Home News Vietnam Binh Thuan proposes to solve problems in implementing the North – South...

Binh Thuan proposes to solve problems in implementing the North – South Expressway project in the East

2
0

On April 14, 2021, the supervisory delegation of the Economic Committee of the National Assembly had a meeting with Binh Thuan province on the implementation situation and difficulties and problems in the implementation and implementation of the North Expressway Project – South East, the section across the province.

At the meeting, Mr. Nguyen Huu Trung – Deputy Director of Binh Thuan Department of Transport said: Over the past time, the province has stepped up the implementation of site clearance work as well as issues related to the project, especially especially the work of solving the demand for construction materials of the expressway project. Up to now, the number of households and organizations has handed over 2,657 / 2,684 dossiers, reaching the rate of 99%; The compensated clean land area was 1,204.89 ha, reaching the rate of 98.6%. 27 households have not received compensation money and handed over the premises. In addition, at the locations where the ground has been handed over, there are 25 cases (received money and signed the handover) but have not moved or handed over the site to construction contractors. Currently, the province is actively directing the People’s Committees of relevant localities to completely settle the compensation and site clearance work in May 2021.

The Economic Committee of the National Assembly’s supervisory delegation works with Binh Thuan province.

According to the report of Project Management Unit (PMU) 7 and PMU Thang Long, the total demand for construction materials for the project of the Vinh Hao – Phan Thiet section and the Phan Thiet – Dau Giay section is nearly 16 million blocks.

Deputy Director of Binh Thuan Department of Transport added: For the demand for construction sand and stone, the construction material mines in the province can meet the needs of the project. As for embankment materials, according to the approved technical design documents of the approved Vinh Hao – Phan Thiet and Phan Thiet – Dau Giay sections, the reserves of the mines in the province meet the quality and demand of the project. project. However, through the field survey at the mines, the volume of soil and soil cover mentioned above is preliminarily classified into 3 categories by PMU 7, PMU Thang Long, including: Soil, rock mixed with weathered rock and rock.

According to the assessment of the two boards mentioned above, the soil mixed with rock and weathered rock does not meet the requirements for making backfill materials according to the project’s technical requirements. Based on the proposals of the Thang Long Project Management Board and PMU 7, the Provincial Working Group is now speeding up the determination of the mines being exploited that need to increase capacity, expand the scale, or push To speed up the mining licensing procedures to guide the Miners in order procedures, shorten the time but ensure compliance with the provisions of law. At the same time, invite the Miners to work to guide the procedures for capacity increase, scaling up and mining licensing. Expected to complete the mining licensing procedures in the second quarter of 2021.

Mr. Vu Hong Thanh – Member of the Party Central Committee – Chairman of the Economic Committee of the National Assembly spoke at the meeting.

At the meeting, Chairman of Binh Thuan Provincial People’s Committee – Le Tuan Phong said: The province has drastically participated in solving the needs of building materials for the expressway project, step by step solving problems, Gradually came to agreement on issues related to the provision of soil filling materials for the project. In particular, the province has instructed the Department of Natural Resources and Environment and related departments and sectors to give priority to processing investment, environmental, land, and mining permits within 3 working days upon receipt. are business records.

To ensure the demand for building materials for the project, the Chairman of the Provincial People’s Committee suggested that the Project Management Units: Thang Long, 7, 85 coordinate closely with relevant departments and branches of the province and mine owners. to survey, evaluate and determine the reserves and quality of each field of embankment materials to unify data, propose ground-filling requirements for each specific construction and installation package, in which clearly identify which mines Exploiting operations need to increase capacity, expand the scale, which mines need to speed up the mining licensing procedures.

The Chairman of the Provincial People’s Committee also requested the Ministry of Natural Resources and Environment to guide the province to shorten the time for implementing mining licensing procedures. At the same time, it is recommended that the Ministry of Transport soon consider and approve the plan to use 1.1 million cubic meters of salvaged rock in package No. 01, Vinh Hao – Phan Thiet section to crush into expressway embankment as proposed. proposal of PMU 7; Consider and approve for the use of rock and wind mixed in mines.

The Chairman of the Economic Committee of the National Assembly – Vu Hong Thanh highly appreciated the efforts of Binh Thuan province in implementing and implementing the North-South Expressway project in the East, the section passing through the province, especially the coordination. solving the need for building materials to implement the project. Mr. Vu Hong Thanh also suggested that the province continue to direct the completion of site clearance in May 2021 according to the province’s progress; Early completion of related procedures to ensure a dumping site for project construction. Regarding the handling of materials for construction, the Chairman of the Economic Committee of the National Assembly requested the Ministry of Transport to review the material needs of the entire route, directing the Project Management Boards to: Thang Long, 7, 85 urgently coordinate with the province to remove problems.