Home News Vietnam Transport infrastructure development in Ba Che

Transport infrastructure development in Ba Che

2
0

Determining that traffic infrastructure plays an important role in socio-economic development in the area, in recent years, with many resources, Ba Che has focused on investing in building a mountainous transport system, step by step. early to promote efficiency.

The flood avoidance road in Ba Che town, Ba Che district will be completed by the end of 2020, contributing to ensuring safe traffic, serving rescue work in the rainy season in the area.

Over the past years, with the attention of all levels and sectors, the district’s socio-economic conditions have been improved, but Ba Che is still the most difficult district in the province, with low economic geography and infrastructure. private, but not synchronized, the lives of ethnic minorities still face many difficulties, of which the basic “bottleneck” is still the transport system.

To gradually remove this “bottleneck”, create a sustainable development step, create a premise for socio-economic development in the area, shorten the gap between regions, right from 2011, Ba Che has practiced surveying and planning orientations on rural transport in the district to ensure socio-economic development associated with security – defense, step by step development in accordance with the general planning orientation. traffic of the province. With the right policy, viewpoints and orientation, the district focuses on mobilizing, flexibly integrating from many sources to develop the rural transport system. In particular, to attach importance to propagating and mobilizing the people’s voluntary contributions with the viewpoint “people know, people discuss, people do, people check”. The district has built and upgraded important arterial roads, big bridges, opened new roads to the centers of communes …

Up to now, most of the important arterial roads of the district have been invested in renovating, upgrading and refreshing, facilitating traffic and travel, opening up great opportunities for economic exchange inside and outside the district. . Ba Che has also completed the transportation system connecting the district to the localities. Traffic connection between the district and communes and villages is concreted 100%, renovated and upgraded roads to avoid floods in the center of the town, provincial road 329 flood avoidance; flooding site improvements …

Only in the period 2015-2020, the district road system of 6 lines, with a total length of 65.66km, will be hardened (upgraded, renovated and expanded 18,291 miles compared to 2015). 37 lines of commune roads, with a total length of 105.7km hardened, increasing 22 routes and 47.15km compared to 2015. Village roads 47 routes, with a total length of 51.21 km hardened, increased 33 routes compared to 2015. Roads of 47 routes, with a total length of 66.80 km, hardened, increased 24 routes and 11.35 km hardened compared to 2015. in 2015. The production road is 24 lines, with a total length of 20.64km hardened, increasing 19 routes and 9.94km in hardening compared to 2015; The district also upgraded and embellished 9 / 15.68km of urban roads.

The district also completed investment in a bus station in Ba Che town with an area of ​​5,000 square meters by 2020, contributing to serving the needs of picking up and dropping off passengers in the area.

Along with the development of the rural transport system, Ba Che takes advantage of opportunities and conditions, focuses on drastic direction and administration, achieving many outstanding results in socio-economic development in the area. The annual growth rate of production value reaches 15.3%; per capita income reached 40 million / person / year.

According to Mr. Nguyen Tien Truong, Head of the Department of Infrastructure Economics in Ba Che district: In the coming time, Ba Che will focus on completing the district planning, including integrating the transport network development planning in the district, creating favorable conditions for the connection of highly motivated regions such as Ha Long City, Cam Pha City.

Along with that, upgrade the system of provincial roads, district roads, communal roads to ensure according to the plan, in which priority, upgrading and renovation of specific roads with specific strong blood: Continue to synchronously upgrade provincial roads. 330, 330B, 342 according to planning (special focus on immediately completing 8 flooding points on provincial roads 330); By 2022, to invest in building a bridge connecting the provincial road 330 to Ba Che town and the system of Ba Che river bank embankment phase 2 in the period of 2021-2025. Well implement traffic management regulations, in which the management and maintenance of traffic works are decentralized to communes, villages for management and use, so that the units can actively fund maintenance and protection. Regular repairs to increase the life of the project and promote efficiency of investment capital.