as <em>#buyARTPOPoniTunes </em>and<em> #ARTPOP</em> simultaneously caused storms on Twitter and was in the top flourishing for many hours.</p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/ce9cd002fa40131e4a51.jpg" width="625" height="625"></p>
<p><em>Despite the flop, &#8220;ARTPOP&#8221; is still a masterpiece in the hearts of fans.</em></p>
<p>Needless to say, &#8220;8 year old album&#8221; has excellently reached # 1 on many iTunes Album charts worldwide, including Vietnam. In the US market, <em>ARTPOP</em> reached # 1 on the iTunes Pop Album chart and is currently at # 2 on the following iTunes Album chart <em>Fearless (Taylor&#8217;s Version)</em>.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/b65eabc0818268dc3193.jpg" width="625" height="582"></p>
<p><em>&#8220;ARTPOP&#8221; reached the 1st place on Vietnam&#8217;s iTunes Album chart.</em></p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/539f41016b43821ddb52.jpg" width="625" height="976"></p>
<p><em>In the US iTunes Album Chart, &#8220;ARTPOP&#8221; is second only to &#8220;Fearless (Taylor&#8217;s Version)&#8221;.</em></p>
<p>When he saw the fan holding a &#8220;big&#8221; party to honor his &#8220;brainchild&#8221;, the owner <em>ARTPOP</em> Can&#8217;t help but feel emotional sharing my feelings on Twitter. Specifically, Lady Gaga said: <em>“The campaign &#8216;Buy ARTPOP album on iTunes platform&#8217; called for ARTPOP album Vol.2 has made me feel very grateful. Doing this album feels like heart surgery. She used to be desperate and in pain and just wanted to put all of her energy into electronic music because she believed it was the most powerful remedy to help her &#8220;close the painful door&#8221; that she had to endure. &#8220;</em></p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/feefed71c7332e6d7722.jpg" width="625" height="629"></p>
<p><em>Gaga greatly appreciated the &#8220;Buy ARTPOP album on iTunes&#8221; movement.</em></p>
<p>The owner hit<em> Rain On Me </em>Also share more: <em>“I also became more relieved when I released ARTPOP. Thank you all for organizing something that seemed to have ended. We believe that ARTPOP has always been at the forefront of its time. Sometimes it will take a few years for the artists to know. My Little Monsters have noticed that too. Always be yourself, love you. &#8220;</em></p>
<p>The good news is DJ White Shadow, the main music producer for<em> ARTPOP</em>After learning that she thanked her fans, she spoke to Lady Gaga. He and Lady Gaga will meet and discuss with each other whether to implement the project <em>ARTPOP ACT II</em> or not. He did not promise to make the project a reality, but this will be good news because finally after 8 years of planning the album.<em> Vol.2</em> is also mentioned.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/6d8a7d145756be08e747.jpg" width="625" height="1111"></p>
<p><em>On DJ White Shadow&#8217;s Instagram Stories, he was &#8220;delighted&#8221; that &#8220;ARTPOP&#8221; reached # 1 on the iTunes Album chart in 27 countries.</em></p>
<p><em>ARTPOP</em> is Lady Gaga&#8217;s 3rd studio album, released at the end of 2013. The album is said to be the &#8220;step backwards&#8221; of the vocalist <em>Always Remember Us This Way</em> because the album was not very successful academically or commercially. Many people also believe that she is quite &#8220;one color&#8221; and refuses to change herself when she continues to abuse vibrant songs to become popular. But behind that story, &#8220;Monster Mother&#8221; suffered both physical and mental pain. She had a hip fracture during the tour <em>Born This Way Ball</em>, album <em>ARTPOP</em> is the process of healing herself through music.</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/af38bea694e47dba24f5.jpg" width="625" height="810"></p>
<p><em>Electronic music has partly helped heal Lady Gaga&#8217;s mental health.</em></p>
<p><em>ACTPOP ACT II</em> (also known as <em>ARTPOP Vol.2</em>) is a project where she has a secret to come out if the above album is successful. However, Gaga mentioned the Vol.2 album only once and was no longer hearing any more. For fans who love Gaga in the electronic music genre, this project is always in their &#8220;wish list&#8221;.</p>
<p>After 8 years then finally the<em> Little Monsters</em> also got what I wanted. It was to regain justice for an album that was supposed to &#8220;end her career&#8221; by Lady Gaga. With the message &#8220;Dance through the pain&#8221;, <em>ARTPOP</em> Somehow it helped heal mental health. This is a very worthwhile electronic album to experience and maybe in the future we will have a similar work born. Let&#8217;s wait and see!</p>
<p><img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_105_38531526/823c94a2bee057be0ef1.jpg" width="625" height="237"></p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/after-8-years-of-being-released-to-the-chicken-coop-lady-gagas-album-project-artpop-2-suddenly-revived/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">717</post-id>	</item>
		<item>
		<title>Binh Thuan proposes to solve problems in implementing the North &#8211; South Expressway project in the East</title>
		<link>https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/</link>
					<comments>https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/#respond</comments>
		
		<dc:creator><![CDATA[Thu Nga]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 04:52:12 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Binh]]></category>
		<category><![CDATA[Binh Thuan]]></category>
		<category><![CDATA[Building materials]]></category>
		<category><![CDATA[East]]></category>
		<category><![CDATA[Embankment]]></category>
		<category><![CDATA[Expressway]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[implementing]]></category>
		<category><![CDATA[Mining]]></category>
		<category><![CDATA[Nguyen Huu Trung]]></category>
		<category><![CDATA[North]]></category>
		<category><![CDATA[North highway]]></category>
		<category><![CDATA[Phan Thiet]]></category>
		<category><![CDATA[PMU 7]]></category>
		<category><![CDATA[Problems]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Project Management Board Thang Long]]></category>
		<category><![CDATA[proposes]]></category>
		<category><![CDATA[Request]]></category>
		<category><![CDATA[solve]]></category>
		<category><![CDATA[South]]></category>
		<category><![CDATA[South East]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[Thuan]]></category>
		<category><![CDATA[Vinh Hao]]></category>
		<category><![CDATA[Vu Hong Thanh]]></category>
		<category><![CDATA[Weathered]]></category>
		<category><![CDATA[Working session]]></category>
		<guid isPermaLink="false">https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/</guid>

					<description><![CDATA[On April 14, 2021, the supervisory delegation of the Economic Committee of the National Assembly had a meeting with Binh Thuan province on the implementation situation and difficulties and problems in the implementation and implementation of the North Expressway Project &#8211; South East, the section across the province. At the meeting, Mr. Nguyen Huu Trung [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On April 14, 2021, the supervisory delegation of the Economic Committee of the National Assembly had a meeting with Binh Thuan province on the implementation situation and difficulties and problems in the implementation and implementation of the North Expressway Project &#8211; South East, the section across the province.</strong><br />
<span id="more-709"></span> </p>
<p>At the meeting, Mr. Nguyen Huu Trung &#8211; Deputy Director of Binh Thuan Department of Transport said: Over the past time, the province has stepped up the implementation of site clearance work as well as issues related to the project, especially especially the work of solving the demand for construction materials of the expressway project. Up to now, the number of households and organizations has handed over 2,657 / 2,684 dossiers, reaching the rate of 99%; The compensated clean land area was 1,204.89 ha, reaching the rate of 98.6%. 27 households have not received compensation money and handed over the premises. In addition, at the locations where the ground has been handed over, there are 25 cases (received money and signed the handover) but have not moved or handed over the site to construction contractors. Currently, the province is actively directing the People&#8217;s Committees of relevant localities to completely settle the compensation and site clearance work in May 2021.</p>
<p><em>The Economic Committee of the National Assembly&#8217;s supervisory delegation works with Binh Thuan province.</em></p>
<p>According to the report of Project Management Unit (PMU) 7 and PMU Thang Long, the total demand for construction materials for the project of the Vinh Hao &#8211; Phan Thiet section and the Phan Thiet &#8211; Dau Giay section is nearly 16 million blocks.</p>
<p>Deputy Director of Binh Thuan Department of Transport added: For the demand for construction sand and stone, the construction material mines in the province can meet the needs of the project. As for embankment materials, according to the approved technical design documents of the approved Vinh Hao &#8211; Phan Thiet and Phan Thiet &#8211; Dau Giay sections, the reserves of the mines in the province meet the quality and demand of the project. project. However, through the field survey at the mines, the volume of soil and soil cover mentioned above is preliminarily classified into 3 categories by PMU 7, PMU Thang Long, including: Soil, rock mixed with weathered rock and rock.</p>
<p>According to the assessment of the two boards mentioned above, the soil mixed with rock and weathered rock does not meet the requirements for making backfill materials according to the project&#8217;s technical requirements. Based on the proposals of the Thang Long Project Management Board and PMU 7, the Provincial Working Group is now speeding up the determination of the mines being exploited that need to increase capacity, expand the scale, or push To speed up the mining licensing procedures to guide the Miners in order procedures, shorten the time but ensure compliance with the provisions of law. At the same time, invite the Miners to work to guide the procedures for capacity increase, scaling up and mining licensing. Expected to complete the mining licensing procedures in the second quarter of 2021.</p>
<p><em>Mr. Vu Hong Thanh &#8211; Member of the Party Central Committee &#8211; Chairman of the Economic Committee of the National Assembly spoke at the meeting.</em></p>
<p>At the meeting, Chairman of Binh Thuan Provincial People&#8217;s Committee &#8211; Le Tuan Phong said: The province has drastically participated in solving the needs of building materials for the expressway project, step by step solving problems, Gradually came to agreement on issues related to the provision of soil filling materials for the project. In particular, the province has instructed the Department of Natural Resources and Environment and related departments and sectors to give priority to processing investment, environmental, land, and mining permits within 3 working days upon receipt. are business records.</p>
<p>To ensure the demand for building materials for the project, the Chairman of the Provincial People&#8217;s Committee suggested that the Project Management Units: Thang Long, 7, 85 coordinate closely with relevant departments and branches of the province and mine owners. to survey, evaluate and determine the reserves and quality of each field of embankment materials to unify data, propose ground-filling requirements for each specific construction and installation package, in which clearly identify which mines Exploiting operations need to increase capacity, expand the scale, which mines need to speed up the mining licensing procedures.</p>
<p>The Chairman of the Provincial People&#8217;s Committee also requested the Ministry of Natural Resources and Environment to guide the province to shorten the time for implementing mining licensing procedures. At the same time, it is recommended that the Ministry of Transport soon consider and approve the plan to use 1.1 million cubic meters of salvaged rock in package No. 01, Vinh Hao &#8211; Phan Thiet section to crush into expressway embankment as proposed. proposal of PMU 7; Consider and approve for the use of rock and wind mixed in mines.</p>
<p>The Chairman of the Economic Committee of the National Assembly &#8211; Vu Hong Thanh highly appreciated the efforts of Binh Thuan province in implementing and implementing the North-South Expressway project in the East, the section passing through the province, especially the coordination. solving the need for building materials to implement the project. Mr. Vu Hong Thanh also suggested that the province continue to direct the completion of site clearance in May 2021 according to the province&#8217;s progress; Early completion of related procedures to ensure a dumping site for project construction. Regarding the handling of materials for construction, the Chairman of the Economic Committee of the National Assembly requested the Ministry of Transport to review the material needs of the entire route, directing the Project Management Boards to: Thang Long, 7, 85 urgently coordinate with the province to remove problems.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">709</post-id>	</item>
		<item>
		<title>Improve transmission capacity for solar power projects in Kon Tum</title>
		<link>https://en.spress.net/improve-transmission-capacity-for-solar-power-projects-in-kon-tum/</link>
					<comments>https://en.spress.net/improve-transmission-capacity-for-solar-power-projects-in-kon-tum/#respond</comments>
		
		<dc:creator><![CDATA[Khoa Chương/TTXVN]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 03:54:10 +0000</pubDate>
				<category><![CDATA[Tech]]></category>
		<category><![CDATA[Advanced]]></category>
		<category><![CDATA[capacity]]></category>
		<category><![CDATA[Dak Glei]]></category>
		<category><![CDATA[Dak Ha]]></category>
		<category><![CDATA[Dak To]]></category>
		<category><![CDATA[Electrical load]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[EVNCPC]]></category>
		<category><![CDATA[Ha Mon]]></category>
		<category><![CDATA[Hydropower plants]]></category>
		<category><![CDATA[Improve]]></category>
		<category><![CDATA[Kon]]></category>
		<category><![CDATA[Kon Tum]]></category>
		<category><![CDATA[line]]></category>
		<category><![CDATA[Loans]]></category>
		<category><![CDATA[Power]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Reciprocal]]></category>
		<category><![CDATA[Recycled energy]]></category>
		<category><![CDATA[Relieve]]></category>
		<category><![CDATA[solar]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[Sun]]></category>
		<category><![CDATA[Thanh Phuong Nguyen]]></category>
		<category><![CDATA[Transmission]]></category>
		<category><![CDATA[Tum]]></category>
		<guid isPermaLink="false">https://en.spress.net/improve-transmission-capacity-for-solar-power-projects-in-kon-tum/</guid>

					<description><![CDATA[Central Power Corporation (EVNCPC) has just implemented the project to improve the transmission capacity of the 110kV Dak Ha transmission line &#8211; the 220kV Kon Tum transformer station. The project has a total budget of about 68 billion VND from commercial loans and reciprocal capital of EVNCPC. Artwork: Mai Phuong / BNEWS / TTXVN To [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Central Power Corporation (EVNCPC) has just implemented the project to improve the transmission capacity of the 110kV Dak Ha transmission line &#8211; the 220kV Kon Tum transformer station.</strong><br />
<span id="more-614"></span> </p>
<p><img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_04_15_324_38531080/4ccb9420ba62533c0a73.jpg" width="625" height="468"></p>
<p><em>The project has a total budget of about 68 billion VND from commercial loans and reciprocal capital of EVNCPC. Artwork: Mai Phuong / BNEWS / TTXVN</em></p>
<p>To meet the need to release capacity for renewable energy sources and create socio-economic development momentum in the northern region of Kon Tum province, Central Power Corporation (EVNCPC) has just implemented the project. Improve transmission capacity of Dak Ha 110kV transmission line &#8211; Kon Tum 220kV transformer station.</p>
<p>The project has a total budget of about 68 billion VND from commercial loans and reciprocal capital of EVNCPC.</p>
<p>Accordingly, the 110 kV Dak Ha transmission line &#8211; the 20 kV Kon Tum transformer station is the lifeblood, supplying and transmitting electricity to the northern districts of Kon Tum province such as Dak Ha, Dak To, Ngoc Hoi, Dak Glei.</p>
<p>However, with the potential to develop renewable energy sources such as hydroelectricity, wind power, and solar power, Kon Tum has attracted many businesses to invest in renewable energy projects.</p>
<p>This leads to the line&#8217;s capacity to carry the load not enough to release capacity, regularly implementing the reduction, causing damage to investors and affecting the local economy.</p>
<p>The project to improve transmission capacity of Dak Ha 110 kV transmission line &#8211; 220 kV Kon Tum substation was commenced by Kon Tum Power Company in March 2020, with the scale of new construction of dual-circuit lines from transformer station The 220 kV Kon Tum voltage to the Dak Ha 110 kV transformer station, more than 14 km in length, was newly built, replacing the entire old line with insufficient capacity with galvanized steel poles, using ACSR-300/39 conductors and the modern dual-circuit 110 kV line connection.</p>
<p>Currently, the project has been completed and energized by Kon Tum Power Company and put into use in March 2021. The completion and putting into operation of the project is very important in promoting the socio-economic development of the locality, contributing to ensuring energy security, improving electricity supply reliability and reducing losses. power failure in the northern districts of Kon Tum province.</p>
<p>Mr. Hoang Danh Chuyen&#8217;s family (village 1, Ha Mon commune, Dak Ha district) currently uses 1 transformer station to cultivate more than 17 hectares of coffee, fruit trees and fish ponds.</p>
<p>“When the line has not been upgraded yet, the current often flickers, sometimes power outages, so it is difficult for the family to focus on production. Now, the upgraded power line has helped to stabilize the power source, so irrigation with electric pumps is more convenient and economical. ”, Mr. Hoang Danh Chuyen shared.</p>
<p>In June 2020, Ngoc Wang Electricity Investment Joint Stock Company invested in building a roof-top solar power project on an area of ​​more than 8,000 m2, in Dak Ha district, with a total investment of 15 billion VND / MW. .</p>
<p>However, the capacity of the 110 kV Dak Ha transmission line is limited, so the company&#8217;s revenue is only 180 million dong / month.</p>
<p>Mr. Nguyen Manh Hung, Chairman of the Board of Directors of Ngoc Wang Electricity Investment Joint Stock Company shared, when the 110 kV Dak Ha line was invested and upgraded, the electricity system was transferred smoothly, no an overload occurs; from there, helping the company&#8217;s revenue to reach more than 300 million / month.</p>
<p>Through the project to improve the capacity of the 110 kV transmission line Dak Ha &#8211; the 220 kV Kon Tum transformer station, nearly 20 small and medium hydropower plants and more than 80 rooftop solar power projects using power lines have been guaranteed. Electricity supply protection and capacity transmission to the national power system.</p>
<p>Deputy Director of Kon Tum Electricity Company Nguyen Thanh Phuong said that the project has helped increase safety in operation and release capacity for hydropower and solar power plants in the region with a capacity of about 240. MW; at the same time, to be able to release the capacity of regional electricity development planning in the coming time, while ensuring electricity supply to meet the needs of socio-economic development, security and national defense in the region. Central &#8211; Central Highlands in general and Kon Tum province in particular./.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/improve-transmission-capacity-for-solar-power-projects-in-kon-tum/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">614</post-id>	</item>
	</channel>
</rss>