<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	>

<channel>
	<title>Weathered &#8211; Spress</title>
	<atom:link href="https://en.spress.net/tag/weathered/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.spress.net</link>
	<description>Spress is a general newspaper in English which is updated 24 hours a day.</description>
	<lastBuildDate>Tue, 08 Jun 2021 07:59:19 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">191965906</site>	<item>
		<title>Ham Rong Mountain &#8211; The most attractive destination in Sapa</title>
		<link>https://en.spress.net/ham-rong-mountain-the-most-attractive-destination-in-sapa/</link>
		
		<dc:creator><![CDATA[Theo Lương Ngọc/Khoa học &#38; Phát triển]]></dc:creator>
		<pubDate>Tue, 08 Jun 2021 07:59:19 +0000</pubDate>
				<category><![CDATA[Travel]]></category>
		<category><![CDATA[Asia tropics]]></category>
		<category><![CDATA[Attractive]]></category>
		<category><![CDATA[Destination]]></category>
		<category><![CDATA[Dragon]]></category>
		<category><![CDATA[Dragon Head Mountain]]></category>
		<category><![CDATA[Evergreen]]></category>
		<category><![CDATA[First class]]></category>
		<category><![CDATA[Geomorphology]]></category>
		<category><![CDATA[Glade]]></category>
		<category><![CDATA[Ham]]></category>
		<category><![CDATA[Ham Rong]]></category>
		<category><![CDATA[Ham Rong mountain]]></category>
		<category><![CDATA[Hoang Lien Son mountain range]]></category>
		<category><![CDATA[majestic]]></category>
		<category><![CDATA[Mountain]]></category>
		<category><![CDATA[Mountains]]></category>
		<category><![CDATA[Muzzle]]></category>
		<category><![CDATA[Rong]]></category>
		<category><![CDATA[sapa]]></category>
		<category><![CDATA[Sapa town]]></category>
		<category><![CDATA[The dustwind]]></category>
		<category><![CDATA[tree]]></category>
		<category><![CDATA[Weathered]]></category>
		<guid isPermaLink="false">https://en.spress.net/ham-rong-mountain-the-most-attractive-destination-in-sapa/</guid>

					<description><![CDATA[Ham Rong Mountain is a mountain located in the majestic Hoang Lien Son range with the meaning of &#8216;dragon&#8217;s jaw&#8217;. Ham Rong Mountain is located close to the center of Sa Pa town and has the lowest point in the South 1,450m, the highest point at 1,850m. Photo: Dao Nguyen Bui Thuy. Terrain with an [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Ham Rong Mountain is a mountain located in the majestic Hoang Lien Son range with the meaning of &#8216;dragon&#8217;s jaw&#8217;.</strong><br />
<span id="more-21489"></span> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/6030795b6a198347da08.jpg" width="625" height="468"> </p>
<p> <em> Ham Rong Mountain is located close to the center of Sa Pa town and has the lowest point in the South 1,450m, the highest point at 1,850m. Photo: Dao Nguyen Bui Thuy.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/a7dabbb1a8f341ad18e2.jpg" width="625" height="417"> <em> Terrain with an average slope angle of about 30 degrees. Geomorphology is mainly exposed weathered casteur bedrock. Photo: Trung Duc.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/082d68467b04925acb15.jpg" width="625" height="418"> <em> Red cherries on Ham Rong peak. Photo: Cao Minh.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/dddfbbb4a8f641a818e7.jpg" width="625" height="414"> <em> Around Ham Rong mountain, there are many different types of mountains, evergreen closed forests, with all kinds of green broad-leaved trees all year round and vines, dense bushes, mixed forests of broadleaf and coniferous trees&#8230; characterized by sparse forest, less dense, sometimes interspersed broadleaf grass. Higher than subtropical moist evergreen closed forest with sparse forest characteristics, few layers of coniferous flora develop. With the height of the mountain top, there are almost no trees left, only sporadic mountain bamboo (Dwarf Truc) and dusty wind blowing. Photo: Tuan_Nikon.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/81c8e4a3f7e11ebf47f0.jpg" width="625" height="468"> <em> The average temperature of Ham Rong mountain area is from 15 to 18 degrees Celsius, the average rainfall is 1,800 &#8211; 2,000mm, especially the climate is different with the appearance of frost and light snow. Photo: Dulichsapacungmytour.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/74071f6c0c2ee570bc3f.jpg" width="625" height="468"> <em> Ham Rong Mountain in Lao Cai province is a province with relatively rich and diverse potential for tourism development. Located in the tourist complex of Lao Cai province, Ham Rong mountain is considered as one of the places with great potential for tourism development and plays a very important role in the process of economic restructuring of the province. Photo: Vietravel.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/2a7f43145056b908e047.jpg" width="625" height="468"> <em> This is an indispensable tourist destination in the travel itinerary of tourists to Sapa. Photo: Dao Nguyen Bui Thuy.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/4a65220e314cd812815d.jpg" width="625" height="417"> <em> Coming to Ham Rong mountain, visitors not only enjoy the wild natural scenery of heaven and earth, but also enjoy the fresh and cool air of Sapa. Photo: Vietnamtourism.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/da47b52ca66e4f30167f.jpg" width="625" height="468"> <em> Visitors to Sa Pa cannot help but come to Ham Rong mountain to talk with rocks, with trees, with wild wind and clouds, to be immersed in the ecstatic scenery of creation, to live in a fairyland in the middle of the world. Photo: Dao Nguyen Bui Thuy.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/c478aa13b951500f0940.jpg" width="625" height="468"> <em> From a distance, Ham Rong Mountain looks like a giant dragon bending over, lying to the west of Hoang Lien Son range. The top part of the mountain is cleverly arranged by the &#8220;mother&#8221; of nature from the lifeless cliffs randomly, but creates a meaningful image. Photo: Thongtindulichsapa.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/14e979826ac0839edad1.jpg" width="625" height="468"> <em> The people here call the top of that mountain Dau Rong mountain because it looks like the head of a dragon baring its fangs towards the sky. Photo: Dao Nguyen Bui Thuy.</em> <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_06_07_304_39103699/adeac181d2c33b9d62d2.jpg" width="625" height="464"> <em> There are many versions of the legend of Ham Rong mountain, but in general, these legends refer to the love, affection, and loyalty of dragons. Photo: Ngo Minh Truc.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">21489</post-id>	</item>
		<item>
		<title>Aliens were exposed after China&#8217;s Chang&#8217;e 4 spacecraft detected an anomaly on the Moon?</title>
		<link>https://en.spress.net/aliens-were-exposed-after-chinas-change-4-spacecraft-detected-an-anomaly-on-the-moon/</link>
		
		<dc:creator><![CDATA[editor]]></dc:creator>
		<pubDate>Sun, 30 May 2021 02:33:09 +0000</pubDate>
				<category><![CDATA[Science]]></category>
		<category><![CDATA[alien]]></category>
		<category><![CDATA[Aliens]]></category>
		<category><![CDATA[Anomaly]]></category>
		<category><![CDATA[Apollo program]]></category>
		<category><![CDATA[Chang Nga]]></category>
		<category><![CDATA[Change]]></category>
		<category><![CDATA[Chinas]]></category>
		<category><![CDATA[detected]]></category>
		<category><![CDATA[Dust]]></category>
		<category><![CDATA[E 4]]></category>
		<category><![CDATA[Expedition ship]]></category>
		<category><![CDATA[Exploration ship Tàu]]></category>
		<category><![CDATA[exposed]]></category>
		<category><![CDATA[Gravitation]]></category>
		<category><![CDATA[Hide numbers]]></category>
		<category><![CDATA[Material structure]]></category>
		<category><![CDATA[Moon]]></category>
		<category><![CDATA[Rock]]></category>
		<category><![CDATA[Russia 4]]></category>
		<category><![CDATA[Ship]]></category>
		<category><![CDATA[Solar wind]]></category>
		<category><![CDATA[spacecraft]]></category>
		<category><![CDATA[Unidentify Flying Object]]></category>
		<category><![CDATA[Von Karman]]></category>
		<category><![CDATA[Weathered]]></category>
		<category><![CDATA[Weirdo]]></category>
		<guid isPermaLink="false">https://en.spress.net/aliens-were-exposed-after-chinas-change-4-spacecraft-detected-an-anomaly-on-the-moon/</guid>

					<description><![CDATA[Up to now, the Moon is still an unexplored mystery. The beginning of the lunar exploration program must include a series of missions belonging to the Apollo Program from the US. The world is expecting that the program will answer all questions about the Moon. However that did not happen. Apollo not only has yet [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>Up to now, the Moon is still an unexplored mystery.</strong><br />
<span id="more-19170"></span> The beginning of the lunar exploration program must include a series of missions belonging to the Apollo Program from the US. The world is expecting that the program will answer all questions about the Moon. However that did not happen.</p>
<p> Apollo not only has yet to answer the questions posed, but also raises more questions about what the true origin of the Moon is. The moon has UFOs, the moon is empty, the moon is an artificial object of an advanced civilization?&#8230; All questions are still unknown. Over the decades, the outcome of the 1969 American Apollo 11 successful landing on the Moon has always been a mystery and very unpredictable. On January 3, 2019, the Chinese lunar probe Chang&#8217;e 4 (Hang&#8217;e 4, Chang&#8217;e-4) successfully landed in the Von Karman crater on the back of the Moon, open hope to solve the mysteries about this place. <strong> Has Russia 4 discovered aliens on the Moon?</strong> <img fifu-featured="1" decoding="async" loading="lazy" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_26_101_38977569/c7f02f103952d00c8943.jpg" width="625" height="299"> <em> The original image from the moon was sent back to Earth by the Chang&#8217;e 4 probe. (Photo: Sohu)</em> Initially, the pictures of the Moon from the Chang&#8217;e 4 probe published by Chinese scientists were very normal, there did not seem to be any signs of aliens and UFOs on the Moon. This has almost caused disappointment in the world of space science. However, recently Thuong Nga 4 sent back to Earth an unusual phenomenon that is expected to happen on Saturday (June 26, 2021). About 430 meters from the ship&#8217;s landing area, a pyramid-shaped stone block appeared, standing out among the surrounding sand and dust. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_26_101_38977569/cc4a25aa33e8dab683f9.jpg" width="625" height="300"> <em> The strange rock mass was discovered by the probe, raising suspicions about aliens. (Photo: Sohu)</em> According to previous studies, due to the impact of the solar wind on the surface of the Moon for a long time, combined with the large difference in temperature between day and night, almost all the rocks on the Moon all become dust. Can we conclude the existence of aliens on the Moon based on the unusual discovery of this rock? Chinese scientists have yet to come to an exact conclusion. They need more observational information and close analysis from the Chang&#8217;e 4 probe before they can make a final statement. <img decoding="async" loading="lazy" class="lazy-img" src="https://photo-baomoi.zadn.vn/w700_r1/2021_05_26_101_38977569/19f9ef19f95b1005494a.jpg" width="625" height="360"> <em> Thuong Nga 4 conducts close-up photography of the rock mass. (Photo: Sohu)</em> Through the process of approaching the object and sending information from the ship to Earth, scientists make preliminary comments, they believe that this phenomenon is unusual, but certainly not caused by aliens. out. Most likely, this is the underground structure of the solar wind weathering phenomenon and the temperature difference between day and night. Over time, it grew stronger and took on a new form that appeared as it is now. Before that, Thuong Nga 4 had many times discovered an anomalous phenomenon on the Moon, but all of them were deciphered by Chinese scientists with no relation to aliens. Once, Chang&#8217;e 4 discovered that the difference in gravity under the Von Karman crater on the back was larger than the rest of the Moon, but later discovered that it was just the result of gravity changes. caused by the nickel-iron compound sinking in the Von Karman crater, not the sign of aliens. Another time, Chang&#8217;e 4 found some special material structures in the Von Karman crater. The interconnected structures form a sticky mass and look slightly shiny. Based on this, many people suspect that there are creatures on the Moon and the liquid they release will bind the lunar soil together. After Thuong Nga 4 conducted close-ups, then sent the photos back to Earth for research. Chinese scientists have come to the final conclusion that this gel-like object is actually created by a thermal layer that, if we look at it from above, will look like a liquid coating on the surface of the Moon and also completely devoid of any signs of life. This is also the reason for us to believe that the rock that Thuong Nga 4 discovered this time was only formed naturally under the impact of weathering for hundreds of millions of years of the Moon, and then one day it will also be destroyed. will return to dust. <em> Reference: Sohu</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19170</post-id>	</item>
		<item>
		<title>Binh Thuan proposes to solve problems in implementing the North &#8211; South Expressway project in the East</title>
		<link>https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/</link>
					<comments>https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/#respond</comments>
		
		<dc:creator><![CDATA[Thu Nga]]></dc:creator>
		<pubDate>Thu, 15 Apr 2021 04:52:12 +0000</pubDate>
				<category><![CDATA[Vietnam]]></category>
		<category><![CDATA[Binh]]></category>
		<category><![CDATA[Binh Thuan]]></category>
		<category><![CDATA[Building materials]]></category>
		<category><![CDATA[East]]></category>
		<category><![CDATA[Embankment]]></category>
		<category><![CDATA[Expressway]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[implementing]]></category>
		<category><![CDATA[Mining]]></category>
		<category><![CDATA[Nguyen Huu Trung]]></category>
		<category><![CDATA[North]]></category>
		<category><![CDATA[North highway]]></category>
		<category><![CDATA[Phan Thiet]]></category>
		<category><![CDATA[PMU 7]]></category>
		<category><![CDATA[Problems]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Project Management Board Thang Long]]></category>
		<category><![CDATA[proposes]]></category>
		<category><![CDATA[Request]]></category>
		<category><![CDATA[solve]]></category>
		<category><![CDATA[South]]></category>
		<category><![CDATA[South East]]></category>
		<category><![CDATA[The transportation]]></category>
		<category><![CDATA[Thuan]]></category>
		<category><![CDATA[Vinh Hao]]></category>
		<category><![CDATA[Vu Hong Thanh]]></category>
		<category><![CDATA[Weathered]]></category>
		<category><![CDATA[Working session]]></category>
		<guid isPermaLink="false">https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/</guid>

					<description><![CDATA[On April 14, 2021, the supervisory delegation of the Economic Committee of the National Assembly had a meeting with Binh Thuan province on the implementation situation and difficulties and problems in the implementation and implementation of the North Expressway Project &#8211; South East, the section across the province. At the meeting, Mr. Nguyen Huu Trung [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><strong>On April 14, 2021, the supervisory delegation of the Economic Committee of the National Assembly had a meeting with Binh Thuan province on the implementation situation and difficulties and problems in the implementation and implementation of the North Expressway Project &#8211; South East, the section across the province.</strong><br />
<span id="more-709"></span> </p>
<p>At the meeting, Mr. Nguyen Huu Trung &#8211; Deputy Director of Binh Thuan Department of Transport said: Over the past time, the province has stepped up the implementation of site clearance work as well as issues related to the project, especially especially the work of solving the demand for construction materials of the expressway project. Up to now, the number of households and organizations has handed over 2,657 / 2,684 dossiers, reaching the rate of 99%; The compensated clean land area was 1,204.89 ha, reaching the rate of 98.6%. 27 households have not received compensation money and handed over the premises. In addition, at the locations where the ground has been handed over, there are 25 cases (received money and signed the handover) but have not moved or handed over the site to construction contractors. Currently, the province is actively directing the People&#8217;s Committees of relevant localities to completely settle the compensation and site clearance work in May 2021.</p>
<p><em>The Economic Committee of the National Assembly&#8217;s supervisory delegation works with Binh Thuan province.</em></p>
<p>According to the report of Project Management Unit (PMU) 7 and PMU Thang Long, the total demand for construction materials for the project of the Vinh Hao &#8211; Phan Thiet section and the Phan Thiet &#8211; Dau Giay section is nearly 16 million blocks.</p>
<p>Deputy Director of Binh Thuan Department of Transport added: For the demand for construction sand and stone, the construction material mines in the province can meet the needs of the project. As for embankment materials, according to the approved technical design documents of the approved Vinh Hao &#8211; Phan Thiet and Phan Thiet &#8211; Dau Giay sections, the reserves of the mines in the province meet the quality and demand of the project. project. However, through the field survey at the mines, the volume of soil and soil cover mentioned above is preliminarily classified into 3 categories by PMU 7, PMU Thang Long, including: Soil, rock mixed with weathered rock and rock.</p>
<p>According to the assessment of the two boards mentioned above, the soil mixed with rock and weathered rock does not meet the requirements for making backfill materials according to the project&#8217;s technical requirements. Based on the proposals of the Thang Long Project Management Board and PMU 7, the Provincial Working Group is now speeding up the determination of the mines being exploited that need to increase capacity, expand the scale, or push To speed up the mining licensing procedures to guide the Miners in order procedures, shorten the time but ensure compliance with the provisions of law. At the same time, invite the Miners to work to guide the procedures for capacity increase, scaling up and mining licensing. Expected to complete the mining licensing procedures in the second quarter of 2021.</p>
<p><em>Mr. Vu Hong Thanh &#8211; Member of the Party Central Committee &#8211; Chairman of the Economic Committee of the National Assembly spoke at the meeting.</em></p>
<p>At the meeting, Chairman of Binh Thuan Provincial People&#8217;s Committee &#8211; Le Tuan Phong said: The province has drastically participated in solving the needs of building materials for the expressway project, step by step solving problems, Gradually came to agreement on issues related to the provision of soil filling materials for the project. In particular, the province has instructed the Department of Natural Resources and Environment and related departments and sectors to give priority to processing investment, environmental, land, and mining permits within 3 working days upon receipt. are business records.</p>
<p>To ensure the demand for building materials for the project, the Chairman of the Provincial People&#8217;s Committee suggested that the Project Management Units: Thang Long, 7, 85 coordinate closely with relevant departments and branches of the province and mine owners. to survey, evaluate and determine the reserves and quality of each field of embankment materials to unify data, propose ground-filling requirements for each specific construction and installation package, in which clearly identify which mines Exploiting operations need to increase capacity, expand the scale, which mines need to speed up the mining licensing procedures.</p>
<p>The Chairman of the Provincial People&#8217;s Committee also requested the Ministry of Natural Resources and Environment to guide the province to shorten the time for implementing mining licensing procedures. At the same time, it is recommended that the Ministry of Transport soon consider and approve the plan to use 1.1 million cubic meters of salvaged rock in package No. 01, Vinh Hao &#8211; Phan Thiet section to crush into expressway embankment as proposed. proposal of PMU 7; Consider and approve for the use of rock and wind mixed in mines.</p>
<p>The Chairman of the Economic Committee of the National Assembly &#8211; Vu Hong Thanh highly appreciated the efforts of Binh Thuan province in implementing and implementing the North-South Expressway project in the East, the section passing through the province, especially the coordination. solving the need for building materials to implement the project. Mr. Vu Hong Thanh also suggested that the province continue to direct the completion of site clearance in May 2021 according to the province&#8217;s progress; Early completion of related procedures to ensure a dumping site for project construction. Regarding the handling of materials for construction, the Chairman of the Economic Committee of the National Assembly requested the Ministry of Transport to review the material needs of the entire route, directing the Project Management Boards to: Thang Long, 7, 85 urgently coordinate with the province to remove problems.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.spress.net/binh-thuan-proposes-to-solve-problems-in-implementing-the-north-south-expressway-project-in-the-east/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">709</post-id>	</item>
	</channel>
</rss>