This wastewater treatment pumping station has just been built and put into operation. Now I heard that it’s going to have to be demolished to make a road, what a waste…
The operator of the air conditioning pump station is located in the heart of the extended Nguyen Sy Sach street The reservoir pumping station project is funded by World Bank (WB) loan. The project has a total investment of more than 20 billion VND, was handed over and put into operation in 2018. However, at this time, another project was started, making this project not yet effective. Break. When project overlaps project In the early days of May, 2021, Reporter of Traffic Newspaper was present at the construction of extended Nguyen Sy Sach Street (in Vinh City, Nghe An Province). As noted, the construction is unfinished but the atmosphere is quite quiet. On the long road through Hung Dung ward, only a few trucks carry the ground for motorbikes to level and flatten. Meanwhile, the ground on this section of the route has not been cleared, the most typical is the pumping station for the conditioning reservoir. According to observations, 2/3 of the construction area is in the middle of the center of the road. In addition, crossing the road, there is a system of floating sewer pipes and submerged culverts carrying water at the bottom. The entire infrastructure in this project is still quite new. A resident living near this project said: “This wastewater treatment pumping station has just been built and has just been put into operation. Now I heard that they are going to have to demolish to make a road, what a waste.” Confirming information, Mr. Nguyen Ngoc Phong, Deputy Head of Vinh City Construction and Investment Management Board said: This pumping station project is part of the Vinh urban development sub-project, invested by Vinh City People’s Committee. from the World Bank (WB) loan. Pumping station with a capacity of 10,500m3/day, built around 2015 – 2016 and handed over for operation in 2018. Mr. Hoang Hong Khanh, Chairman of the Board of Directors of Vinh Urban Infrastructure Development and Management Joint Stock Company, affirmed: The unit has received the pumping station and operated since 2018. Up to now, the station is still operating normally and has never been opened. exploit at full capacity. This station mainly pumps and transfers wastewater along the two banks of the North canal. “The wastewater pumping station component has a total investment of more than 20 billion dong (about 1 million USD), all borrowed from the World Bank. Now that the pumping station has to be demolished to build a road, I don’t know why the project overlaps like that?”, said Mr. Nguyen Trung Dung, former Director of the Urban Development Sub-Project Management Board. Vinh City (representative of the investor) said. Responsible football Talking to PV, Mr. Nguyen The Anh, Deputy Head of Vinh City Urban Construction Project Management Board, added: The city has assigned the City Land Fund Development Center to coordinate with the City Management and Construction Joint Stock Company. develop Vinh urban infrastructure as a plan to relocate a part of the pumping station, making way for the extended Nguyen Sy Sach road project. When asked why in the process of implementing the planning and adjusting the planning to overlap and overlap between the two projects, which wastes money, Mr. Nguyen The Anh explained: The pumping station project is part of the capital project. loans from the World Bank, formed in the 2010s. At that time, there was no master plan for Vinh City until 2030, with a vision to 2050; Subdivision planning and extended Nguyen Sy Sach street have not been formed yet. It was not until 2015, when the pumping station was under construction, that the Prime Minister issued Decision No. 52 “Approving the adjustment of the general planning of Vinh city, Nghe An province to 2030, with a vision to 2050”. At this time, Nguyen Sy Sach Street was extended. “The board is only a construction management unit, on planning issues, you have to ask the City’s Urban Management Department,” said Mr. The Anh. Meanwhile, Mr. Nguyen Viet Duc, Head of Vinh City Urban Management Department only said: “The pumping station existed before the extended Nguyen Sy Sach street project. The prolonged Nguyen Sy Sach Street is a key project of the city, if it is not done immediately, it will lose the opportunity that the Central Government has allowed.” And although the plan and cost of moving the pumping station has not been approved yet, Mr. Duc still affirmed that the displacement value is “almost zero”. As for why in the process of planning and adjusting the plan to prevent encroachment, Mr. Duc immediately pushed the responsibility: “It was the matter of my predecessor, I had not done it at that time, so I do not know”. Regarding the relocation plan and the State’s payment, Chairman of the Board of Directors of Vinh Urban Infrastructure Development and Management Joint Stock Company – Hoang Hong Khanh said: “We have surveyed and identified outside the fence and yard. , the operator must be demolished and relocated to the rear, there is also a section of the floating ditch that is affected and must be adjusted. Fortunately, the pumping system and underground tank were not affected, so the cost of moving (removing and rebuilding – PV) the above items to the back, cost about 1 billion VND. The extended Nguyen Sy Sach road project has a length of 6.5km, started in 2018, expected to be completed in March 2021, extended until December 2021. Total project cost in phase 1 is 240 billion VND. Currently, 4.5km has been compensated for site clearance. The Vinh Urban Development sub-project has a total investment of 128 million USD, of which the WB’s loan is 98 million USD, and 30.43 million USD is the counterpart capital of Vietnam. The project started in June 2013. The basic items were handed over in December 2018, with some remaining balances extended until April 30, 2019.
You must log in to post a comment.